DE112015006058T5 - MANAGEMENT DEVICE FOR OPERATING A WATER HEATING DEVICE, MANAGEMENT SYSTEM FOR OPERATING A WATER HEATING DEVICE AND MANAGEMENT METHOD FOR OPERATING A WATER HEATING DEVICE - Google Patents

MANAGEMENT DEVICE FOR OPERATING A WATER HEATING DEVICE, MANAGEMENT SYSTEM FOR OPERATING A WATER HEATING DEVICE AND MANAGEMENT METHOD FOR OPERATING A WATER HEATING DEVICE Download PDF

Info

Publication number
DE112015006058T5
DE112015006058T5 DE112015006058.8T DE112015006058T DE112015006058T5 DE 112015006058 T5 DE112015006058 T5 DE 112015006058T5 DE 112015006058 T DE112015006058 T DE 112015006058T DE 112015006058 T5 DE112015006058 T5 DE 112015006058T5
Authority
DE
Germany
Prior art keywords
water heater
data
energy
home
operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE112015006058.8T
Other languages
German (de)
Inventor
Takashi Arai
Nobuo Asahi
Masato Nagasawa
Kazuaki Matoba
Akihiro Toda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of DE112015006058T5 publication Critical patent/DE112015006058T5/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1051Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
    • F24D19/1057Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses solar energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H4/00Fluid heaters characterised by the use of heat pumps
    • F24H4/02Water heaters
    • F24H4/04Storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D11/00Central heating systems using heat accumulated in storage masses
    • F24D11/002Central heating systems using heat accumulated in storage masses water heating system
    • F24D11/003Central heating systems using heat accumulated in storage masses water heating system combined with solar energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D11/00Central heating systems using heat accumulated in storage masses
    • F24D11/02Central heating systems using heat accumulated in storage masses using heat pumps
    • F24D11/0214Central heating systems using heat accumulated in storage masses using heat pumps water heating system
    • F24D11/0221Central heating systems using heat accumulated in storage masses using heat pumps water heating system combined with solar energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/0015Domestic hot-water supply systems using solar energy
    • F24D17/0021Domestic hot-water supply systems using solar energy with accumulation of the heated water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/0036Domestic hot-water supply systems with combination of different kinds of heating means
    • F24D17/0063Domestic hot-water supply systems with combination of different kinds of heating means solar energy and conventional heaters
    • F24D17/0068Domestic hot-water supply systems with combination of different kinds of heating means solar energy and conventional heaters with accumulation of the heated water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/02Domestic hot-water supply systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D18/00Small-scale combined heat and power [CHP] generation systems specially adapted for domestic heating, space heating or domestic hot-water supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1039Arrangement or mounting of control or safety devices for water heating systems for central heating the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1051Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
    • F24D19/1054Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1066Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
    • F24D19/1072Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/08Hot-water central heating systems in combination with systems for domestic hot-water supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/144Measuring or calculating energy consumption
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/172Scheduling based on user demand, e.g. determining starting point of heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/212Temperature of the water
    • F24H15/223Temperature of the water in the water storage tank
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/262Weather information or forecast
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/265Occupancy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/40Control of fluid heaters characterised by the type of controllers
    • F24H15/414Control of fluid heaters characterised by the type of controllers using electronic processing, e.g. computer-based
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2101/00Electric generators of small-scale CHP systems
    • F24D2101/40Photovoltaic [PV] modules
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/02Photovoltaic energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/08Electric heater
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/14Solar energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/269Time, e.g. hour or date
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/40Control of fluid heaters characterised by the type of controllers
    • F24H15/414Control of fluid heaters characterised by the type of controllers using electronic processing, e.g. computer-based
    • F24H15/45Control of fluid heaters characterised by the type of controllers using electronic processing, e.g. computer-based remotely accessible
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/20Solar thermal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Power Engineering (AREA)
  • Sustainable Energy (AREA)
  • Atmospheric Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Environmental Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Water Supply & Treatment (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

Ein Wohnungs-Gateway (3), das in jeder von zumindest einer Wohnung angeordnet ist, sammelt Betriebsdaten, die einen Betriebszustand von in jeder Wohnung installierten elektrischen Vorrichtungen (5–8) anzeigen, und sendet die Betriebsdaten zu einer Managementvorrichtung (1) für den Betrieb einer Wasserheizvorrichtung. Die Managementvorrichtung (1) führt den Betrieb der Wasserheizvorrichtung bestimmt auf der Grundlage der Betriebsdaten, ob der Bewohner die Wohnung belegt, und erzeugt Wohnungsbelegungs-Zustandsdaten, die den bestimmten Wohnungsbelegungszustand anzeigen. Weiterhin sagt die Managementvorrichtung (1) für den Betrieb der Wasserheizvorrichtung auf der Grundlage von Wetterinformationen für einen den Ort der Wohnung enthaltenden Bereich eine Überschussenergie einer Solarenergieerzeugung vorher und erzeugt Überschussenergie-Vorhersagedaten, die einen Zeitschlitz für die Erzeugung der vorhergesagten Überschussenergie und einen Wert der Überschussenergie anzeigen. Die Managementvorrichtung (1) für den Betrieb der Wasserheizvorrichtung bestimmt auf der Grundlage der Wohnungsbelegungs-Zustandsdaten und der Überschussenergie-Vorhersagedaten einen Betriebsplan zum Bewirken des Betriebs einer Wasserheizvorrichtung (8) jeder Wohnung.A home gateway (3) located in each of at least one home collects operation data indicating an operation state of electrical devices (5-8) installed in each home, and sends the operation data to a management device (1) for the home office Operation of a water heater. The management apparatus (1) performs the operation of the water heater determined on the basis of the operation data, whether the occupant occupies the apartment, and generates Wohnungsbelegungs status data indicating the specific housing occupancy state. Further, the operation device (1) predicts an excess energy of solar power generation based on weather information for a region containing the location of the water heater, and generates excess energy prediction data including a time slot for generation of the predicted excess energy and a value of the excess energy Show. The water heater operation management apparatus (1) determines an operation plan for effecting the operation of a water heater (8) of each dwelling based on the dwelling condition status data and the surplus energy prediction data.

Description

Technisches Gebiet Technical area

Die vorliegende Offenbarung bezieht sich auf eine Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung, um eine in jeder von einer oder mehreren Wohnungen installierte Wasserheizvorrichtung zu steuern, ein Managementsystem für den Betrieb einer Wasserheizvorrichtung und ein Managementverfahren für den Betrieb einer Wasserheizvorrichtung.  The present disclosure relates to a management apparatus for operating a water heater to control a water heater installed in each of one or more homes, a management system for operating a water heater, and a management method for operating a water heater.

Stand der Technik State of the art

Für Gebäude mit mehreren Einheiten wie Apartmentkomplexen, in denen mehrere Wasserheizvorrichtungen vom Speichertyp installiert sind, die Wasser durch Verwendung von elektrischer Energie erwärmen, wurden in jüngerer Zeit verschiedene Typen von Vorschlägen gemacht, um eine Nivellierung der Energielast zu fördern und einen Anstieg des Energieverbrauchs zu verhindern, was ein Problem ist, wenn mehrere Heißwasser-Heizvorrichtungen vom elektrischen Typ einen Wasserheizvorgang für einen ganzen Tank gleichzeitig während desselben Zeitschlitzes durchführen. For multi-unit buildings such as apartment complexes in which several storage type water heaters are installed which heat water by using electric power, various types of proposals have been made recently to promote energy load leveling and prevent an increase in energy consumption which is a problem when several electric-type hot water heaters perform a water heating operation for a whole tank at the same time during the same time slot.

Das Patentdokument 1 offenbart beispielsweise eine Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung für eine Nivellierung der Energielast durch Senken eines maximalen Werts der Energieverbrauchsmenge, die in einem bestimmten zeitschlitz Auftritt, durch Teilen des Wasserheizbetriebs, der in dem bestimmten Zeitschlitz auftritt, in zwei Operationsmodi mit unterschiedlichen Start- und Stoppzeiten des Wasserheizbetriebs, und durch Verteilen des Energieverbrauchs durch Durchführen des Wasserheizvorgangs in einem Zeitschlitz, der ein anderer als der bestimmte Zeitschlitz ist.  For example, Patent Document 1 discloses a management apparatus for operating a water heater for leveling the energy load by decreasing a maximum value of the energy consumption amount occurring in a certain time slot by dividing the water heating operation occurring in the specific time slot into two operation modes having different start and stop times of the water heating operation, and by distributing the energy consumption by performing the water heating operation in a time slot other than the designated time slot.

Weiterhin ist in den letzten Jahren aufgrund der Einführung eines Einspeise-Tarifschemas für erneuerbare Energie eine Intersystemverbindung (Energiehandel) sehr aktiv hinsichtlich des Sendens von Energierückflüssen von überschüssiger Energie, die durch ein Solarenergie-Erzeugungssystem erzeugt wurde, zu dem Energieversorgungsnetz eines Energieunternehmens.  Furthermore, in recent years, due to the introduction of a renewable energy feed-in tariff scheme, an inter-system connection (energy trading) has been very active in sending energy surges of excess energy generated by a solar power generation system to the power grid of an energy company.

Die von dem Solarenergie-Erzeugungssystem erzeugte Menge von Elektrizität variiert gemäß der Sonneneinstrahlung, und die Menge der erzeugten Energie variiert entsprechend dem Wetter. In dem Fall des Energieerzeugungssystem, bei dem die Energieerzeugung auf diese Weise in Abhängigkeit von dem Wetter variiert, dass mit dem Energieversorgungsnetz verbunden ist und dass einen Energierückfluss zu dem Energieversorgungsnetz vorsieht, ist eine Einstellung des Nachfrage-Angebot-Ausgleichs durch ein Energienivellierungsverfahren wie das des Patentdokuments 1 schwierig, und es besteht die Möglichkeit einer nachteiligen Einwirkung auf die Stabilität des Energieversorgungsnetzes, wie Änderungen der Ausgangsspannung, der Frequenz und dergleichen.  The amount of electricity generated by the solar energy generation system varies according to the solar radiation, and the amount of generated energy varies according to the weather. In the case of the power generation system in which the power generation varies in such a manner depending on the weather that is connected to the power grid and that provides energy return to the power grid, an adjustment of the demand supply balance by an energy leveling method such as the Patent document 1 difficult and there is the possibility of an adverse effect on the stability of the power grid, such as changes in the output voltage, the frequency and the like.

Um ein derartiges Problem zu lösen, schlagen das Patentdokument 2 und das Patentdokument 3 für ein Energiesystem, dass das kommerzielle Energieversorgungsnetz mit einer verteilten Energiequelle wie ein Solarenergie-Erzeugungssystem miteinander verbindet, verfahren zur Energienivellierung vor, die eine Energienivellierung durch Verbinden mit einer Speicherbatterie, die zum Speichern überschüssiger Energie verwendet wird, und durch Laden und Entladen der Speicherbatterie realisieren.  In order to solve such a problem, Patent Document 2 and Patent Document 3 for an energy system connecting the commercial power supply network to a distributed power source such as a solar power generation system propose energy leveling methods that provide energy leveling by connecting to a storage battery is used to store excess energy, and realize by charging and discharging the storage battery.

Zitierungsliste CITATION

Patentliteratur patent literature

  • Patentdokument 1: Veröffentlichung der ungeprüften japanischen Patentanmeldung Kokain Nr. 2014-137200 Patent Document 1: Publication of the Unexamined Japanese Patent Application Kokai No. 2014-137200
  • Patentdokument 2: Veröffentlichung der ungeprüften japanischen Patentanmeldung Kokain Nr. 2000-175360 Patent Document 2: Publication of Unexamined Japanese Patent Application Kokai No. 2000-175360
  • Patentdokument 3: Veröffentlichung der nicht geprüften japanischen Patentanmeldung Kokain Nr. 2006-295090 Patent Document 3: Publication of Unexamined Japanese Patent Application Kokai No. 2006-295090

Kurzfassung der Erfindung Summary of the invention

Technisches Problem Technical problem

Wenn jedoch ein Verfahren zur Energienivellierung wie im Patentdokument 2 und im Patentdokument 3 beschrieben verwendet wird, sind die Kosten und die Belastung, die dem Benutzer auferlegt werden, um eine Speicherbatterie großer Kapazität für die Speicherung überflüssiger Energie vorzusehen, hoch. Weiterhin kann ein Teil der überschüssigen Energie verschwendet werden aufgrund des Auftretens von Lade- oder Entladeverlusten überschüssiger Energie durch die Speicherbatterie.  However, when using a method of energy leveling as described in Patent Document 2 and Patent Document 3, the cost and burden imposed on the user to provide a large-capacity storage battery for storing unnecessary power are high. Furthermore, some of the excess energy may be wasted due to the occurrence of charge or discharge losses of excess energy by the storage battery.

Unter Berücksichtigung der vorgenannten Umstände ist es die Aufgabe der vorliegenden Offenbarung, in dem Fall eines Energieerzeugungssystems, bei dem die erzeugte Energiemenge in Anhängigkeit von Wetterbedingungen variiert und das mit einem Energieversorgungsnetz verbunden ist, die überschüssige Energie bei niedrigeren Kosten als den Kosten der Verwendung einer Speicherbatterie effektiv zu nutzen und eine Energienivellierung zu erreichen.  In view of the above circumstances, it is the object of the present disclosure, in the case of a power generation system in which the amount of energy generated varies depending on weather conditions and connected to a power grid, the excess energy at a lower cost than the cost of using a storage battery to effectively use and achieve energy leveling.

Lösung des Problems the solution of the problem

Um die vorgenannte Aufgabe zu lösen, ist die Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach der vorliegenden Offenbarung eine Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung zur Steuerung des Betriebs einer Wasserheizvorrichtung vom elektrischen Typ, die in jedem von zumindest einem Haus installiert ist, und die ein Energieerzeugungssystem, das Energie in einer Menge, die in Abhängigkeit von Wetterbedingungen variiert, erzeugt, mit einem Energieversorgungsnetz verbindet. Die Managementvorrichtung zum Betrieb einer Wasserheizvorrichtung enthält eine Betriebsdaten-Erwerbsvorrichtung, eine Wetterinformations-Erwerbsvorrichtung, eine Wohnungsbelegungs-Bestimmungsvorrichtung, eine Überschussenergie-Vorhersagevorrichtung und eine Betriebsplan-Bestimmungsvorrichtung. Die Betriebsdatenerwerbsvorrichtung erwirbt Betriebsdaten, die einen Betriebszustand einer elektrischen Vorrichtung, die in der Wohnung installiert ist, anzeigen. Die Wetterinformations-Erwerbsvorrichtung erwirbt Wetterinformationen für einen Bereich, der den Wohnungsort enthält. Die Wohnungsbelegungs-Bestimmungsvorrichtung bestimmt auf der Grundlage der Betriebsdaten, ob sich ein Bewohner in der Wohnung aufhält, und erzeugt Wohnungsbelegungs-Zustandsdaten, die den bestimmten Wohnungsbelegungszustand anzeigen. Die Überschussenergie-Vorhersagevorrichtung sagt auf der Grundlage der Wetterinformationen Überschussenergie des Energieerzeugungssystems voraus, und erzeugt Vorhersage-Überschussenergiedaten, die einen Zeitschlitz und einen Wert der vorhergesagten Überschussenergie anzeigen. Die Betriebsplan-Bestimmungsvorrichtung bestimmt auf der Grundlage der Wohnungsbelegungs-Zustandsdaten und der Vorhersage-Überschussenergiedaten einen Betriebsplan zum Bewirken der Operation der Wasserheizvorrichtung der Wohnung, und erzeugt Betriebsplaninformationen, die den bestimmten Betriebsplan anzeigen.  In order to achieve the above object, the water heater operating device according to the present disclosure is a management device for operating a water heater for controlling the operation of an electric type water heater installed in each of at least one house and which is a power generation system , which connects energy in an amount that varies depending on weather conditions, connects to a power grid. The management apparatus for operating a water heater includes an operation data acquiring apparatus, a weather information acquiring apparatus, a home occupancy determiner, an excess energy prediction apparatus, and an operation plan determiner. The operation data acquisition apparatus acquires operation data indicating an operation state of an electric apparatus installed in the home. The weather information acquirer acquires weather information for an area containing the place of residence. The housing occupancy determiner determines whether a resident is in the flat based on the operation data, and generates housing occupancy status data indicating the determined occupancy status. The surplus energy prediction apparatus predicts surplus energy of the power generation system based on the weather information, and generates prediction surplus energy data indicating a time slot and a value of the predicted surplus energy. The operation plan determiner determines, based on the occupancy state data and the prediction surplus energy data, an operation plan for effecting the operation of the water heater of the dwelling, and generates operation plan information indicating the particular operation plan.

Vorteilhafte Wirkungen der Erfindung Advantageous Effects of the Invention

Gemäß der vorliegenden Offenbarung kann in dem Fall des Energieerzeugungssystems, bei dem die erzeugte Energiemenge in Abhängigkeit von Wetterbedingungen variiert, und das mit dem Energieversorgungsnetz verbunden ist, der Wasserheizvorgang der Wasserheizvorrichtung vom elektrischen Typ für eine oder mehrere Wohnungen mit einer optimalen Zeitsteuerung durchgeführt werden, die Überschussenergie kann wirksam bei geringeren Kosten als in dem Fall der Verwendung der Speicherbatterie genutzt werden, und eine Energienivellierung kann erzielt werden. According to the present disclosure, in the case of the power generation system in which the amount of power generated varies depending on weather conditions and which is connected to the power grid, the water heating operation of the electric-type water heater for one or more homes can be performed with optimum timing Excess energy can be effectively utilized at a lower cost than in the case of using the storage battery, and energy leveling can be achieved.

Kurzbeschreibung der Zeichnungen Brief description of the drawings

1 ist eine Zeichnung, die ein Energiesystem zum Verbinden eines Solarenergie-Erzeugungssystems mit einem Energieversorgungsnetz gemäß dem Ausführungsbeispiel 1 der vorliegenden Offenbarung illustriert; 1 FIG. 12 is a drawing illustrating a power system for connecting a solar power generation system to a power grid according to Embodiment 1 of the present disclosure; FIG.

2 ist ein Blockschaltbild, das ein Konfigurationsbeispiel für ein Managementsystem für den Betrieb einer Wasserheizvorrichtung gemäß dem Ausführungsbeispiel 1 illustriert; 2 FIG. 15 is a block diagram illustrating a configuration example of a management system for operating a water heater according to Embodiment 1; FIG.

3 ist eine Zeichnung, die ein Beispiel für eine Funktionskonfiguration eines Wohnungs-Gateway nach dem Ausführungsbeispiel 1 illustriert; 3 Fig. 12 is a drawing illustrating an example of a functional configuration of a home gateway according to Embodiment 1;

4 ist eine Zeichnung, die ein Beispiel für eine Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert; 4 Fig. 12 is a drawing illustrating an example of a water heater according to Embodiment 1;

5 ist eine Zeichnung, die ein anderes Beispiel für die Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert; 5 Fig. 12 is a drawing illustrating another example of the water heater of Embodiment 1;

6. ist eine Zeichnung, die ein Beispiel für eine Funktionskonfiguration einer Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert; 6 , is a drawing illustrating an example of a functional configuration of a management apparatus for operating a water heater according to the embodiment 1;

7 ist eine Zeichnung, die ein Beispiel für Betriebsdaten gemäß dem Ausführungsbeispiel 1 illustriert; 7 FIG. 15 is a drawing illustrating an example of operation data according to Embodiment 1; FIG.

8 ist ein Flussdiagramm, das ein Beispiel für eine Betriebsdaten-Sammelverarbeitung für den Betrieb einer elektrischen Vorrichtung nach dem Ausführungsbeispiel 1 illustriert; 8th FIG. 10 is a flowchart illustrating an example of operation data collection processing for the operation of an electric device according to Embodiment 1; FIG.

9 ist ein Flussdiagramm, das ein Beispiel für eine Operation einer Wohnungsbelegungszustands-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 1 illustriert; 9 FIG. 10 is a flowchart illustrating an example of an operation of a home occupancy state determination processing according to Embodiment 1; FIG.

10 ist ein Flussdiagramm, das ein Beispiel für die Operation der Wohnungsbelegungszustands-Vorhersageverarbeitung nach dem Ausführungsbeispiel 1 illustriert; 10 Fig. 10 is a flowchart illustrating an example of the operation of the home occupancy state prediction processing according to Embodiment 1;

11 ist eine Zeichnung, die ein Beispiel für Daten des täglichen Wohnungsbelegungszustands nach dem Ausführungsbeispiel 1 illustriert; 11 Fig. 12 is a drawing illustrating an example of daily occupancy state data according to Embodiment 1;

12 ist ein Flussdiagramm, das ein Beispiel für die Operation der Überschussenergie-Vorhersageverarbeitung nach dem Ausführungsbeispiel 1 illustriert; 12 Fig. 10 is a flowchart illustrating an example of the operation of the surplus energy prediction processing according to Embodiment 1;

13 ist ein Flussdiagramm, das ein Beispiel für die Operation der Betriebsplan-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 1 illustriert; 13 is a flowchart illustrating an example of the operation of the operating schedule Determination processing illustrated in the embodiment 1;

14 ist ein Flussdiagramm, das ein Beispiel für die Operation der Betriebsplan-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 2 der vorliegenden Offenbarung illustriert; und 14 FIG. 10 is a flowchart illustrating an example of the operation of the operation plan determination processing according to Embodiment 2 of the present disclosure; FIG. and

15 ist ein Blockschaltbild, das ein Beispiel für eine Hardware-Konfiguration der Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach einem Ausführungsbeispiel der vorliegenden Offenbarung illustriert. 15 FIG. 10 is a block diagram illustrating an example of a hardware configuration of the water heater operating device according to an embodiment of the present disclosure. FIG.

Beschreibung von Ausführungsbeispielen Description of exemplary embodiments

In den nachfolgenden Ausführungsbeispielen werden Beispiele für die Anwendung der vorliegenden Offenbarung auf jede Einheit von gemeinsam genutzten Gebäuden, in denen mehrere Haushalte aufgenommen sind, wie Apartments und dergleichen, beschrieben, wobei jede Einheit in der Lage ist, unabhängig als eine Wohnung verwendet zu werden, oder für zwei oder mehr Haushalte von alleinstehenden Häusern und gemeinschaftlichen Häusern, in denen jeder Haushalt in einem vorgeschriebenen Bereich angeordnet ist. In the following embodiments, examples of the application of the present disclosure will be described to each unit of shared buildings in which a plurality of households are accommodated, such as apartments and the like, each unit being capable of being independently used as an apartment, or for two or more households of single and common households where each household is located in a prescribed area.

Ausführungsbeispiel 1  Embodiment 1

1 ist eine Zeichnung, die ein Energiesystem zum Verbinden eines Solarenergie-Erzeugungssystems mit einem Energieversorgungsnetz gemäß dem Ausführungsbeispiel 1 der vorliegenden Offenbarung illustriert. Von einem Energieversorgungsnetz 21 eines Energieunternehmens erworbene Elektrizität und selbsterzeugte Elektrizität, die von einem Solarpanel 22 über einen Energiekonditionierer 23 geliefert wird, wird zu einem Verteilungspult 25 geliefert. Weiterhin ist ein Energiemesser 24 mit dem Energiekonditionierer 23 verbunden, und wenn aufgrund von Solarenergieerzeugung ein Energieüberschuss vorhanden ist, sind ein Energierückfluss und der Verkauf von Elektrizität möglich. 1 FIG. 10 is a drawing illustrating a power system for connecting a solar power generation system to a power grid according to Embodiment 1 of the present disclosure. FIG. From a power supply network 21 Electricity purchased from an energy company and self-generated electricity generated by a solar panel 22 via an energy conditioner 23 is delivered to a distribution board 25 delivered. Furthermore, it is an energy meter 24 with the energy conditioner 23 and if there is an excess of energy due to solar energy production, energy return and the sale of electricity are possible.

2 ist ein Blockschaltbild, das ein Konfigurationsbeispiel für ein Managementsystem für den Betrieb einer Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert. Ein Managementsystem 100 für den Betrieb einer Wasserheizvorrichtung enthält eine Managementvorrichtung 1 für den Betrieb einer Heizvorrichtung und ein Wohnungs-Gateway 3. Das Wohnungs-Gateway 3 ist in jeder von einer Gesamtheit von N unabhängigen Wohnungen, die in einer Gruppe von Wohnungen 1–N innerhalb eines vorgeschriebenen Bereichs installiert. Weiterhin kann in dem vorliegenden Ausführungsbeispiel, obgleich die Anzahl von Wohnungen als zwei oder mehr betrachtet wird, N gleich 1 sein. Die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung und jedes der Wohnungs-Gateways 3 sind durch ein Kommunikationsnetz 2 auf Funkbasis, Leitungsbasis oder kombinierter Funk-/Leitungsbasis miteinander verbunden. Weiterhin kann das Kommunikationsnetz 2 eine allgemeine öffentliche Kommunikationsleitung, eine unabhängige dedizierte Kommunikationsleitung oder eine Kombination derartiger Leitungen verwenden. 2 FIG. 15 is a block diagram illustrating a configuration example of a management system for operating a water heater according to Embodiment 1. FIG. A management system 100 for the operation of a water heater includes a management device 1 for the operation of a heater and a housing gateway 3 , The apartment gateway 3 is in each of a total of N independent apartments installed in a group of apartments 1-N within a prescribed area. Further, in the present embodiment, although the number of dwellings is regarded as two or more, N may be equal to one. The management device 1 for the operation of the water heater and each of the apartment gateways 3 are through a communication network 2 radio-based, line-based or combined radio / line base interconnected. Furthermore, the communication network 2 use a general public communication line, an independent dedicated communication line, or a combination of such lines.

Das Solarpanel 22, der Energiekonditionierer 23, der Energiemesser 24 und das Verteilungspult 25, die in 1 illustriert sind, können mit einer Gruppe von Wohnungen innerhalb eines vorbestimmten Bereichs für eine kombinierte Verwendung durch die Gruppe verbunden sein, oder eine jeweilige Anordnung dieser Komponenten kann mit jeder Wohnung (von N Wohnungen) verbunden sein. Weiterhin können Wohnungen, die mit Solarenergie-Erzeugungssystemen ausgestattet sind, zusammen mit Wohnungen, die nicht mit Solarenergie-Erzeugungssystemen ausgestattet sind, existieren. The solar panel 22 , the energy conditioner 23 , the energy meter 24 and the distribution board 25 , in the 1 may be associated with a group of apartments within a predetermined area for combined use by the group, or a respective arrangement of these components may be associated with each apartment (of N apartments). Furthermore, flats equipped with solar energy generation systems can coexist with flats that are not equipped with solar energy generation systems.

In dem Beispiel nach 2 sind ein Fernsehgerät 5, ein Klimagerät 6, eine Beleuchtungsvorrichtung und eine Wasserheizvorrichtung 8 in jeder Wohnung als elektrische Vorrichtungen installiert, um den Bewohnern vorbestimmte Funktionen zu bieten, und jede der elektrischen Vorrichtungen ist mit einer Kommunikationsvorrichtung 4 hiervon verbunden. Jede der Kommunikationsvorrichtungen 4 ist durch ein Wohnungsnetz mit dem Wohnungs-Gateway 3 verbunden. In the example below 2 are a TV 5 , an air conditioner 6 , a lighting device and a water heater 8th in each apartment installed as electrical devices to provide the occupants with predetermined functions, and each of the electrical devices is equipped with a communication device 4 connected by this. Each of the communication devices 4 is through a housing network with the apartment gateway 3 connected.

Das Wohnungs-Gateway 3 erwirbt von der Kommunikationsvorrichtung 4 jeder elektrischen Vorrichtung Betriebsdaten, die den Betriebszustand des Fernsehgeräts 5, des Klimageräts 6, der Beleuchtungsvorrichtung 7 und der Wasserheizvorrichtung 8, die in derselben Wohnung installiert sind, anzeigen, und überwacht den Betriebszustand jeder elektrischen Vorrichtung. Die in jeder Wohnung installierten elektrischen Vorrichtungen sind nicht auf diese Beispiele beschränkt, und jede Vorrichtung, die in der Lage ist, durch ein Wohnungsnetz überwacht und gesteuert zu werden, kann als die elektrische Vorrichtung verwendet werden, wie ein Lüftergebläse, eine IH-Kochheizvorrichtung, elektrischer Küchenherd, Kühlschrank, Reiskocher, Personalcomputer, Raumklimagerät, Fußbodenheizvorrichtung, motorgetriebenes Fenster, motorgetriebene Jalousie, und dergleichen. The apartment gateway 3 acquires from the communication device 4 Each electrical device operating data indicating the operating status of the TV 5 , the air conditioner 6 , the lighting device 7 and the water heater 8th , which are installed in the same apartment, and monitors the operating status of each electrical device. The electric devices installed in each home are not limited to these examples, and any device capable of being monitored and controlled by a home network can be used as the electric device such as a fan blower, an IH cooking heater, electric kitchen stove, refrigerator, rice cooker, personal computer, room air conditioner, underfloor heater, motorized window, motorized blind, and the like.

Die Energiemessvorrichtung 9 ist mit dem Wohnungsnetz verbunden und sammelt von CT-Sensoren und dergleichen, die an den Unterbrechern jeder Wohnung an jeder Zweigschaltung angebracht sind, Energieverbrauchsdaten, die den Gesamtenergieverbrauch jeder Wohnung anzeigen, enthaltend den Energieverbrauch von elektrischen Vorrichtungen, die nicht mit dem Wohnungsnetz verbunden sind, eher als den Energieverbrauch von elektrischen Vorrichtungen, die mit dem Wohnungsnetz verbunden sind. Weiterhin sammelt die Energiemessvorrichtung 9 auch Energieerzeugungsdaten, die die durch Solarenergieerzeugung erzeugte Energie anzeigen. The energy measuring device 9 is connected to the housing network and collects, from CT sensors and the like attached to the breakers of each apartment at each branch circuit, energy consumption data indicating the total energy consumption of each apartment including the power consumption of electrical devices not connected to the housing network rather than the power consumption of electrical devices connected to the housing network. Furthermore, the energy meter collects 9 also energy generation data indicating the energy produced by solar energy production.

Das Wohnungs-Gateway 3 erwirbt die Energieerzeugungsdaten und die Energieverbrauchsdaten von der Kommunikationsvorrichtung 4 der Energiemessvorrichtung 9. Das Wohnungs-Gateway 3 überträgt ein Datum und die Zeit einer Sammlung, die die Zeit und das Datum der Sammlung anzeigen, zu den von der Kommunikationsvorrichtung 4 jeder elektrischen Vorrichtung erworbenen Betriebsdaten, und die Energieverbrauchsdaten und die Energieerzeugungsdaten, die von der Kommunikationsvorrichtung 4 der Energiemessvorrichtung 9 erworben wurden (die Betriebsdaten, Energieverbrauchsdaten und Energieerzeugungsdaten werden nachfolgend insgesamt als "Betriebsdaten der elektrischen Vorrichtung" bezeichnet), und das WOhnungs-Gateway 3 überträgt die sich ergebenden Betriebsdaten der elektrischen Vorrichtung zu der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung. The apartment gateway 3 acquires the power generation data and the power consumption data from the communication device 4 the energy meter 9 , The apartment gateway 3 transmits a date and time of a collection indicating the time and date of the collection to those of the communication device 4 operating data acquired by each electrical device, and the power consumption data and the power generation data generated by the communication device 4 the energy meter 9 have been purchased (the operation data, power consumption data and power generation data are hereinafter collectively referred to as "operation data of the electric device"), and the waking gateway 3 transmits the resulting operation data of the electric device to the management device 1 for the operation of the water heater.

Die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung bestimmt auf der Grundlage der von außerhalb erworbenen Wetterinformationen und der Betriebsdaten der elektrischen Vorrichtung, die von jedem in jeder der Wohnungen installierten Wohnungs-Gateways 3 erworben wurden, den Betriebsplan der in jeder Wohnung installierten Wasserheizvorrichtung 8. Die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung sendet die Planinformationen, die den bestimmten Operationsplan anzeigen, zu dem Wohnungs-Gateway 3 der entsprechenden Wohnung. Das Wohnungs-Gateway 3 steuert auf der Grundlage der von der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung empfangenen Planinformationen den Wasserheizbetrieb der Wasserheizvorrichtung 8. The management device 1 for the operation of the water heater determined on the basis of the weather information acquired from outside and the operation data of the electric device of each apartment gateway installed in each of the apartments 3 the operating plan of the water heater installed in each apartment 8th , The management device 1 for operation of the water heater, the schedule information indicating the particular operation plan is sent to the apartment gateway 3 the corresponding apartment. The apartment gateway 3 controls on the basis of the management device 1 plan information received for the operation of the water heater, the water heating operation of the water heater 8th ,

3 ist eine Zeichnung, die ein Beispiel für eine Funktionskonfiguration des Wohnungs-Gateways nach dem Ausführungsbeispiel 1 illustriert. Das Wohnungs-Gateway 3 enthält eine Energiedaten-Erwerbsvorrichtung 31, eine Betriebsdaten-Erwerbsvorrichtung 32, eine Wohnungs-Gateway-Kommunikationsvorrichtung 33 und eine Wasserheizvorrichtung-Steuereinheit 34. Die in jeder der Wohnungen 1–N installierten WOhnungs-Gateways 3 haben eine ähnliche Funktionskonfiguration. Die Kommunikationsvorrichtung 4 aus 3 ist weggelassen. 3 FIG. 12 is a drawing illustrating an example of a functional configuration of the apartment gateway according to Embodiment 1. FIG. The apartment gateway 3 contains an energy data acquisition device 31 , an operating data acquisition device 32 , a home gateway communication device 33 and a water heater control unit 34 , The home gateway installed in each of the apartments 1-N 3 have a similar functional configuration. The communication device 4 out 3 is omitted.

Die Energiedaten-Erwerbsvorrichtung 31 erwirbt die Energieverbrauchsdaten und die Energieerzeugungsdaten von der Energiemessvorrichtung 9. Die Energieverbrauchsdaten sind beispielsweise Daten, die die verbrauchte Energie des Fernsehgeräts 5, des Klimageräts 6, der Beleuchtungsvorrichtung 7 und der Wasserheizvorrichtung 8, die mit dem Wohnungsnetz verbunden sind, anzeigen, und Daten, die die verbrauchte Energie eines Trockners, eines Staubsaugers und dergleichen, die nicht mit dem Wohnungsnetz verbunden sind, anzeigen. The energy data acquisition device 31 acquires the power consumption data and the power generation data from the power meter 9 , The energy consumption data is, for example, data representing the consumed power of the TV 5 , the air conditioner 6 , the lighting device 7 and the water heater 8th indicating the connected to the housing network, and data indicating the consumed energy of a dryer, a vacuum cleaner and the like, which are not connected to the housing network.

Die Betriebsdaten-Erwerbsvorrichtung 32 erwirbt die Betriebsdaten, die den Betriebszustand jeweils des Fernsehgeräts 5, des Klimageräts 6, der Beleuchtungsvorrichtung 7 und der Wasserheizvorrichtung 8 anzeigen. Die Betriebsdaten sind Daten wie ein Energie-Einschalt-/Ausschalt-Zustand und eine Lautstärke des Fernsehgeräts 5, ein Operationsmodus, eine Einstelltemperatur und geplante Zeiten für das Einschalten/Ausschalten des Klimageräts 6, und eine gespeicherte Heißwassermenge und eine Einstelltemperatur der Wasserheizvorrichtung 8. The operating data acquisition device 32 acquires the operating data, the operating status of each of the TV 5 , the air conditioner 6 , the lighting device 7 and the water heater 8th Show. The operating data is data such as a power on / off state and a volume of the TV 5 , an operation mode, a set temperature, and scheduled times for turning on / off the air conditioner 6 , and a stored amount of hot water and a setting temperature of the water heater 8th ,

Die Energiedaten-Erwerbsvorrichtung 31 kann auf der Grundlage der von der Betriebsdaten-Erwerbsvorrichtung 32 erworbenen Betriebsdaten den Energieverbrauch von jeder elektrischen Vorrichtung berechnen durch Verwenden der Informationen, die einen vorher gespeicherten Energieverbrauch pro Zeiteinheit anzeigen. Weiterhin braucht, wenn eine Übertragung der Energieverbrauchsdaten der elektrischen Vorrichtung zu dem Wohnungs-Gateway 3 durch die elektrische Vorrichtung möglich ist, die Übertragung der Energieverbrauchsdaten nicht notwendigerweise über die Energiemessvorrichtung 9 zu erfolgen. The energy data acquisition device 31 can on the basis of the operating data acquisition device 32 acquired operating data calculate the power consumption of each electrical device by using the information indicating a previously stored power consumption per unit time. Further, when transmission of the power consumption data of the electric device to the home gateway needs 3 is possible by the electrical device, the transmission of the energy consumption data is not necessarily via the energy measuring device 9 to be done.

Die Wohnungs-Gateway-Kommunikationsvorrichtung 33 ist eine Kommunikationsschnittstelle, die eine Kommunikation von verschiedenen Typen von Daten mit der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung über beispielsweise das Kommunikationsnetz 2 durchführt, und die Wohnungs-Gateway-Kommunikationsvorrichtung 33 sendet die von der Energiedaten-Erwerbsvorrichtung 31 und der Betriebsdaten-Erwerbsvorrichtung 32 erworbenen Betriebsdaten der elektrischen Vorrichtung zu der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung. Weiterhin empfängt die Wohnungs-Gateway-Kommunikationsvorrichtung 33 die Planinformationen von der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung. The apartment gateway communication device 33 is a communication interface that allows communication of different types of data with the management device 1 for the operation of the water heater via, for example, the communication network 2 performs, and the apartment gateway communication device 33 sends the from the energy data acquirer 31 and the operation data acquisition device 32 acquired operating data of the electrical device to the management device 1 for the operation of the water heater. Furthermore, the home gateway communication device receives 33 the plan information from the management device 1 for the operation of the water heater.

Die Wasserheizvorrichtungs-Steuereinheit 34 sendet auf der Grundlage der von der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung durch die Wohnungs-Gateway-Kommunikationsvorrichtung 33 empfangenen Planinformationen Steuerbefehle zu der Wasserheizvorrichtung 8 und steuert die Wasserheizoperation. The water heater control unit 34 sends on the basis of the from the management device 1 for the operation of the water heater by the home gateway communication device 33 received plan information control commands to the water heater 8th and controls the water heating operation.

4 ist eine Zeichnung, die ein Beispiel für die Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert. In dem Beispiel von 1 sind in der Wasserheizvorrichtung 8 eine Heizvorrichtung 801 vom Wärmepumpentyp und ein Heißwasser-Speichertank 802 durch einen Wasserströmungs-Durchgang 803 miteinander verbunden. In der Heizvorrichtung 801 vom Wärmepumpentyp wird Wärme aus der Luft durch ein Medium in einem Verdampfer 814 absorbiert, dass Medium wird durch Kompression in einem Kompressor 811 auf eine noch höhere Temperatur erwärmt und das erwärmte Medium wird zu einem Wärmetauscher 812 befördert. Das durch den Wasserströmungs-Durchgang 803 hindurchgehende Wasser wird durch eine Zirkulationspumpe 804 in den Wärmetauscher 812 gepumpt, durch Wärmetausch mit einem Wasserkühlungsmedium des Wärmetauschers 812 erwärmt und zu dem Heißwasser-Speichertank 802 geliefert. Das Expansionsventil 813 der Heizvorrichtung 801 vom Wärmepumpentyp ermöglicht eine Expansion des Hochdruckmediums und bewirkt eine Wiederverflüssigung des Mediums. 4 is a drawing showing an example of the water heater after the Embodiment 1 illustrated. In the example of 1 are in the water heater 8th a heater 801 of heat pump type and a hot water storage tank 802 through a water flow passage 803 connected with each other. In the heater 801 The heat pump type is heat from the air through a medium in an evaporator 814 This medium absorbs by compression in a compressor 811 heated to an even higher temperature and the heated medium becomes a heat exchanger 812 promoted. That through the water flow passage 803 passing water is through a circulation pump 804 in the heat exchanger 812 pumped, by heat exchange with a water cooling medium of the heat exchanger 812 heated and to the hot water storage tank 802 delivered. The expansion valve 813 the heater 801 of the heat pump type allows expansion of the high-pressure medium and causes a re-liquefaction of the medium.

Die Heißwasser-Speichermenge des Heißwasser-Speichertanks 802 wird durch eine Heißwasserspeicher-Sensorgruppe 821 überwacht. Die Heißwasserspeicher-Sensorgruppe 821 sendet Informationen, die die Heißwasser-Speichermenge des Heißwasserspeichertanks 802 anzeigen, zu der Betriebsdaten-Erwerbsvorrichtung 32 des Wohnungs-Gateway 3. Weiterhin sendet die Heizvorrichtung 801 vom Wärmepumpentyp die den Betriebszustand anzeigenden Betriebsdaten zu der Betriebsdaten-Erwerbsvorrichtung 32. Die Heizvorrichtung 801 vom Wärmepumpentyp arbeitet als Reaktion auf einen von der Wasserheizvorrichtungs-Steuereinheit 34 gesendeten Steuerbefehl. The hot water storage volume of the hot water storage tank 802 is through a hot water storage sensor group 821 supervised. The hot water storage sensor group 821 sends information showing the hot water storage amount of the hot water storage tank 802 to the operating data acquisition device 32 of the apartment gateway 3 , Furthermore, the heater sends 801 of the heat pump type, the operation state indicating operation data to the operation data acquisition device 32 , The heater 801 heat pump type operates in response to one of the water heater control unit 34 sent control command.

5 ist eine Zeichnung, die ein anderes Beispiel für die Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert. In dem Beispiel von 5 enthält die Wasserheizvorrichtung 8 zusätzlich zu der Struktur der in 4 illustrierten Wasserheizvorrichtung 8 einen Heizkörper 805, eine Fußbodenheizung 806 und ein Strömungsdurchgangs-Einstellventil 807. Die in 5 illustrierte Wasserheizvorrichtung 8 verwendet eine Öffnungs-/Schließ-Betätigung des Strömungsdurchgangs-Einstellventils 807 entweder zum Zirkulieren des durch die Heizvorrichtung 801 vom Wärmepumpentyp erwärmten heißen Wassers zu dem Heißwasserspeichertank 802 oder zu einer Heizungsanlage enthaltend den Heizkörper 805 und die Fußbodenheizung 806. Das heißt, die in 5 illustrierte Wasserheizvorrichtung 8 ist sowohl mit einer Wasserheizfunktion als auch mit einer Raumheizfunktion ausgestattet. Betriebsdaten, die die Ventilrichtung anzeigen, das heißt, Anzeigen ob eine Heißwasserzuführung zu der Wasserheizvorrichtung 8 oder zu der Raumheizung stattfindet, werden durch das Strömungsdurchgangs-Einstellventil 807 zu der Betriebsdaten-Erwerbsvorrichtung 32 gesendet. Das Strömungsdurchgangs-Einstellventil 807 öffnet und schließt als Reaktion auf den von der Wasserheizvorrichtungs-Steuereinheit 34 gesendeten Steuerbefehl. 5 FIG. 14 is a drawing illustrating another example of the water heater of Embodiment 1. FIG. In the example of 5 contains the water heater 8th in addition to the structure of in 4 illustrated water heater 8th a radiator 805 , a floor heating 806 and a flow passage adjusting valve 807 , In the 5 illustrated water heater 8th uses an opening / closing operation of the flow passage adjusting valve 807 either to circulate through the heater 801 heat pump type heated hot water to the hot water storage tank 802 or to a heating system containing the radiator 805 and the underfloor heating 806 , That is, the in 5 illustrated water heater 8th is equipped with both a water heating function and a room heating function. Operating data indicating the valve direction, that is, indicating whether a hot water supply to the water heater 8th or space heating takes place, through the flow passage adjustment valve 807 to the operating data acquisition device 32 Posted. The flow passage adjustment valve 807 opens and closes in response to that from the water heater control unit 34 sent control command.

Weiterhin sind, obgleich 4 und 5 Beispiele für die Erzeugung von heißem Wasser durch die Heizvorrichtung 801 vom Wärmepumpentyp illustrieren, diese Beispiele nicht beschränkend, und die Wasserheizvorrichtung kann jede Wasserheizvorrichtung vom elektrischen Typ sein, die Elektrizität zum Erzeugen von heißem Wasser verwendet, wie eine Wasserheizvorrichtung, die heißes Wasser durch Verwendung einer elektrischen Heizvorrichtung erzeugt. Furthermore, though 4 and 5 Examples of the generation of hot water by the heater 801 illustrate the heat pump type, not limiting these examples, and the water heater may be any electric-type water heater that uses electricity for generating hot water, such as a water heater that generates hot water by using an electric heater.

6 ist eine Zeichnung, die ein Beispiel für eine Funktionskonfiguration der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 illustriert. Die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung enthält eine Kommunikationsvorrichtung 11, eine Wohnungsbelegungs-Bestimmungsvorrichtung 12, eine Wetterinformations-Erwerbsvorrichtung 13, einen Speicher 14, eine Wohnungsbelegungs-Vorhersagevorrichtung 15, eine Vorhersagevorrichtung 16 für überschüssige Energie und eine Planbestimmungsvorrichtung 17. 6 FIG. 12 is a drawing illustrating an example of a functional configuration of the management apparatus for operating the water heater according to Embodiment 1. FIG. The management device 1 for the operation of the water heater includes a communication device 11 , a home occupancy determining device 12 , a weather information acquisition device 13 , a store 14 , an apartment occupancy prediction facility 15 , a predictor 16 for excess energy and a scheduling device 17 ,

Die Kommunikationsvorrichtung 11 ist eine Kommunikationsschnittstelle, die das Senden und das Empfangen von verschiedenen Typen von Daten über beispielsweise das Kommunikationsnetz 2 durchführt. Die Kommunikationsvorrichtung 11 speichert die Betriebsdaten der elektrischen Vorrichtung, die von jedem der Wohnungs-Gateways 3 empfangen werden, in dem Speicher 14. Die Wohnungsbelegungs-Bestimmungsvorrichtung 12 bestimmt auf der Grundlage der in dem Speicher 14 akkumulierten Betriebsdaten über die elektrische Vorrichtung den Wohnungsbelegungszustand des in jeder Wohnung lebenden Bewohners während einer vorbestimmten Einheitszeitperiode und erzeugt die Wohnungsbelegungs-Zustandsdaten, die den bestimmten Wohnungsbelegungszustand anzeigen. The communication device 11 is a communication interface that transmits and receives various types of data over, for example, the communications network 2 performs. The communication device 11 stores the operating data of the electrical device coming from each of the apartment gateways 3 be received in the memory 14 , The Housing Determination Device 12 determined on the basis of in the memory 14 accumulated operation data on the electric device, the housing occupancy state of the resident living in each apartment during a predetermined unit time period and generates the Wohnungsbelegungs status data indicating the specific housing occupancy state.

Beispielsweise erfolgt für eine betrachtete Wohnung, wenn eine Änderung des Energieverbrauchs und eine Veränderung des Betriebszustands jeder elektrischen Vorrichtung in einer gewissen vorbestimmten Zeiteinheit stattfinden, die Bestimmung, dass der Wohnungsbelegungszustand in der vorgeschriebenen Zeiteinheit "belegt" ist, und wenn keine derartige Änderung stattfindet, erfolgt die Bestimmung, dass der Wohnungsbelegungszustand in der vorgeschriebenen Zeiteinheit "nicht belegt" ist. Die Wohnungsbelegungs-Bestimmungsvorrichtung 12 speichert die erzeugten Wohnungsbelegungszustandsdaten in dem Speicher 14. For example, for a considered dwelling, when a change of the power consumption and a change in the operating state of each electric apparatus take place in a certain predetermined time unit, the determination that the dwelling state is "occupied" in the prescribed time unit and no such change takes place is made the provision that the occupancy status in the prescribed unit of time is "not occupied". The Housing Determination Device 12 stores the generated housing occupancy status data in the memory 14 ,

In dem vorliegenden Ausführungsbeispiel wird der Wohnungsbelegungszustand, der anzeigt, ob der Bewohner die Wohnung belegt, durch den Wert "1" oder "0" angezeigt. Der Zustand, in welchem der Bewohner die Wohnung belegt, wird durch "0" angezeigt, und der Zustand, in welchem der Bewohner die Wohnung nicht belegt, wird durch "1" angezeigt, und dieser Wert wird als "Zustandswert" bezeichnet. Hier zeigt die vorbestimmte Zeiteinheit eine Bestimmungsperiode der Bestimmung des Wohnungsbelegungszustands durch die Wohnungsbelegungs-Bestimmungsvorrichtung 12 an, und kann jede Zeitperiode sein, die länger als eine Signalempfangsperiode des Empfangens der Betriebsdaten der elektrischen Vorrichtung durch die Kommunikationsvorrichtung 11 ist. Beispielsweise werden 60 Minuten als die Bestimmungsperiode verwendet, und eine Minute wird als die Signalempfangsperiode der Betriebsdaten der elektrischen Vorrichtung verwendet. In diesem Fall bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12 den Wohnungsbelegungszustand auf der Grundlage des Trends eines 60 Minuten-Periodenbereichs der Betriebsdaten der elektrischen Vorrichtung. In the present embodiment, the housing occupancy state indicating whether the occupant occupies the apartment is indicated by the value "1" or "0". The state in which the occupant occupies the apartment is indicated by "0", and the state in which the occupant does not occupy the apartment is indicated by "1", and this value is referred to as "state value". Here, the predetermined time unit shows a determination period of the determination of the home occupancy state by the home occupancy determining device 12 and may be any time period longer than a signal reception period of receiving the operation data of the electric device by the communication device 11 is. For example, 60 minutes is used as the determination period, and one minute is used as the signal reception period of the operation data of the electric device. In this case, the home occupancy determining device determines 12 the home occupancy state based on the trend of a 60-minute period range of the operation data of the electric device.

In dem vorliegenden Ausführungsbeispiel sammelt die Energiemessvorrichtung 9 die Energieverbrauchsdaten der elektrischen Vorrichtung, und die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung verwendet die gesammelten Energieverbrauchsdaten, um den Wohnungsbelegungszustand zu bestimmen. Jedoch ist diese Konfiguration nicht beschränkend, und die Energiemessvorrichtung 9 kann verwendete Mengen Daten für Gebrauchsgüter wie Gas und Wasser sammeln, und die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung kann derartige verwendete Mengen Daten für die Bestimmung des Wohnungsbelegungszustands verwenden. In the present embodiment, the energy measuring device collects 9 the power consumption data of the electric device, and the management device 1 for the operation of the water heater uses the collected energy consumption data to determine the occupancy state. However, this configuration is not limiting, and the energy meter 9 can collect used amounts of data for commodities such as gas and water, and the management device 1 For the operation of the water heater, such used amounts may use data for determining the occupancy state.

Die Wetterinformations-Erwerbsvorrichtung 13 erwirbt durch die Kommunikationsvorrichtung 11 die Wetterinformationen für die Vergangenheit, die Gegenwart und die Zukunft des Bereichs, der den Ort jeder Wohnung enthält. Die Wetterinformationen sind Informationen wie die Außenlufttemperatur, Feuchtigkeit und meteorologische Informationen. Derartige erworbenen Wetterinformationen werden in dem Speicher 14 gespeichert und als Daten gesammelt. The weather information acquisition device 13 acquired by the communication device 11 the weather information for the past, present and future of the area containing the location of each dwelling. The weather information is information such as the outside air temperature, humidity and meteorological information. Such acquired weather information is stored in the memory 14 stored and collected as data.

Der Speicher 14 speichert die von dem Wohnungs-Gateway 3 empfangenen Betriebsdaten der elektrischen Vorrichtung, die von der Wohnungsbelegungs-Bestimmungsvorrichtung 12 erzeugten Wohnungsbelegungs-Zustandsdaten und die von der Wetterinformations-Erwerbsvorrichtung 13 erworbenen Wetterinformationen. Weiterhin speichert der Speicher 14 Datums- und Zeitdaten, die von einer Quelle wie dem Internet oder einer Standardzeit-Funkwellen-Sendestation erworben wurden, und die ein Datum und eine Zeit anzeigen, die das Jahr, den Monat, den Tag, die Stunde, die Minute die Sekunde sowie den Tag der Woche enthalten, und die Datums- und Zeitendaten sind assoziiert mit dem Datum und der Zeit des Sammelns der Betriebsdaten der elektrischen Vorrichtung. 7 ist eine Zeichnung, die ein Beispiel für die Betriebsdaten gemäß dem Ausführungsbeispiel 1 illustriert. Die Betriebsdaten enthalten das Datum und die Zeit des Sammelns, die das Datum und die Zeit des Sammelns der Betriebsdaten anzeigen, und einen Identifizierer für den Vorrichtungstyp, der den Typ der elektrischen Vorrichtung anzeigt, sowie einen Zustand 1, einen Zustand 2 und einen Zustand 3, die den Betriebszustand der elektrischen Vorrichtung anzeigen. Beispielsweise zeigt der Zustand 1 des Fernsehgeräts einen EIN-/AUS-Zustand der Energie an, der Zustand 2 zeigt eine Lautstärkeeinstellung an, und der Zustand 3 zeigt einen für das Sehen ausgewählten Kanal an. The memory 14 stores those from the apartment gateway 3 received operating data of the electrical device, the of the home occupancy determining device 12 generated housing occupation state data and that of the weather information acquisition device 13 acquired weather information. Furthermore, the memory stores 14 Date and time data acquired from a source such as the Internet or a standard time radio wave broadcasting station, and displaying a date and time including year, month, day, hour, minute and second Day of the week, and the date and time data are associated with the date and time of collecting the operating data of the electrical device. 7 is a drawing illustrating an example of the operating data according to the embodiment 1. The operation data includes the date and time of collection indicating the date and time of collecting the operation data, and an identifier of the device type indicating the type of the electrical device, as well as a state 1, a state 2, and a state 3 indicating the operating state of the electrical device. For example, the TV's state 1 indicates an ON / OFF state of power, state 2 indicates a volume setting, and state 3 indicates a channel selected for viewing.

Die Wohnungsbelegungs-Bestimmungsvorrichtung 12 bezieht sich auf die Betriebsdaten innerhalb der vorgeschriebenen Zeiteinheit und bestimmt, dass der Wohnungsbelegungszustand in der vorgeschriebenen Einheitszeit "belegt" ist, wenn eine Änderung von zumindest einem von dem Zustand 1, dem Zustand 2 oder dem Zustand 3 der elektrischen Vorrichtung stattfindet. Weiterhin ist die Anzahl der durch die Betriebsdaten angezeigten Betriebszustände der elektrischen Vorrichtung nicht auf drei beschränkt, und diese Anzahl kann jede Zahl sein, die gleich oder größer als 1 ist. The Housing Determination Device 12 refers to the operation data within the prescribed time unit and determines that the home occupancy state is "occupied" in the prescribed unit time when there is a change of at least one of the state 1, the state 2, or the state 3 of the electric device. Further, the number of operating states of the electric device indicated by the operation data is not limited to three, and this number may be any number equal to or greater than one.

Die Wohnungsbelegungs-Vorhersagevorrichtung 15 sagt auf der Grundlage der Datums- und der Zeitdaten, der Wetterinformationen und der Wohnungsbelegungs-Zustandsdaten des Speichers 14 den künftigen Wohnungsbelegungszustand für jede Wohnung vorher und erzeugt vorhersage-Wohnungsbelegungs-Zustandsdaten, die den vorhergesagten Wohnungsbelegungszustand anzeigen. Weiterhin kann die Wohnungsbelegungs-Vorhersagevorrichtung 15 den künftigen Wohnungsbelegungszustand jeder Wohnung auf der Grundlage allein der Wohnungsbewegungszustandsdaten vorhersagen. The Housing Forecasting Device 15 says based on the date and time data, the weather information and the home occupancy state data of the memory 14 predicts the future home occupancy status for each home and generates prediction occupancy status data indicating the predicted occupancy status. Furthermore, the home occupancy prediction device 15 predict the future housing status of each dwelling based on the housing movement data alone.

Die Vorhersagevorrichtung 16 für überschüssige Energie sagt auf der Grundlage der Datums- und Zeitdaten und der Energieverbrauchsdaten und der in den Betriebsdaten der elektrischen Vorrichtung enthaltenen Energieerzeugungsdaten des Speichers 14 eine künftige Überschussenergie jeder Wohnung vorher und erzeugt Vorhersagedaten für die überschüssige Energie, die einen Wert der vorhergesagten Überschussenergie anzeigen (nachfolgend als die "Vorhersage-Überschussenergie" bezeichnet). The prediction device 16 for surplus power, on the basis of the date and time data and the power consumption data and the power generation data of the memory included in the operation data of the electric device 14 predicts a future surplus energy of each dwelling and generates surplus energy prediction data indicating a value of the predicted surplus energy (hereinafter referred to as the "prediction surplus energy").

Die Planbestimmungsvorrichtung 17 bestimmt auf der Grundlage der Vorhersage-Wohnungsbelegungs-Zustandsdaten, die von der Wohnungsbelegungs-Vorhersagevorrichtung 15 erzeugt wurden, und der Vorhersagedaten für die überschüssige Energie, die von der Überschussenergie-Vorhersagevorrichtung 16 erzeugt wurden, den Betriebsplan zum Durchführen der Wasserheizoperation der in jeder Wohnung installierten Wasserheizvorrichtung, und erzeugt Planinformationen, die den bestimmten Betriebsplan anzeigen. The scheduling device 17 determined on the basis of the prediction occupancy condition data obtained by the Apartment occupancy predictor 15 and the excess energy prediction data generated by the excess energy prediction device 16 is generated, the operation plan for performing the water heating operation of the water heater installed in each dwelling, and generates plan information indicating the particular operation plan.

Die Kommunikationsvorrichtung 11 sendet die von der Planbestimmungsvorrichtung 17 Planinformationen zu dem Wohnungsgateway 3 der entsprechenden Wohnung. Die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung verwaltet in dieser Weise Zeitschlitze für die Wasserzeugungsvorrichtung 8 jeder Wohnung, um die Wasserheizoperation durchzuführen. The communication device 11 sends the from the planning device 17 Plan information for the apartment gateway 3 the corresponding apartment. The management device 1 for the operation of the water heater manages in this way time slots for the water generating device 8th each apartment to perform the water heating operation.

Die von dem Managementsystem 100 für den Betrieb der Wasserheizvorrichtung nach dem vorliegenden Ausführungsbeispiel durchgeführte verschiedene Verarbeitung wird als nächstes beschrieben. Jede Verarbeitung wird periodisch mit einer vorbestimmten Periode durchgeführt. Das Wohnungs-Gateway 3 führt eine "Sammelverarbeitung" für die "Betriebsdaten der elektrischen Vorrichtung" durch. The of the management system 100 Various processing performed for the operation of the water heater of the present embodiment will be described next. Each processing is performed periodically with a predetermined period. The apartment gateway 3 performs a "collective processing" for the "operation data of the electric device".

Sammelverarbeitung für die Betriebsdaten der elektrischen Vorrichtung 8 ist ein Flussdiagramm, das ein Beispiel für die Operation der Sammelverarbeitung für die Betriebsdaten der elektrischen Vorrichtung nach dem Ausführungsbeispiel 1 illustriert. Die Betriebsdaten-Erwerbsvorrichtung 32 des Wohnungs-Gateways 3 erwirbt die jeweiligen Betriebsdaten von dem Fernsehgerät 5, dem Klimagerät 6, der Beleuchtungsvorrichtung 7 und der Wasserheizvorrichtung 8 (Schritt S11). Die Energiedaten-Erwerbsvorrichtung 31 erwirbt die Energieverbrauchsdaten und die Energieerzeugungsdaten von der Energiemessvorrichtung 9 (Schritt S12). Collective processing for the operating data of the electrical device 8th FIG. 12 is a flowchart illustrating an example of the operation of collecting processing for the operation data of the electric device according to Embodiment 1. FIG. The operating data acquisition device 32 of the apartment gateway 3 acquires the respective operating data from the TV 5 , the air conditioner 6 , the lighting device 7 and the water heater 8th (Step S11). The energy data acquisition device 31 acquires the power consumption data and the power generation data from the power meter 9 (Step S12).

Die Wohnungs-Gateway-Kommunikationsvorrichtung 33 sendet als die Betriebsdaten der elektrischen Vorrichtung die Betriebsdaten, die Energieverbrauchsdaten und die Energieerzeugungsdaten, die durch die Betriebsdaten-Erwerbsvorrichtung 32 und die Energiedaten-Erwerbsvorrichtung 31 erworben wurden, durch das Kommunikationsnetz 2 zu der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung, und die Verarbeitung endet. The apartment gateway communication device 33 As the operation data of the electric device, transmits the operation data, the power consumption data, and the power generation data generated by the operation data acquisition device 32 and the energy data acquisition device 31 acquired through the communications network 2 to the management device 1 for the operation of the water heater, and the processing ends.

Die Zeitsteuerung des Wohnungs-Gateways 3, das die Sammelverarbeitung für die Betriebsdaten der elektrischen Vorrichtung durchführt, wird beispielsweise auf eine Zyklusperiode von einer Minute gesetzt, wie vorher beschrieben wurde. Jedoch ist diese Konfiguration nicht beschränkend, und die Zyklusperiode kann kürzer als die Bestimmungsperiode sein. Weiterhin kann beispielsweise, eher als das aufeinanderfolgende Senden der Betriebsdaten der elektronischen Vorrichtung wie im Schritt S13, ein Speicher für das Wohnungs-Gateway 3 vorgesehen sein, und die Betriebsdaten für die elektrische Vorrichtung können in festen Zeitperiodenabschnitten wie Abschnitten von einem Tag gespeichert werden. In diesem Fall können die Betriebsdaten der elektrischen Vorrichtung von einem festen Zeitperiodenabschnitt durch die Wohnungs-Gateway-Kommunikationsvorrichtung 33 miteinander gruppiert und durch die Wohnungs-Gateway-Kommunikationsvorrichtung 33 zu der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung gesendet werden. Weiterhin kann, falls erforderlich, eine Verarbeitung wie eine Durchschnittsbildung, Integration und dergleichen durchgeführt werden, um die Werte innerhalb der festen Zeitperiode zu verarbeiten. The timing of the apartment gateway 3 for example, which performs the aggregation processing for the operation data of the electric device is set to a cycle period of one minute as described previously. However, this configuration is not limitative, and the cycle period may be shorter than the determination period. Further, for example, rather than successively sending the operation data of the electronic device as in step S13, a memory for the home gateway 3 be provided, and the operating data for the electrical device can be stored in fixed time period sections such as sections of a day. In this case, the operation data of the electric device may be from a fixed time period section through the home gateway communication device 33 grouped together and by the home gateway communication device 33 to the management device 1 be sent for the operation of the water heater. Further, if necessary, processing such as averaging, integration, and the like may be performed to process the values within the fixed time period.

Die Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 führt die "Wohnungsbelegungszustands-Bestimmungsverarbeitung”, die "Wohnungsbelegungszustands-Vorhersageverarbeitung”, die "Wetterinformations-Erwerbsverarbeitung”, die "Überschussenergie-Vorhersageverarbeitung” und die "Betriebsplan-Bestimmungsverarbeitung” durch. The management device for the operation of the water heater 1 executes the "occupancy state determination processing", "occupancy state prediction processing", "weather information acquisition processing", "excess energy prediction processing", and "operation plan determination processing".

Wohnungsbelegungszustands-Bestimmungsverarbeitung  Occupancy status determination process

9 ist ein Flussdiagramm, das ein Beispiel für die Operation der Wohnungsbelegungszustands-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 1 illustriert. Die Wohnungsbelegungs-Bestimmungsvorrichtung 12 der Managementvorrichtung für die Operation der Wasserheizvorrichtung 1 liest aus dem Speicher 14 einen einzelnen Bestimmungsperiodenabschnitt der Betriebsdaten der elektronischen Vorrichtung für die unmittelbar vorhergehende Bestimmungsperiode (Schritt S21). Die Wohnungsbelegungs-Bestimmungsvorrichtung 12 bezieht sich auf den einzelnen Bestimmungsperiodenabschnitt der Betriebsdaten der elektronischen Vorrichtung für die unmittelbar vorhergehende Bestimmungsperiode und bestimmt, ob eine Änderung in dem Betriebszustand des Fernsehgeräts 5 vorliegt (Schritt S22). 9 FIG. 12 is a flowchart illustrating an example of the operation of the home occupancy state determination processing according to Embodiment 1. FIG. The Housing Determination Device 12 the management device for the operation of the water heater 1 reads from the memory 14 a single determination period portion of the operation data of the electronic device for the immediately preceding determination period (step S21). The Housing Determination Device 12 refers to the single determination period portion of the operation data of the electronic device for the immediately preceding determination period, and determines whether a change in the operating state of the television 5 is present (step S22).

Wenn die Bestimmung ergibt, dass eine Änderung des Betriebszustands des Fernsehgeräts 5 vorliegt (JA in Schritt S22), bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12, dass der Bewohner die Wohnung belegt und setzt den Zustandswert dieses Zeitschlitzes der Wohnungsbelegungs-Zustandsdaten auf "0” (Schritt S27), und die Verarbeitung endet. In dem Fall, dass keine Änderung in dem Betriebszustand des Fernsehgeräts 5 vorliegt (NEIN im Schritt S22), bezieht sich die Wohnungsbelegungs-Bestimmungsvorrichtung 12 auf den einzelnen Bestimmungsperiodenabschnitt der Betriebsdaten der elektronischen Vorrichtung für die unmittelbar vorhergehende Bestimmungsperiode, und bestimmt, ob eine Änderung in dem Betriebszustand des Klimageräts 6 vorliegt (Schritt S23). If the determination indicates that a change in the operating condition of the TV 5 is present (YES in step S22), the housing occupancy determination device determines 12 in that the occupant occupies the apartment, and sets the state value of this time slot of the occupancy state data to "0" (step S27), and the processing ends, in the event that there is no change in the operating state of the television 5 is present (NO in step S22), the occupancy determination device refers 12 on the single determination period portion of the operating data of the electronic device for the immediate previous determination period, and determines whether a change in the operating condition of the air conditioner 6 is present (step S23).

Wenn die Bestimmung ergibt, dass eine Änderung des Betriebszustands des Klimageräts 6 vorliegt (JA im Schritt S23), bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12, dass der Bewohner die Wohnung belegt, und setzt den Zustandswert dieses Zeitschlitzes der Wohnungsbelegungs-Zustandsdaten auf "0” (Schritt S27), und die Verarbeitung wird beendet. In dem Fall, dass keine Änderung in dem Betriebszustand des Klimageräts 6 vorliegt (NEIN im Schritt S23), bezieht sich die Wohnungsbelegungs-Bestimmungsvorrichtung 12 auf den einzelnen Bestimmungsperiodenabschnitt der Betriebsdaten der elektronischen Vorrichtung für die unmittelbar vorhergehende Bestimmungsperiode und bestimmt, ob eine Änderung in dem Betriebszustand der Beleuchtungsvorrichtung 7 vorliegt (Schritt S24). If the determination indicates that a change in the operating condition of the air conditioner 6 is present (YES in step S23), the housing occupancy determination device determines 12 in that the occupant occupies the apartment, and sets the state value of this time slot of the occupancy condition data to "0" (step S27), and the processing is terminated., in the event that there is no change in the operation state of the air conditioner 6 is present (NO in step S23), the housing occupancy determiner refers 12 on the single determination period portion of the operation data of the electronic apparatus for the immediately preceding determination period, and determines whether a change in the operation state of the lighting apparatus 7 is present (step S24).

Wenn die Bestimmung ergibt, dass eine Änderung des Betriebszustands der Beleuchtungsvorrichtung 7 vorliegt (JA im Schritt S24), bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12, dass der Bewohner die Wohnung belegt und setzt den Zustandswert dieses Zeitschlitzes der Wohnungsbelegungs-Zustandsdaten auf "0” (Schritt S27), und die Verarbeitung endet. In dem Fall, dass keine Änderung in dem Betriebszustand der Beleuchtungsvorrichtung 7 (NEIN im Schritt S24) vorliegt, bezieht sich die Wohnungsbelegungs-Bestimmungsvorrichtung 12 auf den einzelnen Bestimmungsperiodenabschnitt der Betriebsdaten der elektronischen Vorrichtung für die unmittelbar vorhergehende Bestimmungsperiode, und bestimmt, ob eine Änderung in dem Betriebszustand der Wasserheizvorrichtung 8 vorliegt (Schritt S25). If the determination indicates that a change in the operating state of the lighting device 7 is present (YES in step S24), the housing occupancy determination device determines 12 in that the occupant occupies the apartment and sets the state value of this time slot of the occupancy state data to "0" (step S27), and the processing ends. In the case that there is no change in the operation state of the lighting device 7 (NO in step S24), the housing occupancy determiner refers 12 to the single determination period portion of the operation data of the electronic device for the immediately preceding determination period, and determines whether a change in the operation state of the water heater 8th is present (step S25).

Wenn die Bestimmung ergibt, dass eine Änderung des Betriebszustands der Wasserheizvorrichtung 8 vorliegt (JA im Schritt S25), bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12, dass der Bewohner die Wohnung belegt, und setzt den Zustandswert dieses Zeitschlitzes der Wohnungsbelegungs-Zustandsdaten auf "0” (Schritt S27), und die Verarbeitung wird beendet. In dem Fall, dass keine Änderung in dem Betriebszustand der Wasserheizvorrichtung 8 vorliegt (NEIN im Schritt S25), das heißt, in dem Fall, in welchem keine Änderung in dem Betriebszustand irgendeiner der mit dem Wohnungsnetz verbundenen elektrischen Vorrichtungen vorliegt, bezieht sich die Wohnungsbelegungs-Bestimmungsvorrichtung 12 auf den einzelnen Bestimmungsperiodenabschnitt der Betriebsdaten der elektronischen Vorrichtung für die unmittelbar vorhergehende Bestimmungsperiode und bestimmt, ob eine Änderung der Energieverbrauchsmenge für die gesamte Wohnung oder für jede der Zweigschaltungen vorliegt (Schritt S26). Diese Verarbeitung ermöglicht die Erfassung einer Änderung des Betriebszustands der elektrischen Vorrichtungen, die nicht mit dem Wohnungsnetz verbunden sind, und nicht Gegenstand der Betriebsdatensammlung durch das Wohnungs-Gateway 3 sind. If the determination indicates that a change in the operating state of the water heater 8th is present (YES in step S25), the housing occupancy determination device determines 12 in that the occupant occupies the apartment, and sets the state value of this time slot of the occupancy state data to "0" (step S27), and the processing is terminated., in the case that there is no change in the operation state of the water heater 8th is present (NO in step S25), that is, in the case where there is no change in the operating state of any of the electrical devices connected to the housing network, the occupancy determination device refers 12 to the single determination period portion of the operation data of the electronic apparatus for the immediately preceding determination period, and determines whether there is a change in the amount of power consumption for the entire home or each of the branch circuits (step S26). This processing makes it possible to detect a change in the operating state of the electrical devices that are not connected to the housing network and not the operating data collection by the housing gateway 3 are.

Wenn die Bestimmung ergibt, dass eine Änderung der Energieverbrauchsmenge der gesamten Wohnung vorliegt, oder dass eine Änderung der Energieverbrauchsmenge irgendeiner der Zweigschaltungen vorliegt (JA im Schritt S26), bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12, dass der Bewohner die Wohnung belegt und setzt den Zustandswert dieses Zeitschlitzes der Wohnungsbelegungs-Zustandsdaten auf "0” (Schritt S27), und die Verarbeitung wird beendet. In dem Fall, dass keine Änderung der Energieverbrauchsmenge der gesamten Wohnung oder der Energieverbrauchsmenge irgendeiner der Zweigschaltungen vorliegt (NEIN im Schritt S26), bestimmt die Wohnungsbelegungs-Bestimmungsvorrichtung 12, dass der Bewohner die Wohnung nicht belegt, und setzt den Zustandswert dieses Zeitschlitzes der Wohnungsbelegungs-Zustandsdaten auf "1” (Schritt S28), und die Verarbeitung wird beendet. If the determination is made that there is a change in the amount of energy consumption of the entire apartment or there is a change in the amount of power consumption of any of the branch circuits (YES in step S26), the occupancy determination device determines 12 in that the resident occupies the apartment, and sets the state value of this time slot of the occupancy state data to "0" (step S27), and the processing is terminated In the event that there is no change in the total amount of energy consumption of the entire apartment or the energy consumption amount of any of the branch circuits is present (NO in step S26), the housing occupancy determination device determines 12 in that the occupant does not occupy the apartment, and sets the state value of this time slot of the occupancy state data to "1" (step S28), and the processing is terminated.

Die Zeitsteuerung der Durchführung der Wohnungsbelegungszustands-Bestimmungsverarbeitung durch die Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 ist beispielsweise auf einen 60-Minuten-Zyklus gesetzt, wie vorstehend beschrieben wurde. Jedoch ist diese Periode nicht beschränkend, und die Periode kann jede Periode sein, die länger als der Signalempfangszyklus für die Betriebsdaten der elektronischen Vorrichtung ist. The timing of performing the home occupancy state determination processing by the water heater operation management device 1 For example, it is set to a 60-minute cycle as described above. However, this period is not limitative, and the period may be any period longer than the signal reception cycle for the operation data of the electronic device.

Weiterhin können die elektronischen Vorrichtungen, die der Bestimmung des Wohnungsbelegungszustands in den Schritten S22 bis S25 unterzogen werden, wie erforderlich geändert werden. Beispielsweise ermöglicht in einem Fall, wie solchem, in welchem eine voreingestellte Zeit derart gesetzt wird, dass der Betrieb des Klimageräts 6 vor der Belegung der Wohnung beginnt, damit eine angemessene Temperatur in der Wohnung erreicht ist, wenn der Bewohner nach Hause zurückkehrt, eine vorheriger Ausschluss des Klimageräts 6 von den elektrischen Vorrichtungen, die der Bestimmung des Wohnungsbelegungszustands unterzogen sind, die Verhinderung einer fehlerhaften Bestimmung des Wohnungsbelegungszustands, die aufgrund einer Änderung des Betriebszustands einer elektrischen Vorrichtung, die betrieben wird, während der Bewohner die Wohnung nicht belegt, auftreten würde. Further, the electronic devices subjected to the determination of the home occupancy state in steps S22 to S25 may be changed as required. For example, in a case such as that in which a preset time is set so as to allow the operation of the air conditioner 6 before the occupancy of the apartment begins, so that a reasonable temperature is reached in the apartment when the resident returns home, a prior exclusion of the air conditioner 6 among the electric devices that are subjected to the determination of the home occupancy state, the prevention of an erroneous determination of the occupancy state that would occur due to a change in the operating state of an electrical device that operates while the occupant is not occupying the home.

Weiterhin kann die Schaltung, die der Bestimmung der Energieverbrauchsmenge im Schritt S26 unterzogen wird, in der gleichen Weise wie erforderlich geändert werden. Eine derartige Änderung ermöglicht die Verhinderung einer fehlerhaften Bestimmung des Wohnungsbelegungszustands, die aufgrund der Änderung des Betriebszustands einer elektrischen Vorrichtung, die betrieben wird, während der Bewohner die Wohnung nicht belegt, auftreten würde. Furthermore, the circuit subjected to the determination of the power consumption amount in step S26 may be changed in the same manner as required. Such Change makes it possible to prevent erroneous determination of the housing occupancy state that would occur due to the change of the operating state of an electrical device that operates while the occupant is not occupying the apartment.

Wohnungsbelegungszustands-Vorhersageverarbeitung  Occupancy condition prediction processing

10 ist ein Flussdiagramm, das ein Beispiel für die Operation der Wohnungsbelegungszustands-Vorhersageverarbeitung nach dem Ausführungsbeispiel 1 illustriert. Der Speicher 14 der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 kann einen 24-Stunden-Abschnitt der Wohnungsbelegungs-Zustandsdaten als tägliche Wohnungsbelegungs-Zustandsdaten gruppieren und speichern. Die Wohnungsbelegungs-Vorhersagevorrichtung 15 liest aus dem Speicher 14 aus dem jüngsten bestimmten, mehrere Tage umfassenden Abschnitt der täglichen Wohnungsbelegungs-Zustandsdaten die täglichen Wohnungsbelegungs-Zustandsdaten, die für ein Datum und eine Zeit anwendbar sind, die die gleichen wie ein Datum sind, das dem Setzen des Betriebsplans unterzogen wurde, oder die für eine bestimmte Bedingung wie dem Wochentag, das Wetter und dergleichen, anwendbar sind (Schritt S31). 10 FIG. 10 is a flowchart illustrating an example of the operation of the home occupancy state prediction processing according to Embodiment 1. FIG. The memory 14 the management device for the operation of the water heater 1 may group and store a 24-hour portion of the home occupancy status data as daily occupancy status data. The Housing Forecasting Device 15 reads from the memory 14 from the most recent, multi-day section of daily occupancy status data, the daily occupancy status data applicable to a date and time that are the same as a date that has been submitted to the setting of the operational plan or that for one certain condition such as the day of the week, the weather and the like are applicable (step S31).

11 ist eine Zeichnung, die ein Beispiel für die täglichen Wohnungsbelegungs-Zustandsdaten nach dem Ausführungsbeispiel 1 illustriert. Die täglichen Wohnungsbelegungs-Zustandsdaten enthalten das Bestimmungsdatum, stündliche Bestimmungszeiten und den Zustandswert jeder Bestimmungszeit. In dem Beispiel von 11 belegt der Bewohner die Wohnung von 09:00 bis 22:00 nicht. 11 FIG. 12 is a drawing illustrating an example of the daily occupancy condition data according to Embodiment 1. FIG. The daily occupancy status data includes the determination date, hourly determination times, and the status value of each determination time. In the example of 11 The occupant does not occupy the apartment from 09:00 to 22:00.

Die Wohnungsbelegungs-Vorhersagevorrichtung 15 berechnet für jede Bestimmungszeit einen Durchschnitt der Zustandswerte (Durchschnittszustandswert) der gelesenen täglichen Wohnungsbelegungs-Zustandsdaten (Schritt S32). Die Wohnungsbelegungs-Vorhersagevorrichtung 15 vergleicht den Durchschnittszustandswert mit einem voreingestellten Schwellenwert (Schritt S33). The Housing Forecasting Device 15 calculates, for each determination time, an average of the state values (average state value) of the read daily occupancy state data (step S32). The Housing Forecasting Device 15 compares the average state value with a preset threshold (step S33).

Wenn der Durchschnittszustandswert größer als der Schwellenwert ist (JA im Schritt S33), setzt die Wohnungsbelegungs-Vorhersagevorrichtung 15 den Zustandswert dieser Zeit der Vorhersage-Wohnungsbelegungs-Zustandsdaten auf "1” (Schritt S34), und die Verarbeitung endet. Wenn der Durchschnittszustandswert kleiner als der Schwellenwert ist (NEIN im Schritt S33), setzt die Wohnungsbelegungs-Vorhersagevorrichtung 15 den Zustandswert dieser Zeit der Vorhersage-Wohnungsbelegungs-Zustandsdaten auf "0” (Schritt S35), und die Verarbeitung wird beendet. If the average state value is larger than the threshold value (YES in step S33), the occupancy prediction device continues 15 the state value of this time of the prediction occupancy state data is "1" (step S34), and the processing ends If the average state value is smaller than the threshold value (NO in step S33), the occupancy prediction device continues 15 the state value of this time of the prediction dwelling state data is "0" (step S35), and the processing is ended.

Die Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 führt diese Verarbeitung (Schritte S31 bis S35) für die täglichen Wohnungsbelegungs-Zustandsdaten sämtlicher Wohnungen durch. The management device for the operation of the water heater 1 performs this processing (steps S31 to S35) for the daily occupancy status data of all apartments.

Genauer gesagt, in dem Fall der Vorhersage-Wohnungsbelegungs-Zustandsdaten für beispielsweise 07:00 bis 07:30 des vierten Mittwochs für die Wohnung 1, die auf der Grundlage der Wohnungsbelegungs-Zustandsdaten für den gleichen Monat und den gleichen Tag der Woche berechnet wurden, liest die Wohnungsbelegungs-Vorhersagevorrichtung 15 aus den täglichen Wohnungsbelegungs-Zustandsdaten der Wohnung 1 des jüngsten 21-Tage-Abschnitts (3 Wochen) die drei Wohnungsbelegungs-Zustandsdaten für 07:00 bis 07:30 an dem ersten, zweiten und dritten Mittwoch. Wenn der Wohnungsbelegungs-Zustandswert des ersten Mittwochs gleich "1 (nicht belegt)” ist, ist der Wohnungsbelegungs-Zustandswert des zweiten Mittwochs gleich "0 (belegt)”, und der Wohnungsbelegungs-Zustandswert des dritten Mittwochs gleich "1 (nicht belegt)”, ist der Durchschnittszustandswert gleich "0,66...”. More specifically, in the case of the prediction dwelling condition data for, for example, 07:00 to 07:30 of the fourth Wednesday for the dwelling 1 calculated on the basis of the dwelling condition data for the same month and the same day of the week, reads the occupancy prediction device 15 from the daily housing occupancy status data of apartment 1 of the most recent 21-day period (3 weeks) the three occupancy status data for 07:00 to 07:30 on the first, second and third Wednesday. If the first Wednesday's occupancy status value equals "1 (unoccupied)", the second Wednesday occupancy status value equals "0 (occupied)", and the third occupancy occupancy status value equals "1 (unoccupied)" , the average state value is "0.66 ...".

Hier sagt, wenn der Schwellenwert auf "0,5” gesetzt ist, dadurch, dass der Durchschnittszustandswert größer als der Schwellenwert ist, die Wohnungsbelegungs-Vorhersagevorrichtung 15 vorher, dass der Wohnungsbelegungszustand "nicht belegt” ist, und setzt den Zustandswert der Vorhersage-Wohnungsbelegungszustandsdaten für 07:00 bis 07:30 für den vierten Mittwoch auf "1”. Here, when the threshold is set to "0.5", by the average state value being larger than the threshold, the home occupancy prediction device is saying 15 before that the occupancy state is "not busy", and sets the state value of the prediction occupancy state data to "1" for 07:00 to 07:30 for the fourth Wednesday.

In der vorbeschriebenen Weise werden die Datums- und Zeitdaten von Bedingungen, die die gleichen sind, wie diejenigen das Tages, der dem Setzen des Betriebsplans unterzogen wird, zum Vorhersagen des vorhergesagten Wohnungsbelegungszustands verwendet, und somit kann der Lebensplan des Bewohners mit hoher Genauigkeit vorhergesagt werden. Weiterhin werden die Wetterinformationen für die Vorhersage des Wohnungsbelegungszustands verwendet, und somit kann die Vorhersagegenauigkeit weiter erhöht werden.  In the manner described above, the date and time data of conditions that are the same as those of the day undergone to set the operation plan are used for predicting the predicted occupancy state, and thus the resident's life plan can be predicted with high accuracy , Furthermore, the weather information is used for the prediction of the home occupancy state, and thus the prediction accuracy can be further increased.

Beispielsweise in dem Fall der Vorhersage-Wohnungsbelegungs-Zustandsdaten des 6. Juni in der Zeit von 18:00 bis 18:30, während der Regen vorhergesagt ist, die auf der Grundlage der Wohnungsbelegungs-Zustandsdaten eines vorhergehenden 5-Tage-Abschnitts, in welchem Regen fällt, berechnet wurden, liest die Wohnungsbelegungs-Vorhersagevorrichtung 15 aus den täglichen Wohnungsbelegungs-Zustandsdaten eines Hauses A des jüngsten 56-Tage-Abschnitts (8 Wochen) 5 tägliche Wohnungsbelegungs-Zustandsdaten für 18:00 bis 18:30 der unmittelbar vorhergehenden 5-Datumstage, in denen Regen fällt (5. Juni, 22. Mai, 21. Mai, 5. Mai und 30. April). Wenn die jeweiligen Zustandswerte der Wohnungsbelegungs-Zustandsdaten gleich "0”, "0”, "0”, "1” und "0” sind, dann ist der Durchschnittszustandswert gleich "0,2”. For example, in the case of the prediction occupancy state data of June 6, in the time from 18:00 to 18:30, while the rain is predicted, based on the occupancy state data of a preceding 5-day section, in which Rain drops, calculated, reads the Housing Forecasting device 15 from the daily occupancy status data of a house A of the recent 56-day period (8 weeks) 5 daily occupancy status data for 18:00 to 18:30 of the immediately preceding 5-date days in which rain falls (June 5, 22 May, May 21, May 5 and April 30). If the respective state values of the home occupancy state data is "0", "0", "0", "1", and "0", the average state value is "0.2".

Hier sagt, wenn der Schwellenwert auf "0,5” gesetzt ist, aufgrund dessen, dass der Durchschnittszustandswert kleiner als der Schwellenwert ist, die Wohnungsbelegungs-Vorhersagevorrichtung 15 vorher, dass der Wohnungsbelegungszustand "belegt” ist, und setzt den Zustandswert der Vorhersage-Wohnungsbelegungs-Zustandsdaten für 18:00 bis 18:30 des 6. Juni auf "0”. Here, when the threshold is set to "0.5", due to the average state value being smaller than the threshold, the home occupancy prediction device is saying 15 before that the occupancy state is "busy", and sets the state value of the prediction occupancy state data for 18:00 to 18:30 of June 6 to "0".

Der Schwellenwert zum Vorhersagen des Wohnungsbelegungszustands kann erforderlichenfalls geändert werden. Der Schwellenwert kann auf einen Wert wie 0,7 gesetzt werden, der größer als 0,5 ist, um die Bestimmung der Nichtbelegung schwieriger zu machen. Umgekehrt kann der Schwellenwert auf einen Wert wie 0,3 gesetzt werden, der kleiner als 0,5 ist, um die Bestimmung der Nichtbelegung leichter zu machen. Beispielsweise kann nur in dem Fall, in welchem eine Nichtbelegung in sämtlichen Zeitschlitzen, die der Bestimmung unterzogen werden, besteht, wenn gewünscht wird, den vorhergesagten Wohnungsbelegungszustand zu setzen, der Schwellenwert auf 1 gesetzt werden.  The threshold for predicting the occupancy state may be changed as necessary. The threshold may be set to a value such as 0.7, which is greater than 0.5, to make the determination of non-occupancy more difficult. Conversely, the threshold can be set to a value, such as 0.3, that is less than 0.5 to make the determination of non-occupancy easier. For example, only in the case where there is a non-occupancy in all timeslots undergoing the determination, when it is desired to set the predicted home occupancy state, the threshold value can be set to 1.

Die Wohnungsbelegungs-Vorhersagevorrichtung 15 der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 führt beispielsweise zu einem Zeitpunkt unmittelbar vor dem Tag, der dem Setzen des Betriebsplans unterzogen wird (zum Beispiel: um 23:00 des vorhergehenden Tags), die Wohnungsbelegungszustands-Vorhersageverarbeitung durch, um den Wohnungsbelegungszustand des folgenden Tages für jede Wohnung vorherzusagen. Die Durchführung der Wohnungsbelegungszustands-Vorhersageverarbeitung durch die Wohnungsbelegungs-Vorhersagevorrichtung 15 kann zu einem Zeitpunkt der Beendigung der Speicherung der erforderlichen Daten in dem Speicher 14 erfolgen. Jedoch ist die Durchführung der Wohnungsbelegungszustands-Vorhersageverarbeitung unmittelbar vorher dahingehend vorteilhaft, dass eine derartige Durchführung nicht die vorübergehende Speicherung der Vorhersage-Wohnungsbelegungs-Zustandsdaten in dem Speicher 14 erfordert, und eine Verringerung der Speicherkapazität des Speichers 14 ermöglicht. The Housing Forecasting Device 15 the management device for the operation of the water heater 1 For example, at a point in time immediately before the day that the operating plan is set (for example, at 23:00 of the previous day), the occupancy state prediction processing is performed to predict the occupancy state of the following day for each apartment. The execution of the home occupancy state prediction processing by the occupancy prediction device 15 may at a time the completion of storage of the required data in the memory 14 respectively. However, performing the occupancy state prediction processing immediately before is advantageous in that such a performance does not effect the temporary storage of the prediction occupancy state data in the memory 14 requires, and a reduction in the storage capacity of the memory 14 allows.

Weiterhin wird der vorhergesagte Wohnungsbelegungszustand bei dem vorliegenden Ausführungsbeispiel durch Vergleich zwischen dem Durchschnittszustandswert und dem Schwellenwert bestimmt. Jedoch kann anstelle der Vorhersage und der Verwendung eines Durchschnitts der Wohnungsbelegungszustand auf der Grundlage desjenigen aus mehreren Zustandswerten, der die größte Anzahl hat, "0” oder "1”, vorgesagt werden (auf der Mehrheit basierende Bestimmung).  Furthermore, the predicted occupancy state in the present embodiment is determined by comparing between the average state value and the threshold. However, instead of predicting and using an average, the home occupancy state may be predicated on the basis of that of a plurality of state values having the largest number, "0" or "1" (majority-based determination).

Überschussenergie-Vorhersageverarbeitung  Excess energy-prediction processing

12 ist ein Flussdiagramm, das ein Beispiel für die Operation der Überschussenergie-Vorhersageverarbeitung nach dem Ausführungsbeispiel 1 illustriert. Die Überschussenergie-Vorhersagevorrichtung 16 der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 liest die Wetterinformationen für den folgenden Tag aus dem Speicher 14 (Schritt S41). 12 FIG. 10 is a flowchart illustrating an example of the operation of the surplus power prediction processing according to Embodiment 1. FIG. The excess energy prediction device 16 the management device for the operation of the water heater 1 reads the weather information for the following day from memory 14 (Step S41).

Als nächstes zieht die Überschussenergie-Vorhersagevorrichtung 16 aus den in dem Speicher 14 gespeicherten Wetterinformationen der Vergangenheit einen Tag heraus, für den eine Ähnlichkeit hinsichtlich der Wetterinformationen für den folgenden Tag besteht (Schritt S42). Der Ausdruck "Tag, für den eine Ähnlichkeit hinsichtlich der Wetterinformationen für den folgenden Tag besteht”, bedeutet beispielsweise den Tag, für den Sonnenbestrahlungs-Vorhersagezeitschlitze des folgenden Tages vorhergehenden Sonnenbestrahlungs-Zeitschlitzen am ähnlichsten sind. Next, the excess energy prediction device pulls 16 out of those in the store 14 stored weather information of the past one day, for which there is a similarity in the weather information for the following day (step S42). For example, the term "day for which there is a similarity in the weather information for the following day" means the day for which sun exposure prediction time slots of the following day are most similar to previous sun exposure time slots.

Die Überschussenergie-Vorhersagevorrichtung 16 liest die Energieverbrauchsdaten und die Energieerzeugungsdaten jedes Zeitschlitzes des ähnlichen Tages aus dem Speicher 14 (Schritt S43) und sagt die Überschussenergie jedes Zeitschlitzes auf der Grundlage der gelesenen Energieverbrauchsdaten und Energieerzeugungsdaten vorher (Schritt S44). Die Überschussenergie-Vorhersagevorrichtung 16 erzeugt die Vorhersage-Überschussenergiedaten, die Werte der Vorhersage-Überschussenergie anzeigen (Schritt S45), und die Verarbeitung wird beendet. The excess energy prediction device 16 reads out the energy consumption data and the power generation data of each time slot of the similar day from the memory 14 (Step S43) and predicts the surplus energy of each time slot on the basis of the read power consumption data and power generation data (Step S44). The excess energy prediction device 16 generates the prediction surplus energy data indicating values of the prediction surplus energy (step S45), and the processing is ended.

Die Überschussenergie-Vorhersagevorrichtung 16 der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 führt beispielsweise die Überschussenergie-Vorhersageverarbeitung durch, um die Überschussenergie des folgenden Tages für jede Wohnung zu einer Zeit, die unmittelbar vor (beispielsweise 23:00 des vorhergehenden Tages) dem Setzen des Betriebsplans liegt, vorherzusagen. Die Werte der Vorhersage-Überschussenergie jedes Zeitschlitzes für jede Wohnung werden beispielsweise unter Verwendung der Formel 1 berechnet. The excess energy prediction device 16 the management device for the operation of the water heater 1 For example, performs the excess energy prediction processing to predict the surplus energy of the following day for each dwelling at a time immediately before (for example, 23:00 of the previous day) the setting of the operation plan. For example, the values of the prediction excess energy of each time slot for each dwelling are calculated using formula 1.

[Formel 1]  [Formula 1]

  • Psi = max((Pgi – (Pci – Pbi)), 0)Ps i = max ((Pg i - (Pc i - Pb i )), 0)

Hier zeigt Psi die Vorhersage-Überschussenergie der Wohnung i an (worin i eine Zahl von 1 bis N ist), die in einem gewissen Zeitschlitz auftritt. Pgi zeigt die erzeugte Energie der Wohnung i in demselben Zeitschlitz an. Pci zeigt den Energieverbrauch der Wohnung i in demselben Zeitschlitz an. Pbi zeigt den Energieverbrauch der Wasserheizvorrichtung 8 in diesem Zeitschlitz für den Fall an, in welchem dieser selbe Zeitschlitz in eine Wasserheizbetriebs-Vorhersagezeit fällt. Alle diese Daten werden in dem Schritt S43 aus dem Speicher 14 gelesen. In dem Fall, in welchem die Wohnung i nicht mit einem Solarenergie-Erzeugungssystem ausgestattet ist, ist der Wert von Pgi immer 0, und groß Psi ist in allen Zeitschlitzen = 0. Here, Ps i indicates the prediction surplus energy of the dwelling i (where i is a number from 1 to N) which is in a certain time slot occurs. Pg i indicates the generated energy of the apartment i in the same timeslot. Pc i indicates the energy consumption of the apartment i in the same timeslot. Pb i shows the energy consumption of the water heater 8th in this time slot in the case where this same time slot falls in a water heating operation prediction time. All of these data are out of memory in step S43 14 read. In the case where the dwelling i is not equipped with a solar power generation system, the value of Pg i is always 0, and large Ps i is = 0 in all timeslots.

Weiterhin ist das Verfahren des Herausziehens des Tages, für den eine Ähnlichkeit hinsichtlich der vergangenen Wetterinformationen mit dem folgenden Tag besteht, nicht auf den Fall des Herausziehens des Tages, für den die größte Ähnlichkeit in Bezug auf eine bestimmte meteorologische Bedingung besteht, beschränkt, und mehrere Tage (wie eine Gruppe aus 5 Tagen), die die größte Ähnlichkeit in Bezug auf bestimmte meteorologische Bedingungen haben, können herausgezogen werden. In diesem Fall können Durchschnittswerte der mehreren ähnlichen Tage gebildet werden, um die Vorhersage-Überschussenergie zu berechnen. Weiterhin kann das Verfahren der Berechnung der Vorhersage-Überschussenergie unterschiedlich sein, gemäß der Anwendung wie für die Energieerzeugungsdaten, indem ein Durchschnittswert von mehreren Tagen, in denen eine Ähnlichkeit der Wetterinformationen besteht, genommen wird, und für die Energieverbrauchsdaten, indem ein Durchschnittswert der Tage, die den gleichen Wochentag darstellen, genommen wird.  Furthermore, the method of extracting the day, which is similar to the past weather information with the following day, is not limited to the case of extracting the day for which the greatest similarity with respect to a certain meteorological condition exists, and several Days (such as a group of 5 days) that are most similar to specific meteorological conditions can be pulled out. In this case, averages of the several similar days may be formed to calculate the prediction excess energy. Further, the method of calculating the prediction surplus power may be different according to the application as for the power generation data by taking an average value of several days in which the weather information is similar, and for the energy consumption data by taking an average value of days, which represent the same day of the week is taken.

Betriebsplan-Bestimmungsverarbeitung 1 Operation plan determination processing 1

3 ist ein Flussdiagramm, das ein Beispiel für die Operation der Betriebsplan-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 1 illustriert. Die Planbestimmungsvorrichtung 17 der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung 1 summiert auf der Grundlage der Vorhersage-Überschussenergiedaten, die von der Überschussenergie-Vorhersageverarbeitung erzeugt wurden, die Vorhersageüberschussenergie Psi für jede Wohnung Zeitschlitz-für-Zeitschlitz und berechnet die Vorhersageüberschussenergie der Gruppe (Schritt S51). Jedoch wird in dem Fall, in welchem das Solarenergie-Erzeugungssystem von der Gruppe geteilt wird, die Vorhersageüberschussenergie der Gruppe durch die Gleichung der Formel 2 anstatt durch Psi insgesamt von allen Wohnungen berechnet. 3 FIG. 10 is a flowchart illustrating an example of the operation of the operation plan determination processing according to Embodiment 1. FIG. The scheduling device 17 the management device for the operation of the water heater 1 sums the prediction excess energy Ps i for each apartment, time slot-by-slot, based on the prediction excess energy data generated by the excess energy prediction processing, and calculates the group prediction excess energy (step S51). However, in the case where the solar energy generation system is shared by the group, the prediction surplus energy of the group is calculated by the equation of the formula 2, rather than by Ps i, in total of all apartments.

[Formel 2][Formula 2]

  • Figure DE112015006058T5_0002
    Figure DE112015006058T5_0002

Pg zeigt die erzeugte Energie des Solarenergie-Erzeugungssystems, das von der Gruppe geteilt wird, an. Die Planbestimmungsvorrichtung 17 bestimmt, ob es einen Zeitschlitz gibt (nachfolgend als der "Überschussenergieerzeugungs-Zeitschlitz” bezeichnet), in welchem die Vorhersageüberschussenergie der Gruppe größer als der oder gleich dem Energieverbrauch der Wasserheizoperation der Wasserheizvorrichtung 8 ist (Schritt S52). Wenn kein Überschussenergieerzeugungs-Zeitschlitz vorliegt (NEIN im Schritt S52), setzt die Planbestimmungsvorrichtung 17 die Wasserheizoperationen der Wasserheizvorrichtung 8 der Wohnungen, für die die Wasserheizoperation nicht zugeteilt ist, und setzt (alle Wohnungen) zu dem normalen Zeitschlitz (Nachtzeit) (Schritt S58). Pg indicates the generated energy of the solar power generation system shared by the group. The scheduling device 17 determines whether there is a time slot (hereinafter referred to as the "excess power generation time slot") in which the prediction surplus energy of the group is greater than or equal to the power consumption of the water heating operation of the water heater 8th is (step S52). If there is no excess power generation time slot (NO in step S52), the scheduling device sets 17 the water heating operations of the water heater 8th the apartments for which the water heating operation is not allocated, and sets (all apartments) to the normal time slot (night time) (step S58).

Wenn es einen Überschussenergieerzeugungs-Zeitschlitz gibt (JA im Schritt S52), bestimmt die Planbestimmungsvorrichtung 17 auf der Grundlage der von der Wohnungsbelegungszustands-Vorhersageverarbeitung erzeugten Vorhersage-Wohnungsbelegungs-Zustandsdaten, ob es einen Wohnung gibt, die in dem Überschussenergieerzeugungs-Zeitschlitz unbelegt ist (Schritt S53). If there is an excess power generation time slot (YES in step S52), the scheduling device determines 17 on the basis of the prediction dwelling state data generated by the dwelling state prediction processing, if there is a dwelling vacant in the surplus power generation time slot (step S53).

Wenn Wohnungen existieren, die in dem Überschussenergieerzeugungs-Zeitschlitz unbelegt sind (JA im Schritt S53), bestimmt die Planbestimmungsvorrichtung 17 aus derartigen Wohnungen eine Reihenfolge der Priorität durch Anordnen der Wohnungen in abfallender Reihenfolge von dem Haus mit der größten Menge von verbleibendem heißen Wasser (in aufsteigender Reihenfolge von dem Haus mit der geringsten Menge von heißem Wasser) (Schritt S54). Die Planbestimmungsvorrichtung 17 setzt die Wasserheizoperation der Wasserheizvorrichtung 8 der Wohnung mit der höchsten Priorität in den Überschussenergieerzeugungs-Zeitschlitz (Schritt S55). If there are apartments vacant in the surplus power generation time slot (YES in step S53), the scheduling device determines 17 from such apartments, a priority order by arranging the apartments in descending order from the house with the largest amount of remaining hot water (in ascending order from the house with the least amount of hot water) (step S54). The scheduling device 17 sets the water heating operation of the water heater 8th the highest priority apartment in the excess power generation time slot (step S55).

Nachfolgend schließt die Planbestimmungsvorrichtung 17 die Wohnungen, für die die Wasserheizoperation der Wasserheizvorrichtung 8 in den Überschussenergieerzeugungs-Zeitschlitz gesetzt ist, aus (Schritt S56) und subtrahiert den Energieverbrauch, der für die Wasserheizoperation der Wasserheizvorrichtungen 8 erforderlich ist, von der Vorhersageüberschussenergie des Überschussenergieerzeugungs-Zeitschlitzes (Schritt S57). Die Verarbeitung kehrt zum Schritt S52 zurück und die Schritte S52 bis S57 werden wiederholt, bis keine verbleibenden Überschussenergieerzeugungs-Zeitschlitze vorhanden sind, oder die Wasserheizoperation wird den Wasserheizvorrichtungen 8 aller Wohnungen, die in dem Überschussenergieerzeugungs-Zeitschlitz unbelegt sind, zugeteilt, und es gibt keine verbleibenden Wohnungen, die in dem Überschussenergieerzeugungs-Zeitschlitz unbelegt sind. Subsequently, the planning determination device closes 17 the apartments for which the water heating operation of the water heater 8th is set in the excess power generation time slot (step S56) and subtracts the power consumption required for the water heating operation of the water heaters 8th is required from the prediction surplus energy of the excess power generation time slot (step S57). The processing returns to step S52, and steps S52 to S57 are repeated until there are no remaining surplus power generation time slots, or the water heating operation becomes the water heaters 8th all dwellings unoccupied in the surplus power generation time slot allocated, and there are no remaining dwellings unoccupied in the surplus power generation time slot.

Wenn keine Überschussenergieerzeugungs-Zeitschlitze vorhanden sind (NEIN im Schritt S52), oder wenn keine unbelegten Wohnungen in dem Überschussenergieerzeugungs-Zeitschlitze vorhanden sind (NEIN im Schritt S52), oder wenn keine unbelegten Wohnungen in dem Überschussenergieerzeugungs-Zeitschlitz vorhanden sind (NEIN im Schritt S53), setzt die Planbestimmungsvorrichtung 17 die Wasserheizoperation der Wasserheizvorrichtungen 8 der verbleibenden nicht gesetzten Wohnungen, für die die Wasserheizoperation nicht zugeteilt ist, auf den normalen Zeitschlitz (Nachtzeit) (Schritt S58). If there are no surplus power generation slots (NO in step S52), or if there are no idle residences in the surplus power generation slots (NO in step S52), or if there are no idle residences in the surplus power generation slot (NO in step S53) ) sets the scheduling device 17 the water heating operation of the water heaters 8th the remaining unsettled dwellings for which the water heating operation is not allocated to the normal time slot (night time) (step S58).

Wenn andererseits in dem Überschussenergieerzeugungs-Zeitschlitz keine unbelegten Wohnungen vorhanden sind (NEIN im Schritt S53), setzt die Planbestimmungsvorrichtung 17 die Wasserheizoperation der Wasserheizvorrichtungen 8 der nicht gesetzten Wohnungen (alle Wohnungen), für die die Wasserheizoperation nicht zugeteilt ist, auf den normalen Zeitschlitz (Nachtzeit) (Schritt S58). Zu dieser Zeit braucht die Vorhersageüberschussenergie des Überschussenergieerzeugungs-Zeitschlitzes nicht auf Null revidiert zu werden, beispielsweise aus Bequemlichkeit. On the other hand, if there are no vacant apartments in the excess power generation timeslot (NO in step S53), the scheduling apparatus sets 17 the water heating operation of the water heaters 8th the non-set apartments (all apartments) for which the water heating operation is not allocated, on the normal time slot (night time) (step S58). At this time, the prediction surplus energy of the excess power generation time slot need not be revised to zero, for convenience, for example.

Die Planbestimmungsvorrichtung 17 erzeugt die Planinformationen, die die Wasserheizoperation für alle Wohnungen planen (Schritt S59), die Kommunikationsvorrichtung 11 sendet die Planinformationen über das Kommunikationsnetzt 2 zu den Wohnungs-Gateways 3 der entsprechenden Wohnungen (Schritt S60), und die Verarbeitung wird beendet. The scheduling device 17 generates the schedule information planning the water heating operation for all apartments (step S59), the communication device 11 sends the plan information via the communication network 2 to the apartment gateways 3 of the respective apartments (step S60), and the processing is ended.

Wenn die Wohnungs-Gateway-Kommunikationsvorrichtung des in jeder Wohnung installierten Wohnungs-Gateways 3 den Betriebsplan von der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung über das Kommunikationsnetz 2 empfängt, sendet die Wohnungs-Gateway-Kommunikationsvorrichtung 3 den Betriebsplan zu der Wasserheizvorrichtungs-Steuervorrichtung 34, und die Wasserheizvorrichtungs-Steuereinheit 34 steuert auf der Grundlage des Betriebsplans die Start- und Stoppzeiten der Wasserheizoperation der Wasserheizvorrichtung 8. When the home gateway communication device of the home gateway installed in each home 3 the operating plan from the management device 1 for the operation of the water heater via the communication network 2 receives, sends the apartment gateway communication device 3 the operation plan to the water heater control device 34 , and the water heater control unit 34 controls, on the basis of the operation plan, the start and stop times of the water heating operation of the water heater 8th ,

Weiterhin wird im Schritt S54 die Reihenfolge der Priorität bestimmt durch Anordnung in abfallender Reihenfolge von dem Haus mit der größten Menge von verbleibendem heißen Wasser (in aufsteigender Reihenfolge von der kleinsten Menge heißen Wassers), um einen Komfortverlust für die Bewohner zu vermeiden, und diese Anordnung wird verwendet, eine Reihenfolge der Priorität so zuzuweisen, dass sie die höchste ist, wenn die Wahrscheinlichkeit des Auftretens des Ausgehens von heißem Wasser gering ist. Das Verfahren zur Bestimmung der Reihenfolge der Priorität kann geändert werden, beispielsweise gemäß der Anwendung, wie in abfallender Reihenfolge mit der Energieverbrauchsmenge jeder Wohnung. Weiterhin wird, wenn nur eine einzelne Wohnung vorhanden ist, die Reihenfolge der Priorität der Wohnung automatisch auf die erste Priorität gesetzt.  Further, in step S54, the order of priority is determined by arranging in descending order from the house with the largest amount of remaining hot water (in ascending order of the smallest amount of hot water) to avoid loss of comfort to the occupants, and this arrangement It is used to assign a priority order so as to be the highest when the likelihood of occurrence of hot water leakage is small. The method for determining the order of priority may be changed, for example according to the application, as in descending order with the energy consumption amount of each dwelling. Furthermore, if there is only a single apartment, the order of priority of the apartment is automatically set to the first priority.

Die Planbestimmungsvorrichtung 17 der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung führt die Betriebsplan-Bestimmungsverarbeitung zu einer voreingestellten Zeit durch. The scheduling device 17 the management device 1 for the operation of the water heater, the operation plan determination processing performs at a preset time.

Obgleich bei dem vorliegenden Ausführungsbeispiel die Bestimmung, ob die Wohnung in dem Überschussenergieerzeugungs-Zeitschlitz unbelegt ist, auf der Grundlage der Vorhersage-Wohnungsbelegungs-Zustandsdaten, die bei der Wohnungsbelegungs-Zustands-Vorhersageverarbeitung erzeugt werden, erfolgt, ist diese Konfiguration nicht beschränkend. Beispielsweise kann in dem Fall, in welchem die Überschussenergie-Vorhersageverarbeitung zum Vorhersagen der Überschussenergie an dem folgenden Tag für jede Wohnung zu einer Zeit unmittelbar vor dem Setzen des Betriebsplans durchgeführt wird, die Bestimmung, ob die Wohnung unbelegt ist, auf der Grundlage von Wohnungsbelegungs-Zustandsdaten erfolgen, die in Echtzeit von der Wohnungsbelegungsbestimmungsvorrichtung 12 erzeugt werden. In diesem Fall ist das Vorsehen der Wohnungsbelegungs-Vorhersagevorrichtung 15 für die Managementvorrichtung 1 für den Betrieb der Heizvorrichtung nicht erforderlich. Although in the present embodiment, the determination of whether the dwelling in the excess power generation time slot is idle is made based on the prediction dwelling condition data generated in the dwelling state prediction processing, this configuration is not limitative. For example, in the case where the surplus power prediction processing for predicting the surplus power is performed on the following day for each dwelling at a time immediately before the operation plan is set, the determination of whether the dwelling is idle can be made on the basis of housing occupancy. Condition data is taken in real time from the home occupancy determining device 12 be generated. In this case, the provision of the home occupancy prediction apparatus is 15 for the management device 1 not required for the operation of the heater.

Wie vorstehend beschrieben ist, kann bei dem Managementsystem 100 für den Betrieb der Wasserheizvorrichtung nach dem Ausführungsbeispiel 1 in dem Fall des Energieerzeugungssystems, bei dem sich die erzeugte Energiemenge in Abhängigkeit von Wetterbedingungen ändert, und das mit dem Energieversorgungsnetz verbunden ist, die Wasserheizoperation der Wasserheizvorrichtung vom elektrischen Typ von einer oder mehreren Wohnungen optimal zeitgesteuert werden, Überschussenergie wird effektiv mit geringeren Kosten verwendet als in dem Fall der Verwendung einer Speicherbatterie, und eine Energienivellierung kann realisiert werden. Weiterhin wird der Wasserheizbetriebs-Zeitschlitz der Wasserheizvorrichtung unter Berücksichtigung des Lebensplans der Bewohner gesetzt und wird auf den Zeitschlitz zentriert gesetzt, der die Verwendung von durch die Wasserheizvorrichtung erwärmtem Heißwasser nicht benötigt, und somit kann die Überschussenergie der Solarenergieerzeugung effektiv verwendet werden, während der Komfort für die Bewohner erhalten bleibt. As described above, in the management system 100 for the operation of the water heating apparatus according to Embodiment 1 in the case of the power generation system in which the generated amount of energy changes depending on weather conditions and connected to the power grid, the water heating operation of the water type electric heater of one or more apartments is optimally timed Surplus energy is effectively used at a lower cost than in the case of using a storage battery, and energy leveling can be realized. Further, the water heating operation time slot of the water heater is set in consideration of the resident's life plan and is centered on the time slot which does not require the use of hot water heated by the water heater, and thus the surplus energy of the solar energy generation can be used effectively while the comfort for the inhabitants are preserved.

Ausführungsbeispiel 2  Embodiment 2

Eine auf Anfrage reagierende Technologie existiert als eine Technologie, bei der eine bidirektionale Kommunikation zwischen dem Energieunternehmen (Versorgungsseite) und der Verbraucherwohnung (Verbraucherseite) wie eine Wohnung über eine intelligente Messvorrichtung realisiert wird, die eine elektrische Energiemessvorrichtung enthaltend eine bidirektionale Informationskommunikationsfunktion ist, wobei das Energieunternehmen Energiepreisinformationen zu der Verbraucherwohnung sendet und ein Wohnungsenergie-Managementsystem (HEMS) innerhalb der Verbraucherwohnung auf der Grundlage derartiger Preisinformationen die elektrischen Vorrichtungen in der Wohnung optimal steuert. A responsive technology exists as a technology in which bidirectional communication between the Energy company (supply side) and the consumer apartment (consumer side) as an apartment is realized via an intelligent meter, which is an electrical energy meter containing a bidirectional information communication function, the energy company sends energy price information to the consumer apartment and a housing energy management system (HEMS) within the consumer apartment on the basis of such price information optimally controls the electrical devices in the home.

Im Allgemeinen ist die Nachfrage/Antwort-Technologie eine Nivellierungstechnologie, die den Elektrizitätsverbrauch in den Spitzenzeiten durch Erhöhung der Elektrizitätsrechnung für Spitzenzeiten des Energieverbrauchs verringert. Die Nachfrage/Antwort-Technologie wird hier jedoch verwendet zum Nutzen von Überschussenergie durch Erhöhen der verwendeten Elektrizitätsmängel in den Zeitschlitzen, wenn Überschussenergie erzeugt wird. Bei dem Ausführungsbeispiel 2 wird ein intelligentes Messgerät für die Energiemessvorrichtung 24 nach dem Ausführungsbeispiel 1 verwendet, und somit wird Überschussenergie durch Solarenergieerzeugung mit einem besseren Echtzeitverhalten genutzt. In general, demand / response technology is a leveling technology that reduces peak electricity consumption by increasing electricity bills for peak energy consumption. However, the demand / response technology is used here for the benefit of excess energy by increasing the used electricity deficiencies in the time slots when excess energy is generated. In Embodiment 2, an intelligent meter for the energy measuring device 24 is used according to the embodiment 1, and thus excess energy is used by solar energy generation with a better real-time behavior.

Die Grundkonfiguration des Managementsystems für den Betrieb der Wasserheizvorrichtung nach dem Ausführungsbeispiel 2 ist ähnlich der des Managementsystems 100 für den Betrieb der Wasserheizvorrichtung nach dem Ausführungsbeispiel 1. Komponenten, die die gleichen wie bei dem Ausführungsbeispielen oder diesen ähnlich sind, sind mit den gleichen Bezugszeichen versehen, und die Beschreibung derartiger Komponenten wird weggelassen. The basic configuration of the management system for operating the water heater according to Embodiment 2 is similar to that of the management system 100 for the operation of the water heating device according to Embodiment 1. Components which are the same as or similar to the embodiments are given the same reference numerals, and the description of such components will be omitted.

Die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung nach dem Ausführungsbeispiel 2 enthält zumindest die Kommunikationsvorrichtung 11, den Speicher 14, und die Planbestimmungsvorrichtung 17. Der Gegenstand der Betriebsplan-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 2 ist eine Vertragswohnung, für die ein Vertrag besteht, der dem Energieunternehmen ermöglicht, elektrische Wohnungsvorrichtungen wie die Wasserheizvorrichtung 8 in dem Zeitschlitz, für den das Energieunternehmen bestimmt, dass Überschussenergie durch Solarenergieerzeugung erzeugt wird, automatisch zu steuern. Beispielsweise wird, um eine Kooperation bei der Verwendung von Überschussenergie und eine Stabilisierung des Stromversorgungsnetzes zu erhalten, der Inhalt des Vertrags so festgelegt, dass die Verbraucherwohnung durch Mittel wie Herabsetzen der elektrischen Rechnung für diesen Zeitschlitz Anreize erhält. Bei dem vorliegenden Ausführungsbeispiel ist zumindest eine Vertragswohnung unter den Wohnungen 1–N. The management device 1 for the operation of the water heater according to the embodiment 2, at least includes the communication device 11 , the memory 14 , and the scheduling device 17 , The subject matter of the operation plan determination processing in Embodiment 2 is a contracted apartment for which there is a contract that allows the power company to design electric dwell devices such as the water heater 8th in the timeslot, for which the energy company determines that excess energy is generated by solar energy generation to control automatically. For example, in order to co-operate on the use of surplus power and stabilize the power grid, the content of the contract is determined so as to incentivize the home by means such as lowering the electrical bill for that time slot. In the present embodiment, at least one contracted apartment among the apartments 1-N.

Betriebsplan-Bestimmungsverarbeitung 2 Operation plan determination processing 2

14 ist ein Flussdiagramm, das ein Beispiel für die Operation der Betriebsplan-Bestimmungsverarbeitung nach dem Ausführungsbeispiel 2 illustriert. Wenn das Energieunternehmen bestimmt, dass die Energiezuführungsmenge durch Solarenergieerzeugung zunimmt und dass die Gruppe Überschussenergie erzeugt, sendet das Energieunternehmen Überschussenergieinformationen zu der intelligenten Messvorrichtung, die den berechneten Wert der Überschussenergie und den Zeitschlitz, für den die Erzeugung von Überschussenergie für die Gruppe bestimmt ist, anzeigen. Das intelligente Messgerät sendet die empfangenen Überschussenergieinformationen zu der Kommunikationsvorrichtung 11 der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung. 14 FIG. 12 is a flowchart illustrating an example of the operation of the operation plan determination processing according to Embodiment 2. FIG. If the energy company determines that the energy delivery amount is increasing by solar energy production and the group is generating excess energy, the energy company will send excess energy information to the smart meter indicating the calculated value of the excess energy and the time slot for which the generation of excess energy for the group is determined , The smart meter sends the received excess power information to the communication device 11 the management device 1 for the operation of the water heater.

Wenn keine Überschussenergieinformationen empfangen werden (NEIN im Schritt S61), wiederholt die Kommunikationsvorrichtung 11 der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung den Schritt S61 und wartet auf den Empfang der Überschussenergieinformationen. Bei Empfang der Überschussenergieinformationen durch die Kommunikationsvorrichtung 11 (JA im Schritt S61) bestimmt die Planbestimmungsvorrichtung 17, ob die Überschussenergie der Gruppe des durch die Überschussenergieinformationen angezeigten Zeitschlitzes größer als der oder gleich dem Energieverbrauch durch die Wasserheizoperation der Wasserheizvorrichtung 8 ist (Schritt S62). Wenn die Überschussenergie der Gruppe nicht größer als der oder gleich dem Energieverbrauch der Wasserheizoperation der Wasserheizvorrichtung 8 ist (NEIN im Schritt S62), setzt die Planbestimmungsvorrichtung 17 auf den normalen Zeitschlitz (Nachtzeit) der Wasserheizoperation der Wasserheizvorrichtung 8 der nicht gesetzten Wohnungen (alle Wohnungen) für die die Wasserheizoperation noch nicht zugeteilt ist (Schritt S68). If no excess energy information is received (NO in step S61), the communication device repeats 11 the management device 1 for the operation of the water heater, the step S61 and waits for the receipt of the excess energy information. Upon receipt of the excess energy information by the communication device 11 (YES in step S61) determines the scheduling device 17 Whether the excess energy of the group of the time slot indicated by the excess energy information is greater than or equal to the power consumption by the water heating operation of the water heater 8th is (step S62). When the excess energy of the group is not greater than or equal to the power consumption of the water heating operation of the water heater 8th is (NO in step S62) sets the scheduling device 17 on the normal time slot (night time) of the water heating operation of the water heater 8th the non-set apartments (all apartments) for which the water heating operation has not yet been allocated (step S68).

Wenn die Überschussenergie der Gruppe größer als der oder gleich dem Energieverbrauch durch die Wasserheizoperation der Wasserheizvorrichtung 8 ist (JA in Schritt 62), bezieht sich die klaren Bestimmungsvorrichtung 17 auf die Vertragswohnungsinformationen, die die vorher in den Speicher 14 gespeicherten Vertragsinformationen anzeigen, und bestimmt, ob eine nicht gesetzte Vertragswohnung vorhanden ist, für die die Wasserheiz-Betriebszeit der Wasserheizvorrichtung 8 nicht zugewiesen ist (Schritt S63). When the excess energy of the group is greater than or equal to the power consumption by the water heating operation of the water heater 8th is (YES in step 62), the clear determination device refers 17 on the contract housing information previously stored in the store 14 indicate stored contract information, and determines if there is an unsettled contract housing for which the water heater operating time of the water heater 8th is not assigned (step S63).

Wenn eine Vertragswohnung vorhanden ist (JA in Schritt S63), bestimmt die Planbestimmungsvorrichtung 17 unter den Vertragswohnungen die Reihenfolge der Priorität, indem der Vertragswohnung mit dem größten Energieverbrauch in dem Zeitschlitz die höhere Priorität gegeben wird (Schritt S64). Die Planbestimmungsvorrichtung 17 setzt die Wasserheizoperation der Wasserheizvorrichtung 8 der Wohnung mit der höchsten Priorität in den durch die Überschussenergieinformationen angezeigten Zeitschlitz (Schritt S65). If there is a contracted home (YES in step S63), the scheduling device determines 17 among the contracted apartments the order of priority, adding the contracted apartment with the highest energy consumption in the time slot is given the higher priority (step S64). The scheduling device 17 sets the water heating operation of the water heater 8th the highest priority apartment in the time slot indicated by the excess energy information (step S65).

Danach schließt die Planbestimmungsvorrichtung 17 die Wohnungen, für die die Wasserheizoperation der Wasserheizvorrichtung 8 in den Überschussenergieinformationen angezeigten Zeitschlitz gesetzt ist, aus (Schritt S66), und der für die Wasserheizoperation der Wasserheizvorrichtung 8 erforderliche Energieverbrauch wird von der Überschussenergie des in den Überschussenergieinformationen angezeigten Zeitschlitzes subtrahiert (Schritt S67). Die Verarbeitung kehrt zu dem Schritt S62 zurück, und die Schritte S62–S67 werden wiederholt, bis die Überschussenergie der Gruppe kleiner als der Energieverbrauch durch die Wasserheizoperation der Wasserheizvorrichtung 8 ist, oder bis keine Vertragswohnungen vorhanden sind, für die das Setzen noch nicht durchgeführt wurde. Thereafter, the scheduling device closes 17 the apartments for which the water heating operation of the water heater 8th is set in the time slot indicated in the excess energy information (step S66), and that for the water heating operation of the water heater 8th required power consumption is subtracted from the surplus power of the time slot indicated in the excess power information (step S67). The processing returns to the step S62, and the steps S62-S67 are repeated until the excess energy of the group is smaller than the power consumption by the water heating operation of the water heater 8th or until there are no contract apartments for which the placement has not yet been made.

Wenn die Überschussenergie der Gruppe kleiner als der Energieverbrauch durch die Wasserheizoperation der Wasserheizvorrichtung 8 ist (NEIN in Schritt S62), oder wenn keine Vertragswohnungen verbleiben, für die das Setzen noch nicht durchgesetzt wurde (NEIN in Schritt S63), setzt die Planbestimmungsvorrichtung 17 die Wasserheizoperation der Wasserheizvorrichtungen 8 der verbleibenden Wohnungen, für die das Setzen nicht durchgeführt ist, auf den normalen Zeitschlitz (Nachtzeit), und die Wasserheizoperation wird nicht zugeteilt (Schritt S68). Zu dieser Zeit kann die Überschussenergie des durch die Überschussenergieinformationen angezeigten Zeitschlitzes auf Null revidiert werden, beispielsweise aus Gründen der Bequemlichkeit. When the excess energy of the group is smaller than the power consumption by the water heating operation of the water heater 8th is (NO in step S62), or if there are no contract apartments left for which the setting has not yet been enforced (NO in step S63), the schedule determining apparatus sets 17 the water heating operation of the water heaters 8th the remaining apartments for which setting is not performed are set to the normal time slot (night time), and the water heating operation is not allocated (step S68). At this time, the surplus energy of the time slot indicated by the excess energy information can be revised to zero, for convenience, for example.

Die Planbestimmungsvorrichtung 17 erzeugt die Planinformationen, die den Wasserheiz-Betriebsplan für alle Wohnungen anzeigen (Schritt S69), die Kommunikationsvorrichtung 11 sendet die Planinformationen über das Kommunikationsnetz 2 zu dem Energieunternehmen (Schritt S70), und die Verarbeitung wird beendet. The scheduling device 17 generates the schedule information indicating the water heating operation plan for all apartments (step S69), the communication device 11 sends the plan information over the communication network 2 to the power company (step S70), and the processing is ended.

Bei Empfang des Betriebsplans von der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung steuert das Energieunternehmen auf der Grundlage des Betriebsplans die Startzeit und die Stoppzeit der Wasserheizoperation der Wasserheizvorrichtung 8 der Vertragswohnung. Upon receipt of the operation plan from the management device 1 for the operation of the water heater, the power company controls the start time and the stop time of the water heating operation of the water heater based on the operation plan 8th the contracted apartment.

Weiterhin wird die Reihenfolge der Priorität in Schritt S64 gesetzt, um eine höhere Priorität zuzuweisen, wenn der Energieverbrauch in dem durch die Überschussenergieinformationen angezeigten Zeitschlitz höher ist. Der Energieverbrauch für diesen Zeitschlitz kann der Energieverbrauch in Echtzeit für diese Zeit sein, der durch die Energiedaten-Erwerbsvorrichtung 31 des Wohnungs-Gateways gesammelt wurde, oder alternativ kann der Energieverbrauch der auf der Grundlage vergangener Energieverbrauchsdaten vorhergesagte Energieverbrauch sein. Weiterhin kann, um einen Anreiz durch Herabsetzen der Elektrizitätsrechnung für diesen Zeitschlitz in der Vertragswohnung zu schaffen, beispielsweise die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung die Wohnungsbelegungs-Vorhersagevorrichtung 15 enthalten, und das Verfahren zum Bestimmen der Reihenfolge der Priorität kann beispielsweise gemäß der Anwendung geändert werden, wie Zuweisen der Priorität der Vertragswohnung, für die die Vorhersage-Wohnungsbelegungs-Zustandsdaten „belegt“ sind. Further, the order of priority is set in step S64 to assign a higher priority when the power consumption is higher in the time slot indicated by the excess energy information. The energy consumption for this time slot may be the real time energy consumption for that time by the energy data acquisition device 31 of the apartment gateway, or alternatively, the energy consumption may be the energy consumption predicted based on past energy consumption data. Furthermore, to provide an incentive by reducing the electricity bill for that time slot in the contracted home, for example, the management device 1 for the operation of the water heater, the occupancy prediction device 15 For example, the method of determining the order of priority may be changed according to the application, such as assigning the priority of the contracted apartment for which the prediction occupancy state data is "occupied."

Bei dem Managementsystem für den Betrieb der Wasserheizvorrichtung nach dem vorbeschriebenen Ausführungsbeispiel 2 wird eine bidirektionale Kommunikationsfunktion durch das intelligente Messgerät zwischen dem Energieunternehmen und der Wohnung verwendet, und somit kann die Überschussenergie durch Solarenergieerzeugung mit einem besseren Echtzeitverhalten verwendet werden. Dies ermöglicht einen Beitrag zu der Stabilisierung des Energieversorgungsnetzes des Energieunternehmens.  In the management system for operating the water heater according to the above-described Embodiment 2, a bidirectional communication function by the smart meter is used between the power company and the dwelling, and thus the surplus power can be used by solar power generation with better real-time performance. This will contribute to the stabilization of the power supply network of the energy company.

Obgleich das Ausführungsbeispiel 1 und das Ausführungsbeispiel 2 vorstehend getrennt beschrieben wurden, können diese Ausführungsbeispiele kombiniert werden. Weiterhin kann anstelle der Solarenergieerzeugung ein unterschiedliches Mittel wie eine Winderzeugung und eine geothermische Erzeugung als die erneuerbare Energie nach den Ausführungsbeispielen 1 und 2 verwendet werden.  Although Embodiment 1 and Embodiment 2 have been described separately above, these embodiments can be combined. Further, instead of solar energy generation, different means such as wind generation and geothermal generation may be used as the renewable energy according to Embodiments 1 and 2.

15 ist ein Blockschaltbild, das ein Beispiel für die Hardwarekonfiguration der Managementvorrichtung für den Betrieb der Heißwasservorrichtung nach einem Ausführungsbeispiel der vorliegenden Offenbarung illustriert. Wie in 15 illustriert ist, enthält die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung eine Steuervorrichtung 81, einen Hauptspeicher 82, einen externen Speicher 83, eine Operationseinheit 84, eine Anzeigevorrichtung 85 und einen Sender/Empfänger 86. Der Hauptspeicher 82, der externe Speicher 83, die Operationseinheit 84, die Anzeigevorrichtung 85 und der Sender/Empfänger 86 sind jeweils durch einen internen Bus 80 mit der Steuervorrichtung 81 verbunden. 15 FIG. 10 is a block diagram illustrating an example of the hardware configuration of the management apparatus for operating the hot water device according to an embodiment of the present disclosure. FIG. As in 15 is illustrated contains the management device 1 for the operation of the water heater, a control device 81 , a main memory 82 , an external memory 83 , an operation unit 84 , a display device 85 and a transceiver 86 , The main memory 82 , the external memory 83 , the operation unit 84 , the display device 85 and the transceiver 86 are each through an internal bus 80 with the control device 81 connected.

Die Steuervorrichtung 81 enthält Komponenten wie eine zentrale Verarbeitungseinheit (CPU) und führt entsprechend einem in dem externen Speicher 83 gespeicherten Steuerprogram 89 verschiedene Verarbeitungen der Wohnungsbelegungs-Bestimmungsvorrichtung 12, der Wetterinformations-Erwerbsvorrichtung 13, der Überschussenergie-Vorhersagevorrichtung 16, der Wohnungsbelegungs-Vorhersagevorrichtung 15 und der Planbestimmungsvorrichtung 17 der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung durch. The control device 81 contains components such as a central processing unit (CPU) and corresponding to one in the external memory 83 stored control program 89 various processes of Apartment occupancy determiner 12 , the weather information acquisition device 13 , the excess energy prediction device 16 , the Housing Forecasting Device 15 and the scheduling device 17 the management device 1 for the operation of the water heater by.

Der Hauptspeicher 82 enthält einen Speicher wie einen Speicher mit wahlfreiem Zugriff (RAM), wird zum Laden des in dem externen Speicher 83 gespeicherten Steuerprograms verwendet und wird als ein Arbeitsbereich der Steuervorrichtung 81 verwendet. The main memory 82 contains a memory such as a random access memory (RAM), is used to load the in the external memory 83 stored control programs and is used as a workspace of the control device 81 used.

Der externe Speicher 83 enthält einen nicht-flüchtigen Speicher wie einen Flashspeicher, eine Speicherplatte, einen DVD-RAM und einen DVD-RW, und speichert vorher ein Programm zum Bewirken, dass die Steuervorrichtung 81 die Verarbeitung der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung durchführt, und als Reaktion auf einen Befehl von der Steuervorrichtung 81 liefert der externe Speicher 83 durch das Programm gespeicherte Daten zu der Steuervorrichtung 81, und registriert von der Steuervorrichtung 81 gelieferte Daten. Der Speicher 14 enthält den externen Speicher 83. The external memory 83 includes a non-volatile memory such as a flash memory, a disk, a DVD-RAM and a DVD-RW, and previously stores a program for causing the controller 81 the processing of the management device 1 for the operation of the water heater, and in response to a command from the controller 81 delivers the external memory 83 data stored by the program to the control device 81 , and registered by the control device 81 delivered data. The memory 14 contains the external memory 83 ,

Die Operationseinheit 84 enthält eine Tastatur und eine Zeigervorrichtung wie eine Maus und dergleichen, und eine Schnittstellenvorrichtung, die die Tastatur und die Zeigervorrichtung und dergleichen mit dem internen Bus 80 verbindet. In dem Fall, dass der Benutzer Informationen direkt in die Managementvorrichtung für den Betrieb der Wasserheizvorrichtung eingibt, werden die eingegebenen Informationen über die Operationseinheit 84 zu der Steuervorrichtung 81 geliefert. The operation unit 84 includes a keyboard and a pointing device such as a mouse and the like, and an interface device including the keyboard and the pointing device and the like with the internal bus 80 combines. In the case that the user inputs information directly into the management apparatus for the operation of the water heater, the inputted information becomes about the operation unit 84 to the control device 81 delivered.

Die Anzeigevorrichtung 85 enthält eine Kathodenstrahlröhre (CRT), eine Flüssigkristallanzeigevorrichtung (LCD) und dergleichen. Für den Fall, dass der Benutzer Informationen direkt in die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung eingibt, zeigt die Anzeigevorrichtung 85 einen Operationsschirm an. The display device 85 includes a cathode ray tube (CRT), a liquid crystal display device (LCD), and the like. In the event that the user information directly into the management device 1 for the operation of the water heater shows the display device 85 an operation screen.

Der Sender/Empfänger 86 enthält eine Netzanschlussvorrichtung oder Funkkommunikationsvorrichtung, die eine Verbindung zu einem Netz herstellen, und eine Serienschnittstelle oder eine Schnittstelle eine lokalen Netzes (LAN), die eine Verbindung zu der Netzanschlussvorrichtung oder der Funkkommunikationsvorrichtung herstellen. Der Sender/Empfänger 86 hat die Funktion der Kommunikationsvorrichtung 11. The transmitter / receiver 86 includes a network connection device or radio communication device that connects to a network, and a serial interface or a local area network (LAN) interface that connects to the network connection device or the radio communication device. The transmitter / receiver 86 has the function of the communication device 11 ,

Die Verarbeitung durch die Kommunikationsvorrichtung 11, die Wohnungsbelegungs-Bestimmungsvorrichtung 12, die Wetterinformations-Erwerbsvorrichtung 13, den Speicher 14, die Wohnungsbelegungs-Vorhersagevorrichtung 15, die Überschussenergie-Vorhersagevorrichtung 16 und die Planbestimmungsvorrichtung 17 der in 6 illustrierten Managementvorrichtung für den Betrieb der Wasserheizvorrichtung wird durch die Verarbeitung des Steuerprograms 89 durch Verwendung von Ressourcen wie der Steuervorrichtung 81, des Hauptspeichers 82, des externen Speichers 83, der Operationseinheit 84, der Anzeigevorrichtung 85 und des Senders/Empfängers 86 durchgeführt. The processing by the communication device 11 , the Housing Determination Device 12 , the weather information acquisition device 13 , the memory 14 , the Housing Forecasting Device 15 , the excess energy prediction device 16 and the scheduling device 17 the in 6 Illustrated management device for the operation of the water heater is through the processing of the control program 89 by using resources such as the control device 81 , the main memory 82 , the external memory 83 , the operation unit 84 , the display device 85 and the sender / receiver 86 carried out.

Zusätzlich ist die vorgenannte Hardwarekonfiguration oder das Flussdiagram ein Beispiel und kann frei modifiziert und revidiert werden.  In addition, the aforementioned hardware configuration or flowchart is an example and may be freely modified and revised.

Die Komponenten, die zentral für die Durchführung der Verarbeitung der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung sind und die Steuervorrichtung 81, den Hauptspeicher 82, den externen Speicher 83, die Operationseinheit 84, die Anzeigevorrichtung 85, den Sender/Empfänger 86, den internen Bus 80 und dergleichen enthalten, sind nicht notwendigerweise Komponenten eines dedizierten Systems, und diese Komponenten können durch Verwendung eines normalen Computersystems implementiert werden. Beispielsweise kann die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung, die die vorgenannte Verarbeitung durchführt, realisiert werden durch Speichern eines Computerprograms für die Durchführung der Operationen in einem computerlesbaren Aufzeichnungsmedium (wie einer flexiblen Scheibe, einer CD-ROM, einer DVD-ROM, und dergleichen) durch Verteilen des Aufzeichnungsmediums und durch Installieren des in dem Aufzeichnungsmedium gespeicherten Computerprograms in den Computer. Weiterhin kann die Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung auch durch vorheriges Speichern des Computerprograms in einer Speichervorrichtung einer Servervorrichtung in einem Kommunikationsnetz wie dem Internet und durch Herunterladen des Computerprograms durch ein normales Computersystem realisiert werden. The components that are central to carrying out the processing of the management device 1 for the operation of the water heater and the control device 81 , the main memory 82 , the external memory 83 , the operation unit 84 , the display device 85 , the transmitter / receiver 86 , the internal bus 80 and the like are not necessarily components of a dedicated system, and these components may be implemented using a standard computer system. For example, the management device 1 for the operation of the water heating apparatus performing the aforementioned processing, by storing a computer program for performing the operations in a computer-readable recording medium (such as a flexible disk, a CD-ROM, a DVD-ROM, and the like) by distributing the recording medium and by installing the computer program stored in the recording medium into the computer. Furthermore, the management device 1 for the operation of the water heater also by previously storing the computer program in a storage device of a server device in a communication network such as the Internet and by downloading the computer program by a normal computer system.

Darüber hinaus kann in dem Fall der Realisierung der Funktionen der Managementvorrichtung 1 für den Betrieb der Wasserheizvorrichtung durch eine Durchführung, die einem Betriebssystem (OS) und einem Anwendungsprogram zugeteilt ist oder durch eine Ausführung in Kooperation mit dem OS und der Anwendung der Anwendungsprogramteil allein in dem Aufzeichnungsmedium oder der Speichervorrichtung gespeichert werden. In addition, in the case of the realization of the functions of the management device 1 for the operation of the water heater by a processor allocated to an operating system (OS) and an application program or stored by execution in cooperation with the OS and the application of the application program part alone in the recording medium or the storage device.

Alternativ können Computerprogramme einer Trägerwelle zur Zuführung über ein Kommunikationsnetz überlagert werden. Beispielsweise kann das Computerprogram auf ein Anzeigetafelsystem (BBS) in einem Kommunikationsnetz geladen werden und über ein Netzwerk geliefert werden. Die vorbeschriebenen Prozesse können durchgeführt werden durch Starten der Computerprogramme und Ablaufen der Computerprogramme unter der Steuerung des OS in einer Weise, die ähnlich anderen Anwendungsprogrammen ist.  Alternatively, computer programs may be superimposed on a carrier wave for delivery via a communications network. For example, the computer program may be loaded onto a billboard system (BBS) in a communications network and delivered over a network. The above-described processes can be performed by starting the computer programs and running the computer programs under the control of the OS in a manner similar to other application programs.

Vorstehend werden einige Ausführungsbeispiele zu erläuternden Zwecken beschrieben. Obgleich die vorstehende Diskussion spezifische Ausführungsbeispiele darstellt, erkennt der Fachmann, dass Änderungen in der Form und im Einzelnen vorgenommen werden können, ohne den breiteren Geist und den Bereich der Erfindung zu verlassen. Demgemäß sind die Beschreibung und die Zeichnungen in einem veranschaulichenden und nicht in einem beschränkenden Sinn anzusehen. Diese detaillierte Beschreibung ist daher nicht in einem beschränkenden Sinn auszulegen, und der Bereich der Erfindung ist nur durch die enthaltenen Ansprüche definiert, zusammen mit dem vollständigen Bereich von Äquivalenten, zu denen derartige Ansprüche berechtigt sind.  In the above, some embodiments will be described for illustrative purposes. Although the foregoing discussion represents specific embodiments, those skilled in the art will recognize that changes may be made in form and more particularly without departing from the broader spirit and scope of the invention. Accordingly, the description and drawings are to be considered in an illustrative rather than a limiting sense. Therefore, this detailed description is not to be construed in a limiting sense, and the scope of the invention is defined only by the appended claims, along with the full scope of equivalents to which such claims are entitled.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1 1
Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung Management device for operating a water heater
2 2
Kommunikationsnetz communication network
3 3
Wohnungs-Gateway Housing Gateway
4 4
Kommunikationsvorrichtung communication device
5 5
Fernsehgerät TV
6 6
Klimagerät air conditioning
7 7
Beleuchtungsvorrichtung lighting device
8 8th
Wasserheizvorrichtung water heating
9 9
Energiemessvorrichtung Energy measuring device
11 11
Kommunikationsvorrichtung communication device
12 12
Wohnungsbelegungs-Bestimmungsvorrichtung Apartment occupancy determiner
13 13
Wetterinformations-Erwerbsvorrichtung Weather information acquisition device
14 14
Speicher Storage
15 15
Wohnungsbelegungs-Vorhersagevorrichtung Apartment occupancy predictor
16 16
Überschussenergie-Vorhersagevorrichtung Excess energy prediction device
17 17
Planbestimmungsvorrichtung Plan determining device
21 21
Energieversorgungsnetz Power grid
22 22
Solarpaneel solar panel
23 23
Energiekonditionierer power conditioner
24 24
Energiemesser energy meter
25 25
Verteilungspult distribution panel
31 31
Energiedaten-Erwerbsvorrichtung Energy Data Acquisition Device
32 32
Betriebsdaten-Erwerbsvorrichtung Operating data acquisition device
33 33
Wohnungsgateway-Kommunikationsvorrichtung Apartment gateway communication device
34 34
Wasserheizvorrichtungs-Steuereinheit Wasserheizvorrichtungs control unit
80 80
interner Bus internal bus
81 81
Steuervorrichtung control device
82 82
Hauptspeicher main memory
83 83
externer Speicher external storage
84 84
Operationseinheit operation unit
85 85
Anzeigevorrichtung display device
86 86
Sender/Empfänger Transmitter-receiver
89 89
Steuerprogram control Program
100 100
Managementsystem für den Betrieb einer Wasserheizvorrichtung Management system for operating a water heater
801 801
Heizvorrichtung vom Wärmepumpentyp Heat pump type heater
802 802
Heißwasser-Speichertank Hot water storage tank
803 803
Wasserströmungsdurchgang Water flow passage
804 804
Zirkulationspumpe circulation pump
805 805
Heizkörper radiator
806 806
Fußbodenheizung underfloor heating
807 807
Strömungsdurchgangs-Einstellventil Flow passage adjustment valve
811 811
Kompressor compressor
812 812
Wärmetauscher heat exchangers
813 813
Expansionsventil expansion valve
814 814
Verdampfer Evaporator
821 821
Heißwasserspeicher-Sensorgruppe Hot water tank sensor group

Claims (8)

Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung zur Steuerung des Betriebs einer Wasserheizvorrichtung vom elektrischen Typ, die in zumindest jeweils einer Wohnung installiert ist, die ein Energieerzeugungssystem, das Energie in einer Menge, die in Abhängigkeit von Wetterbedingungen variiert, erzeugt, mit einem Energieversorgungnetz verbindet, wobei die Managementvorrichtung für den Betrieb der Wasserheizvorrichtung aufweist: eine Betriebsdaten-Erwerbsvorrichtung zum Erwerben von Betriebsdaten, die einen Betriebszustand einer in der Wohnung installierten elektrischen Vorrichtung anzeigen; eine Wetterinformations-Erwerbsvorrichtung zum Erwerben von Wetterinformationen eines Bereichs, der einen Ort der Wohnung enthält; eine Wohnungsbelegungs-Bestimmungsvorrichtung zum Bestimmen auf der Grundlage der Betriebsdaten, ob ein Bewohner der Wohnung die Wohnung belegt, und zum Erzeugen von Wohnungsbelegungs-Zustandsdaten, die einen bestimmten Wohnungsbelegungszustand anzeigen; eine Überschussenergie-Vorhersagevorrichtung zum Vorhersagen einer Überschussenergie des Energieerzeugungssystems auf der Grundlage der Wetterinformationen und zum Erzeugen von Überschussenergie-Vorhersagedaten, die einen Zeitschlitz und einen Wert der vorhergesagten Überschussenergie anzeigen; und eine Betriebsplan-Bestimmungsvorrichtung zum Bestimmen eines Betriebsplans zum Bewirken einer Operation der Wasserheizvorrichtung der Wohnung auf der Grundlage der Wohnungsbelegungs-Zustandsdaten und der Überschussenergie-Vorhersagedaten, und zum Erzeugen von Betriebsplaninformationen, die den bestimmten Betriebsplan anzeigen.  A management apparatus for operating a water heating apparatus for controlling the operation of an electric-type water heating apparatus installed in at least one dwelling connecting a power generation system that generates energy in an amount that varies depending on weather conditions to a power supply network the management device for operating the water heater comprises: an operation data acquisition device for acquiring operation data indicating an operation state of an electrical device installed in the home; a weather information acquiring device for acquiring weather information of an area containing a place of the home; an occupancy determination device for determining on the basis of the operation data whether a resident of the apartment occupies the apartment and for generating occupancy status data indicating a particular occupancy state; an excess energy prediction device for predicting an excess energy of the power generation system based on the weather information and generating excess energy prediction data indicating a time slot and a value of the predicted excess energy; and an operation plan determiner for determining an operation plan for effecting an operation of the water heater of the dwelling based on the dwelling condition data and the surplus power prediction data, and for generating operation plan information indicating the particular operation plan. Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach Anspruch 1, weiterhin aufweisend eine Wohnungsbelegungs-Vorhersagevorrichtung zum Vorhersagen des Wohnungsbelegungszustands der Wohnung in dem durch die Überschussenergie-Vorhersagedaten angezeigten Zeitschlitz auf der Grundlage von zumindest der Wohnungsbelegungs-Zustandsdaten, und zum Erzeugen von Wohnungsbelegungszustands-Vorhersagedaten, die den vorhergesagten Wohnungsbelegungszustand anzeigen, wobei die Betriebsplan-Bestimmungsvorrichtung weiterhin vorgesehen ist zum Bestimmen des Betriebsplans und zum Erzeugen der Betriebsplaninformationen auf der Grundlage der Wohnungsbelegungszustands-Vorhersagedaten und der Überschussenergie-Vorhersagedaten. A management apparatus for operating a water heater according to claim 1, Further, a home occupancy prediction apparatus for predicting the home occupancy state of the home in the time slot indicated by the surplus power prediction data based on at least the home occupancy state data, and generating home occupancy state prediction data indicative of the predicted home occupancy state, wherein the operation plan determiner is further provided for determining the operation plan and generating the operation plan information based on the home occupancy state prediction data and the excess energy prediction data. Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach Anspruch 2, bei der die Wohnungsbelegungs-Vorhersagevorrichtung vorgesehen ist zum Vorhersagen des Wohnungsbelegungszustands der Wohnung in dem durch die Überschussenergie-Vorhersagendaten angezeigten Zeitschlitz auf der Grundlage der Wohnungsbelegungs-Zustandsdaten und der Wetterinformationen, und zum Erzeugen der Wohnungsbelegungszustands-Vorhersagedaten. The water heater operating device according to claim 2, wherein the home occupancy prediction means is for predicting the home occupancy state of the home in the time slot indicated by the surplus energy prediction data based on the occupancy state data and the weather information, and generating the home occupancy status. forecast data. Managementvorrichtung zum Betrieb einer Wasserheizvorrichtung nach einem der Ansprüche 1–3, bei der die Betriebsplan-Bestimmungsvorrichtung weiterhin vorgesehen ist zum Zuteilen, für den durch die Überschussenergie-Vorhersagedaten angezeigten Zeitschlitz, einer Operation der Wasserheizvorrichtung der Wohnung, für die der Wohnungsbelegungszustand durch die Wohnungsbelegungs-Zustandsdaten für den Zeitschlitz, der durch die Überschussenergie-Vorhersagedaten angezeigt wird, als „nicht belegt“ angezeigt wird. A water heater driving apparatus according to any one of claims 1-3, wherein the operation plan determining means is further provided for allocating, for the time slot indicated by the surplus power prediction data, an operation of the water heater of the dwelling for which the occupancy state is determined by the occupancy State data for the time slot indicated by the excess energy prediction data is displayed as "not busy". Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach einem der Ansprüche 1–4, bei der die Betriebsplan-Bestimmungsvorrichtung weiterhin vorgesehen ist zum Bestimmen einer Reihenfolge der Priorität der Wohnung, für die der Wohnungsbelegungszustand durch die Wohnungsbelegungs-Zustandsdaten als „nicht belegt“ angezeigt ist, auf der Grundlage der Betriebsdaten, und zum Zuteilen, für den durch die Überschussenergie-Vorhersagedaten angezeigten Zeitschlitz, eines Betriebs der Wasserheizvorrichtung in abfallender Reihenfolge von einer Wohnung, die eine höchste Priorität in der Reihenfolge hat, aus. A water heater operating device according to any one of claims 1-4, wherein said operation plan determining means is further provided for determining an order of priority of the home for which the home occupancy status is indicated by the occupancy status data as "not occupied" the basis of the operating data, and for allocating, for the time slot indicated by the surplus power prediction data, an operation of the water heater in descending order from an apartment having a highest priority in the order. Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach einem der Ansprüche 1–5, bei der die zumindest eine Wohnung eine Vertragswohnung aufweist, in der die Wasserheizvorrichtung automatisch durch einen Energielieferanten in einem Zeitschlitz so gesteuert wird, dass der Energielieferant die erzeugte Überschussenergie bestimmt; die Managementvorrichtung für den Betrieb der Wasserheizvorrichtung weiterhin eine Überschussenergieinformations-Erwerbsvorrichtung aufweist zum Erwerben von Überschussenergieinformationen, die einen berechneten Wert der Überschussenergie und den Zeitschlitz anzeigen, den der Energielieferant für die Erzeugung der Überschussenergie bestimmt hat; und die Betriebsplan-Bestimmungsvorrichtung weiterhin vorgesehen ist zum Bestimmen des Betriebsplans zum Bewirken des Betriebs der Wasserheizvorrichtung der Vertragswohnung auf der Grundlage der Überschussenergieinformationen, und zum Senden der erzeugten Betriebsplaninformationen zu dem Energielieferanten. A management apparatus for operating a water heater according to any one of claims 1-5, wherein the at least one apartment has a contracted apartment in which the water heater is automatically controlled by an energy supplier in a timeslot so that the energy supplier determines the excess energy generated; the water heater operation management apparatus further comprises an excess-energy-information acquiring device for acquiring surplus-energy information indicative of a calculated value of the excess energy and the time-slot determined by the energy supplier to generate the surplus energy; and the operation plan determination device is further provided for determining the operation plan for effecting the operation of the contracted water heater on the basis of the surplus power information, and for sending the generated operation plan information to the power supplier. Managementsystem für den Betrieb einer Wasserheizvorrichtung, welches aufweist: die Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung nach einem der Ansprüche 1–6; die Wasserheizvorrichtung vom elektrischen Typ, die in jeder von der zumindest Wohnung zu installieren ist, das ein Energieerzeugungssystem, das Energie in einer Menge, die in Abhängigkeit von Wetterbedingungen variiert, erzeugt, mit dem Energieversorgungsnetz verbindet; und ein Wohnungs-Gateway, das in jeder von der zumindest einen Wohnung zu installieren ist, um die Betriebsdaten, die den Betriebszustand der in der Wohnung installierten elektrischen Vorrichtung anzeigen, zu sammeln, und die gesammelten Betriebsdaten zu der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung zu senden, wobei das Wohnungs-Gateway vorgesehen ist zum Steuern der Wasserheizvorrichtung auf der Grundlage der Betriebsplaninformationen, die von der Managementvorrichtung für den Betrieb der Wasserheizvorrichtung empfangen wurden und den Betriebsplan zum Bewirken des Betriebs der Wasserheizvorrichtung der zumindest einen Wohnung anzeigen. A management system for operating a water heater, comprising: the management apparatus for operating a water heater according to any one of claims 1-6; the electric-type water heater to be installed in each of the at least one apartment, a power generation system that generates energy in an amount that varies depending on weather conditions connects to the power grid; and a home gateway to be installed in each of the at least one home to collect the operation data indicating the operating state of the electric device installed in the home, and to send the collected operation data to the water heater operating device . wherein the home gateway is provided for controlling the water heater based on the operation plan information received from the water heater operation manager and indicating the operation plan for effecting the operation of the water heater of the at least one home. Managementverfahren für den Betrieb einer Wasserheizvorrichtung, das durch eine Managementvorrichtung für den Betrieb einer Wasserheizvorrichtung, die den Betrieb einer in jeder von zumindest einer Wohnung installierten Wasserheizvorrichtung steuert, wobei die Wohnung ein Energieerzeugungssystem, das Energie in einer Menge, die in Abhängigkeit von Wetterbedingungen variiert, erzeugt, mit einem Energieversorgungsnetz verbindet, durchgeführt wird, welches Verfahren aufweist: einen Wohnungsbelegungs-Bestimmungsschritt des Bestimmens auf der Grundlage von Betriebsdaten, die einen Betriebszustand einer in der Wohnung installierten elektrischen Vorrichtung anzeigen, ob ein Bewohner der Wohnung die Wohnung belegt, und des Erzeugens von Wohnungsbelegungs-Zustandsdaten, die einen bestimmten Wohnungsbelegungszustand anzeigen; einen Überschussenergie-Vorhersageschritt des Vorhersagens von Überschussenergie des Energieerzeugungssystems auf der Grundlage von Wetterinformationen eines Bereichs, der einen Ort der Wohnung enthält, und des Erzeugens von Überschussenergie-Vorhersagedaten, die einen Zeitschlitz und einen Wert der vorhergesagten Überschussenergie anzeigen; und einen Betriebsplan-Bestimmungsschritt des Bestimmens eines Betriebsplans zum Bewirken des Betriebs der Wasserheizvorrichtung der Wohnung auf der Grundlage der Wohnungsbelegungs-Zustandsdaten und der Überschussenergie-Vorhersagedaten, und des Erzeugens von Betriebsplaninformationen, die den bestimmten Betriebsplan anzeigen. A management method for operating a water heater controlled by a water heater operating device that controls the operation of a water heater installed in each of at least one dwelling, the dwelling a power generation system that varies energy in an amount that varies depending on weather conditions; generated, connected to a power grid, is performed, which method comprises: a housing occupancy determination step of determining based on operating data indicating an operating state of an installed in the apartment electrical device, whether Residents of the apartment occupies the apartment, and generating Wohnungsbelegungs status data indicating a specific housing occupancy status; an excess energy prediction step of predicting excess energy of the power generation system based on weather information of an area containing a location of the dwelling and generating excess energy prediction data indicating a time slot and a value of the predicted excess energy; and an operation plan determination step of determining an operation plan for effecting the operation of the water heater of the dwelling based on the dwelling condition data and the surplus power prediction data, and generating operation plan information indicating the particular operation plan.
DE112015006058.8T 2015-01-27 2015-01-27 MANAGEMENT DEVICE FOR OPERATING A WATER HEATING DEVICE, MANAGEMENT SYSTEM FOR OPERATING A WATER HEATING DEVICE AND MANAGEMENT METHOD FOR OPERATING A WATER HEATING DEVICE Pending DE112015006058T5 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/052185 WO2016120995A1 (en) 2015-01-27 2015-01-27 Water heater operation management device, water heater operation management system, and water heater operation management method

Publications (1)

Publication Number Publication Date
DE112015006058T5 true DE112015006058T5 (en) 2017-10-12

Family

ID=54696285

Family Applications (1)

Application Number Title Priority Date Filing Date
DE112015006058.8T Pending DE112015006058T5 (en) 2015-01-27 2015-01-27 MANAGEMENT DEVICE FOR OPERATING A WATER HEATING DEVICE, MANAGEMENT SYSTEM FOR OPERATING A WATER HEATING DEVICE AND MANAGEMENT METHOD FOR OPERATING A WATER HEATING DEVICE

Country Status (4)

Country Link
JP (1) JP5823085B1 (en)
DE (1) DE112015006058T5 (en)
GB (1) GB2547398B (en)
WO (1) WO2016120995A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6846863B2 (en) * 2015-11-27 2021-03-24 三菱電機株式会社 Water heater management equipment, gateway equipment, water heater management system, and programs
JP2018037976A (en) * 2016-09-02 2018-03-08 富士ゼロックス株式会社 Image forming apparatus and program
JP2018074841A (en) * 2016-11-02 2018-05-10 積水化学工業株式会社 Power control system and power control method
CN108571827A (en) * 2017-03-14 2018-09-25 青岛海尔新能源电器有限公司 A kind of Teat pump boiler power supply system and its control method
CN107199939A (en) * 2017-05-22 2017-09-26 六六房车有限公司 A kind of caravan power control system based on solar energy
CN108036518B (en) * 2018-01-02 2023-07-25 成都前锋电子有限责任公司 Compatibility expandable communication system of gas quick water heater
FI128488B (en) 2018-08-30 2020-06-15 Tammerfast Oy Transmission cable joint for a medium voltage underground cable system
JP7345302B2 (en) * 2019-07-19 2023-09-15 三菱電機株式会社 Hot water storage type water heater
DE102019214132A1 (en) * 2019-09-17 2021-03-18 Siemens Aktiengesellschaft Method for operating a network management system for a local energy network as a function of a storage strategy of an energy store, as well as a network management system
CN111306802A (en) * 2020-02-28 2020-06-19 广东格美淇电器有限公司 Mechanical temperature control electric water heater
CN114992874B (en) * 2021-06-30 2024-05-03 青岛经济技术开发区海尔热水器有限公司 Hot water reserve control method, device, electronic equipment and storage medium

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005291563A (en) * 2004-03-31 2005-10-20 Osaka Gas Co Ltd Heat source system
JP2008002702A (en) * 2006-06-20 2008-01-10 Matsushita Electric Ind Co Ltd Hot water storage type water heater, hot water supply method and program
JP2008002703A (en) * 2006-06-20 2008-01-10 Matsushita Electric Ind Co Ltd Hot water storage type water heater and program
US8314375B2 (en) * 2009-08-21 2012-11-20 Tigo Energy, Inc. System and method for local string management unit
EP2625760A2 (en) * 2010-10-04 2013-08-14 Cooper Technologies Company Dynamic thermostatic control of small-scale electrical loads for matching variations in electric utility supply
JP5025834B2 (en) * 2010-11-10 2012-09-12 パナソニック株式会社 Operation planning method, operation planning device, operation method of heat pump hot water supply system, and operation method of heat pump hot water supply heating system
JP5015332B1 (en) * 2011-02-03 2012-08-29 シャープ株式会社 Controller, control program, and controller control method
JP5838825B2 (en) * 2012-01-20 2016-01-06 三菱電機株式会社 Hot water storage hot water supply system
JP5926156B2 (en) * 2012-09-10 2016-05-25 株式会社日立製作所 Consumer energy management device and system
JP6089781B2 (en) * 2013-02-27 2017-03-08 三菱電機株式会社 Hot water storage water heater and solar system equipped with the hot water heater
JP6009976B2 (en) * 2013-03-07 2016-10-19 株式会社東芝 Energy management system, energy management method, program, and server

Also Published As

Publication number Publication date
WO2016120995A1 (en) 2016-08-04
GB201709221D0 (en) 2017-07-26
GB2547398A (en) 2017-08-16
JPWO2016120995A1 (en) 2017-04-27
JP5823085B1 (en) 2015-11-25
GB2547398B (en) 2020-06-17

Similar Documents

Publication Publication Date Title
DE112015006058T5 (en) MANAGEMENT DEVICE FOR OPERATING A WATER HEATING DEVICE, MANAGEMENT SYSTEM FOR OPERATING A WATER HEATING DEVICE AND MANAGEMENT METHOD FOR OPERATING A WATER HEATING DEVICE
Yoon et al. Demand response for residential buildings based on dynamic price of electricity
DE102004030846B4 (en) Central air conditioning system and method of operating the same
DE102016015503B4 (en) Process for temperature control of at least one room in a building with prognosis and optimization of energy consumption
DE112015004810T5 (en) ENERGY SUPPLY MANAGEMENT SYSTEM
CN103617566B (en) A kind of intelligent electric power utilization system based on Spot Price
DE102014213248B4 (en) Method and system for charging an energy storage device of a mobile energy consumer
DE202010015254U1 (en) Control device for controlling an energy allocation and device for providing electrical energy to a building-associated consumer group
EP2615385A1 (en) System manager for energy converters with adjustable power
EP2818803B1 (en) Method for controlling the climate in a building using at least one domestic or process technology system
DE202017007300U1 (en) Electrical power management
DE102018206214A1 (en) Method for operating a power supply system
EP2843788A2 (en) Method for operating a power plant system
WO2019081501A1 (en) Power management system for proactively determining and regulating a flow temperature of a building heating system
Yang et al. Energy consumption characteristics and adaptive electricity pricing strategies for college dormitories based on historical monitored data
Yang et al. Bi-level decentralized control of electric heating loads considering wind power accommodation in real-time electricity market
Tang et al. Game-theoretic optimization of demand-side flexibility engagement considering the perspectives of different stakeholders and multiple flexibility services
WO2016005441A1 (en) Method and apparatus for forecasting the temporal trend in a power requirement for a residential complex
DE102011080830A1 (en) Storage device of electric power supply system installed in house, has local power generator to control energy absorption from power supply unit, and controller that is provided to control electric power supply to power supply unit
DE102010043611A1 (en) Method for controlling distribution of electrical power to consumer network in e.g. office building, involves controlling operation of consumers until amount of power-deployable photovoltaic plant exceeds amount of power threshold value
DE102015109113B4 (en) Storage unit for a consumer, storage system and method for controlling a storage system
EP2998802B1 (en) Energy distribution system for an energy network
DE202019001458U1 (en) Device and cloud server for monitoring energy consumption
DE102012212321A1 (en) Device for determining and / or controlling an operating time of a consumer coupled to a power plant, in particular a photovoltaic power plant, and an energy store, and method for operating an energy store coupled to a power plant
Patteeuw et al. Short-term demand response of flexible electric heating systems: an integrated model

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R079 Amendment of ipc main class

Free format text: PREVIOUS MAIN CLASS: F24H0001000000

Ipc: F24D0019100000

R084 Declaration of willingness to licence
R016 Response to examination communication