DE102019124268A1 - Method for external and internal control of a flywheelless storage power plant - Google Patents
Method for external and internal control of a flywheelless storage power plant Download PDFInfo
- Publication number
- DE102019124268A1 DE102019124268A1 DE102019124268.1A DE102019124268A DE102019124268A1 DE 102019124268 A1 DE102019124268 A1 DE 102019124268A1 DE 102019124268 A DE102019124268 A DE 102019124268A DE 102019124268 A1 DE102019124268 A1 DE 102019124268A1
- Authority
- DE
- Germany
- Prior art keywords
- control
- power
- storage
- memory
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/24—Arrangements for preventing or reducing oscillations of power in networks
- H02J3/241—The oscillation concerning frequency
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J1/00—Circuit arrangements for dc mains or dc distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Abstract
Die Erfindung betrifft ein Verfahren zur externen und internen Regelung eines schwungmasselosen Speicherkraftwerks für eine Bereitstellung von Systemdienstleistungen, welche Momentanreserve, Primärregelung und Sekundärregelung umfassen.
Es ist daher Aufgabe der Erfindung die Nachteile des Standes der Technik zu beseitigen und eine Regelung neuer schwungmasseloser Speicherkraftwerke bereitzustellen, mit welcher ein neues „konventionelles“ Speicherkraftwerk alle Aufgaben der Netzregelung und der elektrischen Energieversorgung in einer vollständigen regenerativen Energieversorgung übernehmen kann.
Die Lösung dieser Aufgabe erfolgt durch die in den Ansprüchen aufgeführten Merkmale.
The invention relates to a method for external and internal control of a flywheelless storage power plant for providing system services which include instantaneous reserve, primary control and secondary control.
It is therefore an object of the invention to eliminate the disadvantages of the prior art and to provide a control system for new flywheel-less storage power plants, with which a new “conventional” storage power plant can take over all the tasks of network control and electrical energy supply in a complete regenerative energy supply.
This object is achieved by the features listed in the claims.
Description
Die Erfindung betrifft ein Verfahren zur externen und internen Regelung eines schwungmasselosen Speicherkraftwerks für eine Bereitstellung von Systemdienstleistungen, welche Momentanreserve, Primärregelung und Sekundärregelung umfassen.The invention relates to a method for external and internal control of a flywheelless storage power plant for providing system services which include instantaneous reserve, primary control and secondary control.
Die Grundprinzipien der Elektrischen Energieversorgung sowie der Netzregelung sind universell und müssen für alle Arten der Erzeugung, der Übertragung und Verteilung sowie des Verbrauchs wie folgt eingehalten werden:
- 1 Weiträumige und feinverteilte Energieversorgung benötigt ein Drehstromnetz.
- 2 Plötzliche Laständerungen müssen instantan durch Momentanreserveleistung gespeist werden.
- 3 Die Speicher der Momentanreserveleistung müssen im Sekundenbereich durch die Primärregelung entlastet und wieder aufgefüllt werden. Dazu werden Primärregelleistungsspeicher benötigt.
- 4 Die Primärregelleistung muss im Minutenbereich durch die Sekundärrregelung abgelöst werden. Dabei ist dann auch deren Speicher wieder aufzuladen.
- 5 Anschließend treten Fahrplanänderungen in Kraft, welche alle Regler wieder „auf null“ stellen.
- 6 In einer vollregenerativ versorgten Energieversorgung kommt. Noch folgende Aufgabe hinzu: Gewisse Mengen der geernteten Energie müssen für Prognosefehler sowie „Dunkelflauten“ gespeichert werden.
- 1 A three-phase network requires a spacious and finely divided power supply.
- 2 Sudden load changes must be fed instantaneously by means of instantaneous reserve power.
- 3 The stores of the instantaneous reserve power must be relieved and replenished in a matter of seconds by the primary control. Primary control power storage is required for this.
- 4 The primary control power must be replaced by the secondary control in the minute range. In this case, their memory must also be recharged.
- 5 Then schedule changes come into force, which set all controllers back to "zero".
- 6 Comes in a fully regenerative energy supply. The following task also needs to be added: Certain amounts of the harvested energy have to be saved for forecast errors and "dark drafts".
Bislang wurden diese Aufgaben von konventionellen Kraftwerken wahrgenommen, welche dazu aus einer Systemkette bestehend aus unterschiedlich schnellen Speichern sowie Umwandlern/Anpassern aufgebaut sind. Diese Systemkette umfasst (am Beispiel einer sprungförmigen Leistungsanforderung):
- Umwandlung/Anpassung: Die sprungförmige elektrische Leistungsanforderung wird vom Generator bei noch konstanter Drehzahl instantan in eine sprungförmige Erhöhung des Luftspalt-Moments und damit der mechanischen Leistung umgesetzt.
- Speicher: Der Turbosatz bestehend aus Turbine-Generator-Erreger speichert instantan kinetische Energie aus und liefert diese mechanische Leistung. Dadurch sinkt die Drehzahl ab, welche die Größe des Speicherinhaltes kennzeichnet.
- Umwandlung/Anpassung: Der Primärregler greift über ein Turbinenventil auf einen Frischdampfspeicher zu, wodurch im Sekundenbereich der Dampfstrom erhöht wird. Damit steigt das Turbinenmoment an und füllt den Drehzahl-Speicher wieder auf.
- Speicher: Durch den erhöhten Dampfstrom sinkt der Dampfdruck ab, welcher hier die Größe des Speicherinhaltes kennzeichnet.
- Umwandlung/Anpassung: Der Brennstoffregler erhöht die Feuerung um den Druck auszuregeln. Dabei wird mehr Kohlenstoff C mit Sauerstoff O zu CO2 umgewandelt. Im Verdampfer wird mehr Dampf erzeugt. Mit dem erhöhten Dampfstrom wird der Druck-Speicher wieder aufgefüllt.
- Speicher: Der Brennstoffregler greift im Minutenbereich auf die Kohlehalde zu und erhöht den Brennstoff-Massenstrom. Die Kohlemasse der Halde wird weniger, welche hier die Größe des Speicherinhalts kennzeichnet. Hier findet keine Wiederaufladung durch das Kraftwerk selbst statt.
- Conversion / adaptation: The step-by-step electrical power requirement is instantly converted by the generator at a constant speed into a step-by-step increase in the air gap torque and thus the mechanical power.
- Storage: The turbo set consisting of a turbine generator exciter instantaneously stores kinetic energy and delivers this mechanical power. As a result, the speed drops, which characterizes the size of the memory content.
- Conversion / adaptation: The primary controller accesses a live steam storage via a turbine valve, which increases the steam flow in the seconds range. This increases the turbine torque and refills the speed memory.
- Storage: Due to the increased steam flow, the steam pressure drops, which indicates the size of the storage content.
- Conversion / adaptation: The fuel regulator increases the combustion to regulate the pressure. More carbon C is converted with oxygen O to CO2. More steam is generated in the evaporator. The pressure accumulator is refilled with the increased steam flow.
- Storage: The fuel regulator accesses the coal stockpile in a matter of minutes and increases the fuel mass flow. The coal mass of the stockpile becomes less, which characterizes the size of the storage content. There is no recharging by the power plant itself.
Durch das zunehmende Vorhandensein regenerativer Energiequellen aus Wind und Sonne muss das konventionelle Kraftwerk zu gewissen Zeiten seine Leistung stark reduzieren, um diesen Erzeugern Platz zu schaffen. Dazu muss die Mindestleistung abgesenkt und die Regelgeschwindigkeit erhöht werden. Diesen Anforderungen müssen sich heute alle Erzeuger aus fossilen Rohstoffen stellen.Due to the increasing availability of renewable energy sources from wind and sun, the conventional power plant has to reduce its output considerably at certain times in order to make room for these producers. To do this, the minimum power must be reduced and the control speed increased. Today, all producers from fossil raw materials have to meet these requirements.
Um die o.g. Versorgungs- und Netzregelaufgaben auch weiterhin in einer vollregenerativen Welt realisieren zu können sind bereits neue „konventionelle“ Kraftwerke entwickelt worden, welche Energie bei „Dunkelflauten“ nicht nur liefern, sondern in Überschuss-Situationen auch speichern können. Dabei müssen diese neuen Anlagen für eine Übergangszeit auch noch in einer schwungmasseorientierten Energieversorgung mit konventionellen Kraftwerken funktionieren. In einer rein umrichterorientierten Energieversorgung können sie dann auch entweder netzbildend oder aber netzstützend bei konstanter Netzfrequenz betrieben werden.To the above To be able to continue to perform supply and grid control tasks in a fully regenerative world, new “conventional” power plants have already been developed, which not only supply energy in the event of “dark doldrums”, but can also store them in surplus situations. For a transitional period, these new plants must also function in a flywheel-oriented energy supply with conventional power plants. In a purely converter-oriented energy supply, they can then be operated either in a grid-forming manner or in a grid-supporting manner at a constant grid frequency.
Im Zuge der Energiewende wird mehr und mehr elektrische Energie von beispielsweise Wind- und PV-Anlagen erzeugt. Diese Energie wird in großen chemischen Speichern gespeichert (Speicherkraftwerk). Diese neuen Speicherkraftwerke werden mit Umrichtern an das Drehstromnetz angeschlossen. Bislang wird versucht, einzelne wegfallende Aufgaben der konventionellen Kraftwerke getrennt zu ersetzen. So wurden Batterien errichtet, welche nur Primärregelleistung erzeugen können.In the course of the energy transition, more and more electrical energy is being generated by wind and PV systems, for example. This energy is stored in large chemical stores (storage power plants). These new storage power plants are connected to the three-phase network with converters. So far, attempts have been made to replace the individual tasks of conventional power plants that have been dropped. So batteries were built that can only generate primary control power.
Anders als herkömmliche Kraftwerke weisen die neuen Speicherkraftwerke systembedingt keine Schwungmassen mehr auf. Die konventionellen Kraftwerke dagegen werden in ihrer Anzahl zurückgehen. Deshalb müssen die Speicherkraftwerke alle Aufgaben der konventionellen Kraftwerke mit Schwungmassen übernehmen.Unlike conventional power plants, the new storage power plants no longer have any inertia due to the system. In contrast, the number of conventional power plants will decrease. So they have to Storage power plants take over all tasks of conventional power plants with flywheels.
Eine Systemkette der neuen „konventionellen“ Kraftwerke umfasst (am Beispiel einer sprungförmigen Leistungsanforderung):A system chain of the new "conventional" power plants includes (using the example of a step-by-step performance requirement):
Umwandlung/Anpassung: Die sprungförmige elektrische Leistungsanforderung führt beim Umrichter bei konstant gehaltenem Netz-Spannungswinkel (netzbildend) zu einer instantanen Erhöhung des Drehstroms und damit auch zu einer instantanen Erhöhung des Gleichstroms auf der Gleichstromseite.Conversion / adaptation: The step-by-step electrical power requirement leads to an instantaneous increase in the three-phase current and thus also to an instantaneous increase in the direct current on the direct current side when the line voltage angle is kept constant (line-forming).
Speicher: Der Speicher, ein Super-Capacitor, speichert instantan elektrische Energie aus und liefert diese Leistung. Dadurch sinkt seine Spannung ab, welche hier die Größe des Speicherinhalts kennzeichnet. Dieses Verhalten entspricht der Momentanreserve des konventionellen Kraftwerks.Storage: The storage, a super-capacitor, instantly stores electrical energy and delivers this power. As a result, its voltage drops, which characterizes the size of the memory content. This behavior corresponds to the instantaneous reserve of the conventional power plant.
Umwandlung/Anpassung: Die Regelung des nachgeschalteten DC/DC-Umrichters soll die Kondensatorspannung konstant halten. Dazu greift sie auf die Batterie zu, wodurch im Sekundenbereich der Batteriestrom erhöht wird. Damit steigt der Kondensator-Ladestrom an und füllt den Spannungsspeicher wieder auf. Dieses Verhalten entspricht der Primärregelung des konventionellen Kraftwerks.Conversion / adaptation: The regulation of the downstream DC / DC converter should keep the capacitor voltage constant. To do this, it accesses the battery, which increases the battery current in seconds. The capacitor charging current thus rises and fills the voltage storage again. This behavior corresponds to the primary control of the conventional power plant.
Speicher: Durch den erhöhten Batteriestrom sinkt die Batteriespannung ab, welche hier die Größe des Speicherinhalts kennzeichnet.Storage: Due to the increased battery current, the battery voltage drops, which indicates the size of the storage content.
Umwandlung/Anpassung: Ein Brennstoffzellen-Regler erhöht die Aktivität der Brennstoffzelle, um die Batterie zu laden und die Batteriespannung auszuregeln. Dabei wird mehr Wasserstoff 2H2 mit Sauerstoff O2 zu H2O umgewandelt. Der DC/DC-Umrichter passt dabei die Spannungen an. Mit dem erhöhten Batterie-Ladestrom wird der Spannungsspeicher wieder aufgefüllt.Conversion / adaptation: A fuel cell regulator increases the activity of the fuel cell in order to charge the battery and to regulate the battery voltage. More hydrogen 2H2 is converted to H2O with oxygen O2. The DC / DC converter adjusts the voltages. The voltage storage is refilled with the increased battery charging current.
Speicher: Der Brennstoffzellenregler greift im Minutenbereich auf den Wasserstoffspeicher zu und erhöht den Brennstoff-Massenstrom. Die Wasserstoff-Masse des Speichers wird geringer, welche hier die Größe des Speicherinhalts kennzeichnet. Hier kann Wiederaufladung stattfinden.Storage: The fuel cell controller accesses the hydrogen storage in minutes and increases the fuel mass flow. The hydrogen mass of the storage is reduced, which characterizes the size of the storage content. Recharging can take place here.
Um im bestehenden frequenzgeregelten Energieversorgungssystem alle Versorgungs- und Regelaufgaben wahrnehmen zu können, muss das Speicherkraftwerk auf die Netzfrequenz und deren Ableitung mit der Lieferung von Primärregel- und Momentanreserveleistung reagieren könnenIn order to be able to perform all supply and control tasks in the existing frequency-controlled energy supply system, the storage power plant must be able to react to the grid frequency and its derivation by supplying primary control and instantaneous reserve power
In einer Energieversorgung mit überwiegend Speicherkraftwerken und nur noch wenigen oder gar keinen konventionellen Kraftwerken mit Schwungmasse mehr, kann auf die „Watt'sche Drehzahlregelung“ verzichtet und das Drehstromnetz mit einer konstanten Frequenz von z.B.f0 = 50 Hz betrieben werden. Die Aufgaben der Netzregelung wie Momentanreserve und Primärregelleistung können dann über den Spannungswinkel am Anschlusspunkt des Speicherkraftwerks realisiert werden.In a power supply with predominantly storage power plants and only a few or no conventional power plants with a flywheel, the "Watt speed control" can be dispensed with and the three-phase network can be operated at a constant frequency of e.g. f0 = 50 Hz. The grid control tasks such as instantaneous reserve and primary control power can then be implemented using the voltage angle at the connection point of the storage power plant.
Darstellung der ErfindungPresentation of the invention
Es ist daher Aufgabe der Erfindung die Nachteile des Standes der Technik zu beseitigen und eine Regelung neuer schwungmasseloser Speicherkraftwerke bereitzustellen, mit welcher ein neues „konventionelles“ Speicherkraftwerk alle Aufgaben der Netzregelung und der elektrischen Energieversorgung in einer vollständigen regenerativen Energieversorgung übernehmen kann. Die notwendigen Einzelmaßnahmen dabei, welche geregelt werden sollen, sind:
- 1 Anschluss des neuen „konventionellen“ Speicherkraftwerks an ein Drehstromnetz, um eine weiträumige und feinverteilte Energieversorgung zu gewährleisten.
- 2 Plötzliche Laständerungen müssen instantan durch Momentanreserveleistung gespeist werden.
- 3 Die Speicher der Momentanreserveleistung müssen im Sekundenbereich durch die Primärregelung entlastet und wieder aufgefüllt werden. Dazu werden Primärregelleistungsspeicher benötigt.
- 4 Die Primärregelleistung muss im Minutenbereich durch die Sekundärregelung abgelöst werden. Dabei ist dann auch deren Speicher wieder aufzufüllen.
- 5 Anschließend treten Fahrplanänderungen in Kraft.
- 6 Bei einer voll regenerativ versorgten Energieversorgung müssen definierte Mengen der geernteten Energie für die Prognose von Fehlern sowie für „Dunkelflauten“ gespeichert werden.
- 1 Connection of the new "conventional" storage power plant to a three-phase network to ensure a spacious and finely divided power supply.
- 2 Sudden load changes must be fed instantaneously by means of instantaneous reserve power.
- 3 The stores of the instantaneous reserve power must be relieved and replenished in a matter of seconds by the primary control. Primary control power storage is required for this.
- 4 The primary control power must be replaced by the secondary control in the minute range. In this case, their memory must also be replenished.
- 5 Changes to the schedule then take effect.
- 6 In the case of a fully regenerative energy supply, defined amounts of the harvested energy have to be stored for the forecast of errors and for "dark doldrums".
Es ist Aufgabe, dass die Regelung des neuen Speicherkraftwerks frequenzgeregelt oder winkelgeregelt erfolgen soll.It is the task that the control of the new storage power plant should be frequency-controlled or angle-controlled.
In den folgenden angegebenen Gleichungen sind alle Werte außer Winkel in bezogenen Größen angegeben.In the following equations, all values except angles are given in related sizes.
Die Lösung dieser Aufgabe erfolgt durch die in den Ansprüchen aufgeführten Merkmale.This object is achieved by the features listed in the claims.
Die Aufgabe wird gelöst mittels eines Verfahrens zur externen und internen Regelung eines schwungmasselosen Speicherkraftwerks. Das Verfahren weist hierfür folgende Verfahrensschritte auf, wobei es denkbar ist, das Verfahren auch in einer anderen als der im Folgenden beschriebenen Reihenfolge durchzuführen.The object is achieved by means of a method for the external and internal control of a flywheelless storage power plant. The For this purpose, the method has the following method steps, it being conceivable to carry out the method in a sequence other than that described below.
Das Verfahren zur externen und internen Regelung eines schwungmasselosen Speicherkraftwerks für eine Bereitstellung von Systemdienstleistungen, welche Momentanreserve, Primärregelung und Sekundärregelung umfassen, ist unterteilt in eine externe und eine interne Regelung. Die externe Regelung wiederum weist eine Wirkleistungsregelung (und eine Blindleistungsregelung) an einem DC/AC-Umrichter auf. Die Wirkleistungsregelung weist folgende Verfahrensschritte auf:The method for external and internal control of a flywheelless storage power plant for the provision of system services, which include the instantaneous reserve, primary control and secondary control, is divided into an external and an internal control. The external control in turn has active power control (and reactive power control) on a DC / AC converter. The active power control has the following process steps:
Verfahren zur externen und internen Regelung eines schwungmasselosen Speicherkraftwerks für eine Bereitstellung von Systemdienstleistungen, welche Momentanreserve, Primärregelung und Sekundärregelung umfassen, Verfahren aufweisend folgende Verfahrensschritte:
- a. externe Regelung, welche eine Wirkleistungsregelung an einem DC/AC-Umrichter umfasst:
- - Auswählen eines Regelungsmodus, wobei ein erster Regelungsmodus eine winkelbasierte Regelung (φReg-Modus) ist und ein zweiter Regelmodus eine frequenzbasierte Regelung (fReg-Modus) ist, wobei die frequenzbasierte Regelung folgende Verfahrensschritte aufweist:
- i. Messen einer momentan abgegeben Wirkleistung
p am DC/AC-Umrichter und Vorgabe einer Änderung einer KraftwerkssollleistungΔpH2 anhand eines Inhaltes eines Wasserstoffspeichers, - ii. Bilden einer Regelabweichung
Δp aus der gemessenen momentan abgegeben Wirkleistungp mit einer Sollwirkleistung, wobei die Sollwirkleistung eine vorgegebene SekundärleistungsänderungΔpsec , eine vorgegebene FahrplanleistungpFP und die Vorgabe der Änderung der KraftwerkssollleistungΔpH2 aufweist und - iii. Errechnen einer synthetischen Netzwinkelgeschwindigkeit
Δω2 aus der RegelabweichungΔp , wobei die synthetische WinkelgeschwindigkeitΔω2 zu einer integralen Verstellung des SpannungswinkelsφU2 am DC/AC-Umrichter führt,
- i. Messen einer momentan abgegeben Wirkleistung
- - Auswählen eines Regelungsmodus, wobei ein erster Regelungsmodus eine winkelbasierte Regelung (φReg-Modus) ist und ein zweiter Regelmodus eine frequenzbasierte Regelung (fReg-Modus) ist, wobei die frequenzbasierte Regelung folgende Verfahrensschritte aufweist:
- a. External control, which includes active power control on a DC / AC converter:
- - Selection of a control mode, a first control mode being an angle-based control (φ Reg mode) and a second control mode being a frequency-based control (f Reg mode), the frequency-based control having the following method steps:
- i. Measuring a currently delivered active power
p on the DC / AC converter and specification of a change in a power plant target powerΔp H2 based on the content of a hydrogen storage, - ii. Form a rule deviation
Δp from the measured active power currently outputp with a target active power, the target active power a predetermined change in secondary powerΔp sec , a given schedule servicep FP and the specification of the change in the power plant target outputΔp H2 has and - iii. Calculate a synthetic network angular velocity
Δω 2 from the control deviationΔp , the synthetic angular velocityΔω 2 for an integral adjustment of the tension angleφ U2 on the DC / AC converter,
- i. Measuring a currently delivered active power
- - Selection of a control mode, a first control mode being an angle-based control (φ Reg mode) and a second control mode being a frequency-based control (f Reg mode), the frequency-based control having the following method steps:
Die winkelbasierte Regelung im Slack-Modus weist folgende Verfahrensschritte auf:
- - Festsetzen einer Regelabweichung Δp=0, wobei der Spannungswinkel
φU2 am DC/AC-Umrichter konstant bleibt und das Speicherkraftwerk als Spannungsquelle mit konstanter Spannungu2 und konstanter Frequenz von 50 Hz arbeitet, wobei die winkelbasierte Regelung Sicherungsmechanismen aufweist, welche anhand der gemessenen momentan abgegebenen Leistungp mittels einer Steuerungsseinheit eingeschaltet werden, wobei die Sicherungsmechanismen folgende Varianten umfassen:- - Manuelle Einstellung einer Leistung
pman , - - Leistungseinstellung anhand eines vordefinierten Leistungsmaximalwertes
pMax und/oder eines vordefinierten LeistungsminimalwertespMin und/oder - - Leistungseinstellung anhand einer Vorgabe einer Änderung einer Kraftwerkssollleistung
ΔpH2 anhand eines Inhaltes eines Wasserstoffspeichers,
- - Manuelle Einstellung einer Leistung
- - Setting a control deviation Δp = 0, the tension angle
φ U2 on the DC / AC converter remains constant and the storage power plant as a voltage source with constant voltageu 2 and a constant frequency of 50 Hz, the angle-based control system having security mechanisms which are based on the measured output powerp can be switched on by means of a control unit, the security mechanisms comprising the following variants:- - Manual setting of a service
p man , - - Power setting based on a predefined maximum power value
p Max and / or a predefined minimum performance valuep min and or - - Power setting based on a specification of a change in a power plant target power
Δp H2 based on the content of a hydrogen storage,
- - Manual setting of a service
Eine Blindleistungsregelung der externen Regelung kann gemäß mehrerer Ausführungsformen folgende Verfahrensschritte aufweisen:
- - Messen einer momentan abgegeben Blindleistung
q2 am DC/AC-Umrichter - - Vergleichen der momentan abgegebenen Blindleistung
q2 mit einer Sollblindleistungq0 , wobei eine Differenz gebildet wird mittels welcher und zusammen mit einer vordefinierten Blindleistungsstatikσq eine Spannung am Speicherkraftwerku2 gebildet wird.
- - Measuring a currently given reactive power
q 2 on the DC / AC converter - - Compare the currently given reactive power
q 2 with a target reactive powerq 0 , whereby a difference is formed by means of which and together with a predefined reactive power staticsσ q a voltage at the storage power plantu 2 is formed.
Die interne Regelung, welche die benötigten Systemdienstleistungen aus Speichern bereitstellt, umfasst folgende Verfahrensschritte:
- - Ermitteln eines Gleichstroms
iKC , welcher von einem ersten Speicher zum DC/AC-Konverter fließt, aus einer gemessenen SpeicherspannunguC des ersten Speichers und der Wirkleistungp , wobei der GleichstromiKC und ein von einem zweiten Speicher zum ersten Speicher fließende StromiCB die SpeicherspannunguC des ersten Speichers integral einstellt. - - Regeln des Gleichstroms
iCB , welcher vom ersten Speicher zum zweiten Speicher fließt, derart, dass die SpeicherspannunguC des ersten Speichers einen Sollwert der SpeicherspannunguC,soll annimmt - - Laden des zweiten Speichers mittels eines mit einem ersten Energiewandler erzeugten Gleichstroms
iBF bei Unterschreiten eines ersten SpeicherspannungswertesŭB des zweiten Speichers, wobei ein Entladen eines dritten Speichers erfolgt, oder Entladen des zweiten Speichers mittels eines mit einem zweiten Energiewandler erzeugten StromesiEB bei Überschreiten eines zweiten Speicherspannungswertes ûB des zweiten Speichers, wobei ein Laden des dritten Speichers erfolgt.
- - Determine a direct current
i KC , which flows from a first memory to the DC / AC converter, from a measured memory voltageu C of the first memory and the active powerp , the direct currenti KC and a current flowing from a second memory to the first memoryi CB the storage voltageu C of the first memory integrally. - - rules of direct current
i CB , which flows from the first memory to the second memory, such that the memory voltageu C a setpoint of the storage voltage of the first storageu C, should assumes - - Charging the second memory by means of a direct current generated with a first energy converter
i BF when falling below a first storage voltage valueŭ B of the second store, wherein a third store is discharged, or the second store is discharged by means of a current generated with a second energy converteri EB when a second storage voltage value û B of the second storage is exceeded, the third storage being loaded.
Gemäß verschiedenen Ausführungsformen wird für ein Eingreifen der Sicherungsmechanismen eine Arbeitspunktleistung
Gemäß einer Ausführungsform weist der erste Speicher einen Kondensator auf oder der erste Speicher ist ein Kondensator.According to one embodiment, the first memory has a capacitor or the first memory is a capacitor.
Gemäß einer Ausführungsform weist der zweite Speicher eine Batterie auf oder der zweite Speicher ist eine Batterie.According to one embodiment, the second memory has a battery or the second memory is a battery.
Gemäß einer Ausführungsform weist der dritte Speicher einen Wasserstoffspeicher auf oder der dritte Speicher ist ein Wasserstoffspeicher. Eine Verwendung weiterer oder anderer chemischer Speicher ist denkbar, aber auch die Verwendung von mechanischen und/oder thermischen Speichern ist denkbar. Hierbei kann eine Wasserstoffmasse
Ferner weist der Energiewandler gemäß einer Ausführungsform eine Brennstoffzelle auf oder es ist eine Brennstoffzelle, und/oder der zweite Energiewandler weist einen Elektrolyseur auf oder es ist ein Elektrolyseur. Die Verwendung weiterer und/oder anderer Energiewandler ist denkbar.Furthermore, according to one embodiment, the energy converter has a fuel cell or it is a fuel cell, and / or the second energy converter has an electrolyzer or it is an electrolyzer. The use of further and / or other energy converters is conceivable.
Gemäß einer weiteren Ausführungsform fließt ein Kreisstrom
Gemäß einer Ausführungsform ist der erste Speicherspannungswert
Mit dem erfindungsgemäßen Verfahren zur externen und internen Regelung eines Speicherkraftwerks für eine Bereitstellung von Systemdienstleistungen, welche Momentanreserve, Primärregelung und Sekundärregelung umfassen, kann ein konventionelles Kraftwerk ersetzt werden. Das neue Speicherkraftwerk kommt mit Hilfe des Verfahrens ohne Schwungmassen aus und kann Leistung sowohl abals auch aufnehmen. Dabei verbraucht es entweder Wasserstoff oder aber es erzeugt Wasserstoff. Damit ist eine vollumfängliche regenerative Energieerzeugung möglich, bei welcher diese neuen Kraftwerke nicht nur Energie speichern, sondern noch alle Systemdienstleistungen wie Momentan-, Primär-, Sekundärregelung und Fahrplan einbringen können.A conventional power plant can be replaced with the method according to the invention for the external and internal control of a storage power plant for the provision of system services which include the instantaneous reserve, primary control and secondary control. With the help of the process, the new storage power plant does not need any inertial masses and can both absorb and absorb power. It either consumes hydrogen or generates hydrogen. This enables full renewable energy generation, in which these new power plants not only store energy, but can also provide all system services such as instantaneous, primary, secondary control and schedule.
Zudem kann das Kraftwerk bei einer zukünftigen Winkelregelung des Elektrischen Netzes als sogenanntes Slack-Kraftwerk wirken, was eine weitere Stabilisierung der Elektrischen Energieversorgung ermöglicht.In addition, the power plant can act as a so-called slack power plant in a future angular control of the electrical network, which enables a further stabilization of the electrical energy supply.
Mit dem Einsatz von schwungmassefreien Speicherkraftwerken mit moderner und leistungsstarker Umrichtertechnik kann sowohl in frequenz- als auch in winkelgeregelten Netzen vernünftig Netzregelung betrieben werden. In frequenzgeregelten Netzen mit noch vorhandenen konventionellen Schwungmassen agieren diese neuen Anlagen wie normale Kraftwerke und können alle Netzregelaufgaben wie Momentanreserve, Primär- und Sekundärregelung sowie Fahrplanbetrieb abdecken. Zusätzlich können sie aber auch Energie aus regenerativen Quellen einspeichern, was Redispatch-Aktionen überflüssig machen kann. In zukünftig winkelgeregelten Netzen ohne physische Schwungmasse können diese Kraftwerke als Slack-Speicherkraftwerke arbeiten, was die Einhaltung einer konstanten Netzfrequenz ermöglicht. Hierzu ist allerdings die genaue Messung der Winkel sowie eines Winkelnormals notwendig. Somit sind alle zukünftigen Anwendungsfälle abdeckbar, was auch in Zukunft den weiteren sicheren Ausbau einer regenerativen Energieversorgung ermöglicht.With the use of flywheel-free storage power plants with modern and high-performance converter technology, grid control can be operated in a reasonable manner both in frequency- and in angle-controlled networks. In frequency-controlled networks with existing conventional flywheels, these new systems act like normal power plants and can cover all network control tasks such as momentary reserve, primary and secondary control and schedule operation. In addition, they can also store energy from renewable sources, which can make redispatch actions unnecessary. In future, angle-controlled networks without physical flywheel mass, these power plants can work as slack storage power plants, which enables a constant grid frequency to be maintained. However, this requires the precise measurement of the angles and an angle standard. This means that all future applications can be covered, which will enable the safe expansion of a renewable energy supply in the future.
Es ist auch ein Verfahren zur externen und internen Regelung eines schwungmasselosen Speicherkraftwerks für eine Bereitstellung von Systemdienstleistungen, welche Momentanreserve, Primärregelung und Sekundärregelung umfassen, offenbart. Verfahren aufweisend folgende Verfahrensschritte:
- - externe Regelung, welche eine Wirkleistungsregelung und eine Blindleistungsregelung an einem DC/AC-Umrichter umfasst, wobei die Wirkleistungsregelung folgende Verfahrensschritte aufweist:
- - Messen einer momentan abgegeben Wirkleistung (
p ) am DC/AC-Umrichter - - Vergleichen der Wirkleistung (
p ) mit einer Sollwirkleistung (p0 ), aufweisend einen Primärregelsollwert (pp0, prim ) - - Bilden einer synthetischen Winkelgeschwindigkeit (
Δω2 ) gemäßΔω2 ) zu einer integralen Verstellung des Spannungswinkels (ϕU2) führt - - Bilden eines Primärregelsollwertes (
p0, prim ) aus einer vordefinierten Wirkleistungsstatik (σ p ) und der synthetischen Netzwinkelgeschwindigkeit (Δω2 ) gemäß
- - Messen einer momentan abgegeben Blindleistung (
q2 ) am DC/AC-Umrichter - - Vergleichen der momentan abgegebenen Blindleistung (
q2 ) mit einer Sollblindleistung (q0 ), wobei eine Differenz gebildet wird mittels welcher, zusammen mit einer vordefinierten Blindleistungsstatik (σ q ), eine Spannung am Speicherkraftwerk (u2 ) gebildet wird
u2 ) der Blindleistungsregelung und dem Spannungswinkel (ϕ U2) der Wirkleistungsregelung zusammen mit einer vordefinierten Netzspannung (u1 ) und einer vordefinierten Netzwinkelfrequenz (Δω1 ) die Wirkleistung (p ) geregelt wird - - Messen einer momentan abgegeben Wirkleistung (
- - interne Regelung: Bereitstellung der Systemdienstleistungen aus Speichern, welche folgende Verfahrensschritte umfasst:
- - Ermitteln eines Gleichstroms (
iKC ), welcher von einem ersten Speicher zum DC/AC-Konverter fließt, aus einer gemessenen Speicherspannung (uC ) des ersten Speichers und der Wirkleistung (p ), wobei der Gleichstrom (iKC ) und ein von einem zweiten Speicher zum ersten Speicher fließende Strom (iCB ) die Speicherspannung (uC ) des ersten Speichers integral einstellt - - Regeln des Gleichstroms (
iCB ), welcher vom ersten Speicher zum zweiten Speicher fließt, derart, dass die Speicherspannung (uC ) des ersten Speichers einen Sollwert der Speicherspannung (uC, soll) annimmt - - Laden des zweiten Speichers mittels eines mit einem ersten Energiewandler erzeugten Gleichstroms (
iBF ) bei Unterschreiten eines ersten Speicherspannungswertes (UB ) des zweiten Speichers, wobei ein Entladen eines dritten Speichers erfolgt, oder Entladen des zweiten Speichers mittels eines mit einem zweiten Energiewandler erzeugten Stromes (iEB ) bei Überschreiten eines zweiten Speicherspannungswertes (ûB) des zweiten Speichers, wobei ein Laden des dritten Speichers erfolgt.
- - Ermitteln eines Gleichstroms (
- - external control, which comprises active power control and reactive power control on a DC / AC converter, the active power control having the following method steps:
- - Measuring a currently delivered active power (
p ) on the DC / AC converter - - comparison of active power (
p ) with a target active power (p 0 ), having a primary control setpoint (p p0, prim ) - - Form a synthetic angular velocity (
Δω 2 ) according toΔω 2 ) leads to an integral adjustment of the voltage angle (ϕ U2 ) - - formation of a primary control setpoint (
p 0, prime ) from a predefined active power statics (σ p ) and the synthetic network angular velocity (Δω 2 ) according to
- - measurement of a currently given reactive power (
q 2 ) on the DC / AC converter - - Compare the currently given reactive power (
q 2 ) with a target reactive power (q 0 ), whereby a difference is formed by means of which, together with a predefined reactive power statics (σ q ), a voltage at the storage power plant (u 2 ) is formed
u 2 ) of the reactive power control and the voltage angle (ϕ U2 ) of the active power control together with a predefined mains voltage (u 1 ) and a predefined network angular frequency (Δω 1 ) the active power (p ) is regulated - - Measuring a currently delivered active power (
- - Internal regulation: provision of system services from storage, which comprises the following procedural steps:
- - determining a direct current (
i KC ), which flows from a first memory to the DC / AC converter, from a measured memory voltage (u C ) of the first memory and the active power (p ), the direct current (i KC ) and a current flowing from a second store to the first store (i CB ) the storage voltage (u C ) of the first memory integrally - - DC current rules (
i CB ), which flows from the first memory to the second memory, such that the memory voltage (u C ) Of the first memory a target value of memory voltage (u C, soll) takes - Charging of the second memory by means of a direct current generated with a first energy converter (
i BF ) when falling below a first storage voltage value (U B ) of the second store, a third store being discharged, or discharging of the second store by means of a current generated by a second energy converter (i EB ) when a second storage voltage value (û B ) of the second storage is exceeded, whereby the third storage is loaded.
- - determining a direct current (
FigurenlisteFigure list
Die Erfindung wird anhand von Ausführungsbeispielen näher erläutert. Hierzu zeigen
-
1 Blockschaltbild der vollständigen Wirkleistungsregelung des Speicherkraftwerkes -
2 Blockschaltbild zur Blindleistungsregelung -
3 Darstellung des Kurzzeitverhaltens bei einer erfindungsgemäßen Regelung -
4 Darstellung des Langzeitverhaltens bei einer erfindungsgemäßen Regelung -
5 Blockschaltbild der externen p-Regelung für Frequenz- und Winkelregelung des Speicherkraftwerks (a ) -
6 Anlagenschema des Speicherkraftwerks (b ) -
7 Interne Regelung eines ersten Speichers am Beispiel eines Superkondensators (c1 ) -
8 Interne Regelung eines zweiten Speichers am Beispiel einer Batterie (c2 ) -
9 Interne Regelung eines ersten und zweiten Energiewandlers an den Beispielen eines Elektrolyseurs und einer Brennstoffzelle (c3 )
-
1 Block diagram of the complete active power control of the storage power plant -
2nd Block diagram for reactive power control -
3rd Representation of the short-term behavior in a control according to the invention -
4th Representation of the long-term behavior in a control according to the invention -
5 Block diagram of the external p control for frequency and angle control of the storage power plant (a ) -
6 System diagram of the storage power plant (b ) -
7 Internal control of a first memory using the example of a supercapacitor (c1 ) -
8th Internal control of a second memory using the example of a battery (c2 ) -
9 Internal control of a first and second energy converter using the examples of an electrolyzer and a fuel cell (c3 )
Das erfindungsgemäße Verfahren zur Regelung eines neuen Speicherkraftwerkes teilt sich in eine interne und eine externe Regelung eines Speicherkraftwerkes für die Bereitstellung von Systemdienstleistungen auf. Systemdienstleistungen sind
- - die Bereitstellung einer Momentanreserve, um plötzliche Laständerungen instant zu speisen,
- - die Bereitstellung einer Primärregelleistung, um einen Momentanreserve-Speicher im Sekundenbereich zu entlasten und wieder aufzufüllen,
- - die Bereitstellung einer Sekundärregelleistung, welche die Primärregelung nach einer bestimmten Zeit im Minutenbereich ablöst und um einen Primärregelungsspeicher wieder aufzufüllen
- - Bereitstellung von Fahrplanänderungen, welche alle Regler wieder auf „Null“ stellen
- - the provision of an instantaneous reserve to feed sudden load changes instantly,
- the provision of primary control power to relieve and replenish an instantaneous reserve memory in the range of seconds,
- - The provision of secondary control power, which replaces the primary control after a certain time in the minute range and to replenish a primary control memory
- - Provision of schedule changes that reset all controllers to "zero"
Die externe Regelung wiederum ist unterteilt in eine Wirkleistungsregelung und eine Blindleistungsregelung.The external control is divided into an active power control and a reactive power control.
In
Das Speicherkraftwerk, beispielsweise ein Kondensator, ist über einen DC/AC-Umrichter am Drehstromnetz angeschlossen und speist dabei Wirkleistung
Damit wird mit der Zeitkonstanten
Ferner speist die ermittelte synthetische Netzwinkelgeschwindigkeit
Der Spannungswinkel
Zusammen mit
Die Spannung
- Eine momentan abgegeben Blindleistung
q2 am DC/AC-Umrichter wird gemessen und mit einer Sollblindleistungq0 verglichen, wobei eine Differenz gebildet wird mittels welcher, zusammen mit einer vordefinierten Blindleistungsstatikσ q die Spannung am Speicherkraftwerku2 gebildet.
- A currently given reactive power
q 2 at the DC / AC converter is measured and with a target reactive powerq 0 compared, a difference being formed by means of which, together with a predefined reactive power staticsσ q the voltage at the storage power plantu 2 educated.
Mit der Spannung
Mit der Wirkleistung
Ferner wird der Gleichstrom
Das Laden und/oder Entladen der Batterie erfolgt mittels des geregelten Gleichstrom
Gemäß einer Ausführungsform fließt ein Kreisstrom
In
In
Ferner ist hier ersichtlich, wie nach ca. 100 Sekunden der Wasserstoffspeicher die gesamte Leistungserzeugung übernimmt und sowohl Kondensator als auch Batterie mit ihren Strömen wieder auf Null zurück gehen. Hierbei sind die Schaltzeitpunkte der Wirkleistung deutlich erkennbar.It can also be seen here how the hydrogen storage takes over the entire power generation after approx. 100 seconds and how both the capacitor and the battery return to zero with their currents. The switching times of the active power are clearly recognizable.
An den Potentialverläufen ist zu erkennen, dass der Kondensator mit seiner Leistungsaus- und -einspeisung nur immer sehr kurz wirkt. Dieses Verhalten entspricht de Momentanreserve. Die Kondensatorspannung
Der Wasserstoffspeicher wird immer dann aktiv, wenn die Batterie einen ihrer Grenzwerte erreicht. Zu Beginn der Zeitspanne speist der Speicher aus und liefert die benötigte Leistung, weshalb sein Wasserstoff-Massewert
Eine externe Regelung, welche eine Wirkleistungsregelung an einem DC/AC-Umrichter umfasst, weist gemäß einer Ausführungsform auch eine Blindleistungsregelung auf, welche hier nicht näher erläutert wird, weiter oben jedoch erläutert ist. Die Wirkleistungsregelung kann zum einen winkelbasiert (
Die frequenzbasierte Regelung regelt die Netzfrequenz im Netz mittels einer Erhöhung einer einzuspeisenden Leistung bei einer niedrigen Netzfrequenz oder mittels einer Reduzierung der einspeisenden Leistung bei einer erhöhten Netzfrequenz. Die frequenzbasierte Netzregelung weist folgende Verfahrensschritte auf:
- - Messen einer momentan abgegeben Wirkleistung
p am DC/AC-Umrichter und Vorgabe einer Änderung einer KraftwerkssollleistungΔpH2 anhand eines Inhaltes eines Wasserstoffspeichers, - - Bilden einer Regelabweichung
Δp aus der gemessenen momentan abgegeben Wirkleistungp mit einer Sollwirkleistung, wobei die Sollwirkleistung eine vorgegebene Sekundärleistungsänderung Δpsec, eine vorgegebene FahrplanleistungpFP und die Vorgabe der Änderung der KraftwerkssollleistungΔpH2 aufweist und - - Errechnen einer synthetischen Netzwinkelgeschwindigkeit
Δω2 aus der RegelabweichungΔp , wobei die synthetische Winkelgeschwindigkeitω2 zu einer integralen Verstellung des SpannungswinkelsφU2 am DC/AC-Umrichter führt.
- - Measuring a currently delivered active power
p on the DC / AC converter and specification of a change in a power plant target powerΔp H2 based on the content of a hydrogen storage, - - Form a rule deviation
Δp from the measured active power currently outputp with a target active power, the target active power a predetermined secondary power change Δp sec , a predetermined schedule powerp FP and the specification of the change in the power plant target outputΔp H2 has and - - Calculate a synthetic network angular velocity
Δω 2 from the control deviationΔp , the synthetic angular velocityω 2 for an integral adjustment of the tension angleφ U2 leads on the DC / AC converter.
Um ein Schwingen des einzustellenden Spannungswinkels
Die winkelbasierte Regelung arbeitet normalerweise im Slack-Modus und weist hierbei folgende Verfahrensschritte auf:
- Festsetzen einer Regelabweichung
Δp =0, wobei der Spannungswinkelφ U2 am DC/AC-Umrichter konstant bleibt und das Speicherkraftwerk als Spannungsquelle mit konstanter Spannungu2 und konstanter Frequenz von 50 Hz arbeitet. Das bedeutet für netzbildende Umrichter der Slack-Speicherkraftwerke, dass sie ihre Spannungen nach Betrag und Winkel konstant halten können, was einem Slack-Knoten (eingeprägte Spannung) entspricht.
- Establishing a rule deviation
Δp = 0, the tension angleφ U2 on the DC / AC converter remains constant and the storage power plant as a voltage source with constant voltageu 2 and constant frequency of 50 Hz works. For grid-forming converters of Slack storage power plants, this means that they can keep their voltages constant according to their magnitude and angle, which corresponds to a Slack node (impressed voltage).
Um ein Schwingen des Spannungswinkels
Eine winkelbasierte Regelung muss überwacht werden, da sonst im Slackmodus die abgegebene oder aufgenommene Leistung zu groß werden kann. Für diese Fälle weist die winkelbasierte Regelung Sicherungsmechanismen auf, welche anhand der gemessenen momentan abgegebenen Leistung
- a. Manuelle Einstellung einer Leistung,
- b. Leistungseinstellung anhand eines vordefinierten Leistungsmaximalwertes (
pMax ) und/oder eines vordefinierten Leistungsminimalwertes (pMin ) und/oder - c. Leistungseinstellung anhand einer Vorgabe einer Änderung einer Kraftwerkssollleistung anhand eines Inhaltes eines Wasserstoffspeichers.
- a. Manual setting of a service,
- b. Power setting based on a predefined maximum power value (
p Max ) and / or a predefined minimum performance value (p min ) and or - c. Power setting based on a specification of a change in a power plant target power based on the content of a hydrogen storage.
Dabei verhält sich die Wirkungsweise des dargestellten Anlagenschema wie die in
Bezugszeichenliste Reference list
- aa
- externe p-Regelung für Frequenz- und Winkelregelungexternal p control for frequency and angle control
- bb
- Anlagenschema SpeicherkraftwerkPlant diagram of a storage power plant
- cc
- Regelung einzelner Komponenten des SpeicherkraftwerksControl of individual components of the storage power plant
- c1c1
- Regelung Superkondensator (Supercapacitor)Supercapacitor control
- c2c2
- Regelung BatterieBattery regulation
- c3c3
- Regelung Brennstoffzelle/ElektrolyseurRegulation fuel cell / electrolyser
- fReg f reg
- Regelmodus FrequenzregelungControl mode frequency control
- ϕU ϕ U
- SpannungswinkelTension angle
- ϕU1 ϕ U1
-
Spannungswinkel der Spannung
u1 am NetzzentrumTension angle of tensionu 1 at the network center - ϕU2 ϕ U2
-
Spannungswinkel der Spannung
u2 am SpeicherkraftwerkTension angle of tensionu 2 at the storage power plant - ϕReg ϕ Reg
- Regelmodus WinkelregelungControl mode angle control
- u1 u 1
- Spannung des NetzzentrumsNetwork center voltage
- u2 u 2
- Spannung am SpeicherkraftwerkVoltage at the storage power plant
- uB u B
- BatteriespannungBattery voltage
- ûB û B
- Batteriespannung MaximalwertBattery voltage maximum value
- ŭB ŭ B
- Batteriespannung MinimalwertBattery voltage minimum value
- uc u c
- KondensatorspannungCapacitor voltage
- uc,0 u c, 0
- Sollwert KondensatorspannungSetpoint capacitor voltage
- iKC i KC
- Gleichstrom vom Kondensator zum DC/AC-KonverterDirect current from the capacitor to the DC / AC converter
- iCB i CB
- Gleichstrom von der Batterie zum KondensatorDC current from the battery to the capacitor
- iBF i BF
- Gleichstrom von der Brennstoffzelle zur BatterieDirect current from the fuel cell to the battery
- iEB i EB
- Gleichstrom von der Batterie zum ElektrolyseurDC current from the battery to the electrolyser
- i0 i 0
- KreisstromCirculating current
- iC i C
- KondensatorstromCapacitor current
- iB i B
- BatteriestromBattery power
- iH i H
- Strom der Brennstoffzelle oder des WasserstoffspeichersElectricity from the fuel cell or hydrogen storage
- pp
- WirkleistungActive power
- p0 p 0
- SollwirkleistungTarget active power
- pprim p prim
- PrimärregelsollwertPrimary control setpoint
- psec p sec
- SekundärregelsollwertSecondary control setpoint
- pFp p mp
- oderor
- p0, FP p 0, FP
- FahrplanTimetable
- ptrans p trans
- transiente Leistungtransient performance
- pman p man
- Manuelle Einstellung einer LeistungManual setting of a service
- p̌Man = pMin,p̌ man = p min ,
- Minimal erlaubte Leistung des SpeicherkraftwerksMinimum allowed output of the storage power plant
- p̂Man = pMax,p̂ man = p max ,
- Maximal erlaubte Leistung des SpeicherkraftwerksMaximum allowed output of the storage power plant
- ΔpΔp
- RegelabweichungControl deviation
- ΔpH2 Δp H2
- Vorgabe einer Änderung einer KraftwerkssollleistungSpecification of a change in a power plant target output
- Δωe Δω e
- Winkelgeschwindigkeit der NetzfrequenzAngular velocity of the network frequency
- Δω1 Δω 1
- Winkelgeschwindigkeit der PLL-RegelungAngular velocity of the PLL control
- Δω2 Δω 2
- synthetische Netzwinkelgeschwindigkeitsynthetic network angular velocity
- TM T M
- Zeitkonstante MomentanreserveTime constant instantaneous reserve
- TB T B
- Zeitkonstante BatterieTime constant battery
- TcTc
- Zeitkonstante KondensatorTime constant capacitor
- TH T H
- Zeitkonstante WasserstoffspeicherTime constant hydrogen storage
- TBF T BF
- Zeitkonstante Regelung Brennstoffzelle-BatterieTime constant control of the fuel cell battery
- TEB T EB
- Zeitkonstante Regelung Batterie-ElektrolyseurTime constant regulation of battery electrolyser
- KBF K BF
- Verstärkung Regelung Brennstoffzelle-BatterieReinforcement regulation fuel cell battery
- KEB K EB
- Verstärkung Regelung Batterie-ElektrolyseurReinforcement regulation battery electrolyser
- σq σ q
- BlindleistungsstatikReactive power statics
- σp σ p
- WirkleistungsstatikActive power statics
- SS
- Laplace-OperatorLaplace operator
- XX
- NetzreaktanzNetwork reactance
- Ω0 Ω 0
- Nennwinkelgeschwindigkeit für 50 HertzNominal angular velocity for 50 Hertz
- q2 q 2
- Blindleistung am DC/AC-WandlerReactive power on the DC / AC converter
- q2, 0 q 2, 0
- Sollblindleistung am DC/AC-WandlerTarget reactive power at the DC / AC converter
- mH m H
- Wasserstoffmasse mit Grenzwerten mHmax(=m̂H) und mHmin Hydrogen mass with limit values m Hmax (= m̂ H ) and m Hmin
- ṁH ṁ H
- WasserstoffmassenstromMass hydrogen flow
- 1, 2, 3, 4, 51, 2, 3, 4, 5
- ÜbergabepunkteTransfer points
Claims (9)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102018122078 | 2018-09-11 | ||
DE102018122078.2 | 2018-09-11 |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102019124268A1 true DE102019124268A1 (en) | 2020-03-12 |
DE102019124268B4 DE102019124268B4 (en) | 2021-09-23 |
Family
ID=69621525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102019124268.1A Active DE102019124268B4 (en) | 2018-09-11 | 2019-09-10 | Process for the external and internal control of a centrifugal massless storage power plant |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102019124268B4 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115642625A (en) * | 2021-07-19 | 2023-01-24 | 中国航天科工飞航技术研究院(中国航天海鹰机电技术研究院) | Flywheel energy storage system, control method, control device and readable storage medium |
-
2019
- 2019-09-10 DE DE102019124268.1A patent/DE102019124268B4/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115642625A (en) * | 2021-07-19 | 2023-01-24 | 中国航天科工飞航技术研究院(中国航天海鹰机电技术研究院) | Flywheel energy storage system, control method, control device and readable storage medium |
CN115642625B (en) * | 2021-07-19 | 2023-12-05 | 中国航天科工飞航技术研究院(中国航天海鹰机电技术研究院) | Flywheel energy storage system, control method, control device and readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
DE102019124268B4 (en) | 2021-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3763012B1 (en) | Method for operating an energy generating system, and energy generating system | |
DE102012212366A1 (en) | Method for controlling an electric generator | |
DE102017106213A1 (en) | Method for feeding electrical power into an electrical supply network | |
DE102012212777A1 (en) | Method for controlling a wind farm | |
AT508183B1 (en) | METHOD FOR OPERATING A WIND POWER PLANT | |
EP3408914B1 (en) | Method for feeding electrical power into an electrical supply network | |
EP2093419A2 (en) | Method of controlling a wind turbine and wind turbine | |
EP2411669A2 (en) | Method for operating a wind turbine | |
WO2013135592A1 (en) | Method for controlling an arrangement for supplying electric current to a power supply system | |
DE102013207264A1 (en) | Method for controlling a wind farm | |
EP2841766A2 (en) | Wind farm with fast local reactive power control | |
DE102016101468A1 (en) | Method for feeding electrical power into an electrical supply network | |
DE102005026062A1 (en) | Virtual rotary mass for use in railroad network, has self-commutated pulse width modulated inverter, which is operated by electronic circuit or software, where inverter supplies power from power station to three-phase power system | |
WO2014206894A2 (en) | Combined power plant | |
AT508182B1 (en) | METHOD FOR OPERATING AN ENERGY-GENERATING PLANT, IN PARTICULAR WIND POWER PLANT | |
DE102013012898A1 (en) | System and method for controlling the frequency and / or voltage maintenance from the distribution network | |
EP2777126A1 (en) | Method for providing control power, taking into account a variable target frequency | |
DE102019124268B4 (en) | Process for the external and internal control of a centrifugal massless storage power plant | |
EP3837753A1 (en) | Method for controlling electrical consumers of an electrical supply grid | |
EP2936645A2 (en) | Method for providing control power to stabilize an alternating current network, using an energy accumulator | |
EP2777119A2 (en) | Method for providing control power with an energy generator and an energy consumer | |
EP3900142A1 (en) | Method for controlling an electrical installation having a plurality of electrical devices, control unit, and electrical installation having such a control unit | |
EP3345279A1 (en) | Method for supplying electrical power | |
WO2022013458A1 (en) | Method for operating a power supply plant, and power supply plant | |
WO2013068233A2 (en) | Method for providing reserve power for stabilizing an alternating current network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |