DE1281324C2 - Traffic signal control unit - Google Patents
Traffic signal control unitInfo
- Publication number
- DE1281324C2 DE1281324C2 DE1963S0088030 DES0088030A DE1281324C2 DE 1281324 C2 DE1281324 C2 DE 1281324C2 DE 1963S0088030 DE1963S0088030 DE 1963S0088030 DE S0088030 A DES0088030 A DE S0088030A DE 1281324 C2 DE1281324 C2 DE 1281324C2
- Authority
- DE
- Germany
- Prior art keywords
- green
- traffic
- time
- counting
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/07—Controlling traffic signals
- G08G1/081—Plural intersections under common control
- G08G1/082—Controlling the time between beginning of the same phase of a cycle at adjacent intersections
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Traffic Control Systems (AREA)
Description
zielt, die sich elastisch von signalisieitem Knoten- ZählEiiervalten, vorzugsweise mit einer Minimalaims, which elastically from signalisieitem knot-counting eggs, preferably with a minimal
punkt za Knotenpunkt der ständig wechselnden Ver- dauer von 2 Sekunden arbeiten, da in kleineren ZählPunkt za junction of the constantly changing duration of 2 seconds work, since in smaller counts
kehrebelastusg, an jedem Knotenpunkt für sich, an- Intervallen keinesfalls mehr als ein Fahrzeug derTurning stress, at each intersection for itself, at intervals no more than one vehicle of the
paßt. Zärüquerschnitt passieren kann. Wahlweis« sollen dufits. Zärücross section can happen. Optional «you should
Die Erfindung besteht darin, daß bei an der Haupt - 5 ZäMeinriehtungen in Inieivallen vor nur einer solstraße
und gegebenenfalls auch an den Querstraßen ch&n Länge, vorzugsweise 5 Sekunden, arbeiten, daf
vor den dem Knotenpunkt zugeordnetes Signalgebern maximal 3 Fahrzeuge den Zäblquerschnitt inncrbalr.
jeweils vorgesehener Zähleinrichtung zur Zählung eines Intervalls passieren können, und daß die Ausj
der sich an ihr vorbei zu dem Knotenpunkt bewegen- wartung der Zählung je Intervall binär eifolgt, inden
j den Verkehrsteilnehmer das Steuergerät am Ende io nur zwischen Null Fahrzeugen oder Fahrzeugen unter-ί
von Intervallen, die vor dem Einschalten des Grün- schieden wird, unabhängig, ob 1, 2 oder 3 Fahrzeug«
signals des der Zähleinrichtung an dem Knotenpunkt den Zählquerschnitt passiert haben,
zugeordneten Signalgebers beginnen und vor dem Dk Auswertung der Zähkrgebnisse bezüglich ihre;
Ausschalten dieses Grünsignals enden, die Anzahl Auswirkung auf-die Grünzeit-rZugaben im zeitlicher,
der von d«r Zähleinrichtung während dieses Inter- 15 Vorlauf oder Nachlauf am betreffenden Knoienpunki
valb gezählten Verkehrsteilnehmer abruft und ein und in der betreffenden Fahrtrichtung kann binär
ihr entsprechendes Steuersignal für den Signalgeber digital de- asaiog erfolgen. Es solle« vorzugsweise
bilde«, das den Einschaltzeitpunkt oder den Aus- Zählungen, die im zeitlichen Vorlauf zur fiktiver
schaltzssipunkt des Grüasignals — vorzugsweise in Gruad-Grünphase im Zählquerschnitt liegen, einer
Abweichung von dem Gnind-Griinband — entspre- so entsprechenden zeitlichen Grünzeit-Vorlauf am becheod
dieser Anzahl schrittweise oder kontinuierlich treffenden Knotenpunkt und in der betreffenden Ververändert,
kehrsrichtung bewirken. Nach einer weiteren zweck-The invention consists in that in the case of the main 5 metering devices in inieivallen in front of only one solstrasse and possibly also on the cross streets ch & n length, preferably 5 seconds, so that a maximum of 3 vehicles within the metering cross-section in front of the signal transmitters assigned to the node. each provided counting device for counting an interval can happen, and that the Ausj who move past her to the junction follows the counting per interval binary maintenance, inden j the road user the control device at the end io only between zero vehicles or vehicles below-ί of intervals that are set before the green light is switched on, regardless of whether 1, 2 or 3 vehicle signals from the counting device at the junction have passed the counting cross-section,
assigned signal generator and before the Dk evaluation of the counting results with regard to their; Turning off this green signal ends, the number of effects on the green time-additions in time that the counting device calls up traffic participants counted at the relevant knee point during this interval, and one and in the relevant direction of travel can send their corresponding control signal in binary for the signaling device digital de-asaiog take place. It should "preferably form" that the switch-on time or the countdowns, which are in the temporal lead-up to the fictitious switching point of the green signal - preferably in the Gruad-Green phase in the counting cross-section, a deviation from the Gnind-Green band - corresponds to the corresponding temporal green time- Advance at the becheod of this number gradually or continuously meeting the intersection and change the direction in question in the relevant change. After another purposeful
Eine Weiterbildung des Verkehrssignalsteusrge- mäßigen V/eiterbildung der Erfindung können jedochA further development of the traffic signal control-related development of the invention can, however
rates kann darin bestehen, daß es in den jeweiligen auch Zählungen, die im zdtlichen Vorlauf zur Grur:d-rates can consist in the fact that there are also counts in the respective counts that are in advance of the Grur: d-
Verkehrsrichtungen vor dan Signalgebern angeord- as Grinpaase im Zählquerschnitt liegen, einen zeit-Traffic directions in front of the signal heads are located in the counting cross-section, a time-based
Bete Vor- oder Zwischensignalgeber unter Mitwir- liehen Grünzeit-Nachlauf am betreffenden Knoten-Pray pre- or intermediate signal generators with help- borrowed green time after-run at the relevant node
kung der Zänleinricntußgen ebenso steuert wie die punkt und in der betreffenden Verkehrsrichtung bekung the Zänleinricntußgen controls as well as the point and be in the relevant traffic direction
Signalgeber an dem Knotenpunkt. wirken, wenn dk insgesamt mögliche Voriauf-Grün-Signal transmitter at the node. take effect if the total possible lead green
GeoäS einer anderen Weiterbildung der Erfindung zeit am Knotenpunkt nicht für die Bewältigung deiGeoäS another development of the invention does not time at the node for coping with the
»oll das Verkehrssignaisteuergerät den Grünsignalen 30 im Vorlauf gezählten Fahrzeuge ausreicht.If the traffic signal control device is sufficient for the green signals 30 vehicles counted in advance.
eise Minimaidauer von 8 bis 10 Sekunden erteilen. Zählungen, die im zeitlichen Nachlauf zur fiktiverGrant a minimum duration of 8 to 10 seconds. Counts in the time lag for the fictitious
Nach einer zweckmäßigen Weiterbildung der Er- Grund-Grünphase im Zählquerschnitt Hegen, sollenAfter an expedient development of the Er-Grund-Grünphase in the counting cross-section Hegen, should
findung kann der Grund^Grünphase kontinuierlich einen entsprecbex^den zeitlichen Grünzeh-NachSaulThe basic green phase can continuously correspond to the temporal green time
oder in Zeitschritteri Grimzeit im zeitlichen Vorlauf am betreffenden Knotenpunkt in der betreffenderor in Zeitschritteri Grimzeit in advance in time at the relevant node in the relevant
oder Nachlauf zugegeben werden. Neuerungsgemäß 35 Verkehrsrichtung bewirken. Nach einer weiteresor run-on can be added. According to the innovation 35 effect traffic direction. After another
»oäl zweckmäßig die Grund-Grünphase in Zeitschrit- zweckmäßigen Weiterbildung der Erfindung könnerOäl expediently the basic green phase in time-step expedient further development of the invention
ten verlängert werden, die eine Minimaldauer von jedoch auch Zählungen, die im zeitlichen Nachlau!ten longer that have a minimum duration of, however, also counts that are delayed in time!
2 Sekunden nicht unterschreiten, da in kleineren zur Grund-Grünphase im Zählquerschnitt HegenDo not fall below 2 seconds, as there are smaller to the basic green phase in the counting cross-section
Zeitschrilten keine merkbare Änderung der Lei- einen zeitlichen Grünzeit -Vorlauf am betreffenderZeitschrilten no noticeable change in the lead time green time lead on the relevant
»tungsfähigkeit der Grünphase erreicht werden kann. 40 Knotenpunkt in der betreffenden Verkehrsrichtung ir»The green phase can be achieved. 40 junction in the relevant traffic direction ir
Die Gesamt-Gründauer für jede Vsrkehrsrichtung dem nächstfolgenden Signalphasen-Umlauf bewirkenEffect the total green duration for each reverse direction of the next following signal phase cycle
»oll eine Umlaufdauer nicht überschreiten, um die wenn die insgesamt mögliche Nachlauf-Grünreit avr »Ought not to exceed a period of circulation by which, if the total possible after-run green riding avr
Verkehrsfüiirung nicht zu verlieren. Deshalb soll die Knotenpunkt nicht für die Bewältigung der im Nach-Not to lose traffic guidance. Therefore, the junction should not be used for coping with the subsequent
Summe aus Grund-Grünphase und GrUnzeit-Zu- lauf gezählten Fahrzeuge ausreicht.The sum of the vehicles counted from the basic green phase and green time inflow is sufficient.
gaben auf eine Dauer beschränkt sein, die kleiner als 45 Eine zweckmäßige Weiterbildung des erfindungsgave be limited to a duration that is less than 45 An expedient development of the fiction
die Dauer eines Signaiphasen-Umlaufes ist. gemäßen Verkehrssignalsteuergerätes kann fernerhiris the duration of a signal phase cycle. according to the traffic signal control device can also be used
Nach einer weiteren zweckmäßigen Weiterbildung darin bestehen, daß es die Zählungen der Zählvorder Erfindung soil das Verkehrssignalsteuergerät so richtungen binär oder digital nach einem Prograuur ausgebildet sein, daß es die Grund-Grünphase inner- mit der Maßgabe auswertet, daß es einem an einen halb der Dauer eines Sign&lphascn-Umlaufs zeitlich 5° Zahlquerschnitt von. einer Zähleinrichtung gezählter derart legt, daß etwa gleiche Zeit für Grünzeit- Fahrzeug eine Grunzeit-Zugahe im zeitlichen Nach· Zugaben im Vorlauf und Nachlauf zur Verfügung lanif zuordnet, wenn das Fahrzeug rsit dieser Grünstehen. zeit-Zugabe den Knotenpunkt noch mit der maximaAccording to a further expedient further development, there are the counts of the counting front Invention, the traffic signal control device should be binary or digital according to a program be designed that it evaluates the basic green phase with the proviso that it is a half of the duration of a sign & lphascn cycle temporally 5 ° number cross-section of. a counter sets in such a way that approximately the same time for green-time vehicles a green-time addition in time lag Allowances in the lead-up and on-carriage are available when the vehicle is in the green. time addition the node with the maxima
Σσ zweckmäßiger Ausbildung derErfindung soll der zulässigen oder einer kleineren FahrgeschwkidigkeiΣσ appropriate training of the invention should be the permissible or a smaller driving speed
für einen Knotenpunkt und eine Verkehrsrichtung 55 überfahren kann, während es sonst db Grünzeitfor a junction and a traffic direction 55 can be run over, while otherwise it is db green time
maßgebende Zählquerschnitt der Zähleinrichtungen Zugabe in der», zeitlichen Vorlauf des nächstfolgenderdecisive counting cross-section of the counting devices addition in the », temporal lead-up to the next
in einem Abstand vor dem Knotenpunkt angeordnet Signalphasen-Umlaufes verlegtplaced at a distance in front of the node arranged signal phase circulation
win, der mindestens gleich dem Produkt der durch Die Gesamtdauer jener Zählzeiten, die eine Grünwin, which is at least equal to the product of the total duration of those counts that make a green
tue Lage des Grund-Grünbandes bestimmten Fahr- zeh-Zugabe bewirke!? können, wird in den meisterdo position of the basic green belt cause certain vehicle allowance !? can will be in the master
geschwindigkeit und der möglichen Gesamtdauer für 60 Fällen der Gesamtzeit des Anteiles für die Griinz^iispeed and the possible total duration for 60 cases of the total time of the share for the Griinz ^ ii
Crünzeil'-Zugaben im Vorlauf oder Nachlauf ist. Da- Zugaben entsprechen. Die Zahlwerte aus der verCrünzeil 'additions in the lead or lag. Da-additions correspond. The numerical values from the ver
durch isi erreicht, daß Registrierungen eine frühest- Weibenden Restzoit in jedem Signalphssen-Umlauisi achieved that registrations of an earliest remaining zoite in each signal phase umlau
mö<?,liche Grünzeii-Zugabe am zugehörigen Knoten- sollen im allgemeinen einen früheren Beginn dePossibility of adding greenery to the associated node should generally have an earlier start
punkt hervorrufen. Griinphase, d, h. eine Grünzeit-Zugabe im zeitlichercause point. Green phase, i.e. a green time addition in time
Die Zählungen können über die Dauer eines 65 Vorlauf bewirken. In dieser Rost-Zählzeit solletThe counts can cause over the duration of a 65 lead. In this rust counting time should
Signalphascn-Ümlaufes oder außerhalb des Grund- hauptsächlich die an den davorliegenden KnotenSignal phase overflow or outside of the ground, mainly those at the nodes in front of it
Griinbandes im Zähiquerschnitt erfolgen. Dabei sol- punkten in die betreffende Verkehrsrichtung einGriinbandes made in tough cross-section. In doing so, point in the relevant traffic direction
kMi die Zähleinrichtungen kontinuierlich oder in gebogesen Fahrzeuge erfaßt werden. Die auf Grün«kMi the counting devices are recorded continuously or in curved vehicles. Those on green «
dieser Auswertung erfolgenden Grünzeit-Zugaben im zeitlichen Voitauf haben daher in den messten Fallen die Bedeutung eines >Vorlaufes*. Bei den hierfür notwendigen Grünäseit-Zugaben soUie der größei« Zeitbedarf infolge des Anfahrens aus dem Stand oerückskiitigt werden. Für die Auswertung ist hier jedoch nur cfe Gesamtzahl der angestauten Fahrzeuge yon Bedeutung und nicht die zeitliche Verteilung. Bei der Auswertung bezüglich der Aufstellung eines Programms für die Länge der Griinzsit-Zagabe im zeitlichen Vorlauf sollte auch t*;r größere Zeitbr-iarf aus den oben angeführten Gründen berücksichtigt werden. Wenn die Gesamtdauer der möglichen Grünzeit-Zugabe im zeitlichen Vorlauf nicht dazu ausreicht die im zugehörigen Zähibereich gezählten Fflirzeuge rechtzeitig vor dem ankommenden Fahrzeugpulk wegzuziehen, so ergibt sich zwangläufig eine Verzögerung dieses Fahrzeugpulkes, die dann durch eine entsprechend bemessene Grünzeit-Zugabe im zeitlichen Nachlauf berücksichtigt werden muß.Green time additions taking place in this evaluation in the temporal Voitauf therefore have in the measured Fall the meaning of a> lead *. In the case of the Grünäseit additions required for this, soUie der large «time required as a result of the approach from the Stand to be withdrawn. For the evaluation is here, however, only cfe the total number of pent-up items Vehicles of importance and not the temporal distribution. When evaluating the installation a program for the length of the Griinzsit-Zagabe in advance should also t *; r larger Time limits may be taken into account for the reasons given above will. If the total duration of the possible green time addition in advance the corresponding counting area is not sufficient for this counted aircraft in good time before arriving Pulling away the vehicle bunch, this inevitably results in a deceleration of this vehicle bunch, which then through an appropriately sized green time addition be taken into account in the time lag got to.
Dss bisher dargelegten Einzelheiten der Erfindung beziehen sich bevorzugt auf Haupt-Verkehrsrichtungen ohne besondere Berücksichtigung der untergeordneten Qiserrichtuiigeii und der Fußgänger, die den Haupt-Straßenzug überqueren müssen. Gemäß einer vorteilhaften Ausbildung des erfindungsgemäßen Verkehrssignalsteuergercües kann es periodisch für der» Querverkehr an den Knotenpunkten eine Grünphase für die dkseia Qusrverkehr zugeordneten Ousrrichtuags&igna'fidier zur Verfügung steilen, wenn eine Anforderung der entsprechenden Zähleinritiiiungsn vorliegt.The details of the invention set out so far preferably refer to main traffic directions without special consideration of the subordinate ones Qiserrichtuiigeii and the pedestrian who have to cross the main street. According to an advantageous embodiment of the invention Traffic signal controller can it periodically for the »cross traffic at the junctions a green phase allocated for the dkseia Qusrverkehr Ousrrichtuags & igna'fidier at your disposal, if there is a requirement for the corresponding counting regulations is present.
Bei dem Querverkehr zu den Haupt-Veikehrsrichtuiigen müssen zwei grundsätzliche Beiastungsfälie unterschieden werden:With the cross traffic to the main Veikehrsrichtuiigen must have two basic cases of inconvenience a distinction can be made:
1. Geringer, gegenüber dem Fahrverkehr in der Haupt-Verkehrsrichhmg sehr untergeordneter Verkehr. >:. B. 1 bis 3 Fahrzeuge pro Signaipftasenurnlauf und wenige·, und1. Lower, compared to the traffic in the Haupt-Verkehrsrichhmg very subordinate Traffic. > :. B. 1 to 3 vehicles per Signaipftasenurnlauf and few ·, and
2. stärkere bis starke Belastung, z. B. 3 Fahrzeuge und mehr pro Signalphasenurnlauf.2. Heavy to heavy loads, e.g. B. 3 vehicles and more per signal phase rotation.
Für den ersten Belastungsiall so'·1, nach einer zweckmäßigen Weiterbildung der Erfindung die Grünphase für die Querrichtung einen minimalen zeitlichen Festwert haben. Gleiches gilt auch für Fußgänger-Gt\im.euen parallel zum Querverkehr.According to an expedient development of the invention, the green phase for the transverse direction has a minimum fixed time value for the first load zone so '· 1. The same applies to pedestrian Gt \ im.euen parallel to cross traffic.
Für den zweiten Belastungsfall soil nach einer weiteren Weiterbildung der Erfindung au· Grünphase für eine Querrichtung, ausgehend vor. einem minimalen Festwert in Zeitschritten oder kontinuierlich bis ?.» einer einstellbaren maximalen Grünzeit verlängert werden, wenn entsprechende Anforderungen durch eine der Qucrrkhtuiigen vorliegen. Wenn die Anforderungen auf Quei-Grünzeii die zur Verfugung siehende Maximal -Grünzeit übe; schreiten, speichert das Verkehresignnlsteuergerat diese Anforderungen und berücksichtigi sie im nächstfolgenden Signalphasen-Umlauf, Soil after further development of the invention au for the second load case · green phase for transverse direction, starting before. a minimum fixed value in time steps or continuously up to?. » an adjustable maximum green time can be extended if corresponding requirements are given by one of the cross-markers. If the requirements on quei green practice the maximum green time available; step, the traffic signal control unit saves these requirements and takes them into account in the next signal phase cycle,
Für den ersten Belastungsfail ist es zweckmäßig, die Zahlstelle in kurzem Abstand vor der Haltelinie anzuordnen, im zweiten Birlastungsfall kann demgegenüber die Zählstelle in größerem Abstand vor der Haiieliti'je angeordnet sein, wobei dann in wenigstens einer lislteiinic ein Zäbklctektor angeordnet ist. dessen Zahlungen mit den ZäHf-rgebnissen der vor der Hiiüolinic liegenden Zühksnrichtungiin verglichen werden, um festzustellen, ob in der Querrichtung zufließender Verkehr während der laufeaden Grünphase die Querrichtung verlassen konnte. Damit ist sichergestellt, daß in besonders gelagerten Fällen, wie z. B. sehr engen Kreuzungsverhähmssec, relativ starkem Abbiegeranteil usw., die Gefahr beseitigt ist, daß Fahrzeug aus der Querrichtung in der dafür vorgesehenen Grünzeit da»! Signal nicht passieren können und im Stauraum zurückbleiben, ohne daß eine nochmalige Anforderung durch diese vorgenommen werden kann. Eine gleiche Detektoranordnung kann auch zur Kontrolle der Griinzeiten der Haupt-Verkehrsrichtung verwendet werden, jedoch wird sich eine dringende Notwendigkeit für eine solche Anordnung in diesem FaIi nur selten ergeben, da durch die auf jeden Fall ständig wiederkehrende Grund-Grünphase diese Gefahr fast ausgeschlossen ist.For the first debit failure it is advisable to to arrange the paying point at a short distance in front of the stop line, in the second case of birch load, on the other hand, the counting point should be arranged at a greater distance in front of the Haiieliti'je, in which case at least a lislteiinic arranged a tooth detector is. its payments with the counting results of the The drawing direction in front of the hiiüolinic was compared to see if in the cross direction incoming traffic during the loading process Green phase could leave the transverse direction. This ensures that in specially stored cases, such as B. very narrow Kreuzungsverhähmssec, relatively strong turn-offs, etc., the risk is eliminated, that the vehicle is there from the transverse direction in the designated green time »! Signal cannot pass and remain in the storage space without another Request can be made through this. The same detector arrangement can also to control the green times of the main traffic direction be used, however, there will be an urgent need for such an arrangement in this case seldom resulted, because of the always recurring basic green phase this danger is almost impossible.
Dem zur Querrichtung parallelen Fußgängerverkehr sollte man zweckmäSigerweise auf Anforderung auch im zweiten Belastangsfall nur eine fest eingestellte Mindest-Grünzeit ohne Varlängerungsmögiichkeit zuordnen.The pedestrian traffic parallel to the transverse direction should be expediently on request even in the second load case, only a fixed minimum green time without the possibility of extension assign to.
In Fallen, in denen die Querrichtung-Zähleinrichtung in größerem Abstand von der Haltelinie &ngeordnet ist und die zusätzliche Detektoranordnung nicht angewendet werden soll, kann das Verkehrssignalsteuergerät wenigstens einer Querrichtung in Zeitabständen, die einer Max im al-Wartezeit entsprechen, eine Grünphase der bekannten Minimaldauer einräumen, wenn auch keine entsprechenden Anforderungen vorliegen.In cases where the cross direction counter at a greater distance from the stop line and the additional detector arrangement should not be used, the traffic signal control device can in at least one transverse direction Time intervals corresponding to a max im al waiting time, Allow a green phase of the known minimum duration, albeit not a corresponding one Requirements exist.
Bezüglich der zeitlichen Festlegung innerhalb der Signalphasen-Umlaufdauer für die Quer-Grünphase sind folgende Gesichtspunkte zu beachten:With regard to the timing within the signal phase cycle duration for the cross-green phase the following points must be observed:
Die Grünzeit-Zugaben im zeitlichen Verlauf zu der Grund-Griinphase in der Haupt-VerkehrsricTitung haben häufig die Bedeutung von »Vorläufen«, d. h., in der. ersten Sekunden ist mit dem Anfahren aus dem Stand zu rechnen und in den folgenden Sekunden einem verzögerten Fahren. Die Zeitbereiche der Grünvorverlegung sind also gegenüber den Grün-Zugaben im zeit! ich en Nachlauf zur Grund-Grünphase von geringerer Leistungsfähigkeit. Es ist daher zweckmäßig, die für die Querrichtung einschließlich der Übergangsphasen benötigte Zeit im AnforderuiigsfaH soweit wie möglich dem Grün-Zugabehereich im zeitlichen Vorlauf der Haupt-Verkehrsrichiung abzuziehen, ohne jedoch ihre Grund-Grünphase zu beschränken. Daher soll das Verkehrssignalsteuergerät die Grünphasen wenigstens einer Querrichtung in jene Zeit '/erlegen, in der nur minimale Anforderungen auf Grünzeit-Zugabe· in der Hauptstraße vorliegt.The green time additions over time to the basic green phase in the main traffic route often have the meaning of "preliminary," i. i.e., in the. first seconds is over with the start to count on the state and delayed driving in the following seconds. The time ranges of the The green are brought forward compared to the green allowances in time! I am after the basic green phase of lower efficiency. It is therefore advisable to include those for the transverse direction the time required for the transition phases as far as possible to the green admission area in advance of the main traffic direction subtract, but without restricting their basic green phase. Therefore, the traffic signal control device should the green phases of at least one transverse direction in that time '/ in which only minimum requirements for green time addition in the main street.
Die bisher erläuterten Einzelheiten der Erfindung bezogen sich vorzugsweise auf ein Programm mit einer Signalphasen-Umlaufdauer. Um jedoch gegebenenfalls veränderten Verkehrsbedtngungen, z. B. Nachtzeit, erheblich geringerer oder stärkerer Belastung im gesamten Straßenzug oder Netz, Straßen-The details of the invention explained so far preferably related to a program a signal phase cycle duration. However, in order to change the traffic conditions, e.g. B. Night time, significantly lower or higher load in the entire street or network, street
6« glätte u. ä. gerecht zu werden, kann an dem Verkehrssignalsteucrgerät die Signalphasen-Umiaufdauer. vorzugsweise verkehrsabhängig, verändert werden. In order to do justice to the smoothness and the like, the signal phase duration can be adjusted on the traffic signal control device. preferably depending on the traffic.
Das beschriebene Verkehrssignalsteuergerät ist in seiner Anwendung nicht auf eine einmal festgelegteThe traffic signal control device described is not fixed once in its application
6vS Anzahl von signalisierten Knotenpunkten beschränkt, sondern kann bausieinartig erweitert werden. In Fällen, in denen die an einem Knotenpunkt zusammentreffenden Verkehrsrichtungen ständig etwa gleich 6 vS number of signaled nodes limited, but can be expanded in a structural way. In cases in which the traffic directions converging at a junction are always roughly the same
OOOO
stark belastet sind, kann mittels eines Auswerlgerates entschieden werden, welche den Anforderungen auf Grünzeit-Zugabe zu bevorrechtigen ist.are heavily loaded, can by means of an evaluation device a decision must be made as to which of the requirements for green time addition is to be given priority.
Die Zeitpunkte der Wirksamkeit vor= gegebenenfalls vor den Knotenpunkten angeordnete» Verkehrszeichen und Sjgnalein richtungen werden durch das Grund-Grünband festgelegt. Dabei sollen die Zähicrgebnisse den jeweiligen Signalzusiand, z. B. cüie Geschwindigkeitsanzeige, bestimmen, so daß derThe times of effectiveness before = if necessary, »traffic signs arranged in front of the intersections and signaling facilities are determined by the basic green tape. The counting results should be the respective signal state, e.g. B. cüie speedometer, determine so that the
au den Kreuzungen B und C sehr genug ist und an Kreuzung A stärker. Entsprechend wurde fü« die Signalanlagen B und C TeSIg(1IcOt, Utiß im A.«fordi: rungsfalle «ine fest eingestellte Grur.pha.se ohne Vcrlängerungsmöglichkeit wirksam wird, während fü: die Signalanlage A zwei Verlangcrungsstufen an·· gefordert werden können.at intersections B and C is very enough and at intersection A it is stronger. Correspondingly, for the signal systems B and C TeSIg ( 1 IcOt, Utiss in the A. “requirement trap” a fixed basic phase without the possibility of extension becomes effective, while for the signal system A two extension levels can be requested .
Aus dem Zeit-Weg--Diagramm nach Fig. 5 isi nocii zu einnehmen: Am Knotenpunkt Λ wurden fürFrom the time-path diagram according to FIG. 5 isi nocii to be taken: At the node Λ were for
Verkehr ohne anzuhalten die nächstfolgende Signa!- io die Querrichli'.ngcn IJ. und !V die maximale Grünanlage passieren kanu. zeit, d. h. Grundzeit mit xwei VerüinpcnHigsstufen
Eine beispielsweise Attsfüjirungsform der Eifin- angefordert. Aus Platzmangel könnt«»! die Gi unddung
ist in den Zeichnungen niedergelegt und nach- zeit 1 und die Verlängerungsscluritte :. und 3 nicht
folgend beschrieben. inehf unterhalb der Abszisse eingeseiclinet A'^-iksn.
Fig. 1 stellt ein Zeit-Weg-Diagramm für die ver- 15 Erkennbar ist nur das Grünbanti. das die sus den
kehrsabhängig gesteuerten Signalanordnungcn an den
drei benachbarten Straßenknotenpunkten A. B und C
dar, die in F i g. 2 im Grundriß, allerdings mit im
Maßstab stark verzerrte« Straßenbreiten aufgezeichnet sind. F i g, 3 zeigt die bereits im Zeit-We-g-Dia- a«
gramm (Fig. 1) enthaltenen Grünzeiten mit den dazugehöriger.
ZählOereichcn nur zur klareren utid
übersichtlicheren Bezeichnung ohne EinzeichnungTraffic without stopping the next following signa! - io die Querrichli'.ngcn IJ. and! V pass the maximum green area canoe. time, ie basic time with x two levels of contingency. Due to lack of space you can «»! Gi is the unddung set forth in the drawings and demand time 1 and the Verlängerungsscluritte. and 3 not described below. inehf below the abscissa einseiclinet A '^ - iksn. 1 shows a time-path diagram for which only the green banti can be recognized. that the sus the traffic-dependent controlled signal arrangements to the
three neighboring road junctions A. B and C
is shown in FIG. 2 in plan, but with im
Strongly distorted «street widths are recorded. Fig. 3 shows the already in Zeit-We-g-Dia- a «
gram (Fig. 1) contained green times with the associated. Counting areas only for the sake of clarity
clearer description without drawing
Querrichtungen in die Haupürichtung <r. gTransverse directions in the main direction <r. G
auf Knotenpunkt B eingebogenen Fahrzeuge darstellt. represents vehicles turned at junction B.
Diese Fahrzeuge werden am Zalilquerschniü V in den vier Zähhntervalien 12. 13, 1 um! 2 rcgisinen und bewirken an den Fahrsigiiiiien dies Ouuvhniues V an der Anlage B eine Vorverlegung des Grünbegjniv. um die vier VorlaufsUifvn 5 bis 2. Dadurch werden die bei Rot an der Haltelinie V aufgestauten Fahfzeuge rechtzeitig mit einem ihrer Zahl entsprechend langen Vorlauf abgezogen.These vehicles are on the Zalilquerschniü V in the four tooth valleys 12. 13, 1 um! 2 rcgisinen and cause the Fahrsigiiien das Ouuvhniues V to the facility B to bring the Grünbegjniv forward. around the four advance lines 5 to 2. As a result, the vehicles that are pent up at the stop line V at red will be withdrawn in good time with a lead time corresponding to their number.
Am Signalquerschnitt I der Anlage Λ wurde die Gruud-GrünzcU 6 infolge Registrierung -or. Fahrzeugen am zugehörigen Zählqucrschnii! Γ ■— hierAt the signal cross-section I of the system Λ, the Gruud-GrünzcU 6 as a result of registration -or. Vehicles on the associated counting cross section! Γ ■ - here
Haltelinien wurden fortlaufend mit den Ziffern) 30 nicht dargestellt — y.m die Vorraufstuien 4.5 und bis XlI beaeicb.net, die dazugehöriger! Zähiquer- die Nachiauistufen 7. S imu 9 verlängert. Dc; Stan schnitte, mit Y. bis XiI'. Die zu den Haltelinien I und der sr.Azn Fahrzeuge erfolgt aus dem Stand. DieseStop lines were consecutively with the digits) 30 not shown - ym the Vorraufstuien 4.5 and up to XlI beaeicb.net, the associated ones! Tough - the Nachiauistufen 7. S imu 9 extended. Dc; Stan cuts, with Y. to XiI '. The to the stop lines I and the sr.Azn vehicles takes place from the stand. This
werden im Zählinterva'.! V' S registriert un-ΰ der Vorlauf am SignaiquerschniU V um eine weitciv. uic are in the counting interval.! V 'S registers un-ΰ the advance at the signal cross-section V by a wider range. uic
net. Für das vorliegende Beispie! sind Grünzeit- 35 letzte zur Verfugung stehende Stufe V I verlängert.
Zugaben in Zeitschritten gewählt, und zwar für alle Wie aus dem Diagramm ersichtlich ist. muü das finde
Grünphasen der Hauptrichtungen je 5 zur Vorverlegung des Grunbeginns (zeitlicher Vorlauf) und
5 zur Verlängerung (zeitlicher Nachlauf). Sie wurden
gleicherweise an aüen Signalquerschnitten mit den 40 Es schließer!, sich die wähnend der Grund-Grün-Ziffem
1 bis S für die Vorlaufschritte und aiii 7 bus phase 6 den Querschnitt \ passiereuden Falij-zeuge an.
Ii für die Nachlaufschritte bezeichnet. An den dazugehörigen
Zählquerschnitten wurden Zählintervalle
mit gleicher Dauer wie die Grünzeit-Zugabe-Stufe«net. For the present example! Green time is extended to the last available level VI. Additions chosen in time steps, for all As can be seen from the diagram. must find the green phases of the main directions 5 each to bring the green beginning forward (temporal lead time) and
5 for extension (time lag). they were
Likewise, on the outside signal cross-sections with the 40 key contacts !, the during the basic green digits 1 to S for the preliminary steps and aiii 7 bus phase 6 the cross-section \ passes through Falij-witness. Ii for the follow-up steps. Counting intervals were created on the associated counting cross-sections
with the same duration as the green time addition stage «
bi 5 dbi 5 d
der Grünbänder sowie aiii einer zeichnerisch gedehnten Sign-alphasen-Umlaufdauer.the green strips as well as aiii a graphically stretched one Sign-alpha round-trip duration.
Die 3 Knotenpunkte steilen normale Kreuzungen mit je 4 einmündenden Straßen dar, die alle signalisiert sind. Sämtliche einmündenden Straßen sind in beiden Richtungen befahren. Die entsprechendenThe 3 junctions are steep normal intersections each with 4 roads leading into it, all of which are signposted. All the roads that flow into it are in drive in both directions. The corresponding
LX gehörenden ZählquerschmUe Γ und ΧΓ wurden aus Gründen der Übersichtlichkeit nicht eingezeich-LX belonging counter crossings Γ and ΧΓ were not shown for the sake of clarity
des letzten für VorlauCstufea wirksamen Zählintei-of the last counting component effective for VorlauCstuf-
p-r. der ersten niö^üchcnp-r. the first failed
valis V" 5 noch vor
GrünzeiJ-Vorlaufstuie V 1valis V "5 still ahead
GrünzeiJ-Vorlaufstuie V 1
die, ohne am Zählquerschnitt V registriert zu werden, in der zugrunde geiegten Geschwindigkeit den Querschnitt V ebenfalls wäiffend dei Grund-Gnin-which, without being registered at the counting cross-section V, in the underlying speed Cross-section V also wäiffende the basic Gnin-
g gg g
gewählt, die ebenfalls die Bezeichnung 1 bis 5 und 45 phase 6 erreichen.chosen, which also achieve the designation 1 to 5 and 45 phase 6.
7 bis 11 erhielten. Im Zestbereich 6 soll nicht gezählt werden.7 to 11 received. In zest area 6 should not be counted will.
Die Zählintervalle 12 und 13 überwachen den Zeitbereich der der Differenzzeit nach der Ve.rlängerungsstufe 11 bis zu der ersten Vorlauf stufe 1 entspricht.The counting intervals 12 and 13 monitor the time range of the difference time after the extension stage 11 corresponds to the first preliminary stage 1.
Die Auswertung soll in diesem Beispiel binär erfolgen, und zwar soll jede positive Registrierung in einem Interval! eine Verlängerung um eine Stufe bewirken, gleich ob Vor- oder Nachlauf. Das kon-In this example, the evaluation should be binary, and every positive registration should be in one interval! cause an extension by one step, regardless of whether it is pre- or post-travel. The con-
Um darzustellen, daß die Dichte des Fahrzeugverkehrs nach Durchfahret! der Kreuzung infolge abbiegender l-'ahrzeuge in manchen Fällen weniger groß ist, wurden in diesen Fallen im Grünband Lücken gelassen. So wurde im Beispiel im Granband in Richtung von A auf B (Hauptrichtung 14) in dem der Verlängerungsstufe I 7 entsprechenden Zeitbereich eine Lücke gelassen und das Griinband erst wieder in den Stufen I S und 9 fortgesetzt. DieTo show that the density of vehicle traffic after passing through! The intersection is in some cases less large due to vehicles turning, gaps have been left in the green belt in these cases. In the example, a gap was left in the Granband in the direction from A to B (main direction 14) in the time range corresponding to the extension stage I 7 and the Granband was only continued again in stages IS and 9. the
scruierte Gninddiagramm ist in Fig. 1 aus den 55 praktische Föhrweise des AufschlisSens ist erkennbar Grand-Grünphasen der Hauptrichtungen, bezeichnet aus der gegenüber dem Grund-Grünband 16 flacheren mit 6, und den sie verbindenden Grund-Grünbändern Neigung des zuletzt genannten Grimbandes. Der in 16 zu erkennen. Weiterhin ist zu erkennen, daß am diesem Bereich fahrende. Pulk wird im Zähiquer-Knotenpunkt B die Grund-Grünphasen an den Quer- schnitt V in den Intervallen 7, 8 und 9 registriert schnitten V und VlI zusammenfallen, gleichbedeutend 60 und infolgedessen die Grünzeit am Signalquerrnit einem Teilpunkt, während an den. Knotend schnittV um die Stufen?., S und 9 verlängert Im und C die Grurid-Grünphasen sowohl der Quer- weiteren wurde im vorliegenden Beispiel der Fall schnitte! und III als auch der Querschnitte. IX gewählt, daß am Knotenpunkt Λ in den Querrich- und XI stark gegeneinander versetzt sind. Die zu- tungen Π und IV wiederum so viele Anforderungen gründe gelegten Grundgeschwmdigkeiten entsprechen 55 gesättigt wurdes, daß die maximale Grünphase wirkden tatsächlich fahrbaren. sam werden muß (1 bis 3). ϊη der Annahme, daßScruierte Gninddiagram is recognizable in Fig. 1 from the 55 practical Föhrweise des AufschlisSens Grand green phases of the main directions, denoted by 6 from the flatter compared to the basic green belt 16, and the connecting basic green belts inclination of the last-mentioned Grimband. The one to be recognized in 16. It can also be seen that people are driving in this area. Bunch of the basic green phases at the cross section V in the intervals 7, 8 and 9 will be registered in the Zähiquer node B , intersections V and VI coincide, equivalent to 60 and consequently the green time at the signal crossover with a partial point, while at the. Knoting cutV by the steps?., S and 9 lengthened Im and C the Grurid-green phases and the cross-cuts in the present example became the case! and III as well as the cross-sections. IX chosen that at the node Λ in the cross and XI are strongly offset from one another. The terms Π and IV, in turn, correspond to so many basic speeds based on requirements 55 has been saturated that the maximum green phase is actually drivable. must be sam (1 to 3). ϊη the assumption that
Bezüglich des Querverkehrs wurde für das vor- keine weiteren Registrierungen für eine Verlängerung liegende Beispiel angenommen, daß die.se Belastung der Grünphasen der Hauptrichtunge.nl and ΠΙ vor-Regarding cross-traffic, no further registrations for an extension have been made before The present example assumes that this burden on the green phases of the main directions.
liegen, konnten die Querriöhtungen 1 ί und IV zum eingezeichneten Zeitpunkt ihre Gninzcii erhalten.are, the Querriöhtungen 1 ί and IV to given point in time their Gninzcii.
Die in Richtung auf ß einbiegenden Fahrzeuge werden 3m Zählquerschnitt V in den drei Zähl-· intervallen 10 bis Ia registriert und bewirken eine J weitere Verlängerung eier Grünzeil am Querschnitt A um die restlichen zwei Nachlaufstufen HO und i\ und eine Votlaufstufe 5 im folgenden Umlauf, Damit is; gewährleistet, daß die aus ο er Querrichtung einbiegenden Fahrzeuge bei aufschließender Fahrweise »© Hoch die Grüöphase erreichen und nicht aufgestaut Werden.The vehicles turning in the direction of ß are registered 3m counting cross-section V in the three counting intervals 10 to Ia and cause a further lengthening of a green line at cross-section A by the remaining two follow-up levels HO and i \ and a pre-selection level 5 in the following cycle, So is; ensures that vehicles turning in from ο he transverse direction reach the green phase when driving »© Hoch and are not backed up.
Die Weiterfahrt der Fahrzeuge in Richtung, auf Knoten C i>t aus deir. Zeit-Weg-Diagramm (Fig. ?) fcu erkennen. Die Abwicklung des Gegenverkehrs 15 t« Von Kreuzung C auf B geschieht im Beispiel folgendermaßen: The onward journey of the vehicles in the direction of node C i> t from deir. Recognize time-distance diagram (Fig.?) Fcu. The processing of oncoming traffic 15 t «from intersection C to B takes place as follows in the example:
Die aus oci angeforderten Querphase X, XII 1 in Richtung auf B eingebogenen Fahrzeuge werden am Jtahiqucrschnitl VH' in den zwei Intervaikn 13 und *t> 12 registriert, ur.d bewirken damit eine« früheren Grünbeginn ain Sigüaique-schnitt ViI um die beiden Voriaufstiifen 5 und 4. Die nachfolgenden Fahrzeuge k\ der Htvuptrichtung passieren am Querschnitt Xl eine im Vorlauf um vier Stufen (I hh 5) verlängerte CJrünixit. Sie werden am ZäWquerschniti VlI'" in den vier Intervallen 2 bis 5 registrier«. L'iid können nur fuxrh die restlichen drei Vorlaufstufen 1 bis 3 wirk- »atri machen, d h.. nich: aste der registrierten Fahrte ugs; köfwen im Vorlauf bewältigt werden. Dadurch jo entsteht eise Verzögcruti?. beirr. Passieren des SignaS- «juerschnitiss VIl, der durch selbsttätige Verlängerung QO Grünzeit um eine« Veriängerungsschrirt Ί t* gegast wird. E>:c infolge der nächsten Registrierung in den drei Zählinterv allen erwirkten Ver'ängerungen schließen dann irt den Stufen 8, 9 und 10 an diesen an.The transverse phase X, XII 1 requested from oci in the direction of B curved vehicles are registered at the Jtahiqucrschnitl VH 'in the two Intervaikn 13 and * t> 12, ur.d thus cause an “earlier green beginning in Sigüaique-intersection ViI around the two leading posts 5 and 4. The following vehicles k \ the Htvuptrrichtung pass a CJrünixit at the cross-section Xl in advance by four steps (I hh 5). You will be registered at the cross-section of the fence in the four intervals 2 to 5. You can only make the remaining three preliminary stages 1 to 3 effective, i.e. not: aste of the registered journeys Pre-run. This creates a delay cruti?. Beirr. Passing the SignaS- «juerschnitiss VIl, which is gazed by an automatic extension QO green time by an« extension step Ί t *. E>: c as a result of the next registration in the three counting intervals The extensions achieved then follow stages 8, 9 and 10 at this stage.
Au·'· dem Zcit-Weg-Diagramm in Fig. 1 ist zu trkcnnftf!. dsß an der K^viizungB am SiignakjuerschniiT V für die Hauptrichtung 14. die Varlängerungsmöglichkcitcji voil und am Qucxschflitt VII für «o cJie !Richtung SS die Veriängerungsniugiichfceitcf! bis auf eine Stufe ebenfalls ausgenutzt wurden. Da> bedeutet. daS in diesem Signaiphasen-Umlauf kf:ine Anfofderung ftir den Querverkehr getätigt worden ist oder in iW/ nicht wirksam wercSen konnte.The Zcit-path diagram in FIG. 1 is closed trkcnnftf !. dsß at the K ^ viizungB at SiignakjuerschniiT V for the main direction 14. the possibility of extension voil and on Qucxschflitt VII for «o cJie! in the direction of the SS the possibility of extension! until were also exploited on one level. There> means. that in this signal phase cycle kf: ine Request for cross traffic has been made is or could not be effective in iW /.
Claims (4)
USA.-Patsntschrift Nr. 2 932ÖO3;
»Siemens-Zeitschrift«, 1935, S. 173.Considered publications:
U.S. Patent No. 2,932ÖO3;
"Siemens-Zeitschrift", 1935, p. 173.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1963S0088030 DE1281324C2 (en) | 1963-10-25 | 1963-10-25 | Traffic signal control unit |
GB4356164A GB1086727A (en) | 1963-10-25 | 1964-10-26 | Improvements in or relating to traffic signal systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1963S0088030 DE1281324C2 (en) | 1963-10-25 | 1963-10-25 | Traffic signal control unit |
Publications (2)
Publication Number | Publication Date |
---|---|
DE1281324B DE1281324B (en) | 1968-10-24 |
DE1281324C2 true DE1281324C2 (en) | 1973-02-15 |
Family
ID=7514179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1963S0088030 Expired DE1281324C2 (en) | 1963-10-25 | 1963-10-25 | Traffic signal control unit |
Country Status (2)
Country | Link |
---|---|
DE (1) | DE1281324C2 (en) |
GB (1) | GB1086727A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114627660B (en) * | 2022-03-11 | 2023-01-20 | 公安部交通管理科学研究所 | Real-time iterative optimization control method for intersection signals facing unbalanced traffic flow |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2932003A (en) * | 1954-09-21 | 1960-04-05 | Eastern Ind Inc | Electronic cycle computer |
-
1963
- 1963-10-25 DE DE1963S0088030 patent/DE1281324C2/en not_active Expired
-
1964
- 1964-10-26 GB GB4356164A patent/GB1086727A/en not_active Expired
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2932003A (en) * | 1954-09-21 | 1960-04-05 | Eastern Ind Inc | Electronic cycle computer |
Also Published As
Publication number | Publication date |
---|---|
DE1281324B (en) | 1968-10-24 |
GB1086727A (en) | 1967-10-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10022812A1 (en) | Method for determining the traffic situation on the basis of reporting vehicle data for a traffic network with traffic-regulated network nodes | |
DE2114621A1 (en) | Method and arrangement for braking and driving control of objects | |
DE1574054B1 (en) | DEVICE FOR DETERMINING CAR TRAFFIC FLOW | |
DE102015218942A1 (en) | A method for controlling an indication of a remaining time | |
EP0739802B1 (en) | Method for improving availability of multi-section axle counters | |
DE3608890C2 (en) | ||
DE1281324C2 (en) | Traffic signal control unit | |
DE2207487C3 (en) | Device for recording and controlling the flow of traffic on roads | |
EP3075626B1 (en) | Method and system for operating a railway system | |
DE102015217529B4 (en) | Method for controlling a signal system of a traffic control | |
DE102016212759B4 (en) | Method and device for release time measurement in a traffic-dependent controllable traffic signal system | |
DE2202963A1 (en) | PROCEDURE FOR THE SELF-ACTING TARGET BRAKING OF RAIL VEHICLES | |
DE9203919U1 (en) | Wrong-way driver traffic warning system | |
DE2344328C3 (en) | System for the automatic control of the speed of a track-bound vehicle | |
DE102015226253A1 (en) | Method and device for creating a control method | |
DE1780194C2 (en) | Device for monitoring or regulating the speed of a route-bound vehicle | |
DE4131786C2 (en) | Security arrangement for a motor vehicle wash | |
WO2023285544A1 (en) | Method for operating a roundabout, and device for carrying out this method | |
DE1038462B (en) | Signal arrangement for regulating road traffic | |
DE1456395A1 (en) | Contactless elevator control | |
EP0481574B1 (en) | Method for predetermining running speed at light signals | |
DE1580867C (en) | Railway system for the introduction of a rail train | |
EP0705753B1 (en) | Method for predeterminating running speed at light signals | |
DE2613007A1 (en) | CONVEYOR SYSTEM WITH RAIL-MOUNTED CONVEYOR CARRIAGES, WHOSE DC DRIVE MOTORS IN INCLINED RAIL SECTIONS CAN BE LOADED IN THE SENSE OF SHORT-CIRCUIT BRAKING | |
WO2001056825A1 (en) | Method for controlling the speed and distance of a motor vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E77 | Valid patent as to the heymanns-index 1977 |