Songer et al.
1997
Project characteristics for successful public-sector design-build
DE1466566U
(enExample )
DE1041982T1
(de )
2001-06-07
HEMMUNG DER p38 KINASE AKTIVITÄT DURCH SUBSTITUIERTEN HETEROCYCLISCHEN HARNSTOFFEN
US10032128B2
(en )
2018-07-24
Yard management apparatus, yard management method, and computer program
JP5403196B1
(ja )
2014-01-29
圧延順序決定システムおよび圧延順序決定方法
CN107169656A
(zh )
2017-09-15
成本管理系统及方法
Jang et al.
2007
Using the kanban for construction production and safety control
CN112365227A
(zh )
2021-02-12
一种适应钢坯直装热送的方法
JP4987795B2
(ja )
2012-07-25
熱間圧延工場の製造ロット編成装置及び編成方法
Matsunaga et al.
1991
Fuzzy hybrid control for DC servomotor
HUP0200830A2
(hu )
2002-07-29
Eljárás szubsztituált pirimidinek előállítására
Dumont
2025
A procedure for the semi-analytical evaluation of generally singular integrals that occur in the three-dimensional boundary element analysis
Byerly
1993
State population estimates by age and sex: 1980 to 1992
JPH0675975A
(ja )
1994-03-18
生産計画方法
RU43384U1
(ru )
2005-01-10
Автоматизированная система управления в реальном времени производством продукции по заказам клиентов на предприятии (варианты)
Slattery
2025
What's in the box?
IE33470B1
(en )
1974-07-10
Process for preparing 1-azacyclo-4-imino-1,4-dihydro-pyridines and product
Dimitrić
2000
Traditional and modern cost management from the point of view of costing systems
Segerstedt
1998
Cover-time planning: a less complex alternative to MRP
JP2000099108A
(ja )
2000-04-07
生産計画立案システム
Awate
1989
Analysis of propagation of stochastic errors through an MRP system, and an industrial case study
RU43385U1
(ru )
2005-01-10
Автоматизированные системы мониторинга производства на предприятии
Plakkaatboek et al.
0
CCMEIC A Calendar of Court Minutes etc. of the East India Company, 1635–1639 to 1677–1679, 11 vols., edited with introductions by Sir William Foster CIO La Compagnie des Iles Orientales (French East India Company)
Smits et al.
2002
Approximations for the waiting time in (s, nQ)-inventory models for different types of consolidation policies
CN108408320B
(zh )
2019-08-09
一种基于人工介入的钢板分配方法