DE1335688U
(enExample )
Jin et al.
2023
Analysis of prevention through design studies in construction: A subject review
Juhi et al.
2019
Assessment of onset of the duration of fatigue in muscle using surface electromyography on women during the different phases of menstrual cycle
DE1426420U
(enExample )
DE99014C
(enExample )
AU595244B2
(en )
1990-03-29
Multipurpose fishing tool
CN204019387U
(zh )
2014-12-17
一种双嘴钳子
DE5234C
(de )
Neuerungen an Zangen
DE634576C
(de )
1936-08-29
Abhaeute-Vorrichtung
DE1636177U
(de )
1952-03-20
Vorrichtung zum anschlagen von im querschnitt u-foermigen buegeln an portemonnaies od. dgl.
DE1340503U
(enExample )
JPH01192434A
(ja )
1989-08-02
管材の接合工具
Matsuura
1981
The distribution of Orowan loops and the work-hardening in a dispersion-hardened alloy
Gabriel et al.
1981
Häufigkeit der HLA-Antigene bei griechischen Patienten mit Offenwinkel-Glaukom
Hasil et al.
0
Implementation of a Direct Model to Improve Learning Outcomes of the Struggle of Fighters in Class V of SD Inpres Kakaskasen 2
DE58836C
(de )
Werkzeug zum Anziehen und Lösen von Hufeisen-Scbraubstollen
DE19542068A1
(de )
1997-05-15
Zangenartiges Werkzeug
DE187156C
(enExample )
DE1437554U
(enExample )
DE1317395U
(enExample )
Buchholz et al.
1994
Application of the Posture, Activity, Tools and Handling (PATH) Analysis for Union Laborers at a Heavy Highway Construction Site
DE1320467U
(enExample )
DE1364834U
(enExample )
DE1350194U
(enExample )
DE1319233U
(enExample )