Tushman et al.
1983
Uncertainty, social location and influence in decision making: A sociometric analysis
McNair et al.
1987
Measuring Performance in an Advanced Manufacturing Environment [2]
Fowler et al.
2002
Workload control in the semiconductor industry
Ginn et al.
1986
The R&D/production interface: A case study of new product commercialization
DE1357274U
(cg-RX-API-DMAC7.html )
Myers
1991
Motivation and performance in the information systems field: a survey of related studies
Yang
1998
A comparison of reorder point and kanban policies for a single machine production system
Henderson et al.
1998
The perils of excellence: Barriers to effective process improvement in product‐driven firms
Lindlar et al.
1997
Geography, exchange rates and trade structures: Germany's export performance since the 1950s
Macmillan
1997
Managing information systems: three key principles for general managers
Kidd
1991
Human and computer integrated manufacturing: A manufacturing strategy based on organization, people, and technology
Hannay et al.
1986
Technology and trade: A study of US competitiveness in seven industries
Dedoussis
1987
Management systems and practices in Japanese subsidiaries: Japanization or localization?
Bowditch
1879
The growth of children: A supplementary investigation
Stativka et al.
2020
Analysis of the public administration system using the tools of the competence management center
Selby et al.
1992
A customer/supplier partnership: groundwork for improved report card grades
Billo et al.
1996
Challenges facing information technology to support world class manufacturing
Golembiewski
2019
I. STRUCTURING WORK AND FOUR POLARITIES
Broussard et al.
0
RESEARCH AND TEACHING
Spencer
1995
Cycle counting in a JIT environment using VAT focusing
Loch et al.
2003
Empirical Validation of the Management Quality Model
Fisher et al.
1996
LAN-based E-mail: Software Evaluation
CN117010826A
(zh )
2023-11-07
研制技术流程与项目计划融合方法、装置、介质及设备
Litsikas
1997
Ebonite takes out 93% of bowling-ball-core rejects
Trilling
1964
The use of a job shop simulator in the generation of production schedules