DE1466566U
(cg-RX-API-DMAC7.html )
EP1249775A2
(en )
2002-10-16
Logistics management system managing distribution and schedule of products from order-acceptance to delivery, using a computer
DE1041982T1
(de )
2001-06-07
HEMMUNG DER p38 KINASE AKTIVITÄT DURCH SUBSTITUIERTEN HETEROCYCLISCHEN HARNSTOFFEN
JP5403196B1
(ja )
2014-01-29
圧延順序決定システムおよび圧延順序決定方法
Jang et al.
2007
Using the kanban for construction production and safety control
Matsunaga et al.
1991
Fuzzy hybrid control for DC servomotor
HUP0200830A2
(hu )
2002-07-29
Eljárás szubsztituált pirimidinek előállítására
Dumont
2025
A procedure for the semi-analytical evaluation of generally singular integrals that occur in the three-dimensional boundary element analysis
CN110322227A
(zh )
2019-10-11
一种项目进度监理控制系统
Byerly
1993
State population estimates by age and sex: 1980 to 1992
Goyal
1973
Optimal decision rules for producing greeting cards
IE33470B1
(en )
1974-07-10
Process for preparing 1-azacyclo-4-imino-1,4-dihydro-pyridines and product
JPH02205457A
(ja )
1990-08-15
Fmsラインにおける生産指示方法およびその装置
JP2001202442A
(ja )
2001-07-27
計画立案システム及び計画立案方法
Hmede et al.
2023
Optimal control of the temperature by the laser path and the thermal treatment time in selective laser melting process
Segerstedt
1998
Cover-time planning: a less complex alternative to MRP
Awate
1989
Analysis of propagation of stochastic errors through an MRP system, and an industrial case study
RU43385U1
(ru )
2005-01-10
Автоматизированные системы мониторинга производства на предприятии
Legal et al.
2018
A. Administration
Aoki
2002
[Document] Cost Control of Apparatus Proposed by PJ Stoops in NEC (1952-53)
CN108408320B
(zh )
2019-08-09
一种基于人工介入的钢板分配方法
Bondar
2021
J. Hermann’s studies on salt production in the Urals in late 18t h century
Plowman
1990
Administered flexibility: restructuring the metal industry award
CN120325679A
(zh )
2025-07-18
双高棒作业计划智能管理方法
DE1357772U
(cg-RX-API-DMAC7.html )