DE1186012B - Method and device for driving Floez sections, especially in underground hard coal mining - Google Patents
Method and device for driving Floez sections, especially in underground hard coal miningInfo
- Publication number
- DE1186012B DE1186012B DES77691A DES0077691A DE1186012B DE 1186012 B DE1186012 B DE 1186012B DE S77691 A DES77691 A DE S77691A DE S0077691 A DES0077691 A DE S0077691A DE 1186012 B DE1186012 B DE 1186012B
- Authority
- DE
- Germany
- Prior art keywords
- conveyor
- cutting machine
- cutting
- driving
- loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 8
- 239000003245 coal Substances 0.000 title claims description 7
- 238000005065 mining Methods 0.000 title claims description 4
- 238000005520 cutting process Methods 0.000 claims description 25
- 238000004519 manufacturing process Methods 0.000 claims 1
- 238000011084 recovery Methods 0.000 claims 1
- 238000005553 drilling Methods 0.000 description 5
- 239000011435 rock Substances 0.000 description 3
- 238000000605 extraction Methods 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 238000010304 firing Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006049 ring expansion reaction Methods 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/1006—Making by using boring or cutting machines with rotary cutting tools
- E21D9/1013—Making by using boring or cutting machines with rotary cutting tools on a tool-carrier supported by a movable boom
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
Verfahren und Vorrichtung zum Auffahren von Flözstrecken, insbesondere im Steinkohlenbergbau unter Tage Gegenstand der Erfindung ist ein Verfahren und eine Vorrichtung zum Auffahren von Flözstrecken, insbesondere im Steinkohlenbergbau unter Tage. Sie befaßt sich mit der Aufgabe, den zur Lösung der Kohle aus ihrem Verband und zum Verladen und Abtransport des so gewonnenen Haufwerks erforderlichen Zeitaufwand abzukürzen.Method and device for driving seams, in particular in underground hard coal mining The invention relates to a method and a device for driving seams, especially in hard coal mining underground. She is concerned with the task of solving the coal from her Bandage and necessary for loading and transporting the debris obtained in this way Shorten the time required.
Während mächtige Flöze in der flachen Lagerung im Türstock aufgefahren werden können, ohne daß Nebengestein mitgenommen werden muß, lassen sich geringmächtige Flöze erst recht der halbsteilen und steilen Lagerung nicht im ganzen Querschnitt zerspanen, ohne daß gleichzeitig Nebengestein unterschiedlicher Festigkeit gelöst werden müßte. Deshalb wird beim Auffahren von Flözstrecken fast ausschließlich die Bohr- und Schießarbeit angewendet.While huge seams were driven up in the flat storage in the door frame can be made without having to take additional rock with you Seams especially of the half-steep and steep storage not in the entire cross-section Machinable without loosening adjacent rocks of different strengths at the same time would have to be. Therefore, when driving seams, the Drilling and shooting work applied.
Um die Schießarbeit zu erleichtern, wird üblicherweise zunächst ein Einbruch in den Kohlestoß gepickt oder ein Schram hergestellt, der gebohrte Abschlag mit mehreren Zündgängen hereingewonnen und das anfallende Haufwerk mittels Lademaschinen in Förderwagen, Bandanlagen oder Stegkettenförderer geladen. Da der Schram meist nicht groß genug gemacht werden kann, muß die Schießarbeit gewöhnlich in mehreren Zündgängen erfolgen. Alle diese Arbeitsgänge, die meistens dort. angewendet werden, wo druckhaftes Gebirge einen Bogen- oder Ringausbau verlangt. und somit auch Bohr- und Schießarbeit im Nebengestein durchzuführen ist, werden zeitlich nacheinander durchgeführt.To make shooting easier, a Picked a break in the coal pile or made a scrape, the drilled tee gained with several ignition gears and the accumulated heap by means of loading machines loaded into trolleys, belt systems or chain conveyors. Since the Schram mostly Cannot be made big enough, the shooting usually has to be done in several Ignition gears take place. All of these operations, mostly there. be applied, where pressurized mountains require an arch or ring expansion. and thus also drilling and shooting work to be carried out in the adjacent rock are sequential carried out.
Gemäß der Erfindung wird eine Steigerung der, Auffahrleistung in Flözstrecken durch teilweise zeitliche überlagerung der beim Streckenvortrieb erforderlichen Arbeitsgänge erstrebt. Sie besteht im wesentlichen darin, daß bei der maschinellen Herstellung eines Einbruches in der Ortsbrust, der einen Förderer aufnimmt, welcher bei Anwendung von Schießarbeit die Hereingewinnung des Haufwerks erleichtert, von einer auf einem Fördermittel geführten, gleichmäßig vorgezogenen, räumenden, vor Kopf arbeitenden Walzenschrämmaschine der Großeinbruch für den neuen Abschlag geschrämt wird, während gleichzeitig das restliche Haufwerk des voraufgehenden Abschlages maschinell mit einer unabhängig betriebenen Räumvorrichtung geladen wird.According to the invention, there is an increase in the drive-up performance in seams by partially overlapping the time required for driving Strives for operations. It consists essentially in the fact that with the machine Creation of a breach in the face that picks up a conveyor, which when using shooting work facilitating the extraction of the debris from an evenly advanced, evacuating, guided on a conveyor Head working roller cutting machine of the major burglary cut for the new tee is, while at the same time the remaining heap of the previous downstroke mechanically loaded with an independently operated clearing device.
Eine zur Durchführung des erfindungsgemäßen Verfahrens geeignete Walzenschrämmaschine wird zweckmäßig beiderseits eines als Ladepanzer ausgebildeten Stegkettenförderers geführt und ist mit einer von ihr angetriebenen heb- und senkbaren Schneidwalze versehen, deren Breite diejenige des Ladepanzers überschreitet, der seinerseits in Streckenlängsrichtung gegenüber der festgelegten, mit einer unabhängig angetriebenen, der jeweiligen Streckenbreite angepaßten Räumvorrichtung verfahrbaren Schrämmaschine verschieblich ist.A roller cutting machine suitable for carrying out the method according to the invention is expedient on both sides of a chain conveyor designed as a loading tank out and is driven by a cutting roller that can be raised and lowered provided, the width of which exceeds that of the loading tank, which in turn in the longitudinal direction of the route compared to the specified, with an independently driven, the respective line width adapted clearing device movable cutting machine is movable.
Es ist zwar bereits eine Streckenvortriebsmaschine bekanntgeworden, mit der in den Ortsstoß ein Einbruch hergestellt werden soll, der als Führungskanal für die Aufnahme des Auslegerendes dient und bei Anwendung von Schießarbeit die Hereingewinnung des Haufwerks erleichtern soll. Bei dieser bekannten Einrichtung ist aber die Größe des Einbruches begrenzt und von gegenüber dem Streckenquerschnitt wesentlich kleinerem Querschnitt, so daß der Einbruch bei der Schießarbeit nicht voll wirksam wird, zumal.der mitgezogene Förderer und das Bohrklein den hergestellten Einbruch verstopfen. Demgegenüber kann der Einbruch nach dem Vorschlag gemäß der Erfindung unabhängig von der Sohle in beliebiger Höhe in die Ortsbrust eingebracht, die Strecke also getrost aufgefahren werden.A tunneling machine has already become known, with which a break-in is to be made in the local joint, which acts as a guide channel is used for receiving the end of the boom and when using shooting work the To facilitate extraction of the heap. In this known device but the size of the break-in is limited and compared to the cross-section of the route significantly smaller cross-section, so that the break-in when shooting is not is fully effective, especially as the dragged conveyor and the cuttings produced Clog burglary. In contrast, according to the proposal according to the Invention introduced into the face at any height regardless of the invert, the route can therefore be confidently driven.
Auch über einem Ladeförderer geführte Schrämmaschinen, denen ein heb- und senkbares Schneidwerkzeug vorgeschaltet ist, sind ebenso bekannt wie Streckenvortriebsmaschinen mit Räumvorrichtungen, mit welchen das lose und kleinstückige Haufwerk abtransportiert wird. Diese Maschinen eignen sich jedoch nicht zur Herstellung eines Einbruches zur Vorbereitung des Schießvorganges, da der Schleppförderer fest an der Maschine angeordnet ist und somit eine Rückwärtsbewegung vor dem Schießvorgang nicht möglich ist. Demgegenüber liegt bei der erfindungsgemäßen Einrichtung der Ladepanzer fest auf der Streckensohle, so daß die Schrämmaschine nebst Räumer entlang dem Ladepanzer in schußsichere Entfernung zurückgefahren werden kann. In der Zeichnung ist die Vorrichtung gemäß der Erfindung sowie eine Ansicht des Streckenstoßs dargestellt. Es zeigt A b b. 1 die in die Strecke eingesetzte Vorrichtung in Seitenansicht, A b b. 2 die Vorrichtung in Draufsicht, A b b. 3 eine Ansicht des Streckenstoßes und A b b. 4 die Vorrichtung in Rückansicht in Pfeilrichtung.Also cutting machines guided over a loading conveyor, which have a lifting and lowerable cutting tool is connected upstream, as are road tunneling machines with clearing devices with which the loose and small-sized debris is transported away will. However, these machines are not suitable for making a burglary in preparation for the shooting process, as the drag conveyor is fixed to the machine is arranged and thus a backward movement is not possible before the shooting process is. In contrast, the loading tank is fixed in the device according to the invention on the bottom of the track, so that the cutting machine and scraper along the loading tank can be retracted at a safe distance. In the drawing the device according to the invention and a view of the route joint is shown. It shows A b b. 1 the device inserted into the line in side view, A. b b. 2 the device in plan view, A b b. 3 is a view of the section joint and A b b. 4 shows the device in a rear view in the direction of the arrow.
Der beiderseits des als Ladepanzer ausgebildeten Stegkettenförderers 1 geführten Schrämmaschine 2 ist die von ihr angetriebene, mittels des Hydraulikzylinders 3 heb- und senkbare Schneidwalze 4 vorgeschaltet, deren Breite diejenige des Ladepanzers überschreitet. Die Schrämmaschine 2 ist mittels des Kettenspills 5 entlang des Stegkettenförderers 1 verfahrbar, welcher auf dem Streckenpanzer 6 gleitet und gegenüber der Streckensohle zur Aufnahme des Rückdruckes durch den Stempel 7 abgespannt ist. An die Schrämmaschine 2 ist seitlich die Räumvorrichtung 8 angelenkt, deren Schrämkette 9 unabhängig angetrieben ist. Zweckmäßig ist auf der Bühne 10 der Räumvorrichtung 8 die Arbeitsbühne 11 angeordnet, die in der Weise zur Erleichterung der Bohr-und Ausbauarbeit benutzt werden kann, daß auf ihr die Bohrgezähe, die Bohrlafette und in Verbindung hiermit eine Hilfsvorrichtung zum Stellen des Streckenausbaues befestigt werden.The cutting machine 2, which is guided on both sides of the armored chain conveyor 1 , is preceded by the cutting roller 4 which is driven by it and can be raised and lowered by means of the hydraulic cylinder 3 , the width of which exceeds that of the armored loader. The cutting machine 2 can be moved by means of the chain cap 5 along the chain conveyor 1, which slides on the track armor 6 and is braced against the track sole to absorb the back pressure from the punch 7. On the side of the cutting machine 2, the clearing device 8 is hinged, the cutting chain 9 is driven independently. The working platform 11 is expediently arranged on the stage 10 of the clearing device 8 and can be used to facilitate the drilling and expansion work by attaching the drilling teeth, the drilling carriage and, in connection with this, an auxiliary device for setting the route expansion.
Die Arbeitsweise der Einrichtung ist folgende: Die Schrämmaschine 2 wird in Verbindung mit der an ihr angelenkten Räumeinrichtung 8 auf dem Ladepanzer 1 in Streckenlängsrichtung zum Stoß vorgefahren, wobei die Räumvorrichtung die ganze Streckenbreite neben dem Stegkettenförderer bestreicht.The operation of the device is as follows: The cutting machine 2 is advanced in connection with the clearing device 8 linked to it on the loading tank 1 in the longitudinal direction of the route to the joint, the clearing device sweeping the entire route width next to the chain conveyor.
Hierbei lädt die Räumvorrichtung 8 das geschossene Haufwerk in den Stegkettenförderer 1 und schneidet mittels ihrer Schrämkette etwaige auf der Flözsohle anstehende Kohle oder weiche Berge frei. Gleichzeitig wird hierbei die von der Schrämmaschine angetriebene Vorschaltwalze 4 in den neuen Ortsstoß eingefahren und das von ihr gelöste Haufwerk von der umlaufenden Schrämkette 9 der Räumvorrichtung nach rückwärts transportiert und geladen. Da die Breite der Vorschaltwalze die Ladepanzerbreite übersteigt, so kann der Einbruch 12 (Ab b. 3) bis auf die Streckensohle hergestellt werden. Durch Festlegen der: Schrämmaschine und Lösen des Abspannstempels 7 wird nunmehr mittels des Kettenspills 5 der Ladepanzer unter der Schrämmaschine hindurch in den erstellten Einbruch vorgezogen und im Anschluß hieran von der Arbeitsbühne 11 aus der Ausbau eingebracht und der neue Abschlag abgebohrt. Vor dem Schießen wird die beschriebene maschinelle Einrichtung zurückgefahren.In this case, the clearing device 8 loads the heaped pile into the web chain conveyor 1 and, by means of its cutting chain, cuts any coal or soft mountains that may be present on the bedrock. At the same time, the feed roller 4 driven by the cutting machine is retracted into the new site and the debris it has loosened is transported backwards and loaded by the rotating cutting chain 9 of the clearing device. Since the width of the feed roller exceeds the width of the loading armor, the notch 12 (Ab b. 3) can be produced down to the bottom of the track. By setting the: cutting machine and loosening the guy ram 7, the loading armor is now pulled up under the cutting machine into the burglary created by means of the chain cap 5 and then brought in from the platform 11 from the expansion and the new tee is drilled off. Before firing, the mechanical equipment described is retracted.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES77691A DE1186012B (en) | 1962-01-24 | 1962-01-24 | Method and device for driving Floez sections, especially in underground hard coal mining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES77691A DE1186012B (en) | 1962-01-24 | 1962-01-24 | Method and device for driving Floez sections, especially in underground hard coal mining |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1186012B true DE1186012B (en) | 1965-01-28 |
Family
ID=7506970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DES77691A Pending DE1186012B (en) | 1962-01-24 | 1962-01-24 | Method and device for driving Floez sections, especially in underground hard coal mining |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1186012B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE853890C (en) * | 1949-10-02 | 1952-10-30 | Gustav Dr-Ing Schaar | Crawler loader with drilling device |
DE1035079B (en) * | 1954-08-17 | 1958-07-31 | Eisengiesserei A Beien | Tunneling machine and method for driving excavation routes |
DE1090161B (en) * | 1955-06-18 | 1960-10-06 | Willibald Kamm Dipl Ing | Loader for clearing debris in mining operations |
FR1268468A (en) * | 1959-11-17 | 1961-08-04 | Lorraine Houilleres | Integral slaughtering machine for straightening veins |
-
1962
- 1962-01-24 DE DES77691A patent/DE1186012B/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE853890C (en) * | 1949-10-02 | 1952-10-30 | Gustav Dr-Ing Schaar | Crawler loader with drilling device |
DE1035079B (en) * | 1954-08-17 | 1958-07-31 | Eisengiesserei A Beien | Tunneling machine and method for driving excavation routes |
DE1090161B (en) * | 1955-06-18 | 1960-10-06 | Willibald Kamm Dipl Ing | Loader for clearing debris in mining operations |
FR1268468A (en) * | 1959-11-17 | 1961-08-04 | Lorraine Houilleres | Integral slaughtering machine for straightening veins |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10046497C2 (en) | Extraction facility for underground ore mining operations and method for extracting mining products in underground ore mining operations | |
DE1458675A1 (en) | Method for sinking Schaechten or for driving on routes or the like. in mining and tunnel operations as well as machines for carrying out the process | |
DE2554107A1 (en) | SHIELD DRIVE DEVICE, IN PARTICULAR FOR DRIVING ROADS IN MINING UNDERGROUND OPERATIONS | |
DE2307413C2 (en) | Device for the extraction of a floz-like deposit in longwall mining | |
DE2749631A1 (en) | METHOD AND DEVICE FOR DRILLING BALCONY HOLES WHILE DRIVING CONVEYORS OR IN TUNNEL CONSTRUCTION | |
DE2754381C2 (en) | Extraction equipment, in particular for coal extraction in underground operations | |
EP2758633B1 (en) | Shield driving device | |
DE1186012B (en) | Method and device for driving Floez sections, especially in underground hard coal mining | |
DE2004828C3 (en) | Driving shield for tunnel construction | |
DE3335098C2 (en) | ||
DE3009923A1 (en) | METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION | |
DE938543C (en) | Schraembaggergeraet with shield for mining underground natural resources, preferably lignite | |
DE3232906C2 (en) | ||
DE2839983C2 (en) | Mining route drive-up device for underground mining | |
DE2246233C2 (en) | Long face coal mining using chisels on chain - involves cutting stepped vertical slit, in initial horizontal hewing slit, and wedging | |
DE102004062780A1 (en) | Method for extraction and removal of soil and rock in deposits e.g. phosphate rock in phosphate deposits, in surface mining, involves forming of conveying equipment by conveyor, which is positioned on floor of deposits | |
DE972417C (en) | Method and device for the independent extraction and loading of coal in longwall mining | |
DE1913183C3 (en) | Loading, conveying and drilling equipment for drifting | |
DE2401196A1 (en) | Loading and cutting machine for driving underground galleries - has horizontally and vertically movable loader head and single-chain conveyor | |
AT502468B1 (en) | METHOD AND DEVICE FOR DISMANTLING UNDERLYING STORAGE SITES | |
DE1154057B (en) | Drill breaker loader guided on a conveyor | |
DD260408A3 (en) | METHOD AND DEVICE FOR SELECTIVELY OBTAINING MINERALS WITH A MECHANIZED FULL CYCLE | |
DE1108155B (en) | Tunneling machine for excavation routes | |
DE1234170B (en) | Tunneling machine | |
DE2940472A1 (en) | Tunnel or mine gallery forward drilling machine - has drilling head movable sideways as well as forward, with additional side drills |