Van Lancker et al.
2022
HRM in entrepreneurial firms: A systematic review and research agenda
DE1476248U
(enrdf_load_stackoverflow )
DE202015006102U1
(de )
2015-11-13
Fernauslesung von Gepäckstücken
EP0847943B1
(de )
2002-07-17
Vollautomatischer Warenaufzug
Lamberton
1998
Information economics research: points of departure
Cummings et al.
2024
On minimal non-σ-scattered linear orders
Fry et al.
1991
Implementing drum-buffer-rope to control manufacturing lead time
Kim et al.
2019
The Status of Nuclear Material Accountancy at KAERI
Chen et al.
2017
Two Dimension Cyclic Hoist Scheduling
Yang
2000
An approach to determine appropriate fab development plans by taking space constraints and cost-effectiveness into consideration
DE1358960U
(enrdf_load_stackoverflow )
Shuraleva
2024
Labor Relations in the Context of the Precarity of Labor and Employment in Russia
Conway et al.
2020
From data to action
Carlo et al.
2018
A shared strategy to minimize unloaded travel in cross-docks
Ojogbo
2024
Analysis and development of shop floor management in a unique manufacturing company
Mistry et al.
2021
Automation of Warehouse
Blažević et al.
2006
MES System Data Acquisition in Rolling Mill
Lindblom
2021
Proactive order monitoring in available-to-promise chain: Possibilities in material availability reporting
EP0705045A3
(de )
2000-04-05
Verfahren zur Erhaltung der Systemzeitdaten beim Ausfall der Stromversorgung in Kommunikations-Vermittlungsanlagen
KASHIWADANI et al.
1982
A STUDY OF MULTIOBJECTIVE ACTIVITY ALLOCATION MODEL IN COASTAL AREA
IGNOMINY
1973
THE BATTLE OF BRISBANE: GLORY
DE1484741U
(enrdf_load_stackoverflow )
McCarthy
1991
Author's reply
WATANABE et al.
1990
The Locally Transitive Representation of a Strongly Connected Tournament
DE1487633U
(enrdf_load_stackoverflow )