Bartholdi III et al.
2005
Using bucket brigades to migrate from craft manufacturing to assembly lines
Khalil
1973
Facilities relative allocation technique (FRAT)
EP1538734A3
(de )
2008-07-02
Stromversorgungseinrichtung
DE1656632U
(de )
1953-06-03
Befestigungsvorrichtung.
DE1374385U
(enrdf_load_html_response )
CN205894636U
(zh )
2017-01-18
用于钢构高空焊接作业的吊笼装置
DE1412598U
(enrdf_load_html_response )
DE1367137U
(enrdf_load_html_response )
DE1325276U
(enrdf_load_html_response )
Kranz
2024
Gemeinsam gegen den Fachkräftemangel
DE1743079U
(de )
1957-04-11
Werkzeugmanipulator.
DE1356550U
(enrdf_load_html_response )
Adelia et al.
2025
Mewujudkan Lingkungan Sehat dan Berkelanjutan: Kolaborasi Mahasiswa dengan Masyarakat Desa Gunung Menyan
Taladon et al.
2017
Capacity Building on Essential Ecosystem Approach to Fisheries Management (E-EAFM)
Karimah et al.
2019
Design facility tool for reducing the work posture risk and increasing productivity at batik industry
DE1455377U
(enrdf_load_html_response )
DE177126C
(enrdf_load_html_response )
LINES
0
USING BUCKET BRIGADES TO MIGRATE FROM CRAFT MANUFACTURING TO ASSEMBLY LINES
DE1389765U
(enrdf_load_html_response )
DE29921016U1
(de )
2000-03-16
Vereinfachter Stirlingmotor
DE1407042U
(enrdf_load_html_response )
Portmann et al.
2002
Dominance properties for permutation flow shop problems
DE1465223U
(enrdf_load_html_response )
DE1525065U
(enrdf_load_html_response )
DE1412771U
(enrdf_load_html_response )