DE69529973D1
(de )
2003-04-24
Superagonisten und Antagonisten von Humanen IL-6 und Methoden zu deren Selektion
DE1380408U
(OSRAM )
Raouf et al.
1982
A new method for assembly line balancing having stochastic work elements
Karacapilidis et al.
1993
Optimal due date determination and sequencing of n jobs on a single machine using the SLK method
DE1396848U
(OSRAM )
DE1465117U
(OSRAM )
DE1398798U
(OSRAM )
DE1401143U
(OSRAM )
DE1519979U
(OSRAM )
DE1446817U
(OSRAM )
DE1523843U
(OSRAM )
DE1365693U
(OSRAM )
Dehqānī Ᾱrānī
2021
Examining and analyzing the orientalists' views on the Awaiting and preparedness for the advent of the savior to Muslims
No et al.
1986
Optimum Scheduling Algorithm for Job Sequence, Common Due Date Assignment and Makespan to Minimize Total Costs for Multijob in Multimachine Systems
DE1405639U
(OSRAM )
DE1776315U
(de )
1958-10-23
Vorrichtung zum aufziehen von laufdecken.
DE1433420U
(OSRAM )
Hamberg
0
RIEMANNIAN OBSERVERS FOR EULER-LAGRANGE SYSTEMS
DE1471739U
(OSRAM )
Jankovsky et al.
2003
How much does bad data cost your company?
DE1447869U
(OSRAM )
DE1513887U
(OSRAM )
DE1447034U
(OSRAM )
DE1426428U
(OSRAM )
DE1515231U
(OSRAM )