Van Lancker et al.
2022
HRM in entrepreneurial firms: A systematic review and research agenda
DE112007002137T5
(de )
2009-07-02
Automatisches Lager
DE1476248U
(cg-RX-API-DMAC7.html )
DE202015006102U1
(de )
2015-11-13
Fernauslesung von Gepäckstücken
EP0847943B1
(de )
2002-07-17
Vollautomatischer Warenaufzug
Lamberton
1998
Information economics research: points of departure
Cummings et al.
2024
On minimal non-σ-scattered linear orders
Zhang et al.
2015
Cyclic scheduling of flexible job-shop with time window constraints and resource capacity constraints
Fry et al.
1991
Implementing drum-buffer-rope to control manufacturing lead time
Kim et al.
2019
The Status of Nuclear Material Accountancy at KAERI
Chen et al.
2017
Two Dimension Cyclic Hoist Scheduling
Shuraleva
2024
Labor Relations in the Context of the Precarity of Labor and Employment in Russia
Conway et al.
2020
From data to action
EP3361849B1
(de )
2021-08-18
Anordnung für ein rechenzentrum, rechenzentrum mit einer derartigen anordnung, verfahren zum betrieb einer derartigen anordnung
Ojogbo
2024
Analysis and development of shop floor management in a unique manufacturing company
Blažević et al.
2006
MES System Data Acquisition in Rolling Mill
Zencker
2022
EURAD WP 8 (SFC) Task 3-Update: Behaviour of nuclear fuel and cladding after discharge
EP0705045A3
(de )
2000-04-05
Verfahren zur Erhaltung der Systemzeitdaten beim Ausfall der Stromversorgung in Kommunikations-Vermittlungsanlagen
Lindblom
2021
Proactive order monitoring in available-to-promise chain: Possibilities in material availability reporting
IGNOMINY
1973
THE BATTLE OF BRISBANE: GLORY
DE1484741U
(cg-RX-API-DMAC7.html )
McCarthy
1991
Author's reply
WATANABE et al.
1990
The Locally Transitive Representation of a Strongly Connected Tournament
Collins
2002
CBOT's Neubauer ready to move on
Chen et al.
1999
Period of processing on serial production line, optimal scheduling and application