DE102022108574A1 - Charging an electric vehicle on a local power grid - Google Patents

Charging an electric vehicle on a local power grid Download PDF

Info

Publication number
DE102022108574A1
DE102022108574A1 DE102022108574.0A DE102022108574A DE102022108574A1 DE 102022108574 A1 DE102022108574 A1 DE 102022108574A1 DE 102022108574 A DE102022108574 A DE 102022108574A DE 102022108574 A1 DE102022108574 A1 DE 102022108574A1
Authority
DE
Germany
Prior art keywords
electric vehicle
charging
bev
power
power grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102022108574.0A
Other languages
German (de)
Inventor
Jens Berger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bayerische Motoren Werke AG
Original Assignee
Bayerische Motoren Werke AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bayerische Motoren Werke AG filed Critical Bayerische Motoren Werke AG
Priority to DE102022108574.0A priority Critical patent/DE102022108574A1/en
Publication of DE102022108574A1 publication Critical patent/DE102022108574A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/0071Regulation of charging or discharging current or voltage with a programmable schedule
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/51Photovoltaic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/53Batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2260/00Operating Modes
    • B60L2260/40Control modes
    • B60L2260/50Control modes by future state prediction
    • B60L2260/58Departure time prediction
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/54The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads according to a pre-established time schedule
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading

Abstract

Ein Verfahren dient zum Laden eines Elektrofahrzeugs (BEV) an einem lokalen Stromnetz (1), das mindestens eine regenerative Energiequelle (2) und mindestens einen Ladepunkt (EVSE) zum Laden des Elektrofahrzeugs (BEV) aufweist, wobei bei dem Verfahren für ein mit dem Ladepunkt gekoppeltes Elektrofahrzeug (BEV) dessen Ladebedarf und dessen voraussichtliche Abfahrtszeit vorgehalten wird, eine prognostizierte zeitliche Verteilung einer Überschussleistung des lokalen Stromnetzes für die voraussichtliche Abstelldauer des Elektrofahrzeugs (BEV) anhand einer prognostizierten zeitlichen Verteilung einer elektrischen Leistung der mindestens einen regenerativen Energiequelle (2) bestimmt wird, für das gekoppelte Elektrofahrzeug (BEV) ein Ladeplan anhand der prognostizierten zeitlichen Verteilung der Überschussleistung dergestalt aufgestellt wird, dass das Elektrofahrzeug (BEV) zur voraussichtlichen Abfahrtszeit einen gewünschten Ladezustand aufweist und die Überschussleistung zum Laden des Elektrofahrzeugs (BEV) verwendet wird, und das Elektrofahrzeug (BEV) entsprechend dem Ladeplan aufgeladen wird. Die Erfindung ist insbesondere vorteilhaft anwendbar zum Laden von Plug-In-Hybridfahrzeugen und vollelektrisch angetriebenen Fahrzeugen an Privathaushalten.A method is used to charge an electric vehicle (BEV) on a local power grid (1), which has at least one renewable energy source (2) and at least one charging point (EVSE) for charging the electric vehicle (BEV), wherein in the method for a with Charging point coupled electric vehicle (BEV) whose charging requirement and its expected departure time are provided, a predicted temporal distribution of excess power from the local power grid for the expected parking period of the electric vehicle (BEV) is determined based on a predicted temporal distribution of an electrical power of the at least one renewable energy source (2). a charging plan is drawn up for the coupled electric vehicle (BEV) based on the predicted time distribution of the excess power in such a way that the electric vehicle (BEV) has a desired state of charge at the expected departure time and the excess power is used to charge the electric vehicle (BEV), and that Electric vehicle (BEV) is charged according to the charging plan. The invention can be used particularly advantageously for charging plug-in hybrid vehicles and fully electrically powered vehicles in private households.

Description

Die Erfindung betrifft ein Verfahren zum Laden eines Elektrofahrzeugs an einem lokalen Stromnetz, das mindestens eine regenerative Energiequelle und mindestens einen Ladepunkt zum Laden des Elektrofahrzeugs aufweist, wobei bei dem Verfahren eine prognostizierten zeitlichen Verteilung einer elektrischen Leistung der mindestens einen regenerativen Energiequelle bestimmt wird, für das gekoppelte Elektrofahrzeug ein Ladeplan anhand der prognostizierten Leistung aufgestellt wird und das Elektrofahrzeug entsprechend dem Ladeplan aufgeladen wird. Die Erfindung betrifft auch ein lokales Stromnetz, aufweisend mindestens einen lokalen Verbraucher, mindestens eine regenerative Energiequelle und mindestens einen Ladepunkt zum Laden eines Elektrofahrzeugs, wobei das lokale Stromnetz dazu eingerichtet ist, das Verfahren durchzuführen. Die Erfindung betrifft auch ein Wohnhaus mit einem solchen lokalen Stromnetz. Die Erfindung ist insbesondere vorteilhaft anwendbar zum Laden von Plug-In-Hybridfahrzeugen und vollelektrisch angetriebenen Fahrzeugen an Privathaushalten.The invention relates to a method for charging an electric vehicle on a local power grid, which has at least one regenerative energy source and at least one charging point for charging the electric vehicle, wherein in the method a predicted temporal distribution of an electrical power of the at least one regenerative energy source is determined, for which A charging plan for the coupled electric vehicle is drawn up based on the predicted performance and the electric vehicle is charged according to the charging plan. The invention also relates to a local power grid, having at least one local consumer, at least one renewable energy source and at least one charging point for charging an electric vehicle, the local power grid being set up to carry out the method. The invention also relates to a residential building with such a local power grid. The invention can be used particularly advantageously for charging plug-in hybrid vehicles and fully electrically powered vehicles in private households.

Im Markt werden intelligente Energiesteuerungen im intelligenten Haus („Smart Home“) mit Anbindung an Photovoltaikanlagen angeboten, mit der es ermöglicht wird, eine Batterie eines Elektrofahrzeugs an einer Ladestation des Hauses mittels Überschussladens aufzuladen (z.B. unter dem Handelsnamen AMTRONO von der Fa. MENNEKES Elektrotechnik GmbH & Co. KG).Intelligent energy controls in intelligent houses (“smart homes”) with a connection to photovoltaic systems are offered on the market, which make it possible to charge an electric vehicle battery at a charging station in the house using excess charging (e.g. under the trade name AMTRONO from MENNEKES Elektrotechnik GmbH & Co. KG).

Beim einem solchen Überschussladen wird das Elektrofahrzeug in der Praxis bisher nur geladen, wenn die Photovoltaikanlage Energie im Überschuss produziert, d.h., mit überschüssiger Energie, die ansonsten in das öffentliche Stromversorgungsnetz eingespeist würde. Dadurch kann der Eigentümer seinen Photovoltaik-Eigenverbrauch erhöhen. Dieses Vorgehen erfreut sich bei Besitzern von Elektrofahrzeugen großer Beliebtheit, wenn der Strombezug aus dem öffentlichen Stromnetz mehr kostet als die Vergütung des durch die Photovoltaikanlage in das öffentliche Stromnetz eingespeisten Stroms einbringt. Bisher wird dazu ein Anschluss der Ladestation an das Lokalnetz sowie ein im Lokalnetz installiertes Energiemessgerät benötigt, wobei dieses „Lokalnetz“-Energiemessgerät die von dem Lokalnetz aus dem öffentlichen Stromversorgungsnetz abgerufene elektrische Leistung und die bei Überschuss aus dem Lokalnetz in das öffentlichen Stromversorgungsnetz eingespeiste elektrische Leistung misst. Ein Ladevorgang wird nur dann durchgeführt wird, wenn durch dieses „Lokalnetz“-Energiemessgerät das Vorliegen von überschüssiger Energie festgestellt wird. Das „Lokalnetz“-Energiemessgerät misst die gleiche Leistung wie ein von dem Stromversorger, einem Energiehändler oder einem Messtellenbetreiber am Netzanschlusspunkt installiertes „externes“, „abrechnungsrelevantes“ Energiemessgerät, wobei die Messdaten des „Lokalnetz“-Energiemessgeräts dem Nutzer des lokalen Stromnetzes und damit der Ladestation zur Verfügung stehen, die Messdaten des von dem Stromversorger installierten externen Energiemessgeräts hingegen in der Regel nicht.With such excess charging, in practice the electric vehicle has so far only been charged when the photovoltaic system produces excess energy, i.e. with excess energy that would otherwise be fed into the public power grid. This allows the owner to increase his own photovoltaic consumption. This approach is very popular with owners of electric vehicles when purchasing electricity from the public power grid costs more than the remuneration for the electricity fed into the public power grid by the photovoltaic system. To date, this requires a connection of the charging station to the local network and an energy measuring device installed in the local network, whereby this “local network” energy measuring device records the electrical power drawn from the local network from the public power supply network and the electrical power fed into the public power supply network from the local network in the event of a surplus measures. A charging process will only be carried out if this “local network” energy measuring device detects the presence of excess energy. The “local network” energy measuring device measures the same power as an “external”, “billing-relevant” energy measuring device installed by the electricity supplier, an energy retailer or a measuring point operator at the network connection point, whereby the measurement data from the “local network” energy measuring device is available to the user of the local electricity network and thus to the Charging station is available, but the measurement data from the external energy measuring device installed by the electricity supplier is usually not.

Nachteilig hierbei ist ein Kosten- und Installationsaufwand zum Anschluss des Lokalnetz-Energiemessgeräts, was gerade bei Nachrüstlösungen einen erheblichen baulichen Aufwand verursacht. Außerdem ergibt sich ein Nachteil dadurch, dass ein Ladevorgang anhand der Ad-Hoc-Regelung (Überschuss aktuell vorhanden / nicht vorhanden) durchgeführt wird und ein Nutzer daher keine Gewissheit hat, ob sein Elektrofahrzeug zur gewünschten Abfahrtzeit den für seine Mobilitätsbedürfnisse notwendigen Ladezustand bzw. Speicherfüllstand aufweisen wird.The disadvantage here is the cost and installation effort required to connect the local network energy measuring device, which causes considerable construction effort, especially with retrofit solutions. There is also a disadvantage in that a charging process is carried out based on the ad hoc control (surplus currently available/not available) and a user therefore has no certainty as to whether his electric vehicle will have the charge level or storage level necessary for his mobility needs at the desired departure time will have.

US 9 937 810 B2 offenbart ein Leistungsverteilungssystem für ein Gebäude mit einem Gleichstrombus und daran angeschlossen: einen Netzanschlusspunkt zu einem öffentlichen Stromnetz, mehrere lokale Verbraucher, eine Mehrzahl von Leistungs-Stromspeichern mit jeweiligen gewünschten Minimal- und Maximalwerten ihres Ladezustands und eine Datenverarbeitungseinrichtung zum selektiven Zu- und Abschalten der Leistungs-Stromspeicher sowie zum Aufstellen eines Lade- und Entladeplans für die Leistungs-Stromspeicher derart, dass zuerst Leistungs-Stromspeicher mit einem Ladezustand größer als ihrem jeweiligen Maximalwert entladen werden, bevor Leistungs-Stromspeicher entladen werden, deren Ladezustand unterhalb ihres jeweiligen Maximalwerts liegt. Außerdem werden zuerst Leistungs-Stromspeicher mit einem Ladezustand kleiner ihrem jeweiligen Minimalwert aufgeladen werden, bevor Leistungs-Stromspeicher aufgeladen werden, deren Ladezustand oberhalb ihres jeweiligen Minimalwerts liegt. Das Leistungsverteilungssystem kann auch eine mit dem Gleichstrombus verbundene regenerative Energiequelle, insbesondere Photovoltaikanlage, aufweisen, wobei der Lade- und Entladeplan dann beruhend auf einer prognostizierten zukünftigen Gleichstromleistung der regenerative Energiequelle aufgestellt werden kann. Ferner kann als ein Leistungs-Stromspeicher eine Antriebsbatterie eines über einen Ladepunkt an den Gleichstrombus angeschlossenen kommerziellen Fahrzeugs wie eines Gabelstaplers oder Golfkarrens usw. verwendet werden. US 9,937,810 B2 discloses a power distribution system for a building with a direct current bus and connected to it: a network connection point to a public power grid, several local consumers, a plurality of power electricity storage devices with respective desired minimum and maximum values of their state of charge and a data processing device for selectively switching the power on and off -Power storage and for setting up a charging and discharging plan for the power storage in such a way that power storage with a state of charge greater than their respective maximum value is first discharged before power storage is discharged whose state of charge is below their respective maximum value. In addition, power storage devices will first be charged with a state of charge lower than their respective minimum value, before power storage devices whose state of charge is above their respective minimum value will be charged. The power distribution system can also have a regenerative energy source, in particular a photovoltaic system, connected to the direct current bus, wherein the charging and discharging plan can then be set up based on a predicted future direct current power of the regenerative energy source. Further, as a power storage device, a traction battery of a commercial vehicle such as a forklift or golf cart, etc. connected to the DC bus via a charging point can be used.

WO 2020/186363 A1 offenbart eine Vorrichtung und ein Verfahren zum Verwalten der Ausgangsleistung eines Leistungswandlers, die einen Stromeingangsleistungsmesser zum Messen der von einem Stromanschluss eines Haushalts mit einem öffentlichen Versorgungsnetz gezogenen Leistung, ein Vorhersagemodul für den Anstieg der Leistungsaufnahme im Haushalt und eine Steuerung zum Beschränken eines von dem Leistungswandler ausgegebenen Strompegels aufweist, um zu verhindern, dass die von dem Stromeingang aufgenommene elektrische Leistung einen vordefinierte Grenzwert überschreitet, falls ein wahrscheinlichster Sprung in der aufgenommenen Leistung auftritt. Ferner ist eine Benutzerschnittstelle vorgesehen, die es einem Benutzer ermöglicht, Änderungen an dem maximalen Strompegel vorzunehmen, um ein Elektrofahrzeug zu laden, wobei die Steuerung dem Benutzer Vorschläge macht, die aufgenommene Leistung anzupassen, und den Benutzer die Änderungen bestätigen lässt, um die Zuweisung gemäß den Einstellungen des Benutzers neu zuzuweisen. Der Haushalt kann über eine Photovoltaikanlage verfügen. Da die Stromerzeugung aus Sonnenkollektoren schwankt und möglicherweise nicht einfach mit dem Stromverbrauch einer Last synchronisiert werden kann, wird als notwendig angesehen, die Solarenergie für eine spätere Verwendung zu speichern, beispielsweise in einer Batterie oder einem anderen Speichersystem, wenn kein Solarstrom erzeugt werden kann. Eine Weiterbildung betrifft einen Leistungswandler wie etwa ein bidirektionales Batterieladegerät für Elektrofahrzeuge, das einem Benutzer Vorschläge macht, um einen von einem Ladegerät bereitgestellten Leistungspegel an ein oder mehrere Elektrofahrzeuge und/oder andere Lasten anzupassen, um zu vermeiden, dass ein Nennbudget des elektrischen Stromanschlusses überschritten wird, wenn der größte wahrscheinliche Verbrauchssprung auftritt. Dazu kann eine zeitbasierte Vorhersage des Energieverbrauchs der nicht aufladenden Last, der größte wahrscheinliche Sprung, auf einer Modellierung und/oder historischen Überwachung des Energieverbrauchs der nicht aufladenden Last basieren. Der Haushalt kann ferner Energie von einer lokalen Erzeugungsquelle empfangen und einem Nutzer zum Planen eines Stromverbrauchs angezeigt werden, z.B. einer Solar-, Wind-, Mikro-Hydro- oder Verbrennungsmotor-Erzeugungsquelle. Insbesondere kann einem Nutzer eine durch eine Photovoltaikanlage erzeugte Leistung anhand einer Wettervorhersage prognostiziert werden. WO 2020/186363 A1 discloses an apparatus and method for managing the output power of a power converter that includes a current input power meter for measuring the power drawn from a power connection of a household with a public supply network, a prediction module for the increase in power consumption in the household and a controller for limiting a current level output by the power converter in order to prevent the electrical power consumed by the power input from exceeding a predefined limit , if a most likely jump in the power consumed occurs. A user interface is further provided that allows a user to make changes to the maximum power level to charge an electric vehicle, the controller making suggestions to the user to adjust the power drawn and letting the user confirm the changes to make the allocation according to reassign to the user's settings. The household can have a photovoltaic system. Because electricity production from solar panels fluctuates and may not be easily synchronized with a load's electricity consumption, it is considered necessary to store the solar energy for later use, such as in a battery or other storage system, when solar power cannot be generated. A further development relates to a power converter, such as a bidirectional battery charger for electric vehicles, that provides suggestions to a user to adapt a power level provided by a charger to one or more electric vehicles and/or other loads in order to avoid exceeding a rated budget of the electrical power connection , when the largest likely jump in consumption occurs. To this end, a time-based prediction of the energy consumption of the non-charging load, the largest likely jump, may be based on modeling and/or historical monitoring of the energy consumption of the non-charging load. The household may also receive energy from a local generation source and display it to a user for planning electricity usage, e.g., a solar, wind, micro-hydro, or internal combustion engine generation source. In particular, the power generated by a photovoltaic system can be predicted to a user based on a weather forecast.

Es ist die Aufgabe der vorliegenden Erfindung, die Nachteile des Standes der Technik zumindest teilweise zu überwinden und insbesondere eine besonders kostengünstige Möglichkeit zum Laden eines Elektrofahrzeugs im Überschuss eines lokalen Stromnetzes, insbesondere Stromnetz eines Privathaushalts, das eine regenerative Energiequelle aufweist, bereitzustellen.It is the object of the present invention to at least partially overcome the disadvantages of the prior art and, in particular, to provide a particularly cost-effective option for charging an electric vehicle in excess of a local power grid, in particular the power grid of a private household, which has a renewable energy source.

Diese Aufgabe wird gemäß den Merkmalen der unabhängigen Ansprüche gelöst. Bevorzugte Ausführungsformen sind insbesondere den abhängigen Ansprüchen entnehmbar.This task is solved according to the features of the independent claims. Preferred embodiments can be found in particular in the dependent claims.

Die Aufgabe wird gelöst durch ein Verfahren zum Laden eines Elektrofahrzeugs an einem lokalen Stromnetz, das mindestens eine regenerative Strom- bzw. Energiequelle und mindestens einen Ladepunkt zum Laden des Elektrofahrzeugs aufweist, wobei bei dem Verfahren

  • - für ein mit dem Ladepunkt gekoppeltes Elektrofahrzeug dessen Ladebedarf und dessen voraussichtliche Abfahrtszeit vorgehalten wird,
  • - eine prognostizierte zeitliche Verteilung einer Überschussleistung des lokalen Stromnetzes für die voraussichtliche Abstelldauer des Elektrofahrzeugs anhand einer Differenz zwischen einer prognostizierten zeitlichen Verteilung einer elektrischen Leistung der mindestens einen regenerativen Energiequelle bestimmt wird,
  • - für das gekoppelte Elektrofahrzeug ein Ladeplan anhand der prognostizierten zeitlichen Verteilung der Überschussleistung dergestalt aufgestellt wird, dass das Elektrofahrzeug zur voraussichtlichen Abfahrtszeit einen gewünschten Ladezustand aufweist und die Überschussleistung zum Laden des Elektrofahrzeugs verwendet wird, und
  • - das Elektrofahrzeug entsprechend dem Ladeplan aufgeladen wird.
The object is achieved by a method for charging an electric vehicle on a local power grid, which has at least one renewable power or energy source and at least one charging point for charging the electric vehicle, wherein in the method
  • - for an electric vehicle coupled to the charging point, its charging requirement and its expected departure time are kept available,
  • - a predicted time distribution of an excess power of the local power grid for the expected parking period of the electric vehicle is determined based on a difference between a predicted time distribution of an electrical power of the at least one renewable energy source,
  • - a charging plan is drawn up for the coupled electric vehicle based on the predicted temporal distribution of the excess power in such a way that the electric vehicle has a desired state of charge at the expected departure time and the excess power is used to charge the electric vehicle, and
  • - the electric vehicle is charged according to the charging plan.

Dieses Verfahren weist den Vorteil auf, dass es ohne Lokalnetz-Energiemessgerät auskommt, was Kosten und Aufwand durch Installation, Wartung und Betrieb spart. Dennoch kann das Elektrofahrzeug aufgrund der Prognose(n) mit hoher Wahrscheinlichkeit im Überschuss geladen werden. Die Prognose(n) ermöglichen es zudem vorteilhafterweise, den Ladeplan zeitlich besonders flexibel zu gestalten, was beispielsweise eine besonders kostengünstige Ladung ermöglicht.This method has the advantage that it does not require a local network energy meter, which saves costs and effort through installation, maintenance and operation. Nevertheless, based on the forecast(s), the electric vehicle can most likely be charged in excess. The forecast(s) also advantageously make it possible to make the charging plan particularly flexible in terms of time, which, for example, enables particularly cost-effective charging.

Das Elektrofahrzeug kann ein Plug-In-Hybridfahrzeug (auch als „PHEV“ bezeichnet) oder ein vollelektrisch angetriebenes Fahrzeug (auch als „BEV“ gezeichnet) sein. Das Laden des Elektrofahrzeugs umfasst ein Laden eines elektrischen Energiespeichers, im Folgenden ohne Beschränkung der Allgemeinheit als „Batterie“ bezeichnet, insbesondere zumindest einer Antriebsbatterie des Elektrofahrzeugs. Das Elektrofahrzeug ist insbesondere ein Personenwagen oder ein Motorrad.The electric vehicle can be a plug-in hybrid vehicle (also referred to as a “PHEV”) or a fully electric vehicle (also referred to as a “BEV”). Charging the electric vehicle includes charging an electrical energy storage device, hereinafter referred to as a “battery” without limiting generality, in particular at least one drive battery of the electric vehicle. The electric vehicle is in particular a passenger car or a motorcycle.

Das lokale Stromnetz ist insbesondere ein an ein öffentliches Stromversorgungsnetz angeschlossenes Stromnetz, wobei am Netzanschlusspunkt zwischen dem öffentlichen Stromversorgungsnetz und dem lokalen Stromnetz typischerweise ein von dem Energieversorger, einem Energiehändler oder einem Messtellenbetreiber installiertes externes, typischerweise abrechnungsrelevantes Energiemessgerät vorhanden ist, über den eine aus dem öffentlichen Stromversorgungsnetz bezogene Strommenge und eine in das öffentliche Stromversorgungsnetz eingespeiste Strommenge gemessen wird, beispielsweise zu Abrechnungszwecken. Das lokale Stromnetz umfasst insbesondere ein Wechselspannungsnetz, an das Gleichspannungsgeräte wie eine Photovoltaikanlage, eine Fahrzeugbatterie, ein stationären Stromspeicher usw. über entsprechende uni- oder bidirektionale Stromrichter angeschlossen sind oder werden können.The local power grid is, in particular, a power grid connected to a public power grid, with typically one of at the grid connection point between the public power grid and the local power grid The energy supplier, an energy retailer or a measuring point operator has an external, typically billing-relevant energy measuring device installed, via which an amount of electricity drawn from the public power supply network and an amount of electricity fed into the public power supply network are measured, for example for billing purposes. The local power grid includes in particular an alternating voltage network to which direct voltage devices such as a photovoltaic system, a vehicle battery, a stationary power storage device, etc. are or can be connected via appropriate uni- or bi-directional power converters.

Es ist eine Weiterbildung, dass das externe Energiemessgerät ein Smart Meter ist, dass automatisch eine Leistung misst und an eine Erfassungsstelle übermittelt. Ist dies der Fall, können in einer Weiterbildung diese Messdaten über ein Smart Meter-Gateway an den Nutzer des lokalen Stromnetzes weitergeleitet werden, z.B. über ein EEBus-Protokoll.It is a further development that the external energy measuring device is a smart meter that automatically measures power and transmits it to a recording point. If this is the case, in a further development these measurement data can be forwarded to the user of the local power grid via a smart meter gateway, e.g. via an EEBus protocol.

Es ist eine Ausgestaltung, dass lokale Stromnetz ein Stromnetz eines Privathaushalts ist, z.B. eines privaten Wohnhauses oder einer Wohnung.It is an embodiment that the local power grid is a power grid of a private household, e.g. a private residential building or an apartment.

Die mindestens eine regenerative Energiequelle kann beispielsweise mindestens eine Photovoltaikanlage, mindestens eine Windkraftanlage, mindestens eine Geothermieanlage, usw. umfassen oder sein. Eine elektrischen Leistung der mindestens einen regenerativen Energiequelle entspricht der durch die mindestens eine regenerative Energiequelle in das lokale Stromnetz eingespeisten „regenerativen“ elektrischen Leistung. Die (Gleichspannungs-)Photovoltaikanlage kann über einen unidirektionalen Wechselrichter mit dem restlichen lokalen (Wechselspannungs-)Stromnetz verbunden sein.The at least one renewable energy source can include or be, for example, at least one photovoltaic system, at least one wind turbine, at least one geothermal system, etc. An electrical power of the at least one regenerative energy source corresponds to the “regenerative” electrical power fed into the local power grid by the at least one regenerative energy source. The (DC) photovoltaic system can be connected to the rest of the local (AC) power grid via a unidirectional inverter.

Der mindestens eine Ladepunkt kann mindestens eine Ladesäule mit ein oder mehreren Ladepunkten, mindestens eine Wallbox, mindestens eine induktive Ladefläche, usw. umfassen oder sein. Der Ladepunkt kann auch als „EVSE“ bezeichnet werden.The at least one charging point can include or be at least one charging station with one or more charging points, at least one wallbox, at least one inductive charging area, etc. The charging point can also be referred to as “EVSE”.

Dass ein Elektrofahrzeug mit dem Ladepunkt gekoppelt ist, kann insbesondere umfassen, dass das Elektrofahrzeug bzw. dessen Batterie(n) durch den Ladepunkt ladbar sind, z.B. weil ein Ladekabel angeschlossen ist oder das Elektrofahrzeug auf einer induktiven Ladefläche abgestellt ist. Es ist eine Weiterbildung, dass das Elektrofahrzeug und der Ladepunkt miteinander über einen Kommunikationskanal uni- oder bidirektional digital kommunizieren können, beispielsweise gemäß ISO 15118 / IEC 61851. Eine Leistungselektronik zur Wandlung von netzseitiger Wechselspannung in Gleichspannung der Batterie des Elektrofahrzeugs, und ggf. auch umgekehrt, kann innerhalb oder außerhalb des Elektrofahrzeugs erfolgen. Die Regelung des Lade- und ggf. auch Entladevorgangs kann in Ladecontroller übernehmen, an den über den digitalen Kommunikationskanal Vorgaben zur Ladesteuerung gesandt werden.The fact that an electric vehicle is coupled to the charging point can in particular include that the electric vehicle or its battery(s) can be charged through the charging point, e.g. because a charging cable is connected or the electric vehicle is parked on an inductive charging surface. It is a further development that the electric vehicle and the charging point can communicate with each other unidirectionally or bidirectionally digitally via a communication channel, for example in accordance with ISO 15118 / IEC 61851. Power electronics for converting the AC voltage from the grid into the DC voltage of the battery of the electric vehicle, and if necessary vice versa , can be done inside or outside the electric vehicle. The regulation of the charging and, if necessary, discharging process can be carried out by charging controllers, to which specifications for charging control are sent via the digital communication channel.

Dass für ein mit dem Ladepunkt gekoppeltes Elektrofahrzeug dessen Ladebedarf und dessen voraussichtliche Abfahrtszeit vorgehalten werden, umfasst insbesondere, dass der Ladebedarf und die voraussichtliche Abfahrtszeit abrufbar gespeichert sind.The fact that the charging requirement and the expected departure time of an electric vehicle coupled to the charging point are stored includes, in particular, that the charging requirement and the expected departure time are stored in a retrievable manner.

Beispielsweise können der Ladebedarf und dessen voraussichtliche Abfahrtszeit in einer Datenverarbeitungseinrichtung gespeichert sein, die insbesondere auch dazu eingerichtet ist, den Ladeplan zu erstellen. Die Datenverarbeitungseinrichtung kann eine lokal in dem Haushalt vorhandene Datenverarbeitungseinrichtung, z.B. ein Computer oder eine IT-Anlage sein. Alternativ kann die Datenverarbeitungseinrichtung eine externe Instanz wie ein Cloudrechner oder ein Netzwerk-Server sein.For example, the charging requirement and its expected departure time can be stored in a data processing device, which is in particular also set up to create the charging plan. The data processing device can be a data processing device located locally in the household, for example a computer or an IT system. Alternatively, the data processing device can be an external entity such as a cloud computer or a network server.

Es ist eine Weiterbildung, dass der Ladebedarf aus einer Differenz zwischen einem aktuellen Ladezustand (SoC; „State-of-Charge“) des Elektrofahrzeugs und einem gewünschten Ladezustand bestimmt wird. Der gewünschte Ladezustand kann beispielsweise ein fest vorgegebener Wert (z.B. 80 % SoC) oder ein auf die Mobilitätsbedürfnisse des Nutzers des Elektrofahrzeugs nach Abfahrt abgestimmter Ladezustand bzw. Speicherfüllstand sein. Der Ladebedarf kann z.B. eine Energiemenge sein. Die Bestimmung des Ladebedarfs ist grundsätzlich bekannt und wird deshalb nicht weiter ausgeführt.It is a further development that the charging requirement is determined from a difference between a current state of charge (SoC) of the electric vehicle and a desired state of charge. The desired state of charge can, for example, be a fixed value (e.g. 80% SoC) or a state of charge or storage level that is tailored to the mobility needs of the user of the electric vehicle after departure. The charging requirement can be, for example, an amount of energy. The determination of the charging requirement is basically known and will therefore not be explained further.

Die Abfahrtszeit kann beispielsweise von einem Nutzer angegeben werden, über eine Angabe eines Zielorts und einer Zielzeit zusammen mit einer Routenplanung abgeschätzt werden oder kann aus Historiendaten abgeschätzt werden.The departure time can, for example, be specified by a user, estimated by specifying a destination and a destination time together with route planning, or can be estimated from history data.

Die Überschussleistung des lokalen Stromnetzes entspricht vorliegend einer Differenz der durch die mindestens eine regenerative Energiequelle in das lokalen Stromnetz eingespeisten Leistung abzüglich der von lokalen Verbrauchern des lokalen Stromnetzes zum selben Zeitpunkt verbrauchten Leistung. Das mindestens eine Elektrofahrzeug zählt dabei nicht zu den lokalen Verbrauchern. Ist also eine Überschussleistung vorhanden, wird diese zumindest teilweise zum Laden des Elektrofahrzeugs verwendet und nur ein nicht zum Laden verwendeter Anteil, falls dann noch vorhanden, kann in das öffentliche Stromversorgungsnetz eingespeist werden. Lokale Verbraucher können beispielsweise Küchengeräte, Waschmaschinen, Lampen, weiterer Elektrogeräte usw. sein.In the present case, the excess power of the local power grid corresponds to a difference in the power fed into the local power grid by the at least one renewable energy source minus the power consumed by local consumers of the local power grid at the same time. The at least one electric vehicle is not considered a local consumer. If excess power is available, it is at least partially used to charge the electric vehicle and only a portion not used for charging, if still available, can be fed into the public power supply network. Local consumers can, for example Kitchen appliances, washing machines, lamps, other electrical appliances, etc.

Der Ladeplan beruht also im einfachsten Fall nur auf der prognostizierten bzw. voraussichtlichen oder wahrscheinlichen Überschussleistung und nicht auf einer Ad-hoc-Messung des am Netzanschlusspunkt zum öffentlichen Stromversorgungsnetz fließenden Stroms. Dadurch mag es zwar zu einigen Zeiten mit von der Realität abweichender Prognose zu einem Aufladen des Elektrofahrzeugs aus dem öffentlichen Stromversorgungsnetz kommen, jedoch wird dieser sich ggf. ergebende Kostennachteil durch die Einsparung eines Lokalnetz-Energiemessgeräts an dem Ladepunkt in der Regel mehr als ausgeglichen.In the simplest case, the charging plan is based only on the forecast or expected or probable excess power and not on an ad hoc measurement of the electricity flowing at the network connection point to the public power supply network. As a result, the electric vehicle may have to be charged from the public power supply network at some times when the forecast differs from reality, but this possible cost disadvantage is usually more than compensated for by the saving of a local network energy meter at the charging point.

Der Ladeplan kann beispielsweise eine Festlegung einer zeitliche Verteilung einer zum Laden des Elektrofahrzeugs angeforderten oder bereitgestellten Ladeleistung während des Abstellzeitraums des Elektrofahrzeugs („Lastgang“) umfassen.The charging plan can, for example, include a determination of a time distribution of a charging power requested or provided to charge the electric vehicle during the parking period of the electric vehicle (“load profile”).

Dass die Überschussleistung aus dem lokalen Stromnetz zum Laden des Elektrofahrzeugs verwendet wird, kann umfassen, dass die Überschussleistung ganz oder teilweise zum Laden des Elektrofahrzeugs verwendet wird.Using the excess power from the local power grid to charge the electric vehicle may include using all or part of the excess power to charge the electric vehicle.

Dass das Elektrofahrzeug entsprechend dem Ladeplan aufgeladen wird, kann in einer Weiterbildung umfassen, dass der Ladeplan an den Ladepunkt kommuniziert wird und dann der Ladepunkt den Ladevorgang steuert. Alternativ kann darunter verstanden werden, dass der Ladeplan an das Elektrofahrzeug kommuniziert wird und dann das Elektrofahrzeug den Ladevorgang steuert. Dass das Elektrofahrzeug entsprechend dem Ladeplan aufgeladen wird, kann also umfassen, dass das Elektrofahrzeug und/oder der Ladepunkt dazu ertüchtigt wird, den Ladevorgang gemäß dem Ladeplan zu steuern.In a further development, the fact that the electric vehicle is charged according to the charging plan can include the charging plan being communicated to the charging point and then the charging point controlling the charging process. Alternatively, this can be understood to mean that the charging plan is communicated to the electric vehicle and then the electric vehicle controls the charging process. Charging the electric vehicle according to the charging plan can therefore include enabling the electric vehicle and/or the charging point to control the charging process according to the charging plan.

Es ist eine Ausgestaltung, dass die mindestens eine regenerative Energiequelle eine Photovoltaikanlage umfasst und die prognostizierte zeitliche Verteilung der elektrischen Leistung der Photovoltaikanlage nur anhand von Anlagendaten (z.B. umfassend eine Leistungsfähigkeit, Ausrichtung, Aufstellort, usw.) und Sonnenstandsdaten (z.B. umfassend eine Sonneneinstrahlung, insbesondere Strahlungsintensität) prognostiziert wird. Eine solche Prognose ist besonders einfach bereitstellbar. So werden die Anlagendaten bei Planung oder Aufbau der Photovoltaikanlage erstellt, die Sonnenstandsdaten sind für den Aufstellort der Photovoltaikanlage einfach verfügbar.It is an embodiment that the at least one renewable energy source comprises a photovoltaic system and the predicted temporal distribution of the electrical power of the photovoltaic system only based on system data (e.g. comprising performance, orientation, installation location, etc.) and sun position data (e.g. comprising solar radiation, in particular Radiation intensity) is predicted. Such a forecast is particularly easy to provide. The system data is created when planning or setting up the photovoltaic system, and the sun position data is easily available for the installation location of the photovoltaic system.

Es ist eine Ausgestaltung, dass die mindestens eine regenerative Energiequelle eine Photovoltaikanlage umfasst und die prognostizierte zeitliche Verteilung der elektrischen Leistung der Photovoltaikanlage anhand von Anlagendaten und Sonnenstandsdaten und zusätzlich anhand von Historiendaten und/oder Wettervorhersagen prognostiziert wird. So kann vorteilhafterweise eine besonders genaue Prognose abgegeben werden.It is an embodiment that the at least one renewable energy source comprises a photovoltaic system and the predicted temporal distribution of the electrical power of the photovoltaic system is predicted based on system data and sun position data and additionally based on historical data and/or weather forecasts. In this way, a particularly accurate forecast can advantageously be made.

Es ist eine Ausgestaltung, dass die mindestens eine regenerative Energiequelle eine Windkraftanlage ist die prognostizierte zeitliche Verteilung der elektrischen Leistung der Windkraftanlage anhand einer Windprognose und eines Modells der Windkraftanlage prognostiziert wird.It is an embodiment that the at least one renewable energy source is a wind turbine, the predicted temporal distribution of the electrical power of the wind turbine is predicted based on a wind forecast and a model of the wind turbine.

Es ist eine Ausgestaltung, dass die prognostizierte zeitliche Verteilung der Überschussleistung des lokalen Stromnetzes anhand von Historiendaten eines an einem Netzanschlusspunkt zwischen dem lokalen Stromnetz und einem öffentlichen Versorgungsnetz installierten lokalen oder externen Energiemessgeräts bestimmt wird, zu denen kein Elektrofahrzeug geladen worden ist. Dies ist vorteilhaft, weil sich so auf besonders einfache Weise ein elektrischer Leistungsverbrauch im lokalen Stromnetz ohne spezielle Messungen berücksichtigt werden kann. Solche Historiendaten können beispielsweise für Zeiträume ermittelt werden, in denen noch kein Ladepunkt an dem lokalen Stromnetz angeschlossen war, für Zeitpunkt ohne Koppelung zwischen Ladepunkt und Elektrofahrzeug, für Zeiträume außerhalb von Ladevorgängen usw.It is an embodiment that the predicted temporal distribution of the excess power of the local power grid is determined based on historical data from a local or external energy measuring device installed at a grid connection point between the local power grid and a public supply grid, to which no electric vehicle has been charged. This is advantageous because it allows electrical power consumption in the local power grid to be taken into account in a particularly simple way without special measurements. Such historical data can be determined, for example, for periods in which no charging point was yet connected to the local power grid, for times when there was no connection between the charging point and the electric vehicle, for periods outside of charging processes, etc.

Es ist eine Ausgestaltung, dass die prognostizierte zeitliche Verteilung der Überschussleistung anhand einer Differenz zwischen der prognostizierten zeitlichen Verteilung der elektrischen Leistung der mindestens einen regenerativen Energiequelle und einer prognostizierten zeitlichen Verteilung einer von dem lokalen Stromnetz verbrauchten elektrischen Leistung bestimmt wird. Dies ergibt den Vorteil, dass sich die Überschussleistung ganz besonders genau prognostizieren lässt.It is an embodiment that the predicted temporal distribution of the excess power is determined based on a difference between the predicted temporal distribution of the electrical power of the at least one renewable energy source and a predicted temporal distribution of an electrical power consumed by the local power grid. This has the advantage that excess performance can be forecast particularly precisely.

Es ist eine Ausgestaltung, dass die von dem lokalen Stromnetz verbrauchte elektrische Leistung anhand von Historiendaten oder anhand einer geschätzten zeitlichen Verteilung prognostiziert wird. Dies ist vorteilhafterweise besonders einfach umsetzbar. Die geschätzte zeitliche Verteilung kann beispielsweise eine Schätzung anhand eines typischen Energieverbrauchs von Häusern ähnlicher Größe, Bauart, und ggf. auch Standort und/oder Bewohnerzahl umfassen.It is an embodiment that the electrical power consumed by the local power grid is predicted based on historical data or based on an estimated temporal distribution. This is advantageously particularly easy to implement. The estimated time distribution can, for example, include an estimate based on typical energy consumption of houses of similar size, design, and possibly also location and/or number of residents.

Es ist eine Ausgestaltung, dass die prognostizierte zeitliche Verteilung der verbrauchten elektrischen Leistung einem vorgegebenen Spitzenwert entspricht. Dies ist vorteilhaft, um das Elektrofahrzeug besonders zuverlässig nur im Überschuss zu laden. Der Spitzenwert kann beispielsweise einem gemessenen Maximum einer verbrauchten elektrischen Leistung oder einem anderen Wert, der insbesondere höher als ein Mittelwert einer Leistung ist, entsprechen, z.B. 90 % des Spitzenwerts, 125 % des Mittelwerts. Der Spitzenwert kann für den zu planenden Lade- oder Abstellzeitraum als konstant angenommen werden oder kann einer zeitlichen Leistungsverteilung mit individuellen Spitzenwert zu jeweiligen Zeitpunkten entsprechen.It is an embodiment that the predicted time distribution of the consumed electrical power corresponds to a predetermined peak value. This is advantageous in order to charge the electric vehicle particularly reliably, only in excess. The peak value can, for example, be one measured maximum of a consumed electrical power or another value that is in particular higher than an average value of a power, for example 90% of the peak value, 125% of the average value. The peak value can be assumed to be constant for the charging or shutdown period to be planned or can correspond to a temporal power distribution with individual peak values at respective points in time.

Es ist eine Ausgestaltung, dass der Ladeplan dergestalt aufgestellt bzw. ausgebildet wird, dass das Elektrofahrzeug nur dann geladen wird bzw. werden soll, wenn die prognostizierte Überschussleistung einen zum Laden des Elektrofahrzeugs benötigten oder empfohlenen Mindestschwellwert überschreitet. So wird vorteilhafterweise berücksichtigt, dass bestimmte Zeiträume trotz eines nominellen Überschusses möglicherweise nicht zum Laden des Elektrofahrzeugs zur Verfügung stehen. Dies wiederum ermöglicht ein noch zuverlässigeres Laden. Beispielsweise kann ein Mindestschwellwert bei 2 kW liegen.It is an embodiment that the charging plan is set up or designed in such a way that the electric vehicle is or should only be charged when the predicted excess power exceeds a minimum threshold value required or recommended for charging the electric vehicle. This advantageously takes into account that certain periods of time may not be available for charging the electric vehicle despite a nominal surplus. This in turn enables even more reliable charging. For example, a minimum threshold may be 2 kW.

Es ist eine Ausgestaltung, dass das lokale Stromnetz ein zwischenspeicherloses Stromnetz ist und der Ladeplan dergestalt aufgestellt wird, dass die Überschussleistung unmittelbar zum Laden des Elektrofahrzeugs verwendet wird. So wird der Vorteil erreicht, dass das lokale Stromnetz besonders einfach ausgestaltet sein kann und dadurch das Verfahren insbesondere auch für Privathaushalte besonders geeignet ist. Dass das lokale Stromnetz zwischenspeicherlos ist, kann insbesondere umfassen, dass an ihm kein stationärer Stromspeicher angeschlossen ist, der dazu vorgesehen (d.h., ausgestaltet und angeschlossen) ist, die von der regenerativen Energiequelle erzeugte Strommenge zur späteren Nutzung in dem lokale Stromnetz zwischenzuspeichern.It is an embodiment that the local power grid is a power grid without buffer storage and the charging plan is set up in such a way that the excess power is used directly to charge the electric vehicle. This achieves the advantage that the local power grid can be designed to be particularly simple and the method is therefore particularly suitable for private households. The fact that the local power grid does not have a buffer can in particular mean that there is no stationary power storage connected to it, which is intended (i.e. designed and connected) to temporarily store the amount of electricity generated by the renewable energy source for later use in the local power grid.

Es ist eine Ausgestaltung, dass das lokale Stromnetz einen stationären Stromspeicher aufweist, der dazu vorgesehen ist, die von der regenerativen Energiequelle erzeugte elektrische Energie bzw. Strom zur späteren Nutzung in dem lokale Stromnetz zwischenzuspeichern. Dies ermöglicht vorteilhafterweise eine Aufstellung einer besonders flexiblen gut optimierten Ladeplans. Es ist eine Ausgestaltung, dass der Ladeplan dergestalt aufgestellt wird, dass die Überschussleistung unmittelbar zum Laden des Elektrofahrzeugs verwendet wird und dass dann, wenn keine Überschussleistung zur Verfügung steht, das Elektrofahrzeug aus dem stationären Stromspeicher aufgeladen wird. So kann der Ladeplan vorteilhafterweise zeitlich flexibler aufgestellt werden. Der stationäre Stromspeicher kann z.B. über einen bidirektionalen Stromrichter mit dem restlichen lokalen Stromnetz verbunden sein.It is an embodiment that the local power grid has a stationary power storage device, which is intended to temporarily store the electrical energy or electricity generated by the renewable energy source for later use in the local power grid. This advantageously enables a particularly flexible, well-optimized charging plan to be drawn up. It is an embodiment that the charging plan is drawn up in such a way that the excess power is used directly to charge the electric vehicle and that if no excess power is available, the electric vehicle is charged from the stationary power storage. This means that the charging plan can advantageously be set up more flexibly in terms of time. The stationary power storage can be connected to the rest of the local power grid via a bidirectional power converter, for example.

Es ist eine Weiterbildung, dass der stationäre Stromspeicher nur aus der regenerativen Energiequelle gespeist wird.It is a further development that the stationary power storage is only fed from the renewable energy source.

Es ist eine Ausgestaltung, dass dann, wenn der Ladebedarf größer oder gleich der bis zu dem Abfahrtzeitpunkt prognostizierten Überschuss-Energie ist, das Elektrofahrzeug mit maximaler Leistung aus der prognostizierte Überschussleistung geladen wird. So wird der Vorteilerreicht, dass besonders viel Überschuss-Energie zum Laden verwendet werden kann bzw. ein besonders hoher Anteil des Ladebedarfs durch Überschussenergie gedeckt wird. Ein noch fehlender Anteil des Ladebedarfs kann auf Wunsch oder bei Bedarf aus dem stationären Stromspeicher, falls vorhanden, und/oder aus dem öffentlichen Stromversorgungsnetz gespeist werden.It is an embodiment that if the charging requirement is greater than or equal to the excess energy forecast up to the time of departure, the electric vehicle is charged with maximum power from the forecast excess power. This has the advantage that a particularly large amount of excess energy can be used for charging or a particularly high proportion of the charging requirement is covered by excess energy. If desired or required, any remaining portion of the charging requirement can be supplied from the stationary power storage system, if available, and/or from the public power supply network.

Es ist eine Ausgestaltung, dass dann, wenn der Ladebedarf geringer ist als die bis zu dem Abfahrtzeitpunkt prognostizierte Überschuss-Energie ist, das Elektrofahrzeug mit einer weniger als maximalen Leistung aus der prognostizierte Überschussleistung geladen wird. Dadurch können die Laderadbedingungen vorteilhafterweise so gewählt werden, dass sich außer dem Erreichen des gewünschten Ladezustands zum Abfahrtszeitpunkt weitere Vorteile erreichen lassen. So kann der Ladeplan derart aufgestellt werden, dass er auch folgende Ziele erreicht:

  • - besonders batterieschonendes Laden, insbesondere mit geringen Ladeströmen;
  • - Stoppen des Ladens zu Zeiten, in denen es monetär sinnvoller ist, den Überschuss in das öffentliche Stromversorgungsnetz einzuspeisen als zum Laden eines Elektrofahrzeugs zu verwenden;
  • - die Möglichkeit, die Batterie(n) des Elektrofahrzeugs als (ggf. zusätzlichen) Zwischenspeicher mit der Möglichkeit zur Rückspeisung in das lokale Stromnetz und/oder in das öffentliche Stromversorgungsnetz zu verwenden, falls eine solche Rückspeisefähigkeit, z. B. V2G, besteht.
It is an embodiment that if the charging requirement is lower than the excess energy predicted up to the time of departure, the electric vehicle is charged with less than the maximum power from the predicted excess power. As a result, the loading wheel conditions can advantageously be selected so that other advantages can be achieved in addition to reaching the desired charging state at the time of departure. The charging plan can be drawn up in such a way that it also achieves the following goals:
  • - particularly battery-friendly charging, especially with low charging currents;
  • - Stopping charging at times when it makes more monetary sense to feed the surplus into the public power grid than to use it to charge an electric vehicle;
  • - the possibility of using the battery(s) of the electric vehicle as (possibly additional) intermediate storage with the possibility of feeding back into the local power grid and/or into the public power grid, if such recovery capability, e.g. B. V2G.

Wie bereits oben ausgeführt, kann das Verfahren vorteilhafterweise auch ohne Lokalnetz-Energiemessgerät am Ladepunkt durchgeführt werden. Es ist jedoch eine vorteilhafte Weiterbildung, dass zusätzlich Messdaten über einen Energie- bzw. Leistungsfluss aus dem lokalen Stromnetz in das öffentliche Stromversorgungsnetz und umgekehrt vorliegen, sei es durch Vorhandensein eines Lokalnetz-Energiemessgeräts oder durch einen externen „Smart Meter“-Hauszähler des Energieversorgers/Messtellenbetreibers am Netzanschlusspunkt, dessen Messdaten dem Nutzer des lokalen Stromnetzes vorliegen. Insbesondere können so Ladezeiträume verhindert werden, bei denen das Elektrofahrzeug aus dem öffentlichen Stromversorgungsnetz geladen würde. Zudem bleiben die Vorteile der Prognose für den zukünftigen Ladeplan bestehen, und die Prognosequalität kann sogar durch die Messdaten verbessert werden.As already stated above, the method can advantageously also be carried out at the charging point without a local network energy measuring device. However, it is an advantageous further development that additional measurement data about an energy or power flow from the local power grid to the public power grid and vice versa is available, be it through the presence of a local grid energy measuring device or through an external “smart meter” house meter from the energy supplier/ Measuring point operator at the grid connection point, whose measurement data is available to the user of the local power grid. In particular, this can prevent charging periods during which the electric vehicle would be charged from the public power supply network. In addition, the advantages of the forecast for the future charging plan remain, and the forecast quality can even be improved by the measurement data.

Die Prognosequalität kann auch dadurch verbessert werden, dass während des Ladevorgangs bestimmte weitere Messwerte zur Überprüfung und/oder Aktualisierung des Ladeplans verwendet werden, beispielsweise um dessen Zielgenauigkeit und/oder um dessen Prognosequalität zu verbessern.The forecast quality can also be improved by using certain additional measured values to check and/or update the charging plan during the charging process, for example in order to improve its target accuracy and/or to improve its forecast quality.

Beispielsweise können zur Aufstellung und/oder Aktualisierung des Ladeplans folgende weitere Messwerte verwendet werden:

  • - Messwerte der aus der Photovoltaik-Anlage in das lokale Stromnetz eingespeisten PV-Leistung, gemessen z.B. durch den zugehörigen Wechselrichter;
  • - Messwerte der mit dem Zwischenspeicher ausgetauschten Energiemenge, gemessen z.B. durch den zugehörigen Stromrichter;
  • - Messwerte der mit dem Ladepunkt ausgetauschten Energiemenge bzw. der tatsächlichen Lade- bzw. Rückspeise-Energiemenge zu bzw. von dem Elektrofahrzeug, gemessen beispielsweise durch einen dem Ladepunkt zugeordneten Gleichrichters oder Stromrichters.
For example, the following additional measured values can be used to set up and/or update the charging plan:
  • - Measured values of the PV power fed into the local power grid from the photovoltaic system, measured for example by the associated inverter;
  • - Measured values of the amount of energy exchanged with the buffer, measured for example by the associated power converter;
  • - Measured values of the amount of energy exchanged with the charging point or the actual amount of charging or recovery energy to or from the electric vehicle, measured for example by a rectifier or power converter assigned to the charging point.

Es ist eine Weiterbildung, dass die ab dem Messzeitpunkt noch vorliegenden Leistungsprognose(n) selbst anhand der gemessenen Energiemengen bzw. Leistungen aktualisiert wird bzw. werden.It is a further development that the performance forecast(s) that are still available from the time of measurement are themselves updated based on the measured amounts of energy or performance.

Wird keine Abfahrtszeit angegeben und liegt auch sonst keine Abfahrtszeit vor, kann das Elektrofahrzeug beispielsweise möglichst schnell oder möglichst batterieschonend auf einen gewünschten Ladezustand aufgeladen werden. Ist auch der gewünschte Ladezustand nicht bekannt, kann beispielsweise auf einen standardmäßig vorgegebenen Ladezustand, z.B. 80 % SoC, aufgeladen werden. Ist das Elektrofahrzeug rückspeisefähig, kann es dann auch als Zwischenspeicher verwendet werden, wobei eine Abweichung zu dem gewünschten Ladezustand dann insbesondere innerhalb eines eher engen Bands des Ladezustands (z.B. von +/- 10 % SoC) gehalten wird.If no departure time is specified and there is no other departure time, the electric vehicle can, for example, be charged to a desired charge level as quickly or as battery-friendly as possible. If the desired charge level is not known, you can, for example, charge to a standard charge level, e.g. 80% SoC. If the electric vehicle is capable of regenerative energy, it can then also be used as a buffer storage, with any deviation from the desired state of charge then being kept within a rather narrow band of the state of charge (e.g. of +/- 10% SoC).

Die Aufgabe wird auch gelöst durch ein lokales Stromnetz, aufweisend mindestens einen lokalen Verbraucher, mindestens eine regenerative Strom- bzw. Energiequelle und mindestens einen Ladepunkt zum Laden eines Elektrofahrzeugs, wobei das lokale Stromnetz dazu eingerichtet ist, das Verfahren wie oben beschrieben durchzuführen.The task is also solved by a local power grid, having at least one local consumer, at least one renewable power or energy source and at least one charging point for charging an electric vehicle, the local power grid being set up to carry out the method as described above.

Es ist eine Weiterbildung, dass das lokale Stromnetz eine Datenverarbeitungseinrichtung (auch als „IT-System“ bezeichenbar) aufweist, welche mit dem Elektrofahrzeug und/oder mit dem Ladepunkt datentechnisch verbindbar ist und dazu eingerichtet ist, das Verfahren nach einem der vorhergehenden Ansprüche zumindest teilweise durchzuführen, insbesondere den Ladeplan aufzustellen. Alternativ oder zusätzlich ist das lokale Stromnetz mit einer solchen externen Datenverarbeitungseinrichtung wie einem Netzwerkserver oder einem Cloudrechner datentechnisch verbindbar oder verbunden, z.B. über ein Netzwerk wie das Internet o.ä. Die Verbindung mit externen Datenverarbeitungseinrichtung ertüchtigt als das lokale Stromnetz das Verfahren wie oben beschrieben durchzuführen. In einer anderen Sichtweise wird das Verfahren wie oben beschrieben dann durch ein System aus dem lokale Stromnetz und der damit datentechnisch verbundenen externen Datenverarbeitungseinrichtung gelöst.It is a further development that the local power grid has a data processing device (also referred to as an “IT system”), which can be connected to the electric vehicle and/or to the charging point for data technology and is set up to at least partially implement the method according to one of the preceding claims carry out, in particular drawing up the loading plan. Alternatively or additionally, the local power network can be connected or connected in terms of data technology to such an external data processing device such as a network server or a cloud computer, for example via a network such as the Internet or similar. The connection to the external data processing device enables the local power network to carry out the method as described above . In another perspective, the method as described above is then solved by a system consisting of the local power grid and the external data processing device connected to it.

Das lokale Stromnetz kann insbesondere eine oder mehrere der folgenden Komponenten und/oder Eigenschaften aufweisen:

  • - Der Ladepunkt ist über das OCPP Protokoll an die Datenverarbeitungseinrichtung bzw. das IT-System angebunden;
  • - Das Elektrofahrzeug und/oder ein Nutzerendgerät, insbesondere mobiles Nutzerendgerät, z.B. ein Smartphone, sind mit der Datenverarbeitungseinrichtung vernetzt. Informationen bzw. Präferenzen zum Fahrzeugzustand und Ladevorgang werden im Elektrofahrzeug und/oder das Nutzerendgerät dargestellt und gesteuert;
  • - Das Elektrofahrzeug und/oder das Nutzerendgerät kommuniziert beispielsweise eine ID, Ankunftszeit, gewünschte oder abgeschätzte Abfahrtzeit und benötigte und verfügbare Energiemengen der Fahrzeugbatterie an die Datenverarbeitungseinrichtung;
  • - Die Datenverarbeitungseinrichtung ist dazu eingerichtet, z.B. dazu programmiert, eine Prognose der Energieerzeugung durch die regenerative Energiequelle(n), eine Prognose des Energieverbrauchs und ggf. eine Energiespeicherprognose vorzuhalten oder zu berechnen. Beispielsweise kann die Energieerzeugungsprognose mit Aufstellung der regenerativen Energiequelle in der Datenverarbeitungseinrichtung hinterlegt worden sein, z.B. in Form einer Tabelle oder Kennlinie;
  • - Die Prognose der Energieerzeugung wird insbesondere abgeglichen mit dem erwarteten Energieverbrauch im lokalen Stromnetz und ggf. der Energiespeichermöglichkeiten entweder durch einen stationären Stromspeicher oder unter Einbeziehung der Fahrzeugbatterie als zusätzlichen Pufferspeicher im Fall eines rückspeisefähigen Elektrofahrzeugs;
  • - Eine lokale Energiemessung kann zusätzlich oder alternativ durch den „Smart Meter“-Hauszähler des Energieversorgers/Messtellenbetreibers am Netzanschlusspunkt erfolgen und in die Energieerzeugung/ -verbrauchs-Prognose mit eingehen.
  • - Ein Optimierer bzw. eine mit einem Optimierungsalgorithmus programmierte Datenverarbeitungseinrichtung nutzt die Ankunftszeit, Abfahrtzeit sowie die benötigten und verfügbaren Energiemengen und prognostiziert einen Lastgang (Leistung (P) über die Zeit (t)), der für den Ladepunkt / das Elektrofahrzeug auf einen Ladezustand des Elektrofahrzeugs zum Zeitpunkt der Abfahrtzeit hin optimiert ist;
  • - Das Laden des Elektrofahrzeugs erfolgt unter Nutzung regenerativer Energie aus Eigenerzeugung und insbesondere unter einer Minimierung des Netzbezugs, wobei auch Speicherkapazitäten durch stationäre Energiespeicher und Elektrofahrzeuge mit Rückspeisefähigkeit prognostiziert werden können;
  • - Wenn ein Netzbezug notwendig ist, sollte dieser zu möglichst geringen Kosten und/oder mit Strom aus erneuerbaren Energien sattfinden;
  • - Wenn Energie in das öffentliche Stromversorgungsnetz eingespeist wird, passiert dies vorteilhafterweise zu Zeiten, zu denen maximale Erlöse erwirtschaftet werden können bzw. der Bedarf an erneuerbaren Energien hoch ist. So wird sichergestellt, dass das Elektrofahrzeug zur Abfahrtzeit auf den z.B. durch den Nutzer spezifizierten Ladezustand bzw. Speicherfüllstand geladen ist, und zwar unter Optimierung des Energieeigenbedarfs, der Energiekosten, der Energieerlöse und/oder der Nutzung von CO2freien erneuerbaren Energien;
  • - Der Nutzer kann, z.B. über das Nutzerendgerät, informiert werden, wenn diese Optimierung nicht erreicht werden kann.
The local power grid can in particular have one or more of the following components and/or properties:
  • - The charging point is connected to the data processing device or IT system via the OCPP protocol;
  • - The electric vehicle and/or a user terminal, in particular a mobile user terminal, for example a smartphone, are networked with the data processing device. Information or preferences regarding the vehicle status and charging process are displayed and controlled in the electric vehicle and/or the user terminal;
  • - The electric vehicle and/or the user terminal communicates, for example, an ID, arrival time, desired or estimated departure time and required and available amounts of energy from the vehicle battery to the data processing device;
  • - The data processing device is set up, for example programmed, to maintain or calculate a forecast of energy production by the renewable energy source(s), a forecast of energy consumption and, if necessary, an energy storage forecast. For example, the energy production forecast with a list of the renewable energy source can have been stored in the data processing device, for example in the form of a table or characteristic curve;
  • - The forecast of energy production is compared in particular with the expected energy consumption in the local power grid and, if necessary, the energy storage options either through a stationary power storage system or including the vehicle battery as an additional buffer storage in the case of a regenerative electric vehicle;
  • - Local energy measurement can additionally or alternatively be carried out by the energy supplier/measuring point operator's “smart meter” house meter at the grid connection point and included in the energy production/consumption forecast.
  • - An optimizer or a data processing device programmed with an optimization algorithm uses the arrival time, departure time as well as the required and available amounts of energy and predicts a load profile (power (P) over time (t)) that corresponds to a charging state of the charging point / electric vehicle Electric vehicle is optimized at the time of departure;
  • - The electric vehicle is charged using renewable energy from self-generation and in particular by minimizing the grid consumption, whereby storage capacities can also be predicted through stationary energy storage and electric vehicles with regenerative capacity;
  • - If a connection to the grid is necessary, it should be at the lowest possible cost and/or with electricity from renewable energies;
  • - When energy is fed into the public power supply network, this advantageously happens at times when maximum revenue can be generated or when the need for renewable energies is high. This ensures that the electric vehicle is charged at the time of departure to the charge level or storage level specified by the user, for example, while optimizing its own energy requirements, energy costs, energy revenues and/or the use of CO2 - free renewable energies;
  • - The user can be informed, for example via the user device, if this optimization cannot be achieved.

Die Aufgabe wird ferner gelöst durch ein Wohnhaus, insbesondere privates Wohnhaus, aufweisend ein lokales Stromnetz wie oben beschrieben. Das Wohnhaus kann analog zu dem Verfahren und/oder zu dem lokalen Stromnetz ausgebildet werden, und umgekehrt, und weist die gleichen Vorteile auf.The task is further solved by a residential building, in particular a private residential building, having a local power grid as described above. The residential building can be designed analogously to the method and/or to the local power grid, and vice versa, and has the same advantages.

Die oben beschriebenen Eigenschaften, Merkmale und Vorteile dieser Erfindung sowie die Art und Weise, wie diese erreicht werden, werden klarer und deutlicher verständlich im Zusammenhang mit der folgenden schematischen Beschreibung eines Ausführungsbeispiels, das im Zusammenhang mit den Zeichnungen näher erläutert wird.The characteristics, features and advantages of this invention described above and the manner in which they are achieved will be more clearly and clearly understood in connection with the following schematic description of an exemplary embodiment, which will be explained in more detail in connection with the drawings.

1 zeigt eine Skizze eines lokalen Stromnetzes 1, an das ein Elektrofahrzeug BEV angeschlossen ist. Das lokale Stromnetz 1 ist Teil eines Privathauses PH, das mit einer Photovoltaikanlage 2, insbesondere Dachanlage, ausgerüstet ist, die über einen Wechselrichter 2a an das restliche lokale Stromnetz 1 angeschlossen ist. Das lokale Stromnetz 1 ist ein Wechselstromnetz, das z.B. eine Nennspannung von 110 V, 230 V oder - bei Drehstrom für 3-phasiges Laden - zwischen 380 V bis 400 V aufweisen kann. An das lokale Stromnetz 1 sind Verbraucher wie z.B. Küchengeräte 3, Lampen, Multimediageräte, eine Klimaanlage, usw. angeschlossen. Optional kann an das lokale Stromnetz 1 ein stationärer Stromspeicher 4 über einen bidirektionalen Stromrichter 4a angeschlossen sein. Ferner ist an das lokale Stromnetz 1 ein Ladepunkt in Form einer Wallbox EVSE angeschlossen, über den eine Batterie 5 des Elektrofahrzeugs BEV geladen und optional auch wieder entladen werden kann. Die Wallbox EVSE und das Elektrofahrzeug BEV können bei Kopplung bidirektional kommunizieren, beispielsweise gemäß ISO 15118 / IEC 61851. 1 shows a sketch of a local power grid 1 to which a BEV electric vehicle is connected. The local power grid 1 is part of a private house PH, which is equipped with a photovoltaic system 2, in particular a roof system, which is connected to the rest of the local power grid 1 via an inverter 2a. The local power network 1 is an alternating current network that can, for example, have a nominal voltage of 110 V, 230 V or - in the case of three-phase current for 3-phase charging - between 380 V and 400 V. Consumers such as kitchen appliances 3, lamps, multimedia devices, air conditioning, etc. are connected to the local power grid 1. Optionally, a stationary power storage 4 can be connected to the local power grid 1 via a bidirectional power converter 4a. Furthermore, a charging point in the form of a wallbox EVSE is connected to the local power grid 1, via which a battery 5 of the electric vehicle BEV can be charged and optionally discharged again. The wallbox EVSE and the electric vehicle BEV can communicate bidirectionally when coupled, for example in accordance with ISO 15118 / IEC 61851.

Das lokale Stromnetz 1 ist ferner über ein von einem Messstellenbetreiber installiertes „externes“ Energiemessgerät, hier optional als Smart Meter 6 ausgebildet, mit einem öffentlichen Stromversorgungsnetz 7 verbunden.The local power grid 1 is also connected to a public power grid 7 via an “external” energy measuring device installed by a measuring point operator, here optionally designed as a smart meter 6.

Der Smart Meter 6 sowie die Wallbox EVSE und/oder das Elektrofahrzeug BEV können mit einem externen IT-System 8 datentechnisch gekoppelt sein (wie durch die blitzartigen Pfeile angedeutet), z.B. drahtgebunden und/oder drahtlos über ein Kommunikationsnetzwerk wie das Internet usw. Das IT-System 8 kann z.B. auf einen Netzwerkserver oder als Cloudrechner implementiert sein.The smart meter 6 as well as the wallbox EVSE and/or the electric vehicle BEV can be linked in terms of data technology to an external IT system 8 (as indicated by the lightning-like arrows), e.g. wired and/or wirelessly via a communication network such as the Internet, etc. The IT -System 8 can be implemented, for example, on a network server or as a cloud computer.

Im Folgenden wird die Situation weiter beschrieben, dass ein Nutzer sein Elektrofahrzeug BEV mit der Wallbox EVSE gekoppelt hat, indem er es beispielsweise über ein Ladekabel an die Wallbox EVSE angeschlossen hat. Der Nutzer kann nun über ein Nutzerendgerät, z.B. sein Smartphone 9, auf dem ein entsprechendes Applikationsprogramm läuft, eine gewünschte Abfahrtszeit eintragen oder eine vorgeschlagene oder hinterlegte Abfahrtszeit betätigen oder ändern. Die voraussichtliche Abfahrtszeit wird an das IT-System 8 übertragen.The situation is further described below in which a user has coupled his electric vehicle BEV with the Wallbox EVSE, for example by connecting it to the Wallbox EVSE via a charging cable. The user can now enter a desired departure time or activate or change a suggested or stored departure time via a user terminal, for example his smartphone 9, on which a corresponding application program is running. The expected departure time is transmitted to the IT system 8.

Alternativ kann die Abfahrtszeit von dem bzw. über das Elektrofahrzeug BEV direkt oder über die Wallbox EVSE an das IT-System 8 übertragen werden. Das Elektrofahrzeug BEV kann ferner beispielsweise eine ID, die Ankunftszeit und benötigte und verfügbare Energiemengen, insbesondere einen Ladebedarf zum Abfahrtszeitpunkt, direkt oder über die Wallbox EVSE an das IT-System 8 übertragen.Alternatively, the departure time can be transmitted from or via the BEV electric vehicle to the IT system 8 directly or via the EVSE wallbox. The electric vehicle BEV can also, for example, have an ID, the arrival time and required and available amounts of energy, in particular a charging requirement at the time of departure is transmitted to the IT system 8 directly or via the EVSE wallbox.

In dem IT-System 8 sind ferner eine prognostizierte zeitliche Verteilung einer von der Photovoltaikanlage 2 produzierten elektrischen Leistung bzw. Energie und eine prognostizierte zeitliche Verteilung des Energie- bzw. Stromverbrauchs der Verbraucher 3 vorgehalten, insbesondere abrufbar gespeichert. Daraus kann das IT-System 8 eine zeitliche Verteilung einer Überschussleistung des lokalen Stromnetzes 1 für die voraussichtliche Abstelldauer des Elektrofahrzeugs BEV bis zu dessen Abfahrtszeit prognostizieren. Die zeitliche Verteilung der Überschussleistung kann, falls ein stationärer Stromspeicher 4 vorhanden ist, auch eine Prognose einer Ladung und Entladung des stationären Stromspeichers 4 umfassen, die z.B. eine Speicherkapazität, einen Ladezustand usw. des stationären Stromspeichers 4 nutzen kann.In the IT system 8, a predicted time distribution of an electrical power or energy produced by the photovoltaic system 2 and a predicted time distribution of the energy or power consumption of the consumers 3 are stored, in particular stored in a retrievable manner. From this, the IT system 8 can predict a temporal distribution of excess power from the local power grid 1 for the expected parking period of the electric vehicle BEV up to its departure time. If a stationary power storage 4 is present, the temporal distribution of the excess power can also include a forecast of a charge and discharge of the stationary power storage 4, which can use, for example, a storage capacity, a state of charge, etc. of the stationary power storage 4.

Daraus kann das IT-System 8 für das gekoppelte Elektrofahrzeug BEV einen Ladeplan anhand dergestalt aufstellen, dass das Elektrofahrzeug BEV zur voraussichtlichen Abfahrtszeit den gewünschten Ladezustand aufweist und eine möglichst hohe Überschussleistung zum Laden des Elektrofahrzeugs verwendet wird, falls dies günstiger ist als das Laden aus dem öffentlichen Stromversorgungsnetz 7. Der Ladeplan kann beispielsweise im Hinblick auf möglichst geringe Kosten, auf einen hohen Anteil von Strom aus erneuerbaren Energien sattfinden. Dazu das IT-System 8 auf Information über Preise bei Netzbezug, Erlöse bei Netzeinspeisung usw. zumindest für den Abstellzeitraum des Elektrofahrzeugs BEV zurückgreifen.From this, the IT system 8 can draw up a charging plan for the coupled electric vehicle BEV in such a way that the electric vehicle BEV has the desired state of charge at the expected departure time and the highest possible excess power is used to charge the electric vehicle if this is cheaper than charging from the public power supply network 7. The charging plan can, for example, be based on a high proportion of electricity from renewable energies with a view to keeping costs as low as possible. To do this, the IT system 8 can access information about prices for grid purchases, revenues for grid feed-in, etc., at least for the parking period of the BEV electric vehicle.

Der Ladeplan kann an das Elektrofahrzeug BEV oder die Wallbox EVSE übertragen werden, welche dann das Elektrofahrzeug BEV entsprechend dem Ladeplan aufgeladen.The charging plan can be transferred to the BEV electric vehicle or the EVSE wallbox, which then charges the BEV electric vehicle according to the charging plan.

Optional kann das Elektrofahrzeug BEV auch die Fähigkeit zur Stromrückspeisung aufweisen und damit ebenfalls als Zwischenspeicher für das lokale Stromnetz 1 dienen.Optionally, the electric vehicle BEV can also have the ability to regenerate electricity and thus also serve as a buffer for the local power grid 1.

Das obige Verfahren ist insbesondere dazu geeignet, auf ein zum Ad-hoc-Überschussladen meist benötigtes Lokalnetz-Energiemessgerät 10 verzichten zu können. Ist das externe Energiemessgerät wie hier gezeigt als Smart Meter 6 ausgebildet und dazu eingerichtet, Messdaten an den Nutzer des lokalen Stromnetzes 1 zu übertragen, kann auch ohne Lokalnetz-Energiemessgerät 10 ein Ad-hoc-Überschussladen durchgeführt werden, insbesondere verhindert werden, dass das Elektrofahrzeug BEV aus dem öffentlichen Stromversorgungsnetz geladen wird. Jedoch bleibt auch dann der Vorteil einer Aufstellung eines Ladeplans anhand der Prognose(n) bestehen.The above method is particularly suitable for being able to dispense with a local network energy measuring device 10, which is usually required for ad hoc excess charging. If the external energy measuring device is designed as a smart meter 6 as shown here and is set up to transmit measurement data to the user of the local power network 1, ad hoc excess charging can also be carried out without a local network energy measuring device 10, in particular preventing the electric vehicle BEV is charged from the public power grid. However, the advantage of drawing up a charging plan based on the forecast(s) still remains.

Optional kann die prognostizierte Überschussleistung anhand von in dem lokalen Stromnetz 1 gemessenen Energieflüssen aktualisiert werden, um eine Prognosegenauigkeit zu verbessern. So kann in einer Weiterbildung die Prognose über die von der Photovoltaikanlage 2 voraussichtlich einzuspeisende elektrische Energie durch eine zwischen der Photovoltaikanlage 2 und dem restlichen lokalen Stromnetz 1 vorhandene PV-Energiemesseinrichtung 11 abgeglichen werden. Die PV-Energiemesseinrichtung 11 kann in einer Weiterbildung in den Wechselrichter 2a integriert sein, so dass z. B. die aktuelle Leistung der Photovoltaikanlage 2 über den Wechselrichter 2a messbar ist.Optionally, the forecast excess power can be updated based on energy flows measured in the local power grid 1 in order to improve forecast accuracy. In a further development, the forecast about the electrical energy expected to be fed in by the photovoltaic system 2 can be compared by a PV energy measuring device 11 present between the photovoltaic system 2 and the rest of the local power grid 1. The PV energy measuring device 11 can be integrated into the inverter 2a in a further development, so that z. B. the current performance of the photovoltaic system 2 can be measured via the inverter 2a.

Außerdem kann in einer Weiterbildung die Prognose über die Überschussleistung durch eine zwischen dem Zwischenspeicher 4 und dem restlichen lokalen Stromnetz 1 vorhandene Zwischenspeicher-Energiemesseinrichtung 12 abgeglichen werden. Die Zwischenspeicher-Energiemesseinrichtung 12 kann in einer Weiterbildung in den bidirektionalen Stromrichter 4a integriert sein, so dass z.B. die aktuell von dem Zwischenspeicher 4 aufgenommene oder abgegebene Leistung über den Stromrichter 4a messbar ist.In addition, in a further development, the forecast about the excess power can be compared by a buffer energy measuring device 12 present between the buffer 4 and the rest of the local power grid 1. In a further development, the buffer energy measuring device 12 can be integrated into the bidirectional power converter 4a, so that, for example, the power currently received or delivered by the buffer 4 can be measured via the power converter 4a.

Zudem kann die Lade- bzw. Entladeleistung des Elektrofahrzeugs BEV selbst durch eine EVSE-Energiemesseinrichtung 13 gemessen werden. Die EVSE-Energiemesseinrichtung 13 kann in einer Weiterbildung in die Wallbox EVSE integriert seinIn addition, the charging or discharging power of the electric vehicle BEV itself can be measured by an EVSE energy measuring device 13. The EVSE energy measuring device 13 can be integrated into the EVSE wallbox in a further development

Es kann in einer Weiterbildung auch ein Lokalnetz-Energiemessgerät 10 vorhanden sein, das z.B. die Funktion des externen Energiemessgeräts übernehmen kann, wenn dieses nicht als Smart Meter 6 ausgebildet ist oder Messdaten nicht an den Nutzer des lokalen Stromnetzes 1 übermittelt.In a further development, a local network energy measuring device 10 can also be present, which can, for example, take over the function of the external energy measuring device if it is not designed as a smart meter 6 or does not transmit measurement data to the user of the local power network 1.

Insbesondere können die obigen Energiemesseinrichtungen 10 bis 13, falls vorhanden, ihre Messdaten bezüglich der durch sie durchgeleiteten elektrischen Leistungen bzw. Energiemengen dem IT-System 8 melden, das dann dazu eingerichtet sein kann, Abweichungen der Prognose(n) von den real auftretenden Leistungen zu erkennen. Dies kann durch das IT-System 8 wiederum dazu genutzt werden, den Ladeplan zu aktualisieren und/oder mindestens eine der Prognosen für Erzeugung und Verbrauch im lokalen Stromnetz 1 anzupassen.In particular, the above energy measuring devices 10 to 13, if present, can report their measurement data regarding the electrical power or amounts of energy passed through them to the IT system 8, which can then be set up to record deviations of the forecast(s) from the actually occurring power recognize. This can in turn be used by the IT system 8 to update the charging plan and/or to adjust at least one of the forecasts for generation and consumption in the local power grid 1.

Selbstverständlich ist die vorliegende Erfindung nicht auf das gezeigte Ausführungsbeispiel beschränkt.Of course, the present invention is not limited to the exemplary embodiment shown.

Allgemein kann unter „ein“, „eine“ usw. eine Einzahl oder eine Mehrzahl verstanden werden, insbesondere im Sinne von „mindestens ein“ oder „ein oder mehrere“ usw., solange dies nicht explizit ausgeschlossen ist, z.B. durch den Ausdruck „genau ein“ usw.In general, “a”, “an” etc. can be understood as a singular or a plural, in particular in the sense of “at least one” or “one or more” etc., as long as this is not explicitly excluded, for example by the expression “exactly on” etc.

Auch kann eine Zahlenangabe genau die angegebene Zahl als auch einen üblichen Toleranzbereich umfassen, solange dies nicht explizit ausgeschlossen ist.A numerical statement can also include exactly the number specified as well as a usual tolerance range, as long as this is not explicitly excluded.

BezugszeichenlisteReference symbol list

11
Lokales StromnetzLocal power grid
22
PhotovoltaikanlagePhotovoltaic system
2a2a
WechselrichterInverter
33
Küchengerätkitchen appliance
44
Stationärer StromspeicherStationary electricity storage
4a4a
StromrichterPower converter
55
Batteriebattery
66
Smart MeterSmart meters
77
Öffentliches StromversorgungsnetzPublic power supply network
88th
IT-SystemIT system
99
SmartphoneSmartphone
1010
Lokalnetz-EnergiemessgerätLocal network energy meter
1111
PV-EnergiemessgerätPV energy meter
1212
Zwischenspeicher-EnergiemessgerätTemporary storage energy meter
1313
EVSE-EnergiemessgerätEVSE energy meter
BEVBEV
ElektrofahrzeugElectric vehicle
EVSEEVSE
WallboxWallbox
PHPh
PrivathausPrivate house

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDED IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of documents listed by the applicant was generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • US 9937810 B2 [0005]US 9937810 B2 [0005]
  • WO 2020186363 A1 [0006]WO 2020186363 A1 [0006]

Claims (15)

Verfahren zum Laden eines Elektrofahrzeugs (BEV) an einem lokalen Stromnetz (1), das mindestens eine regenerative Energiequelle (2) und mindestens einen Ladepunkt (EVSE) zum Laden des Elektrofahrzeugs (BEV) aufweist, wobei bei dem Verfahren - für ein mit dem Ladepunkt gekoppeltes Elektrofahrzeug (BEV) dessen Ladebedarf und dessen voraussichtliche Abfahrtszeit vorgehalten wird, - eine prognostizierte zeitliche Verteilung einer Überschussleistung des lokalen Stromnetzes für die voraussichtliche Abstelldauer des Elektrofahrzeugs (BEV) anhand einer prognostizierten zeitlichen Verteilung einer elektrischen Leistung der mindestens einen regenerativen Energiequelle (2) bestimmt wird, - für das gekoppelte Elektrofahrzeug (BEV) ein Ladeplan anhand der prognostizierten zeitlichen Verteilung der Überschussleistung dergestalt aufgestellt wird, dass das Elektrofahrzeug (BEV) zur voraussichtlichen Abfahrtszeit einen gewünschten Ladezustand aufweist und die Überschussleistung zum Laden des Elektrofahrzeugs (BEV) verwendet wird, und - das Elektrofahrzeug (BEV) entsprechend dem Ladeplan aufgeladen wird.Method for charging an electric vehicle (BEV) on a local power grid (1), which has at least one renewable energy source (2) and at least one charging point (EVSE) for charging the electric vehicle (BEV), wherein in the method - for an electric vehicle (BEV) coupled to the charging point, its charging requirement and its expected departure time are kept available, - a predicted time distribution of an excess power of the local power grid for the expected parking period of the electric vehicle (BEV) is determined based on a predicted time distribution of an electrical power of the at least one renewable energy source (2), - a charging plan is drawn up for the coupled electric vehicle (BEV) based on the predicted time distribution of the excess power in such a way that the electric vehicle (BEV) has a desired state of charge at the expected departure time and the excess power is used to charge the electric vehicle (BEV), and - the electric vehicle (BEV) is charged according to the charging plan. Verfahren nach Anspruch 1, bei dem die mindestens eine regenerative Energiequelle eine Photovoltaikanlage (2) umfasst und die prognostizierte zeitliche Verteilung der elektrischen Leistung der Photovoltaikanlage (2) nur anhand von Anlagendaten und Sonnenstandsdaten prognostiziert wird.Procedure according to Claim 1 , in which the at least one renewable energy source comprises a photovoltaic system (2) and the predicted temporal distribution of the electrical power of the photovoltaic system (2) is predicted only based on system data and sun position data. Verfahren nach Anspruch 1, bei dem die mindestens eine regenerative Energiequelle eine Photovoltaikanlage (2) umfasst und die prognostizierte zeitliche Verteilung der elektrischen Leistung der Photovoltaikanlage (2) anhand von Anlagendaten und Sonnenstandsdaten und zusätzlich anhand von Historiendaten und/oder Wettervorhersagen prognostiziert wird.Procedure according to Claim 1 , in which the at least one renewable energy source comprises a photovoltaic system (2) and the predicted temporal distribution of the electrical power of the photovoltaic system (2) is predicted based on system data and sun position data and additionally based on historical data and / or weather forecasts. Verfahren nach Anspruch 1, bei dem die prognostizierte zeitliche Verteilung der Überschussleistung des lokalen Stromnetzes (1) anhand von Historiendaten eines an einem Netzanschlusspunkt des lokalen Stromnetzes (1) zu einem öffentlichen Stromversorgungsnetz (7) installierten Strommessgeräts (8) bestimmt wird, zu denen kein Elektrofahrzeug (BEV) geladen worden ist.Procedure according to Claim 1 , in which the predicted temporal distribution of the excess power of the local power grid (1) is determined based on historical data from an electricity measuring device (8) installed at a grid connection point of the local power grid (1) to a public power grid (7), which does not include an electric vehicle (BEV) has been loaded. Verfahren nach einem der vorhergehenden Ansprüche, bei dem die prognostizierte zeitliche Verteilung der Überschussleistung anhand einer Differenz zwischen der prognostizierten zeitlichen Verteilung der elektrischen Leistung der mindestens einen regenerativen Energiequelle (2) und einer prognostizierten zeitlichen Verteilung einer von dem lokalen Stromnetz verbrauchten elektrischen Leistung bestimmt wird.Method according to one of the preceding claims, in which the predicted temporal distribution of the excess power is determined based on a difference between the predicted temporal distribution of the electrical power of the at least one renewable energy source (2) and a predicted temporal distribution of an electrical power consumed by the local power grid. Verfahren nach einem der vorhergehenden Ansprüche, bei dem die von dem lokalen Stromnetz (1) verbrauchte elektrische Leistung anhand von Historiendaten oder einer geschätzten zeitlichen Verteilung prognostiziert wird.Method according to one of the preceding claims, in which the electrical power consumed by the local power grid (1) is predicted based on history data or an estimated temporal distribution. Verfahren nach Anspruch 6, wobei die prognostizierte zeitliche Verteilung der verbrauchten elektrischen Leistung einem insbesondere konstanten Spitzenwert entspricht.Procedure according to Claim 6 , whereby the predicted temporal distribution of the consumed electrical power corresponds to a particularly constant peak value. Verfahren nach einem der vorhergehenden Ansprüche, bei dem der Ladeplan dergestalt aufgestellt wird, dass das Elektrofahrzeug (BEV) nur dann geladen werden soll, wenn die prognostizierte Überschussleistung einen zum Laden des Elektrofahrzeugs (BEV) benötigten oder empfohlenen Mindestschwellwert überschreitet.Method according to one of the preceding claims, in which the charging plan is drawn up in such a way that the electric vehicle (BEV) should only be charged when the predicted excess power exceeds a minimum threshold value required or recommended for charging the electric vehicle (BEV). Verfahren nach einem der vorhergehenden Ansprüche, bei dem das lokale Stromnetz (1) ein zwischenspeicherloses Stromnetz ist und der Ladeplan dergestalt aufgestellt wird, dass die Überschussleistung unmittelbar zum Laden des Elektrofahrzeugs (BEV) verwendet wirdMethod according to one of the preceding claims, in which the local power grid (1) is a power grid without buffer storage and the charging plan is set up in such a way that the excess power is used directly to charge the electric vehicle (BEV). Verfahren nach einem der vorhergehenden Ansprüche, bei dem das lokale Stromnetz (1) einen stationären Stromspeicher (4) aufweist, der dazu vorgesehen ist, die von der regenerativen Energiequelle (2) erzeugte elektrische Leistung zur späteren Nutzung in dem lokalen Stromnetz (1) zwischenzuspeichern und der Ladeplan dergestalt aufgestellt wird, dass die Überschussleistung unmittelbar zum Laden des Elektrofahrzeugs (BEV) verwendet wird und dass dann, wenn keine Überschussleistung zur Verfügung steht, das Elektrofahrzeug (BEV) aus dem stationären Stromspeicher (4) aufgeladen wird.Method according to one of the preceding claims, in which the local power grid (1) has a stationary power storage (4) which is intended to temporarily store the electrical power generated by the renewable energy source (2) for later use in the local power grid (1). and the charging plan is drawn up in such a way that the excess power is used directly to charge the electric vehicle (BEV) and that when no excess power is available, the electric vehicle (BEV) is charged from the stationary power storage (4). Verfahren nach einem der vorhergehenden Ansprüche, bei dem dann, wenn der Ladebedarf größer oder gleich der bis zu dem Abfahrtzeitpunkt prognostizierten Überschuss-Energie ist, das Elektrofahrzeug (BEV) mit maximaler Leistung aus der prognostizierte Überschussleistung geladen wird.Method according to one of the preceding claims, in which if the charging requirement is greater than or equal to the excess energy forecast up to the departure time, the electric vehicle (BEV) is charged with maximum power from the forecast excess power. Verfahren nach einem der vorhergehenden Ansprüche, bei dem dann, wenn der Ladebedarf geringer ist als die bis zu dem Abfahrtzeitpunkt prognostizierte Überschuss-Energie ist, das Elektrofahrzeug (BEV) mit einer weniger als maximalen Leistung aus der prognostizierte Überschussleistung geladen wird.Method according to one of the preceding claims, in which if the charging requirement is lower than the excess energy predicted up to the time of departure, the electric vehicle (BEV) is charged with less than maximum power from the predicted excess power. Verfahren nach einem der vorhergehenden Ansprüche, bei dem der Ladepunkt ein privater Ladepunkt, insbesondere Wallbox (EVSE), ist.Method according to one of the preceding claims, in which the charging point is a private charging point, in particular a wallbox (EVSE). Lokales Stromnetz, aufweisend mindestens einen lokalen Verbraucher (3), mindestens eine regenerative Energiequelle (2) und mindestens einen Ladepunkt (EVSE) zum Laden eines Elektrofahrzeugs (BEV), wobei das lokale Stromnetz (1) dazu eingerichtet ist, das Verfahren nach einem der vorhergehenden Ansprüche durchzuführen.Local power grid, comprising at least one local consumer (3), at least one renewable energy source (2) and at least one charging point (EVSE) for charging an electric vehicle (BEV), the local power grid (1) being set up to carry out the method according to one of to carry out the preceding claims. Wohnhaus (PH), aufweisend ein lokales Stromnetz (1) nach Anspruch 14.Residential building (PH), having a local power network (1). Claim 14 .
DE102022108574.0A 2022-04-08 2022-04-08 Charging an electric vehicle on a local power grid Pending DE102022108574A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102022108574.0A DE102022108574A1 (en) 2022-04-08 2022-04-08 Charging an electric vehicle on a local power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102022108574.0A DE102022108574A1 (en) 2022-04-08 2022-04-08 Charging an electric vehicle on a local power grid

Publications (1)

Publication Number Publication Date
DE102022108574A1 true DE102022108574A1 (en) 2023-10-12

Family

ID=88094112

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102022108574.0A Pending DE102022108574A1 (en) 2022-04-08 2022-04-08 Charging an electric vehicle on a local power grid

Country Status (1)

Country Link
DE (1) DE102022108574A1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2426804A1 (en) 2010-09-02 2012-03-07 ABB Research Ltd. Charging of electrical vehicles
DE102013002078A1 (en) 2013-02-06 2013-08-29 Daimler Ag Method for charging battery of e.g. fully electrically driven vehicle, involves considering user requirements, boundary conditions and amount of electrical solar energy during determination and adjustment of loading profiles
DE102014213248A1 (en) 2014-07-08 2016-01-14 Continental Automotive Gmbh Method and system for charging an energy store of a mobile energy consumer
DE102016217162A1 (en) 2016-09-09 2018-03-15 Bayerische Motoren Werke Aktiengesellschaft Charging system and method for controlling optimal charging
US9937810B2 (en) 2012-08-16 2018-04-10 Robert Bosch Llc Charging and discharging of DC microgrid energy storage
WO2020186363A1 (en) 2019-03-19 2020-09-24 Ossiaco Inc. Converter with power management system for household users to manage power between different loads including their electric vehicle
DE102020205128A1 (en) 2020-04-23 2021-10-28 DEZONY GmbH Method for charging a battery of an electrical consumer and charging station with a control unit for carrying out such a method
DE102021104556A1 (en) 2021-02-25 2022-08-25 Bayerische Motoren Werke Aktiengesellschaft Distributing electrical power in a local power grid

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2426804A1 (en) 2010-09-02 2012-03-07 ABB Research Ltd. Charging of electrical vehicles
US9937810B2 (en) 2012-08-16 2018-04-10 Robert Bosch Llc Charging and discharging of DC microgrid energy storage
DE102013002078A1 (en) 2013-02-06 2013-08-29 Daimler Ag Method for charging battery of e.g. fully electrically driven vehicle, involves considering user requirements, boundary conditions and amount of electrical solar energy during determination and adjustment of loading profiles
DE102014213248A1 (en) 2014-07-08 2016-01-14 Continental Automotive Gmbh Method and system for charging an energy store of a mobile energy consumer
DE102016217162A1 (en) 2016-09-09 2018-03-15 Bayerische Motoren Werke Aktiengesellschaft Charging system and method for controlling optimal charging
WO2020186363A1 (en) 2019-03-19 2020-09-24 Ossiaco Inc. Converter with power management system for household users to manage power between different loads including their electric vehicle
DE102020205128A1 (en) 2020-04-23 2021-10-28 DEZONY GmbH Method for charging a battery of an electrical consumer and charging station with a control unit for carrying out such a method
DE102021104556A1 (en) 2021-02-25 2022-08-25 Bayerische Motoren Werke Aktiengesellschaft Distributing electrical power in a local power grid

Similar Documents

Publication Publication Date Title
DE102016217162B4 (en) Charging system and method for controlling optimal charging processes
EP2465177B1 (en) Controlling charging stations
EP2647522B1 (en) Electricity charging point with quick-charge stations
DE102013002078A1 (en) Method for charging battery of e.g. fully electrically driven vehicle, involves considering user requirements, boundary conditions and amount of electrical solar energy during determination and adjustment of loading profiles
AT506911B1 (en) METHOD AND SYSTEM FOR REGULATING THE INTENSITY OF LOADING A BATTERY
WO2011104219A2 (en) Power distribution method and device
DE102020129232A1 (en) VEHICLE LOADING CONTROL SYSTEMS AND PROCEDURES
DE102012219313A1 (en) Personalized charging management for a vehicle
DE102012202465A1 (en) Power supply system for supplying electric current to e.g. house to charge battery of hybrid car, has storage device storing surplus of electric solar when amount of electricity is larger than amount of electric current consumed by load
DE102009043380A1 (en) Charging control system for controlling unidirectional charging process of electrical vehicle, has charging control unit receiving predicted charging motion and controlling charging of battery in relation to unidirectional charging motion
DE112014001783T5 (en) A method of changing a charging plan, vehicle, charging control device and information input / information output device
DE102011008676A1 (en) System and method for charging batteries of vehicles
WO2012095129A2 (en) Method for charging a battery of a vehicle
EP1646526A1 (en) Motor vehicle
DE102013216090A1 (en) A vehicle operating under renewable energy management system
WO2011039284A2 (en) Monitoring system and method for monitoring energy transfer between a first energy unit and a second energy unit
DE102011008674A1 (en) Method for charging vehicle battery, involves providing power connection of appropriate power connector and control unit by load management unit based on charging curve transmitted from control unit
DE102021101812A1 (en) Method for operating a motor vehicle for charging a traction battery and motor vehicle
DE102020210552A1 (en) SYSTEM FOR PROVIDING ELECTRICAL ENERGY AND VEHICLE
DE102014213248A1 (en) Method and system for charging an energy store of a mobile energy consumer
DE102021107380A1 (en) Energy supply system and energy supply method
EP3820011A1 (en) Load management system and method for controlling such a load management system
EP3532340B1 (en) Energy management system for a vehicle
DE102013022087A1 (en) Apparatus, method and system for adjusting a charging current of electrical energy storage devices in electrified vehicles
DE102018202755A1 (en) Method and control device for adapting an electric power supply to an electrical power requirement in an electrical network

Legal Events

Date Code Title Description
R163 Identified publications notified