DE102019218502A1 DE102019218502.9A DE102019218502A DE102019218502A1 DE 102019218502 A1 DE102019218502 A1 DE 102019218502A1 DE 102019218502 A DE102019218502 A DE 102019218502A DE 102019218502 A1 DE102019218502 A1 DE 102019218502A1
Authority
DE
Germany
Prior art keywords
voltage
input
changeover switch
test circuit
values
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102019218502.9A
Other languages
German (de)
Inventor
Martin Kuhlendahl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Continental Automotive Technologies GmbH
Original Assignee
Continental Automotive GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Continental Automotive GmbH filed Critical Continental Automotive GmbH
Priority to DE102019218502.9A priority Critical patent/DE102019218502A1/en
Publication of DE102019218502A1 publication Critical patent/DE102019218502A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/20Measuring earth resistance; Measuring contact resistance, e.g. of earth connections, e.g. plates
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/005Testing of electric installations on transport means
    • G01R31/006Testing of electric installations on transport means on road vehicles, e.g. automobiles or trucks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52Testing for short-circuits, leakage current or ground faults

Abstract

Die Erfindung betrifft ein Verfahren sowie eine Testschaltung (10) zur Prüfung der Isolation zwischen einem Stromkreis (12) und einer Fahrzeugkarosserie (16). Die Testschaltung (10) hat einen ersten Eingang (20), der mit dem ersten Pol (14) kontaktiert ist, einen zweiten Eingang (22), der mit dem zweiten Pol (18) kontaktiert ist und einen dritten Eingang (24), der mit der Fahrzeugkarosserie (16) kontaktiert ist. Ein erster Messpfad (26) mit zumindest einem ersten Messwiderstand (R3) und einem ersten Spannungsabgriffspunkt (28) für eine erste Spannung (U1) verläuft zwischen dem ersten Eingang (20) und dem zweiten Eingang (22), ein zweiter Messpfad (32) mit einem zweiten Spannungsabgriffspunkt (34) für eine zweite Spannung (U2) verläuft zwischen dem zweiten Eingang (22) und dem dritten Eingang (24). Ein erster Umschalter (40) kann in geschlossenem Zustand eine Verbindung zwischen dem ersten Spannungsabgriffspunkt (28) und dem dritten Eingang (24) herstellen. Bei geöffnetem und geschlossenem ersten Umschalter (40) wird jeweils ein Wert für die erste und/oder die zweite Spannung (U1, U2) erfasst, und aus den erfassten Werten der ersten Spannung (U1) und/oder der zweiten Spannung (U2) der elektrische Widerstand des ersten und des zweiten Isolationswiderstandes (R1, R2) ermittelt. Nach dem Öffnen und dem Schließen des ersten Umschalters (40) wird jeweils der zeitliche Verlauf der ersten Spannung (U1) und/oder der zweiten Spannung (U2) erfasst und die Werte der ersten und/oder der zweiten Spannung (U1, U2) in Abhängigkeit von den zeitlichen Verläufen der ersten und/oder der zweiten Spannung (U2) ermittelt.The invention relates to a method and a test circuit (10) for testing the insulation between a circuit (12) and a vehicle body (16). The test circuit (10) has a first input (20) which is in contact with the first pole (14), a second input (22) which is in contact with the second pole (18) and a third input (24) which is in contact with the vehicle body (16). A first measuring path (26) with at least one first measuring resistor (R3) and a first voltage tap point (28) for a first voltage (U1) runs between the first input (20) and the second input (22), a second measuring path (32) with a second voltage tap point (34) for a second voltage (U2) runs between the second input (22) and the third input (24). A first changeover switch (40) can establish a connection between the first voltage tap point (28) and the third input (24) in the closed state. When the first changeover switch (40) is open and closed, a value is recorded for the first and / or the second voltage (U1, U2), and from the recorded values of the first voltage (U1) and / or the second voltage (U2) electrical resistance of the first and second insulation resistance (R1, R2) is determined. After the first changeover switch (40) has been opened and closed, the time profile of the first voltage (U1) and / or the second voltage (U2) is recorded and the values of the first and / or the second voltage (U1, U2) are recorded in Determined as a function of the time courses of the first and / or the second voltage (U2).

Description

Die Erfindung betrifft ein Verfahren sowie eine Testschaltung zur Prüfung der Isolation zwischen einem Stromkreis und einer Fahrzeugkarosserie, insbesondere zwischen einem Hochvolt-Stromkreis und einer Fahrzeugkarosserie.The invention relates to a method and a test circuit for testing the insulation between a circuit and a vehicle body, in particular between a high-voltage circuit and a vehicle body.

In Fahrzeugen, insbesondere in Elektrofahrzeugen, kommen immer häufiger Stromkreise mit hohen Spannungen zum Einsatz. Aus Sicherheitsgründen müssen diese Hochvoltstromkreise im Fahrzeug elektrisch isoliert werden, also so abgeschirmt sein, dass Personen nicht mit dem Hochvoltstromkreis in Kontakt gelangen können bzw. das Fahrzeugteile, mit denen Personen in Kontakt gelangen können gegen den Hochvoltstromkreis isoliert sind. Diese Abschirmung muss über die gesamte Lebensdauer des Fahrzeugs bei allen im Fahrzeugbetrieb auftretenden Belastungen, beispielsweise Vibrationen, Umwelteinflüssen oder Unfällen, gewährleistet sein.In vehicles, especially in electric vehicles, circuits with high voltages are used more and more frequently. For safety reasons, these high-voltage circuits in the vehicle must be electrically insulated, i.e. shielded in such a way that people cannot come into contact with the high-voltage circuit or that parts of the vehicle that people come into contact with are isolated from the high-voltage circuit. This shielding must be guaranteed over the entire service life of the vehicle for all loads that occur during vehicle operation, for example vibrations, environmental influences or accidents.

Diese Abschirmung muss permanent überprüft werden, um Fehler in der Abschirmung schnell erkennen und entsprechende Sicherheitsmaßnahmen durchführen zu können. Beispielsweise kann nach dem Detektieren einer fehlerhaften Abschirmung die Batterie vom Verbraucher und/oder einer Ladeeinheit getrennt werden oder ein optisches oder akustisches Warnsignal ausgegeben werden. Die Qualität der Abschirmung wird auch als Isolationswiderstand zwischen dem Hochvoltstromkreis und der Fahrzeugkarosserie bezeichnet, wobei der Isolationswiderstand möglichst hoch sein muss.This shielding must be constantly checked in order to quickly identify errors in the shielding and to be able to take appropriate safety measures. For example, after a defective shielding has been detected, the battery can be disconnected from the consumer and / or a charging unit or an optical or acoustic warning signal can be output. The quality of the shielding is also referred to as the insulation resistance between the high-voltage circuit and the vehicle body, with the insulation resistance having to be as high as possible.

Zur Prüfung der Abschirmung bzw. des Isolationswiderstandes kann beispielsweise mit einem passiven Messansatz erfolgen.A passive measurement approach can be used, for example, to test the shielding or the insulation resistance.

Bei einem passiven Meßansatz wird zwischen der Hochvoltseite und der Fahrzeugkarosserieseite eine hochohmige Testschaltung, also eine Testschaltung mit einem sehr hohen elektrischen Widerstand, geschaltet. Der elektrische Widerstand dieser Testschaltung ist so hoch, dass die über die Testschaltung an der Fahrzeugkarosserie anliegenden Ströme sicherheitstechnisch unbedenklich sind. Aus den Verhältnissen der elektrischen Widerstände der Testschaltung und der Isolationswiderstände können mittels Spannungsmessungen an bestimmten Messpunkten der Testschaltung die Isolationswiderstände berechnet werden.In the case of a passive measurement approach, a high-resistance test circuit, that is to say a test circuit with a very high electrical resistance, is connected between the high-voltage side and the vehicle body side. The electrical resistance of this test circuit is so high that the currents applied to the vehicle body via the test circuit are harmless in terms of safety. The insulation resistances can be calculated from the ratios of the electrical resistances of the test circuit and the insulation resistances by means of voltage measurements at certain measuring points of the test circuit.

Die Testschaltung kann üblicherweise zwischen zumindest zwei verschiedenen Widerstandszuständen gewechselt werden, wobei aus den unterschiedlichen Spannungsverteilungen in den beiden Zuständen die Isolationswiderstände zwischen der Fahrzeugkarosserie und den beiden Polen des Stromkreises bzw. der Batterie bestimmt werden können. Nach dem Wechseln zwischen den Widerstandszuständen kommt es aber zunächst zu Aufladevorgängen, da neben den Isolationswiderständen zwischen der Hochvoltseite und der Fahrzeugkarosserieseite auch elektrische Kapazitäten vorhanden sind, deren Größe unbekannt ist. Die Ladevorgänge dieser Kapazitäten müssen abgewartet werden, bevor eine zuverlässige Widerstandsmessung erfolgen kann. Die Einschwingvorgänge bzw. die Ladevorgänge benötigen aber Zeit, wodurch die Messung der Isolationswiderstände, also die Prüfung der Abschirmung, eine definierte Zeit benötigt.The test circuit can usually be switched between at least two different resistance states, with the insulation resistances between the vehicle body and the two poles of the circuit or the battery being able to be determined from the different voltage distributions in the two states. After switching between the resistance states, however, there are initially charging processes, since in addition to the insulation resistances between the high-voltage side and the vehicle body side, there are also electrical capacitances, the size of which is unknown. The charging processes of these capacities must be awaited before a reliable resistance measurement can take place. The transient processes or the charging processes, however, require time, which means that the measurement of the insulation resistance, i.e. the testing of the shielding, requires a defined time.

Aufgabe der Erfindung ist es, ein Verfahren sowie eine Testschaltung zur Prüfung der Isolation zwischen einem Stromkreis und einer Fahrzeugkarosserie, insbesondere zwischen einem Hochvolt-Stromkreis und einer Fahrzeugkarosserie, bereitzustellen, die eine schnellere Ermittlung der Isolationswiderstände und somit eine schnellere Prüfung der Abschirmung zwischen dem Hochvoltstromkreis und der Fahrzeugkarosserie ermöglichen. Des Weiteren soll die Testschaltung in der Lage sein, eine Selbstdiagnose durchzuführen.The object of the invention is to provide a method and a test circuit for testing the insulation between a circuit and a vehicle body, in particular between a high-voltage circuit and a vehicle body, which enable the insulation resistance to be determined more quickly and thus a faster test of the shielding between the high-voltage circuit and the vehicle body. Furthermore, the test circuit should be able to carry out a self-diagnosis.

Zur Lösung der Aufgabe ist ein Verfahren zur Prüfung der Isolation zwischen einem Stromkreis und einer Fahrzeugkarosserie vorgesehen, insbesondere zur Prüfung eines ersten Isolationswiderstandes zwischen einem ersten Pol einer Stromquelle und der Fahrzeugkarosserie und eines zweiten Isolationswiderstandes zwischen einem zweiten Pol der Fahrzeugkarosserie und der Fahrzeugkarosserie, mit einer Testschaltung, die einen ersten Eingang, der mit dem ersten Pol kontaktiert ist, einem zweiten Eingang, der mit dem zweiten Pol kontaktiert ist und einem dritten Eingang, der mit der Fahrzeugkarosserie kontaktiert ist, aufweist. Die Testschaltung weist einen ersten Messpfad zwischen dem ersten Eingang und dem zweiten Eingang auf, mit einem ersten Messwiderstand und einem ersten Spannungsabgriffspunkt für eine erste Spannung sowie einen zweiten Messpfad zwischen dem zweiten Eingang und dem dritten Eingang aufweist, mit einem zweiten Spannungsabgriffspunkt für eine zweite Spannung. Des Weiteren weist die Testschaltung einen Umschalter auf, der in geschlossenem Zustand eine Verbindung zwischen dem ersten Spannungsabgriffspunkt und dem dritten Eingang herstellt. Es wird jeweils bei geöffnetem ersten Umschalter und geschlossenem erstem Umschalters ein Wert für die erste Spannung und ein Wert für die zweite Spannung erfasst, und aus den jeweils in den Schaltzuständen erfassten Werten der ersten Spannung und der zweiten Spannungen werden der erste und der zweite Isolationswiderstand ermittelt. Nach dem Öffnen und dem Schließen des ersten Umschalters werden der zeitliche Verlauf der ersten Spannung und der zeitliche Verlauf der zweiten Spannung erfasst und die Werte der ersten und der zweiten Spannung in Abhängigkeit von den zeitlichen Verläufen der ersten und der zweiten Spannung ermittelt.To solve the problem, a method for testing the insulation between a circuit and a vehicle body is provided, in particular for testing a first insulation resistance between a first pole of a power source and the vehicle body and a second insulation resistance between a second pole of the vehicle body and the vehicle body, with a Test circuit which has a first input that is contacted with the first pole, a second input that is contacted with the second pole and a third input that is contacted with the vehicle body. The test circuit has a first measuring path between the first input and the second input, with a first measuring resistor and a first voltage tap point for a first voltage and a second measuring path between the second input and the third input, with a second voltage tap point for a second voltage . Furthermore, the test circuit has a changeover switch which, in the closed state, establishes a connection between the first voltage tap point and the third input. With the first changeover switch open and the first changeover switch closed, a value for the first voltage and a value for the second voltage are recorded, and from the respective in the values of the first voltage and the second voltages recorded according to the switching states, the first and the second insulation resistance are determined. After opening and closing the first changeover switch, the time profile of the first voltage and the time profile of the second voltage are recorded and the values of the first and second voltage are determined as a function of the time profiles of the first and second voltage.

Bislang wird nach dem Öffnen und dem Schließen des ersten Umschalters ein definierter Zeitraum abgewartet, in dem unter Berücksichtigung aller möglichen negativen Umstände die Ladevorgänge innerhalb des Systems beendet sind. Dieser Zeitraum beträgt aber mehrere Sekunden. Das heißt, um sowohl bei geöffnetem wie auch bei geschlossenem ersten Umschalter eine Messung vornehmen zu können, war es bislang jeweils erforderlich, mehrere Sekunden abzuwarten, bis eine zuverlässige Messung erfolgen konnte.So far, after opening and closing the first switch, a defined period of time has been waited for, in which the charging processes within the system are ended, taking into account all possible negative circumstances. However, this period is several seconds. That is, in order to be able to carry out a measurement both with the first changeover switch open and with the first switch closed, it was previously necessary to wait several seconds before a reliable measurement could take place.

Erfindungsgemäß wird die Einschwingzeit nicht mehr als absolute Zeitdauer betrachtet, sondern individuell ermittelt. Hierzu werden nach dem Öffnen und dem Schließen des ersten Umschalters jeweils die zeitlichen Verläufe der ersten Spannung und der zweiten Spannung betrachtet und aus diesen Rückschlüsse auf das Einschwingverhalten des Systems gezogen bzw. die Dauer der Ladevorgänge abgeschätzt bzw berechnet. Dadurch kann der Zeitpunkt, zu dem ein Ladevorgang beendet ist, sehr genau bestimmt bzw. abgeschätzt werden, so dass die Messung der ersten Spannung und der zweiten Spannung ohne zeitliche Verzögerung erfolgen kann. Sobald die erste Spannung und die zweite Spannung in einem Zustand bestimmt sind, können die Umschalter zum Herstellen des zweiten Zustandes geöffnet oder geschlossen werden und für diesen Zustand ebenfalls die zeitliche Dauer des Ladevorganges abgeschätzt und nach Beendigung des Ladevorgang eine Bestimmung der ersten Spannung und der zweiten Spannung durchgeführt werden.According to the invention, the settling time is no longer viewed as an absolute time period, but rather is determined individually. For this purpose, after opening and closing the first changeover switch, the temporal progressions of the first voltage and the second voltage are considered and conclusions are drawn about the transient behavior of the system or the duration of the charging processes is estimated or calculated. As a result, the point in time at which a charging process is ended can be determined or estimated very precisely, so that the first voltage and the second voltage can be measured without a time delay. As soon as the first voltage and the second voltage are determined in one state, the changeover switches can be opened or closed to establish the second state and the duration of the charging process can also be estimated for this state and, after the charging process has ended, the first voltage and the second can be determined Voltage to be carried out.

Da jeweils unmittelbar nach Beendigung des Ladevorganges eine Messung der ersten Spannung und der zweiten Spannung durchgeführt werden kann, können die Werte für die erste Spannung und die zweite Spannung wesentlich schneller ermittelt werden, so dass die Berechnung des Isolationswiderstandes deutlich schneller durchgeführt werden kann.Since a measurement of the first voltage and the second voltage can be carried out immediately after the end of the charging process, the values for the first voltage and the second voltage can be determined much faster, so that the calculation of the insulation resistance can be carried out much faster.

Insbesondere wenn der Isolationswiderstand niedrig sein sollte, beispielsweise aufgrund eines Defektes, ist mit diesem Verfahren eine deutliche schnellere Ermittlung des Isolationswiderstandes und somit ein schnelleres Detektieren eines Defektes möglich, so dass erforderliche Maßnahmen zur Herstellung eines sicheren Zustandes deutlich schneller eingeleitet werden können.In particular, if the insulation resistance should be low, for example due to a defect, this method enables the insulation resistance to be determined much more quickly and thus a defect to be detected more quickly, so that the necessary measures to establish a safe state can be initiated much more quickly.

Bei hohen Isolationswiderständen, wie sie bei funktionierender Isolation üblich sind, kann dieser Ladevorgang auch länger dauern. Hier kann hilfsweise eine maximale Zeit festgelegt werden, bei der das System als eingeschwungen angenommen wird.If the insulation resistance is high, as is usual with functioning insulation, this charging process can take longer. As an alternative, a maximum time can be set here at which the system is assumed to have settled.

Zusätzlich kann ein zweiter Umschalter vorgesehen sein, der in geschlossenem Zustand einen zweiten Messwiderstand parallel zum zweiten Spannungsabgriffspunkt zwischen dem zweiten Eingang und dem dritten Eingang schaltet, wobei bei offenem oder geschlossenem ersten Umschalter Werte der ersten Spannung und der zweiten Spannung bei offenem und geschlossenem zweiten Umschalter verglichen werden und bei einer Abweichung der Werte eine Fehlermeldung ausgegeben wird, wobei nach dem Öffnen und dem Schließen des zweiten Umschalters der zeitliche Verlauf der ersten Spannung und der zeitliche Verlauf der zweiten Spannung erfasst werden und die Werte der ersten und der zweiten Spannung in Abhängigkeit von den zeitlichen Verläufen der ersten und der zweiten Spannung ermittelt werden.In addition, a second changeover switch can be provided which, in the closed state, switches a second measuring resistor parallel to the second voltage tap point between the second input and the third input, with values of the first voltage and the second voltage with the second changeover switch open or closed when the first changeover switch is open or closed are compared and if there is a discrepancy between the values, an error message is output, with the time profile of the first voltage and the time profile of the second voltage being recorded after the second switch is opened and closed, and the values of the first and second voltage are recorded as a function of the time courses of the first and the second voltage can be determined.

Durch den zweiten Umschalter können innerhalb der Testschaltung zwei verschiedene Zustände mit verschiedenen Pfaden für den Strom hergestellt werden. Der erste und der zweite Spannungsabgriffspunkt sind hierbei so gewählt, dass in beiden durch den zweiten Umschalter hergestellten Zuständen an den Spannungsabgriffspunkt dieselbe Spannung bzw. derselbe Spannungsverlauf anlegen muss. Weichen diese voneinander ab, muss von einem Fehler innerhalb der Testschaltung ausgegangen werden und es wird eine Fehlermeldung ausgegeben. Mit dem vorstehend beschriebenen Verfahren ist somit eine Selbstdiagnose der Testschaltung möglich, um die korrekte Funktion der Testschaltung zu prüfen.The second switch can produce two different states with different paths for the current within the test circuit. The first and the second voltage tap point are selected in such a way that the same voltage or the same voltage curve must be applied to the voltage tap point in both states produced by the second changeover switch. If these differ from one another, an error within the test circuit must be assumed and an error message is output. With the method described above, a self-diagnosis of the test circuit is thus possible in order to check the correct function of the test circuit.

Beispielsweise werden der zeitliche Verlauf, insbesondere die zeitliche Änderung, der ersten Spannung und der zeitliche Verlauf, insbesondere die zeitliche Änderung, der zweiten Spannung jeweils mit einem Grenzwert verglichen und bei Unterschreiten des Grenzwertes die die Werte für die erste und die zweite Spannung erfasst werden. Mit zunehmendem Ladevorgang nähern sich die erste Spannung und die zweite Spannung einem Grenzwert, d. h. die zeitliche Änderung der ersten Spannung und der zweiten Spannung nimmt ab, sodass sich die erste Spannung und die zweite Spannung einem Grenzwert annähern. Unterschreiten die zeitlichen Änderungen der ersten Spannung und der zweiten Spannung einen definierten Grenzwert, kann davon aus gegangen werden, dass der Ladevorgang beendet ist und die Beendigung kurz bevorsteht. Insbesondere kann der Verlauf der zeitlichen Änderung der ersten Spannung und der zweiten Spannung betrachtet werden und aus diesen ein Zeitpunkt vorausberechnet werden, zu dem die zeitliche Änderung der ersten Spannung und der zweiten Spannung den Grenzwert voraussichtlich unterschreiten.For example, the temporal progression, in particular the temporal change, of the first voltage and the temporal progression, in particular the temporal change, of the second voltage are each compared with a limit value and the values for the first and second voltage are recorded when the limit value is undershot. As the charging process increases, the first voltage and the second voltage approach a limit value, ie the change in the first voltage and the second voltage over time decreases, so that the first voltage and the second voltage approach a limit value. Fall below the If changes over time in the first voltage and the second voltage exceed a defined limit value, it can be assumed that the charging process has ended and the end is imminent. In particular, the course of the temporal change in the first voltage and the second voltage can be viewed and a point in time can be calculated from this in advance at which the temporal change in the first voltage and the second voltage will likely fall below the limit value.

Um das Verfahren zur Prüfung des Isolationswiderstandes möglichst schnell durchzuführen, werden unmittelbar nach Erfassen der Werte für die erste und die zweiten Spannung bei geschlossenen oder offenem ersten Umschalter der erste und/oder der zweite Umschalter geöffnet oder geschlossen.In order to carry out the method for testing the insulation resistance as quickly as possible, the first and / or the second changeover switch are opened or closed immediately after the values for the first and second voltages have been recorded with the first changeover switch closed or open.

Es kann auch eine Warnmeldung ausgegeben wird, wenn der zeitliche Verlauf der ersten Spannung und oder der zeitliche Verlauf der zweiten Spannung außerhalb eines Grenzbereichs liegen.A warning message can also be output if the time profile of the first voltage and / or the time profile of the second voltage lie outside a limit range.

Der Grenzbereich kann beispielsweise eine maximale Ladezeit sein. Liegen nach Ablauf dieser maximalen Zeit keine konstanten Werte für die erste Spannung und oder die zweite Spannung vor, kann ein Fehlersignal ausgegeben werden, da davon ausgegangen werden kann, dass in diesem Fall ein Defekt der Testschaltung oder des Isolationswiderstandes vorliegt.The limit range can be a maximum charging time, for example. If there are no constant values for the first voltage and / or the second voltage after this maximum time has elapsed, an error signal can be output, since it can be assumed that in this case there is a defect in the test circuit or the insulation resistance.

Alternativ kann der Grenzwert eine maximale oder eine minimale Steigung der zeitlichen Änderung der ersten Spannung oder der zweiten Spannung sein. Beispielsweise kann ein Grenzbereich definiert sein, der die zeitliche Änderung der ersten Spannung und der zweiten Spannung bei funktionierendem Isolationswiderstand und/oder bei funktionierender Testschaltung darstellt. Liegt die zeitliche Änderung der ersten Spannung und/oder der zweiten Spannung außerhalb dieses Grenzbereichs, muss davon ausgegangen werden, dass ein Defekt der Testschaltung oder des Isolationswiderstandes vorliegt. Somit kann ein entsprechender Defekt detektiert werden, bevor der ein Ladevorgang beendet ist, sodass eine sehr schnelle Erfassung des Defektes möglich ist.Alternatively, the limit value can be a maximum or a minimum slope of the change over time in the first voltage or the second voltage. For example, a limit range can be defined which represents the change over time in the first voltage and the second voltage when the insulation resistance is functioning and / or when the test circuit is functioning. If the change over time in the first voltage and / or the second voltage lies outside this limit range, it must be assumed that there is a defect in the test circuit or in the insulation resistance. In this way, a corresponding defect can be detected before a charging process has ended, so that the defect can be detected very quickly.

Zusätzlich können zeitliche Schwankungen des Stromverbrauchs im Stromkreis erfasst werden und aus dem zeitlichen Verlauf der ersten Spannung und dem zeitliche Verlauf der zweiten Spannung herausgerechnet werden. Zeitliche Änderungen der Spannung können auch durch Schwankungen des Stromverbrauchs hervorgerufen werden. Diese werden vorzugsweise zusätzlich erfasst, um diese aus den zeitlichen Änderungen der ersten Spannung und der zweiten Spannung herausrechnen zu können, sodass eine zuverlässige Betrachtung der Einschwingvorgänge möglich ist.In addition, temporal fluctuations in the power consumption in the circuit can be recorded and calculated from the temporal course of the first voltage and the temporal course of the second voltage. Changes in voltage over time can also be caused by fluctuations in power consumption. These are preferably also recorded in order to be able to calculate them out of the temporal changes in the first voltage and the second voltage, so that a reliable observation of the transient processes is possible.

Die Werte der ersten Spannung und der zweiten Spannung können auch aus den zeitlichen Verläufen der ersten Spannung und der zweiten Spannung abgeschätzt werden. Durch Betrachtung der zeitlichen Änderung der ersten Spannung und der zweiten Spannung kann also bereits ein Endwert für die erste Spannung und die zweite Spannung berechnet oder abgeschätzt werden, beispielsweise wenn die zeitliche Änderung der ersten Spannung und/oder der zweiten Spannung abnimmt, sodass sich die erste Spannung und/oder die zweite Spannung einem Grenzwert annähert. Es muss also nicht der vollständige Ladevorgang abgewartet werden, wodurch eine noch schnellere Prüfung des Isolationswiderstandes möglich ist.The values of the first voltage and the second voltage can also be estimated from the time profiles of the first voltage and the second voltage. By considering the temporal change in the first voltage and the second voltage, an end value for the first voltage and the second voltage can already be calculated or estimated, for example if the temporal change in the first voltage and / or the second voltage decreases so that the first Voltage and / or the second voltage approaches a limit value. It is therefore not necessary to wait for the complete charging process, which enables the insulation resistance to be checked even more quickly.

Die Messschaltung kann zusätzlich einen Speicher aufweisen, in dem zeitlichen Verläufe der ersten Spannung und der zweiten Spannung, wobei die gespeicherten zeitlichen Verläufe der ersten Spannung und der zweiten Spannung zur Ermittlung der Werte für die erste Spannung und die zweite Spannung verwendet werden. Ältere gespeicherte zeitliche Verläufe der ersten Spannung und/oder der zweiten Spannung können verwendet werden, um die aktuellen zeitlichen Verläufe der ersten Spannung und/oder der zweiten Spannung abzuschätzen. Beispielsweise kann, wenn ein ähnlicher oder gleicher zeitlicher Verlauf der ersten Spannung und/oder der zweiten Spannung bereits im Speicher abgespeichert ist, davon ausgegangen werden, dass ein ähnlicher oder ein gleicher Wert für die erste Spannung und/oder die zweite Spannung erreicht wird.The measuring circuit can additionally have a memory in which the time profiles of the first voltage and the second voltage, the stored time profiles of the first voltage and the second voltage being used to determine the values for the first voltage and the second voltage. Older stored time profiles of the first voltage and / or the second voltage can be used to estimate the current time profiles of the first voltage and / or the second voltage. For example, if a similar or the same time curve of the first voltage and / or the second voltage is already stored in the memory, it can be assumed that a similar or the same value is achieved for the first voltage and / or the second voltage.

Zur Lösung der Aufgabe ist des Weiteren eine Testschaltung zur Prüfung der Isolation zwischen einem Stromkreis und einer Fahrzeugkarosserie vorgesehen, insbesondere zur Prüfung eines ersten Isolationswiderstandes zwischen einem ersten Pol einer Stromquelle und der Fahrzeugkarosserie und eines zweiten Isolationswiderstandes zwischen einem zweiten Pol der Fahrzeugkarosserie und der Fahrzeugkarosserie. Die Testschaltung hat einen ersten Eingang, der mit dem ersten Pol kontaktiert ist, einen zweiten Eingang, der mit dem zweiten Pol kontaktiert ist und einen dritten Eingang, der mit der Fahrzeugkarosserie kontaktiert ist. Des Weiteren weist die Testschaltung einen ersten Messpfad zwischen dem ersten Eingang und dem zweiten Eingang auf, mit einem ersten Messwiderstand und einem ersten Spannungsabgriffspunkt für eine erste Spannung, sowie einen zweiten Messpfad zwischen dem zweiten Eingang und dem dritten Eingang aufweist, mit einem zweiten Spannungsabgriffspunkt für eine zweite Spannung. Die Testschaltung weist des Weiteren einen Umschalter auf, der in geschlossenem Zustand eine Verbindung zwischen dem ersten Spannungsabgriffspunkt und dem dritten Eingang herstellt. Die Testschaltung weist eine Steuerung zur Durchführung eines vorstehend beschriebenen Verfahrens auf.To solve the problem, a test circuit for testing the insulation between a circuit and a vehicle body is also provided, in particular for testing a first insulation resistance between a first pole of a power source and the vehicle body and a second insulation resistance between a second pole of the vehicle body and the vehicle body. The test circuit has a first input that is contacted with the first pole, a second input that is contacted with the second pole and a third input that is contacted with the vehicle body. Furthermore, the test circuit has a first measuring path between the first input and the second input, with a first measuring resistor and a first voltage tap point for a first voltage, as well as a second measuring path between the second input and the third input, with a second voltage tap point for a second voltage. The test circuit also has a changeover switch which, in the closed state, establishes a connection between the first voltage tap point and the third input. The test circuit has a controller for carrying out a method described above.

Die Testschaltung kann einen zweiten Umschalter aufweisen, der in geschlossenem Zustand einen zweiten Messwiderstand parallel zum zweiten Spannungsabgriffspunkt zwischen dem zweiten Eingang und dem dritten Eingang schaltet, die Testschaltung bei offenem oder geschlossenem ersten Umschalter Werte der ersten Spannung und der zweiten Spannung bei offenem und geschlossenem zweiten Umschalter vergleichen kann und bei einer Abweichung der Werte eine Fehlermeldung ausgegeben wird.The test circuit can have a second changeover switch which, in the closed state, switches a second measuring resistor in parallel with the second voltage tap point between the second input and the third input, the test circuit values the first voltage and the second voltage with an open and closed second changeover switch when the first changeover switch is open or closed Can compare changeover switches and an error message is output if the values differ.

Weitere Vorteile und Merkmale finden sich in der Nachfolgenden Beschreibung in Verbindung mit den beigefügten Zeichnungen. In diesen zeigen:

  • 1 eine Testschaltung zur Prüfung der Isolation zwischen einem Stromkreis und einer Fahrzeugkarosserie in einem ersten Schaltzustand;
  • 2 ein Ersatzschaubild der Testschaltung aus 1;
  • 3 die Testschaltung aus 1 in einem zweiten Schaltzustand;
  • 4 ein Ersatzschaubild der Testschaltung aus 2;
  • 5 die Testschaltung aus 1 in einem dritten Schaltzustand;
  • 6 die Testschaltung aus 1 in einem vierten Schaltzustand;
  • 7 Einen Schaltungsaufbau mit einer Testschaltung aus den 1 bis 6;
  • 8 zeitliche Verläufe der Spannungen innerhalb des Schaltungsaufbaus aus 9;
  • 9 Einen zweiten Schaltungsaufbau mit einer Testschaltung aus den 1 bis 6;
  • 10 zeitliche Verläufe der Spannungen innerhalb des Schaltungsaufbaus aus 9; und
  • 11 Einen dritten Schaltungsaufbau mit einer Testschaltung aus den 1 bis 6.
Further advantages and features can be found in the following description in conjunction with the accompanying drawings. In these show:
  • 1 a test circuit for testing the insulation between a circuit and a vehicle body in a first switching state;
  • 2 an equivalent diagram of the test circuit 1 ;
  • 3rd the test circuit off 1 in a second switching state;
  • 4th an equivalent diagram of the test circuit 2 ;
  • 5 the test circuit off 1 in a third switching state;
  • 6th the test circuit off 1 in a fourth switching state;
  • 7th A circuit structure with a test circuit from the 1 to 6th ;
  • 8th Time curves of the voltages within the circuit structure 9 ;
  • 9 A second circuit structure with a test circuit from the 1 to 6th ;
  • 10 Time curves of the voltages within the circuit structure 9 ; and
  • 11 A third circuit structure with a test circuit from the 1 to 6th .

In 1 ist eine Testschaltung 10 zur Prüfung der Isolation zwischen einem Stromkreis in einem Fahrzeug und einer Fahrzeugkarosserie gezeigt.In 1 is a test circuit 10 for testing the insulation between a circuit in a vehicle and a vehicle body.

In modernen Fahrzeugen, insbesondere in Elektrofahrzeugen, werden Stromkreise mit relativ hohen Spannungen, beispielsweise 400 V, verwendet. Aus Sicherheitsgründen darf es zwischen diesen Stromkreisen und Fahrzeugteilen, mit denen Personen in Kontakt gelangen können, keine elektrische Verbindung geben. Zwischen dem Stromkreis und den übrigen Teilen des Fahrzeuges, also der Fahrzeugkarosserie, muss daher eine Isolation vorhanden sein, die eine zuverlässige Trennung zwischen dem Stromkreis und den übrigen Teilen des Fahrzeugs bereitstellt. Diese Isolation muss bei den im Fahrzeug auftretenden Belastungen, beispielsweise Umwelteinflüssen, Vibrationen oder auch bei außergewöhnlichen Ereignissen wie Unfällen, eine zuverlässige Trennung des Stromkreises von den übrigen Fahrzeugteilen gewährleisten.In modern vehicles, in particular in electric vehicles, circuits with relatively high voltages, for example 400 V, are used. For safety reasons, there must be no electrical connection between these circuits and vehicle parts with which people can come into contact. An insulation must therefore be present between the circuit and the other parts of the vehicle, that is to say the vehicle body, which provides a reliable separation between the circuit and the other parts of the vehicle. This insulation must ensure a reliable separation of the circuit from the other vehicle parts in the event of loads occurring in the vehicle, for example environmental influences, vibrations or even in the event of extraordinary events such as accidents.

Des Weiteren muss diese Isolation im Betrieb des Fahrzeugs ständig überwacht werden, um bei einem Fehler der Isolation umgehend erforderliche Maßnahmen, beispielsweise eine vollständige Trennung des Stromkreises von der Stromquelle, veranlassen können.Furthermore, this insulation must be constantly monitored during operation of the vehicle in order to be able to initiate necessary measures immediately in the event of a fault in the insulation, for example a complete separation of the circuit from the power source.

Die Testschaltung 10 bestimmt hierzu den Isolationswiderstand zwischen dem Hochvoltstromkreis und der Fahrzeugkarosserie, insbesondere einen ersten Isolationswiderstand R1 zwischen einem ersten Pol 14 des Stromkreises 12 und der Fahrzeugkarosserie 16 sowie einen zweiten Isolationswiderstand R2 zwischen einem zweiten Pol 18 des Stromkreises 12 und der Fahrzeugkarosserie 16. Bei intakter Isolation zwischen dem Stromkreis 12 und der Fahrzeugkarosserie 16 müssen die Isolationswiderstände R1, R2 sehr hoch sein, sodass kein oder nur ein sehr geringer Stromfluss zwischen den Polen 14, 18 des Stromkreises 12 und der Fahrzeugkarosserie 16 vorliegt. Unterschreitet der elektrische Widerstand eines der Isolationswiderstände R1, R2 einen definierten Wert, können Schutzmaßnahmen ausgelöst werden, beispielsweise eine Fehlermeldung oder eine Trennung der Batterie vom Stromkreis.The test circuit 10 for this purpose determines the insulation resistance between the high-voltage circuit and the vehicle body, in particular a first insulation resistance R1 between a first pole 14th of the circuit 12th and the vehicle body 16 and a second insulation resistor R2 between a second pole 18th of the circuit 12th and the vehicle body 16 . With intact insulation between the circuit 12th and the vehicle body 16 need the insulation resistances R1 , R2 be very high, so that no or only a very low current flow between the poles 14th , 18th of the circuit 12th and the vehicle body 16 is present. If the electrical resistance falls below one of the insulation resistances R1 , R2 a defined value, protective measures can be triggered, for example an error message or a disconnection of the battery from the circuit.

Die Testschaltung 10 hat einen ersten Eingang 20, der mit dem ersten Pol 14 kontaktiert ist, einen zweiten Eingang 22, der mit dem zweiten Pol 22 kontaktiert ist sowie einen dritten Eingang 24, der mit der Fahrzeugkarosserie 16 kontaktiert ist.The test circuit 10 has a first entrance 20th , the one with the first pole 14th is contacted, a second input 22nd , the one with the second pole 22nd is contacted as well as a third input 24 that with the vehicle body 16 is contacted.

Die Testschaltung 10 weist einen ersten Meßpfad 26 auf, der sich vom ersten Eingang 20 über einen ersten Widerstand R3 und einen ersten Spannungsabgriffspunkt 28 bis zum zweiten Eingang 22 erstreckt. Am ersten Spannungsabgriffspunkt 28 ist ein Spannungsteiler 30 vorgesehen, der aus zwei Teilwiderstände R4.1, R4.2 gebildet ist, die gemeinsam einen Widerstand R4 bilden. Der erste Spannungsabgriffspunkt 28 ist mit einem ersten Ausgang 29 verbunden.The test circuit 10 has a first measurement path 26th on that is from the first entrance 20th about a first resistance R3 and a first voltage tap point 28 to the second entrance 22nd extends. At the first voltage tap point 28 is a voltage divider 30th provided, which consists of two partial resistors R4.1 , R4.2 is formed, which together have a resistance R4 form. The first voltage tap point 28 is with a first exit 29 connected.

Ein zweiter Meßpfad 32 ist zwischen dem zweiten Eingang 22 und dem dritten Eingang 24 gebildet, wobei dieser Meßpfad 32 einen zweiten Spannungsabgriffspunkt 34 aufweist. Des Weiteren ist ein Spannungsteiler 36 vorgesehen, der durch zwei Teilwiderstände R5.1, R5.2 gebildet ist, die gemeinsam einen Widerstand R5 bilden. Der zweite Spannungsabgriffspunkt 34 ist mit einem zweiten Ausgang 35 verbunden.A second measurement path 32 is between the second entrance 22nd and the third entrance 24 formed, this measuring path 32 a second voltage tap point 34 having. There is also a voltage divider 36 provided by two partial resistors R5.1 , R5.2 is formed, which together have a resistance R5 form. The second voltage tap point 34 is with a second exit 35 connected.

Zwischen dem ersten Widerstand R3 und dem ersten Spannungsabgriffspunkt 28 zweigt eine erste Leitung 38 vom ersten Meßpfad 26 ab, die mit dem dritten Eingang 24 verbunden ist. Die Leitung 38 kann durch einen Umschalter 40 geschlossen oder unterbrochen werden.Between the first resistance R3 and the first voltage tap point 28 a first line branches off 38 from the first measurement path 26th starting with the third entrance 24 connected is. The administration 38 can through a toggle switch 40 closed or interrupted.

Des Weiteren ist eine zweite Leitung 42 mit einem zweiten Widerstand R6 sowie einen zweiten Umschalter 44 vorgesehen, die parallel zum zweiten Spannungsabgriffspunkt 34 angeordnet ist bzw. von der ersten Leitung 38 zwischen dem ersten Umschalter 40 und dem dritten Eingang 24 abzweigt und nach dem ersten Spannungsabgriffspunkt 28 in den ersten Meßpfad 26 mündet.There is also a second line 42 with a second resistor R6 and a second switch 44 provided parallel to the second voltage tap point 34 is arranged or from the first line 38 between the first switch 40 and the third entrance 24 branches off and after the first voltage tap point 28 in the first measuring path 26th flows out.

Der erste Umschalter 40 und der zweite Umschalter 44 sind jeweils mit einer Kontaktstelle 41, 45 verbunden, über die die Umschalter 40, 44 gesteuert werden können.The first switch 40 and the second switch 44 are each with a contact point 41 , 45 connected through which the switch 40 , 44 can be controlled.

Über die Ausgänge 29, 30 sowie die Kontaktstellen 41, 45 ist die Testschaltung 10 mit einer Steuerungschaltung 46 verbunden (7). Die Steuerungschaltung 46 weist eine Steuerung 48 auf, die mit den Kontaktstellen 41, 45 kontaktiert ist und über die die Umschalter 40, 44 gesteuert werden können. Des Weiteren weist die Steuerungschaltung 46 eine Auswerteschaltung 50 auf, die mit der Steuerung 48 sowie den Ausgängen 29, 35 verbunden ist und aus den von der Steuerung 48 und den Ausgängen 29, 35 empfangenen Signalen die elektrischen Widerstände der Isolationswiderstände R1, R2 berechnen kann. Die berechneten elektrischen Widerstände der Isolationswiderstände R1, R2 werden an eine Kommunikationsschnittstelle 52 ausgegeben. Des Weiteren weist die Steuerschaltung 46 eine zweite Kommunikationsschnittstelle 54 zum Empfang verschiedener Signale oder Steuerbefehle auf.About the exits 29 , 30th as well as the contact points 41 , 45 is the test circuit 10 with a control circuit 46 connected ( 7th ). The control circuit 46 instructs a controller 48 on that with the contact points 41 , 45 is contacted and through which the switch 40 , 44 can be controlled. Furthermore, the control circuit 46 an evaluation circuit 50 on that with the controller 48 as well as the outputs 29 , 35 connected to and from the controller 48 and the exits 29 , 35 received signals the electrical resistances of the insulation resistors R1 , R2 can calculate. The calculated electrical resistances of the insulation resistances R1 , R2 are connected to a communication interface 52 issued. Furthermore, the control circuit 46 a second communication interface 54 to receive various signals or control commands.

Die elektrischen Widerstände der Widerstände R3, R6 sowie die elektrischen Widerstände der Widerstände R4.2, R4.2, R5.1. R5.2 der Spannungsteiler 30, 36 sind bekannt. Die Widerstände R3, R6 sind hierbei so groß gewählt, dass die über die Widerstände R3, R6 zwischen dem Stromkreis 12 und der Fahrzeugkarosserie 16 fließenden Ströme sehr gering und somit sicherheitstechnisch unbedenklich. Des Weiteren ist die zwischen dem ersten Pol 14 und dem zweiten Pol 18 anliegende Batteriespannung UBat bekannt.The electrical resistances of the resistors R3 , R6 as well as the electrical resistances of the resistors R4.2 , R4.2 , R5.1 . R5.2 the voltage divider 30th , 36 are known. The resistances R3 , R6 are chosen so large that the resistances R3 , R6 between the circuit 12th and the vehicle body 16 flowing currents are very low and therefore safe from a safety point of view. Furthermore, the one between the first pole 14th and the second pole 18th applied battery voltage U Bat known.

Die elektrischen Widerstände der Isolationswiderstände R1, R2 sind unbekannt und sollen mit der vorstehend beschriebenen Schaltung bestimmt werden.The electrical resistances of the insulation resistances R1 , R2 are unknown and should be determined using the circuit described above.

In einem ersten Zustand, der in 1 dargestellt ist, ist der zweite Umschalter 44 geöffnet und der erste Umschalter 40 geschlossen.In a first state, which in 1 is the second toggle switch 44 opened and the first toggle switch 40 closed.

Der dadurch entstandene Schaltzustand ist schematisch in 2 dargestellt.The resulting switching status is shown schematically in 2 shown.

Zwischen dem ersten Pol 14 und der Fahrzeugkarosserie 16 ist der erste Widerstand R3 parallel zum ersten Isolationswiderstand R1 angeordnet.Between the first pole 14th and the vehicle body 16 is the first resistance R3 parallel to the first insulation resistance R1 arranged.

Zwischen dem zweiten Pol 22 und der Fahrzeugkarosserie 16 sind die beiden Spannungsabgriffspunkte 28, 34 mit den zugehörigen Spannungsteilers 30, 36 bzw. deren Widerstände R4 bzw. R5 jeweils parallel zum zweiten Isolationswiderstand R2 angeordnet.Between the second pole 22nd and the vehicle body 16 are the two voltage tap points 28 , 34 with the associated voltage divider 30th , 36 or their resistances R4 or. R5 each parallel to the second insulation resistor R2 arranged.

In einem zweiten Zustand, der in 3 dargestellt ist, ist der zweite Umschalter 44 geschlossen und der erste Umschalter 40 geöffnet.In a second state, which is in 3rd is the second toggle switch 44 closed and the first toggle switch 40 open.

Der dadurch entstandene Schaltzustand ist schematisch in 4 dargestellt. Zwischen dem ersten Pol 14 und der Fahrzeugkarosserie 16 ist nur der Isolationswiderstand R1 angeordnet, da über den offenen ersten Umschalter 40 kein Strom zwischen den ersten Eingang 20 und dem dritten Eingang 24 über den ersten Widerstand R3 fließen kann. Zwischen dem zweiten Pol 22 und der Fahrzeugkarosserie 16 sind der zweite Isolationswiderstand R2 der zweite Spannungsabgriffspunkt 34 mit den Widerständen R5.1, R5.2 sowie der zweite Widerstand R6 parallel angeordnet.The resulting switching status is shown schematically in 4th shown. Between the first pole 14th and the vehicle body 16 is just the insulation resistance R1 arranged, because over the open first changeover switch 40 no power between the first input 20th and the third entrance 24 about the first resistance R3 can flow. Between the second pole 22nd and the vehicle body 16 are the second insulation resistance R2 the second voltage tap point 34 with the resistors R5.1 , R5.2 as well as the second resistor R6 arranged in parallel.

Ein dritter Zustand kann durch Schließen beider Umschalter 40, 44 hergestellt werden (siehe 5). In diesem dritten Zustand ist der erste Widerstand R3 parallel zum ersten Isolationswiderstand R1 zwischen dem ersten Pol 14 und der Fahrzeugkarosserie 16 angeordnet. Zwischen dem zweiten Pol 18 und der Fahrzeugkarosserie sind die beiden Spannungsangriffspunkte 28, 34 mit den Spannungsteilern 30, 36 bzw. deren Widerständen R4 und R5 sowie der zweite Widerstand R6 parallel zum zweiten Isolationswiderstand R2 geschaltet.A third state can be achieved by closing both changeover switches 40 , 44 be produced (see 5 ). The first resistor is in this third state R3 parallel to the first insulation resistance R1 between the first pole 14th and the vehicle body 16 arranged. Between the second pole 18th and the vehicle body are the two stress application points 28 , 34 with the voltage dividers 30th , 36 or their resistances R4 and R5 as well as the second resistor R6 parallel to the second insulation resistance R2 switched.

In einem vierten Zustand (6) sind beide Umschalter 40, 44 geöffnet, sodass zwischen im ersten Pol 14 und der Fahrzeugkarosserie 16 nur der erste Isolationswiderstand R1 geschaltet ist und zwischen dem zweiten Pol 18 und der Fahrzeugkarosserie lediglich die Widerstände R5.1, R5.2 des zweiten Spannungsteilers 36 parallel zum zweiten Isolationswiderstand R2 geschaltet sind.In a fourth state ( 6th ) are both toggles 40 , 44 opened so that between in the first pole 14th and the vehicle body 16 only the first insulation resistance R1 is connected and between the second pole 18th and the vehicle body only the resistors R5.1 , R5.2 of the second voltage divider 36 parallel to the second insulation resistance R2 are switched.

Durch die Messung der ersten Spannung U1 am ersten Spannungsabgriffspunkt 30 und/oder der zweiten Spannung U2 am zweiten Spannungsabgriffspunkt 34 in zwei ausgewählten der vorstehend beschriebenen Zustände kann mit den bekannten elektrischen Widerständen der Widerstände R3, R4.1, R4.2, R5.1, R5.2, R6 sowie der bekannten Batteriespannung Ubat in diesen beiden Zuständen ein Gleichungssystem aufgestellt werden, durch dessen Lösung die elektrischen Widerstände der Isolationswiderstände R1, R2 bestimmt werden können.By measuring the first voltage U 1 at the first voltage tap point 30th and / or the second voltage U 2 at the second voltage tap point 34 in two selected of the above-described states can be with the known electrical resistances of the resistors R3 , R4.1 , R4.2 , R5.1 , R5.2 , R6 and the known battery voltage U bat, a system of equations can be set up in these two states, by solving the electrical resistances of the insulation resistances R1 , R2 can be determined.

Das Verfahren zur Bestimmung der elektrischen Widerstände der Isolationswiderstände R1, R2 wird nachfolgend beispielsweise anhand des ersten und des zweiten Zustandes beschrieben.The procedure for determining the electrical resistances of the insulation resistances R1 , R2 is described below using the first and second states, for example.

Im ersten Zustand liegt die Batteriespannung Ubat.1 an und es wird die erste Spannung U1.1 am ersten Spannungsabgriffspunkt 30 gemessen.In the first state, the battery voltage U bat.1 is applied and the first voltage U 1.1 is applied at the first voltage tap point 30th measured.

Im ersten Zustand gilt: U B a t ,1 U 1,1 = 1 1 R 2 + 1 R 4 + 1 R 5 1 1 R 2 + 1 R 4 + 1 R 5 + 1 1 R 1 + 1 R 3

Figure DE102019218502A1_0001
bzw. U 1,1 U B a t ,1 = 1 + 1 R 2 + 1 R 4 + 1 R 5 1 R 1 + 1 R 3
Figure DE102019218502A1_0002
oder [ U 1,1 U B a t ,1 1 ] [ 1 R 3 + 1 R 1 ] = 1 R 2 + 1 R 4 + 1 R 5
Figure DE102019218502A1_0003
In the first state: U B. a t ,1 U 1.1 = 1 1 R. 2 + 1 R. 4th + 1 R. 5 1 1 R. 2 + 1 R. 4th + 1 R. 5 + 1 1 R. 1 + 1 R. 3rd
Figure DE102019218502A1_0001
or. U 1.1 U B. a t ,1 = 1 + 1 R. 2 + 1 R. 4th + 1 R. 5 1 R. 1 + 1 R. 3rd
Figure DE102019218502A1_0002
or [ U 1.1 U B. a t ,1 - 1 ] [ 1 R. 3rd + 1 R. 1 ] = 1 R. 2 + 1 R. 4th + 1 R. 5
Figure DE102019218502A1_0003

Anschließend wird durch Schließen des ersten Umschalter 40 und Öffnen des zweiten Umschalter 44 in den zweiten Zustand gewechselt und in diesem die erste Spannung U1.2 am ersten Spannungsabgriffspunkt 30 bei der Batteriespannung UBat.2 gemessen.Then by closing the first toggle switch 40 and opening the second switch 44 changed to the second state and in this the first voltage U 1.2 at the first voltage tap point 30th measured at the battery voltage U Bat.2.

Im zweiten Zustand gilt: 1 R 1 = [ 1 R 2 + 1 R 5 + 1 R 6 ] U B a t ,2 U 1,2 U B a t ,2

Figure DE102019218502A1_0004
In the second state: 1 R. 1 = [ 1 R. 2 + 1 R. 5 + 1 R. 6th ] U B. a t , 2 U 1.2 - U B. a t , 2
Figure DE102019218502A1_0004

In die umgeformte Gleichung des ersten Zustandes eingesetzt gilt somit: [ U 1,1 U B a t ,1 1 ] [ 1 R 3 + [ 1 R 2 + 1 R 5 + 1 R 6 ] U B a t ,2 U 1,2 U B a t ,2 ] = 1 R 2 + 1 R 4 + 1 R 5

Figure DE102019218502A1_0005
Inserted into the transformed equation of the first state, the following applies: [ U 1.1 U B. a t ,1 - 1 ] [ 1 R. 3rd + [ 1 R. 2 + 1 R. 5 + 1 R. 6th ] U B. a t , 2 U 1.2 - U B. a t , 2 ] = 1 R. 2 + 1 R. 4th + 1 R. 5
Figure DE102019218502A1_0005

Des Weiteren gilt U 1,1 U B a t ,1 1 = U 1,1 U B a t ,1 U B a t ,1

Figure DE102019218502A1_0006
so dass [ U 1,1 U B a t ,1 U B a t ,1 ] [ 1 R 3 + [ 1 R 2 + 1 R 5 + 1 R 6 ] U B a t ,2 U 1,2 U B a t ,2 ] = 1 R 2 + 1 R 4 + 1 R 5
Figure DE102019218502A1_0007
Furthermore applies U 1.1 U B. a t ,1 - 1 = U 1.1 - U B. a t ,1 U B. a t ,1
Figure DE102019218502A1_0006
so that [ U 1.1 - U B. a t ,1 U B. a t ,1 ] [ 1 R. 3rd + [ 1 R. 2 + 1 R. 5 + 1 R. 6th ] U B. a t , 2 U 1.2 - U B. a t , 2 ] = 1 R. 2 + 1 R. 4th + 1 R. 5
Figure DE102019218502A1_0007

Diese Gleichung kann nach R2 aufgelöst werden 1 R 2 [ [ U 1,1 U B a t ,1 U B a t ,1 U B a t ,2 U 1,2 U B a t ,2 ] 1 ]                        = 1 R 4 + 1 R 5 + 1 R 3 [ U 1,1 U B a t ,1 U B a t ,1 ] [ U 1,1 U B a t ,1 U B a t ,1 U B a t ,2 U 1,2 U B a t ,2 ]

Figure DE102019218502A1_0008
so dass gilt R 2 = 1 [ U 1,1 U B a t ,1 U B a t ,1 U B a t ,2 U 1,2 U B a t ,2 ] [ U 1,1 U B a t ,1 U B a t ,1 [ U B a t ,2 U 1,2 U B a t ,2 [ 1 R 5 + 1 R 6 ] + 1 R 3 ] ] 1 R 4 + 1 R 5
Figure DE102019218502A1_0009
This equation can be used according to R2 to be resolved 1 R. 2 [ [ U 1.1 - U B. a t ,1 U B. a t ,1 U B. a t , 2 U 1.2 - U B. a t , 2 ] - 1 ] = 1 R. 4th + 1 R. 5 + 1 R. 3rd [ U 1.1 - U B. a t ,1 U B. a t ,1 ] - [ U 1.1 - U B. a t ,1 U B. a t ,1 U B. a t , 2 U 1.2 - U B. a t , 2 ]
Figure DE102019218502A1_0008
so that applies R. 2 = 1 - [ U 1.1 - U B. a t ,1 U B. a t ,1 U B. a t , 2 U 1.2 - U B. a t , 2 ] [ U 1.1 - U B. a t ,1 U B. a t ,1 [ U B. a t , 2 U 1.2 - U B. a t , 2 [ 1 R. 5 + 1 R. 6th ] + 1 R. 3rd ] ] - 1 R. 4th + 1 R. 5
Figure DE102019218502A1_0009

Die Gleichung erhält somit nur bekannte bzw. in den beiden Zuständen ermittelte Werte, so dass R2 berechnet werden kann. Ist R2 bekannt, kann die Gleichung für den zweiten Zustand nach R1 aufgelöst und R1 berechnet werden.The equation thus only contains known values or values determined in the two states, so that R2 can be calculated. Is R2 known, the equation for the second state can after R1 dissolved and R1 be calculated.

Anstelle des oben beschriebenen Gleichungssystems für den ersten und den zweiten Zustand kann für die Aufstellung des Gleichungssystems zwei andere Zustände verwendet werden, wenn durch die Auflösung des Gleichungssystems eine Bestimmung der Isolationswiderstände R1, R2 möglich ist.Instead of the above-described system of equations for the first and the second state, two other states can be used for setting up the system of equations if the insulation resistances are determined by solving the system of equations R1 , R2 is possible.

Des Weiteren kann durch eine geeignete Wahl der Zustände für die beiden Messungen der Spannungen U1 und U2 eine Eigendiagnose des Testschaltung 12 durchgeführt werden.Furthermore, through a suitable choice of the states for the two measurements of the voltages U 1 and U 2 a self-diagnosis of the test circuit 12th be performed.

Zur Selbstdiagnose der Testschaltung werden zwei der oben beschriebenen vier Zustände verwendet, bei welchen am ersten Spannungsabgriffspunkt 28 und/oder am zweiten Spannungsabgriffspunkt 34 die gleiche Spannung U1 bzw. U2 anlegen muss.For self-diagnosis of the test circuit, two of the four states described above are used, in which at the first voltage tap point 28 and / or at the second voltage tap point 34 the same tension U1 or. U2 must create.

Der Widerstände zwischen den Polen 14, 18 und der Fahrzeugkarosserie 16 lassen sich aber nicht allein als ohmsche Widerstände beschreiben. Vielmehr sind zwischen den Polen 14, 18 und der Fahrzeugkarosserie Kapazitäten 47, 49 mit unbekannter Größe vorhanden, die nach dem Herstellen des ersten und des zweiten Zustandes aufgeladen werden. Die Ladevorgänge dieser Kapazitäten müssen abgewartet werden, bevor eine zuverlässige Spannungsmessung am ersten und/oder Spannungsabgriffspunkt 28, 34 und somit eine zuverlässige Bestimmung der Isolationswiderstände R1, R2 erfolgen kann.The resistance between the poles 14th , 18th and the vehicle body 16 but cannot be described as ohmic resistances alone. Rather, they are between the poles 14th , 18th and the vehicle body capacities 47 , 49 of unknown size, which are charged after the first and second states have been established. The loading processes of these capacities must be awaited before a reliable voltage measurement at the first and / or voltage tap point 28 , 34 and thus a reliable determination of the insulation resistance R1 , R2 can be done.

Üblicherweise wird für die Ladevorgänge eine feste Zeit nach Herstellen des ersten bzw. des zweiten Zustandes angenommen, innerhalb der Die Aufladevorgänge auch bei den ungünstigsten Bedingungen in jedem Fall beendet sind. Nach Ablauf dieser Zeit wird eine Messung der Spannungen am ersten und/oder Spannungsabgriffspunkt 28, 34 im ersten oder im zweiten Zustand durchgeführt.Usually, a fixed time is assumed for the charging processes after the first or the second state has been established, within which the charging processes are ended in any case, even under the most unfavorable conditions. After this time has elapsed, the voltages are measured at the first and / or voltage tap point 28 , 34 carried out in the first or in the second state.

Im regulären Fahrzeugbetrieb, insbesondere beim Start des Fahrzeugs ist aber eine wesentlich schnellere Messung der Isolationswiderstände R1, R2 erforderlich.In regular vehicle operation, especially when the vehicle is started, the insulation resistance measurements are much faster R1 , R2 required.

Um die Zeit zur Erfassung der ersten Spannung U1 und/oder der zweiten Spannung U2 in den verschiedenen Zuständen zu verkürzen, wird nach dem Öffnen und dem Schließen des ersten Umschalters 40 und/oder des zweiten Umschalter 44 jeweils der zeitliche Verlauf der ersten Spannung U1 und der zeitliche Verlauf der zweiten Spannung U2 erfasst. Die Werte der ersten Spannung U1 und der zweiten Spannung U2 in Abhängigkeit von den zeitlichen Verläufen der ersten Spannung U1 und der zweiten Spannung U2 ermittelt.About the time to detect the first voltage U1 and / or the second voltage U2 Shortening in the various states is made after opening and closing the first toggle switch 40 and / or the second switch 44 each time the course of the first voltage U1 and the time course of the second voltage U2 detected. The values of the first voltage U1 and the second voltage U2 depending on the time course of the first voltage U1 and the second voltage U2 determined.

Es wird also grundsätzlich keine feste Zeitspanne abgewartet, bevor die Messungen der ersten Spannung U1 und der zweiten Spannung U2 erfolgen. Stattdessen wird der Zeitpunkt der Messungen der ersten Spannung U1 und der zweiten Spannung U2 individuell bestimmt, in Abhängigkeit von den zeitlichen Verläufen der ersten Spannung U1 und der zweiten Spannung U2.In principle, there is no fixed period of time before the measurements of the first voltage U1 and the second voltage U2 respectively. Instead, the time of the measurements becomes the first voltage U1 and the second voltage U2 determined individually, depending on the time course of the first voltage U1 and the second voltage U2 .

Beispielsweise wird über die Betrachtung des zeitlichen Verlaufs der ersten Spannung U1 und der zweiten Spannung U2 bestimmt, ob der Ladevorgang beendet ist.For example, the time course of the first voltage is considered U1 and the second voltage U2 determines whether charging has ended.

Beispielsweise wird der zeitliche Verlauf, insbesondere die zeitliche Änderung a1, a2, der ersten Spannung U1 und der zweiten Spannung U2 erfasst (8) und vorab in einer Filtereinheit 56 gefiltert bzw. Spannungsspannungen kompensiert.For example, the course over time, in particular the change over time a1, a2, of the first voltage U1 and the second voltage U2 detected ( 8th ) and in advance in a filter unit 56 filtered or voltage voltages compensated.

Mit zunehmendem Fortschritt des Ladevorgangs nimmt die zeitliche Änderung a1, a2 der ersten Spannung U1 und der zweiten Spannung U2 ab. Die zeitliche Änderung a1, a2 der ersten Spannung U1 und der zweiten Spannung U2 wird nach dem Erfassen und Filtern in einer Vergleichseinheit 58 jeweils mit einem in einem Speicher 60 gespeicherten Grenzwert verglichen.As the charging process progresses, the change a1, a2 over time in the first voltage increases U1 and the second voltage U2 from. The time change a1, a2 of the first voltage U1 and the second voltage U2 is after the acquisition and filtering in a comparison unit 58 each with one in a memory 60 stored limit value compared.

Bei Unterschreiten eines Grenzwertes der zeitlichen Änderung a1, a2 der ersten Spannung U1 und der zweiten Spannung U2, der in einem Speicher 60 hinterlegt ist, kann davon ausgegangen werden, dass die Ladevorgänge beendet oder annähernd beendet sind. Anschließend können die Werte der ersten Spannung U1 und der zweiten Spannung U2 zur Berechnung der elektrischen Widerstände der Isolationswiderstände R1, R2 und/oder zur Durchführung einer Selbstdiagnose verwendet werden.When the change a1, a2 of the first voltage falls below a limit value U1 and the second voltage U2 that is in a store 60 is stored, it can be assumed that the loading processes have ended or are almost finished. Then the values of the first voltage U1 and the second voltage U2 to calculate the electrical resistance of the insulation resistance R1 , R2 and / or used to perform a self-diagnosis.

Es wird also der Zeitpunkt bestimmt, zu dem die Einschwingvorgänge beendet sind, um unmittelbar nach Beendigung der Einschwingvorgänge eine Messung der ersten Spannung U1 und der zweiten Spannung U2 durchzuführen. Anschließend kann durch Öffnen oder Schließen eines Umschalter 40, 44 ein weiterer Zustand hergestellt und in diesem nach erneuter Bestimmung des Endes der Einschwingzeit mit dem oben beschriebenen Verfahren die Messung der ersten Spannung U1 und der zweiten Spannung U2 durchgeführt werden. Mit den zwei Werten der ersten Spannung U1 und der zweiten Spannung U2 kann anschließend eine Bestimmung der elektrischen Widerstände der Isolationswiderstände R1, R2 und/oder eine Selbstdiagnose erfolgen. Die Zeit zur Bestimmung der elektrischen Widerstände der Isolationswiderstände R1, R2 und/oder zur Durchführung einer Selbstdiagnose kann so deutlich verkürzt werden.The point in time at which the transient processes are ended is therefore determined in order to be able to measure the first voltage immediately after the transient processes have ended U1 and the second voltage U2 perform. You can then open or close a toggle switch 40 , 44 a further state is established and in this, after the end of the settling time has been determined again with the method described above, the measurement of the first voltage U1 and the second voltage U2 be performed. With the two values of the first voltage U1 and the second voltage U2 can then determine the electrical resistance of the insulation resistance R1 , R2 and / or self-diagnosis. The time to determine the electrical resistances of the insulation resistances R1 , R2 and / or to carry out a self-diagnosis can thus be significantly shortened.

Optional kann die bisher verwendete maximale Zeit für die Einschwingvorgänge weiterhin in der Steuerung bzw. im Speicher 60 gespeichert sein. Wenn nach Ablauf der maximalen Zeit die zeitliche Änderung a1, a2 der ersten Spannung U1 und der zweiten Spannung U2 über einem definierten Grenzwert liegt, also die Ladevorgänge nicht beendet sind, beispielsweise, weil sich die elektrischen Widerstände der Isolationswiderstände R1, R2 während der Messung verändert haben oder ein Defekt in der Testschaltung vorliegt, kann eine Warnmeldung ausgegeben werden.Optionally, the previously used maximum time for the transient processes can still be stored in the controller or in the memory 60 be saved. If, after the maximum time has elapsed, the time change a1, a2 in the first voltage U1 and the second voltage U2 is above a defined limit value, so the charging processes are not completed, for example because the electrical resistances of the insulation resistances R1 , R2 have changed during the measurement or there is a defect in the test circuit, a warning message can be output.

Optional oder zusätzlich können im Speicher 60 Grenzwerte, insbesondere Grenzbereiche für die zeitliche Verläufe, insbesondere die zeitlichen Änderungen, der ersten Spannung U1 und der zweiten Spannung U2 gespeichert sein, die einen regulären zeitlichen Verlauf der Spannungen U1, U2 bei intakten Isolationswiderständen R1, R2 beschreiben (10). Die Grenzwerte und/oder Grenzbereiche werden mit einer zweiten Vergleichseinheit 62 (siehe 9) mit den zeitlichen Verläufen der ersten Spannung U1 und/oder der zweiten Spannung U2 verglichen. Liegt die zeitliche Änderung der ersten Spannung U1 und/oder der zweiten Spannung U2 zu einem definierten Zeitpunkt oder einem bestimmten Zeitraum außerhalb der im Speicher hinterlegen Grenzwerte oder Grenzbereiche wird davon ausgegangen, dass die elektrischen Widerstände der Isolationswiderstände außerhalb eines definierten Bereiches liegen und es wird eine Fehlermeldung ausgegeben.Optionally or additionally can be stored in the memory 60 Limit values, in particular limit ranges for the time courses, in particular the changes over time, of the first voltage U1 and the second voltage U2 be stored, which has a regular temporal course of the voltages U1 , U2 with intact insulation resistances R1 , R2 describe ( 10 ). The limit values and / or limit ranges are compared with a second comparison unit 62 (please refer 9 ) with the time courses of the first voltage U1 and / or the second voltage U2 compared. The time change of the first voltage lies U1 and / or the second voltage U2 At a defined point in time or a certain period of time outside the limit values or limit ranges stored in the memory, it is assumed that the electrical resistances of the insulation resistances are outside a defined range and an error message is output.

Dieses Verfahren ermöglicht eine Erkennung von Unregelmäßigkeiten der Isolationswiderstände R1, R2 bevor die Ladevorgänge des Systems nach dem Herstellen eines Zustandes durch Öffnen oder Schließen zumindest eines der Umschalter 40, 44 beendet ist, so dass eine schnellere Prüfung der Isolationswiderstände R1, R2 möglich ist.This procedure enables the detection of irregularities in the insulation resistance R1 , R2 before the charging of the system after establishing a state by opening or closing at least one of the changeover switches 40 , 44 is finished, allowing a faster insulation resistance test R1 , R2 is possible.

Zusätzlich kann ein weiterer Speicher 64 vorgesehen sein, in dem die ermittelten Verläufe der ersten Spannung U1 und der zweiten Spannung U2 gespeichert werden. Diese historischen Werte können verwendet werden, um die im Speicher 60 gespeicherten Grenzwerte bzw. Grenzbereiche zu korrigieren oder um die aktuellen Verläufe der Spannungen U1, U2 besser abschätzen zu können.In addition, another memory 64 be provided in which the determined curves of the first voltage U1 and the second voltage U2 get saved. These historical values can be used to keep track of those in memory 60 to correct stored limit values or limit ranges or to correct the current curves of the voltages U1 , U2 to be able to assess better.

Werden feste Grenzwerte bzw. Grenzbereiche verwendet, müssen diese alle im Fahrzeugbetrieb auftretenden Zustände sowie zeitbedingte Änderungen erfassen. Die Grenzwerte bzw. die Grenzbereiche müssen also einen ausreichend großen Abstand zum normalen zeitlichen Verlauf der Spannungen U1, U2 haben, um falsche Fehlermeldungen zu vermeiden.If fixed limit values or limit ranges are used, they must record all conditions that occur during vehicle operation as well as time-related changes. The limit values or the limit ranges must therefore be at a sufficiently large distance from the normal time profile of the voltages U1 , U2 to avoid false error messages.

Unregelmäßigkeiten in den zeitlichen Verläufen der Spannungen U1, U2 werden somit nur erfasst, wenn diese einen bestimmte Wert überschreiten. Durch die Kompensation mit historischen Werten können die Grenzwerte bzw. die Grenzbereiche näher an die regulären Verläufe der Spannungen U1, U2 angepasst werden, da bei intakten Isolationswiderständen die Ladekurve sich nicht oder nur sehr langsam ändert.Irregularities in the timing of the tensions U1 , U2 are therefore only recorded if they exceed a certain value. By compensating with historical values, the limit values or the limit ranges can be closer to the regular curves of the voltages U1 , U2 must be adjusted, since the charging curve does not change or changes only very slowly if the insulation resistances are intact.

Die zeitlichen Verläufe der ersten Spannung U1 und der zweiten Spannung U2 3.4. können auch verwendet werden, um die Endwerte der Spannungen U1, U2 zu berechnen bzw. zu interpolieren. Beispielsweise kann es sich bei den zeitlichen Verläufen der ersten Spannung U1 und der zweiten Spannung U2 um E-Funktionen handeln, so dass ein Grenzwert für die erste Spannung und/oder die zweite Spannung berechnet werden kann.The time courses of the first tension U1 and the second voltage U2 3.4 . can also be used to calculate the final values of the voltages U1 , U2 to calculate or interpolate. For example, it can be the time courses of the first voltage U1 and the second voltage U2 be E-functions, so that a limit value for the first voltage and / or the second voltage can be calculated.

Diese Methode der Spannungsberechnung kann sehr schnell erfolgen, so dass, beispielsweise beim Startvorgang eines Fahrzeuges sehr schnell eine erste Bestimmung der elektrischen Widerstände der Isolationswiderstände R1, R2 vorliegt. Die Genauigkeit dieser Berechnung reicht in jedem Fall aus, um abzuschätzen, ob die Isolationswiderstände R1, R2 intakt sind. Eine genauere Bestimmung kann, sobald die korrekte Funktion der Isolationswiderstände R1, R2 festgestellt wurde, im laufenden Betrieb mit einem der vorstehend beschriebenen Verfahren erfolgen.This method of voltage calculation can take place very quickly, so that, for example, when a vehicle is started, a first determination of the electrical resistances of the insulation resistances is very quick R1 , R2 is present. The accuracy of this calculation is sufficient in any case to estimate whether the insulation resistance R1 , R2 are intact. A more precise determination can be made as soon as the correct functioning of the insulation resistances R1 , R2 was determined to be carried out during operation using one of the methods described above.

Claims (10)

Verfahren zur Prüfung der Isolation zwischen einem Stromkreis (12) und einer Fahrzeugkarosserie (16), insbesondere zur Prüfung eines ersten Isolationswiderstandes (R1) zwischen einem ersten Pol (20) einer Stromquelle und der Fahrzeugkarosserie (16) und eines zweiten Isolationswiderstandes (R2) zwischen einem zweiten Pol (18) und der Fahrzeugkarosserie (16), mit einer Testschaltung (10), die einen ersten Eingang (20), der mit dem ersten Pol (14) kontaktiert ist, einem zweiten Eingang (22), der mit dem zweiten Pol (18) kontaktiert ist und einem dritten Eingang (24), der mit der Fahrzeugkarosserie (16) kontaktiert ist, aufweist, wobei die Testschaltung (10) einen ersten Messpfad (26) zwischen dem ersten Eingang (20) und dem zweiten Eingang (22) aufweist, mit zumindest einem ersten Messwiderstand (R3) und einem ersten Spannungsabgriffspunkt (28) für eine erste Spannung (U1), und wobei die Testschaltung (10) einen zweiten Messpfad (32) zwischen dem zweiten Eingang (22) und dem dritten Eingang (24) aufweist, mit einem zweiten Spannungsabgriffspunkt (34) für eine zweite Spannung (U2), und wobei die Testschaltung (10) einen ersten Umschalter (40) aufweist, der in geschlossenem Zustand eine Verbindung zwischen dem ersten Spannungsabgriffspunkt (28) und dem dritten Eingang (24) herstellt, wobei jeweils bei geöffnetem ersten Umschalter (40) und geschlossenem erstem Umschalter (40) ein Wert für die erste Spannung (U1) und/oder ein Wert für die zweite Spannung (U2) erfasst wird, und aus den jeweils in den Schaltzuständen erfassten Werten der ersten Spannung (U1) und/oder der zweiten Spannung (U2) der elektrische Widerstand des ersten Isolationswiderstandes (R1) und des zweiten Isolationswiderstandes (R2) ermittelt werden, dadurch gekennzeichnet, dass nach dem Öffnen und dem Schließen des ersten Umschalters (40) jeweils der zeitliche Verlauf der ersten Spannung (U1) und/oder der zeitliche Verlauf der zweiten Spannung (U2) erfasst wird und die Werte der ersten Spannung (U1) und/oder der zweiten Spannung (U2) in Abhängigkeit von den zeitlichen Verläufen der ersten Spannung (U1) und/oder und der zweiten Spannung (U2) ermittelt werden.Method for testing the insulation between a circuit (12) and a vehicle body (16), in particular for testing a first insulation resistance (R1) between a first pole (20) of a power source and the vehicle body (16) and a second insulation resistance (R2) between a second pole (18) and the vehicle body (16), with a test circuit (10) having a first input (20) which is contacted with the first pole (14), a second input (22) which is connected to the second Pole (18) is contacted and has a third input (24) which is in contact with the vehicle body (16), the test circuit (10) having a first measurement path (26) between the first input (20) and the second input ( 22), with at least a first measuring resistor (R3) and a first voltage tap point (28) for a first voltage (U1), and wherein the test circuit (10) has a second measuring path (32) between the second input (22) and the third Input ng (24), with a second voltage tap point (34) for a second voltage (U2), and wherein the test circuit (10) has a first changeover switch (40) which, in the closed state, establishes a connection between the first voltage tap point (28) and the third input (24), with a value for the first voltage (U1) and / or a value for the second voltage (U2) being recorded in each case with the first changeover switch (40) open and the first changeover switch (40) closed, and off the values of the first voltage (U1) and / or the second voltage (U2) recorded in the respective switching states, the electrical resistance of the first insulation resistor (R1) and the second insulation resistor (R2) are determined, characterized in that after opening and the Closing the first changeover switch (40) in each case the time profile of the first voltage (U1) and / or the time profile of the second voltage (U2) is recorded and the values of the first voltage (U1) and / or the second voltage (U2) depending on the time profiles of the first voltage (U1) and / or and the second voltage (U2 ) be determined. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass ein zweiter Umschalter (44) vorgesehen ist, der in geschlossenem Zustand einen zweiten Messwiderstand (R6) parallel zum zweiten Spannungsabgriffspunkt (34) zwischen dem zweiten Eingang (22) und dem dritten Eingang (24) schaltet, wobei Werte der ersten Spannung (U1) und/oder der zweiten Spannung (U2) bei offenem oder geschlossenem ersten Umschalter (40) und zweiten Umschalter (44) verglichen werden und bei einer Abweichung der Werte eine Fehlermeldung ausgegeben wird, wobei nach dem Öffnen und dem Schließen des ersten Umschalter und/oder des zweiten Umschalters (44) der zeitliche Verlauf der ersten Spannung (U1) und/oder der zeitliche Verlauf der zweiten Spannung (U2) erfasst werden und die Werte der ersten und der zweiten Spannung (U1, U2) in Abhängigkeit von den zeitlichen Verläufen der ersten und der zweiten Spannung (U1, U2) ermittelt werden.Procedure according to Claim 1 , characterized in that a second changeover switch (44) is provided which, when closed, switches a second measuring resistor (R6) parallel to the second voltage tap point (34) between the second input (22) and the third input (24), with values of the first voltage (U1) and / or the second voltage (U2) are compared with the first changeover switch (40) and second changeover switch (44) open or closed, and an error message is output if the values differ, after opening and closing the first changeover switch and / or the second changeover switch (44) the time profile of the first voltage (U1) and / or the time profile of the second voltage (U2) can be detected and the values of the first and second voltage (U1, U2) as a function can be determined from the time curves of the first and the second voltage (U1, U2). Verfahren nach einem der Ansprüche 1 und 2, dadurch gekennzeichnet, dass der zeitliche Verlauf, insbesondere die zeitliche Änderung (a1), der ersten Spannung (U1) und der zeitliche Verlauf, insbesondere die zeitliche Änderung (a2), der zweiten Spannung (U2) jeweils mit einem Grenzwert verglichen werden und bei Unterschreiten des Grenzwertes die Werte für die erste und/oder die zweite Spannung (U1, U2) erfasst werden.Method according to one of the Claims 1 and 2 , characterized in that the course over time, in particular the change over time (a1), the first voltage (U1) and the course over time, in particular the change over time (a2), the second voltage (U2) are each compared with a limit value and at If the limit value falls below the values for the first and / or the second voltage (U1, U2) are recorded. Verfahren nach einem der Ansprüche 1 und 2, dadurch gekennzeichnet, dass unmittelbar nach Erfassen der Werte für die erste Spannung /U1) und/oder die zweiten Spannung (U2) bei geschlossenen oder offenem ersten und/oder zweiten Umschalter (40, 44) der erste und oder der zweite Umschalter (40, 44) geöffnet oder geschlossen wird.Method according to one of the Claims 1 and 2 , characterized in that immediately after the values for the first voltage / U1) and / or the second voltage (U2) have been recorded, with the first and / or second changeover switch (40, 44) closed or open, the first and / or the second changeover switch (40 , 44) is opened or closed. Verfahren nach einem der Ansprüche 2 und 3, dadurch gekennzeichnet, dass eine Warnmeldung ausgegeben wird, wenn der zeitliche Verlauf der ersten Spannung (U1) und oder der zeitliche Verlauf der zweiten Spannung (U2) außerhalb eines Grenzbereichs liegen.Method according to one of the Claims 2 and 3rd , characterized in that a warning message is output when the time profile of the first voltage (U1) and / or the time profile of the second voltage (U2) are outside a limit range. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zeitliche Schwankungen des Stromverbrauchs im Stromkreis (12) erfasst werden und aus dem zeitlichen Verlauf der ersten Spannung (U1) und dem zeitliche Verlauf der zweiten Spannung (U2) herausgerechnet werden.Method according to one of the preceding claims, characterized in that temporal fluctuations in the power consumption in the circuit (12) are recorded and calculated from the temporal course of the first voltage (U1) and the temporal course of the second voltage (U2). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Werte der ersten Spannung (U1) und der zweiten Spannung (U2) aus den zeitlichen Verläufen der ersten Spannung (U1) und der zweiten Spannung (U2) abgeschätzt werden.Method according to one of the preceding claims, characterized in that the values of the first voltage (U1) and the second voltage (U2) are estimated from the time curves of the first voltage (U1) and the second voltage (U2). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Messschaltung (10) einen Speicher (66) aufweist, in dem zeitlichen Verläufe der ersten Spannung (U1) und der zweiten Spannung (U2), wobei die gespeicherten zeitlichen Verläufe der ersten Spannung (U1) und der zweiten Spannung (U2) zur Ermittlung der Werte für die erste Spannung (U1) und die zweite Spannung (U2) verwendet werden.Method according to one of the preceding claims, characterized in that the measuring circuit (10) has a memory (66) in which the time profiles of the first voltage (U1) and the second voltage (U2), the stored time profiles of the first voltage ( U1) and the second voltage (U2) can be used to determine the values for the first voltage (U1) and the second voltage (U2). Testschaltung (10) zur Prüfung der Isolation zwischen einem Stromkreis (12) und einer Fahrzeugkarosserie (16), insbesondere zur Prüfung eines ersten Isolationswiderstandes (R1) zwischen einem ersten Pol (14) einer Stromquelle und der Fahrzeugkarosserie (16) und eines zweiten Isolationswiderstandes (R2) zwischen einem zweiten Pol (18) und der Fahrzeugkarosserie (16), mit einem ersten Eingang (20), der mit dem ersten Pol (14) kontaktiert ist, einem zweiten Eingang (22), der mit dem zweiten Pol (18) kontaktiert ist und einem dritten Eingang (24), der mit der Fahrzeugkarosserie (16) kontaktiert ist, wobei die Testschaltung einen ersten Messpfad zwischen dem ersten Eingang und dem zweiten Eingang aufweist, mit einem ersten Messwiderstand und einem ersten Spannungsabgriffspunkt für eine erste Spannung, wobei die Testschaltung (10) einen ersten Messpfad (26) zwischen dem ersten Eingang (20) und dem zweiten Eingang (22) aufweist, mit zumindest einem ersten Messwiderstand (R3) und einem ersten Spannungsabgriffspunkt (28) für eine erste Spannung (U1), und wobei die Testschaltung (10) einen zweiten Messpfad (32) zwischen dem zweiten Eingang (22) und dem dritten Eingang (24) aufweist, mit einem zweiten Spannungsabgriffspunkt (34) für eine zweite Spannung (U2), und wobei die Testschaltung (10) einen ersten Umschalter (40) aufweist, der in geschlossenem Zustand eine Verbindung zwischen dem ersten Spannungsabgriffspunkt (28) und dem dritten Eingang (24) herstellt, dadurch gekennzeichnet, dass die Testschaltung eine Steuerung (46) zur Durchführung eines Verfahren nach einem der vorhergehenden Ansprüche aufweist.Test circuit (10) for testing the insulation between a circuit (12) and a vehicle body (16), in particular for testing a first insulation resistance (R1) between a first pole (14) of a power source and the vehicle body (16) and a second insulation resistance ( R2) between a second pole (18) and the vehicle body (16), with a first input (20) which is in contact with the first pole (14), a second input (22) which is in contact with the second pole (18) is contacted and a third input (24) which is contacted with the vehicle body (16), wherein the test circuit has a first measuring path between the first input and the second input, with a first measuring resistor and a first voltage tap point for a first voltage, wherein the test circuit (10) has a first measuring path (26) between the first input (20) and the second input (22), with at least a first measuring resistor (R3) and a first Voltage tap point (28) for a first voltage (U1), and wherein the test circuit (10) has a second measuring path (32) between the second input (22) and the third input (24), with a second voltage tap point (34) for a second voltage (U2), and wherein the test circuit (10) has a first changeover switch (40) which, in the closed state, establishes a connection between the first voltage tap point (28) and the third input (24), characterized in that the test circuit has a Control (46) for performing a method according to one of the preceding claims. Testschaltung nach Anspruch 9, dadurch gekennzeichnet, dass ein zweiter Umschalter (44) vorgesehen ist, der in geschlossenem Zustand einen zweiten Messwiderstand (R6) parallel zum zweiten Spannungsabgriffspunkt (34) zwischen dem zweiten Eingang (22) und dem dritten Eingang (24) schaltet, und dass die Testschaltung (10) Werte der ersten Spannung (U1) und/oder der zweiten Spannung (U2) bei offenem oder geschlossenem ersten Umschalter (40) und zweiten Umschalter (44) vergleicht und bei einer Abweichung der Werte eine Fehlermeldung ausgibt, wobei nach dem Öffnen und dem Schließen des ersten Umschalter und/oder des zweiten Umschalters (44) der zeitliche Verlauf der ersten Spannung (U1) und/oder der zeitliche Verlauf der zweiten Spannung (U2) erfasst werden und die Werte der ersten und der zweiten Spannung (U1, U2) in Abhängigkeit von den zeitlichen Verläufen der ersten und der zweiten Spannung (U1, U2) ermittelt werden.Test circuit after Claim 9 , characterized in that a second changeover switch (44) is provided which, when closed, switches a second measuring resistor (R6) parallel to the second voltage tap point (34) between the second input (22) and the third input (24), and that the Test circuit (10) compares values of the first voltage (U1) and / or the second voltage (U2) with the first changeover switch (40) and second changeover switch (44) open or closed and outputs an error message if the values deviate, whereby after opening and when the first changeover switch and / or the second changeover switch (44) are closed, the time profile of the first voltage (U1) and / or the time profile of the second voltage (U2) are recorded and the values of the first and second voltage (U1, U2) can be determined as a function of the time curves of the first and second voltage (U1, U2).
DE102019218502.9A 2019-11-28 2019-11-28 Method and test circuit for testing the insulation between a circuit and a vehicle body Pending DE102019218502A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102019218502.9A DE102019218502A1 (en) 2019-11-28 2019-11-28 Method and test circuit for testing the insulation between a circuit and a vehicle body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102019218502.9A DE102019218502A1 (en) 2019-11-28 2019-11-28 Method and test circuit for testing the insulation between a circuit and a vehicle body

Publications (1)

Publication Number Publication Date
DE102019218502A1 true DE102019218502A1 (en) 2021-06-02

Family

ID=75896849

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102019218502.9A Pending DE102019218502A1 (en) 2019-11-28 2019-11-28 Method and test circuit for testing the insulation between a circuit and a vehicle body

Country Status (1)

Country Link
DE (1) DE102019218502A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102021122817A1 (en) 2021-09-03 2023-03-09 Webasto SE Measuring and monitoring method for an isolation device and a vehicle
WO2023148328A1 (en) * 2022-02-03 2023-08-10 Webasto SE Measuring and monitoring method for an insulation device, and a vehicle

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016214458A1 (en) * 2015-12-02 2017-06-08 Hyundai Motor Company DEVICE AND METHOD FOR DETECTING A DIELECTRIC PUNCH IN AN ENVIRONMENTALLY FRIENDLY VEHICLE
US20170334295A1 (en) * 2016-05-19 2017-11-23 Qian Turner Tester for measuring isolation between a high voltage direct current system and a chassis

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016214458A1 (en) * 2015-12-02 2017-06-08 Hyundai Motor Company DEVICE AND METHOD FOR DETECTING A DIELECTRIC PUNCH IN AN ENVIRONMENTALLY FRIENDLY VEHICLE
US20170334295A1 (en) * 2016-05-19 2017-11-23 Qian Turner Tester for measuring isolation between a high voltage direct current system and a chassis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102021122817A1 (en) 2021-09-03 2023-03-09 Webasto SE Measuring and monitoring method for an isolation device and a vehicle
WO2023148328A1 (en) * 2022-02-03 2023-08-10 Webasto SE Measuring and monitoring method for an insulation device, and a vehicle

Similar Documents

Publication Publication Date Title
DE102007046483B4 (en) Circuit arrangement and method for monitoring electrical insulation
EP3503343B1 (en) Electrical system and method for diagnosing the functionality of power relays in an electrical system
DE102018217116B3 (en) High-voltage system and method for monitoring insulation faults in a high-voltage system
DE2627053C2 (en) Procedure for checking a storage battery
DE102012213159A1 (en) Battery system with battery contactors and a diagnostic device for monitoring the functional status of the contactors and the associated diagnostic procedure
DE102015108024B4 (en) CONTINUOUS LEAK DETECTION CIRCUIT WITH INTEGRATED ROBUSTNESS TESTING AND SYMMETRIC FAULT DETECTION
DE102011004516A1 (en) Electric circuit for use with lithium ion battery system for diagnosis of switching contacts in battery-powered road vehicle, has unit for generating and measuring voltage drop via resistance element
DE2633305A1 (en) METHOD AND DEVICE FOR CHECKING AN ACCUMULATOR BATTERY
DE102010042750A1 (en) Method and device for detecting a short circuit
DE102014220017A1 (en) Battery system with a trained for supplying a high-voltage network with electrical energy battery and a measuring device for measuring at least one insulation resistance of the battery
DE102019218502A1 (en) Method and test circuit for testing the insulation between a circuit and a vehicle body
EP0198861B1 (en) Control installation for batteries
DE102018124109A1 (en) Method and device for determining the insulation resistance
DE102021119830B3 (en) Method for self-diagnosis of a circuit for measuring the insulation resistance of a high-voltage system
WO2021122368A1 (en) Device and method for monitoring at least three battery cells of a battery
WO2017148471A1 (en) Method for testing electrical functions in a vehicle
EP0204163B1 (en) Measuring method for determining the quality of a battery
WO2016020149A1 (en) Self-discharge characterizing device and method for characterizing a self-discharge of energy stores
DE102013013951A1 (en) Measuring arrangement, measuring device and method for the determination of insulation faults
EP0122473B1 (en) Method of monitoring the charging of batteries
DE102012215619A1 (en) Lithium ion battery system for vehicle i.e. power train, has series arrangements fixed with measurement unit in network and provided with switches and measuring resistors, where resistors and terminals are connected with measurement unit
DE3513849C2 (en)
DE3712783A1 (en) Method for checking the operability of a test device for high-voltage conductors and test device
DE102019203687A1 (en) Method for diagnosing exhaust gas sensors
DE2242592C3 (en) Method and device for testing batteries

Legal Events

Date Code Title Description
R163 Identified publications notified
R081 Change of applicant/patentee

Owner name: CONTINENTAL AUTOMOTIVE TECHNOLOGIES GMBH, DE

Free format text: FORMER OWNER: CONTINENTAL AUTOMOTIVE GMBH, 30165 HANNOVER, DE

R081 Change of applicant/patentee

Owner name: CONTINENTAL AUTOMOTIVE TECHNOLOGIES GMBH, DE

Free format text: FORMER OWNER: CONTINENTAL AUTOMOTIVE TECHNOLOGIES GMBH, 30165 HANNOVER, DE