Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2020 Groundwater Compliance and Interpretation Technical Memorandum (dated May 12, 2022)
Providing a mathematical model to calculate Manning roughness coefficient in mountainous rivers based on geotechnical properties of the substrate and the hydraulic properties of flow section