DE102013211567A1 - Method for checking the functionality of a DC link - Google Patents

Method for checking the functionality of a DC link Download PDF

Info

Publication number
DE102013211567A1
DE102013211567A1 DE102013211567.9A DE102013211567A DE102013211567A1 DE 102013211567 A1 DE102013211567 A1 DE 102013211567A1 DE 102013211567 A DE102013211567 A DE 102013211567A DE 102013211567 A1 DE102013211567 A1 DE 102013211567A1
Authority
DE
Germany
Prior art keywords
voltage
link
intermediate circuit
converter
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102013211567.9A
Other languages
German (de)
Inventor
Sebastian Walenta
Paul Mehringer
Jie Ge
Amalinda Christina Post
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Robert Bosch GmbH
Original Assignee
Robert Bosch GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robert Bosch GmbH filed Critical Robert Bosch GmbH
Priority to DE102013211567.9A priority Critical patent/DE102013211567A1/en
Priority to PCT/EP2014/060526 priority patent/WO2014202326A1/en
Publication of DE102013211567A1 publication Critical patent/DE102013211567A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L1/00Supplying electric power to auxiliary equipment of vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/0023Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
    • B60L3/003Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train relating to inverters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/0023Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
    • B60L3/0046Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train relating to electric energy storage systems, e.g. batteries or capacitors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/12Recording operating variables ; Monitoring of operating variables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/20Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules having different nominal voltages
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/64Testing of capacitors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/10Vehicle control parameters
    • B60L2240/36Temperature of vehicle components or parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/545Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/547Voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/549Current
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/26Measuring inductance or capacitance; Measuring quality factor, e.g. by using the resonance method; Measuring loss factor; Measuring dielectric constants ; Measuring impedance or related variables
    • G01R27/2605Measuring capacitance
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/40Testing power supplies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Abstract

Es werden ein Verfahren und eine Anordnung zum Überprüfen der Funktionsfähigkeit eines Zweischenkreises (60) in einem Mehrspannungsnetz (50), das einen Gleichspannungswandler (56) umfasst, vorgestellt. Bei dem Verfahren wird ein fester Strom eingestellt, mit dem der Zwischenkreis (60) beaufschlagt wird, und eine Spannung, die am Zwischenkreis (60) anliegt, an zeitlich aufeinanderfolgenden Abtastpunkten gemessen, wobei aus den gemessenen Spannungswerten unter Berücksichtigung von Zeitabständen zwischen den Abtastpunkten eine Kapazität (64) des Zwischenkreises (60) berechnet wird.A method and arrangement for verifying the functionality of a two-circuit (60) in a multi-voltage network (50) comprising a DC-DC converter (56) is presented. In the method, a fixed current is applied to the intermediate circuit (60) is applied, and a voltage applied to the intermediate circuit (60), measured at successive sampling points, wherein from the measured voltage values, taking into account intervals between the sampling points Capacitance (64) of the intermediate circuit (60) is calculated.

Description

Die Erfindung betrifft ein Verfahren zur Überprüfung der Funktionsfähigkeit eines Zwischenkreises eines elektrischen Antriebs und eine Anordnung zur Durchführung des Verfahrens.The invention relates to a method for checking the operability of a DC link of an electric drive and an arrangement for carrying out the method.

Stand der TechnikState of the art

Als Antrieb von Kraftfahrzeugen werden neben Verbrennungsmotoren immer häufiger Elektromotoren als elektrische Antriebe eingesetzt, die alternativ oder ergänzend, insbesondere bei Hybridantrieben, zu herkömmlichen Verbrennungsmotoren Verwendung finden. As drive of motor vehicles, more and more electric motors than electric drives are used in addition to internal combustion engines, which are used alternatively or additionally, especially in hybrid drives, to conventional internal combustion engines.

Zu beachten ist, dass in konventionellen Fahrzeugen regelmäßig nur ein Bordnetz existiert. Dieses besteht im Wesentlichen aus einem 12-Volt-Generator, einer 12-Volt-Batterie und 12-Volt-Verbrauchern sowie einem 12-Volt-Startsystem. In zukünftigen Bordnetztopologien, insbesondere bei der Hybridantriebstechnik für Kraftfahrzeuge, werden Mehrspannungsbordnetze mit zwei oder mehr Energiespeichern verwendet. Zum Energietransfer von einem höheren Spannungsnetz zum 12-Volt-Bordnetz oder umgekehrt wird dabei üblicherweise ein Gleichspannungswandler, der auch als DC/DC-Wandler bezeichnet wird, eingesetzt.It should be noted that in conventional vehicles there is regularly only one vehicle electrical system. This essentially consists of a 12 volt generator, a 12 volt battery and 12 volt consumers as well as a 12 volt starting system. In future on-board network topologies, especially in the hybrid propulsion technology for motor vehicles, multi-voltage systems with two or more energy storage devices are used. For energy transfer from a higher voltage network to 12-volt electrical system or vice versa, a DC-DC converter, which is also referred to as a DC / DC converter, is usually used.

Es sind unterschiedliche Arten von Hybridantrieben bekannt. Als Mild-Hybridantrieb wird ein Antrieb bezeichnet, bei dem der Elektroantrieb parallel zum Verbrennungsmotor arbeitet und diesen zur Leistungssteigerung unterstützt. Ein solcher Mild-Hybridantrieb umfasst wie ein Boost-Rekuperationssystem (BRS) zwei Bordnetze, nämlich ein Hochvolt (48-V)- und ein Niedervolt (12-V)-Bordnetz. Im Hochvolt-Bordnetz bzw. auf der Hochvolt-Seite wird eine elektrische Maschine verwendet, die sowohl generatorisch als auch motorisch mit viel höherer Leistung als ein konventioneller Generator und Starter arbeitet. Zur Ansteuerung der elektrischen Maschine in dem definierten motorischen oder generatorischen Betrieb wird in der Regel ein Inverter eingesetzt, der die Stromrichtung und Stromform zwischen Gleich- und Wechselstrom für die elektrische Maschine umrichtet. Da der konventionelle Generator für das 12-Volt-Bordnetz nicht mehr vorhanden ist, wird ein Gleichspannungswandler eingesetzt, um das 12-Volt-Bordnetz zu versorgen.Different types of hybrid drives are known. A mild hybrid drive is a drive in which the electric drive works in parallel to the combustion engine and supports it to increase performance. Such a mild hybrid drive, like a boost recuperation system (BRS), includes two on-board systems, namely a high-voltage (48 V) and a low-voltage (12 V) on-board network. In the high-voltage on-board electrical system or on the high-voltage side, an electric machine is used which operates both as a generator and as a motor with much higher power than a conventional generator and starter. To control the electrical machine in the defined motor or generator operation, an inverter is usually used, which umricht the current direction and current waveform between DC and AC for the electric machine. Since the conventional generator for the 12-volt electrical system is no longer available, a DC-DC converter is used to power the 12-volt electrical system.

Auf der Hochvolt-Seite können auch Hochvolt-Stromverbraucher neben dem Inverter angeschlossen sein. Oft wird der Gleichspannungswandler auch in umgekehrter Richtung, d. h. dass dieser Energie aus dem Niedervolt-Bordnetz zu dem Hochvolt-Bordnetz wandelt, betrieben, um die Verfügbarkeit des Hochvolt-Bordnetzes bzw. Hochvolt-Systems zu verbessern.On the high-voltage side, high-voltage power consumers can also be connected next to the inverter. Often the DC-DC converter is also in the reverse direction, d. H. that this energy from the low-voltage electrical system converts to the high-voltage electrical system, operated to improve the availability of the high-voltage electrical system or high-voltage system.

Zu beachten ist, dass ein auf der Hochvolt-Seite verwendeter Energiespeicher bspw. als eine Li-Ion-Batterie oder auch als ein Zweischichtkondensator (DLC: Double Layer Capacitor) bzw. Supercap realisiert und möglicherweise mit einem Trennelement zum Hochvolt-Bordnetz zu- bzw. abschaltbar sein kann.It should be noted that an energy store used on the high-voltage side, for example, realized as a Li-ion battery or as a two-layer capacitor (DLC: Double Layer Capacitor) or Supercap and possibly with a separating element to the high-voltage electrical system or can be switched off.

Ein Inverter besteht in der Regel aus einer Halbleiter-Brückenschaltung und einem Zwischenkreis, der als Energiepuffer die Strom- bzw. Spannungswelligkeit während des Schaltvorgangs des Inverters glättet. Bei dem genannten Zwischenkreis handelt es sich um eine elektrische Einrichtung, die aus Kondensatoren besteht und als Energiespeicher mehrere elektrische Netze auf einer gemeinsamen Spannungsebene über Inverter elektrisch koppelt. Ein voll oder teilweise defekter Zwischenkreis wird zum Ausfall des Inverters und oft auch zum Versagen der Sicherheitsfunktion des Antriebs führen. Daher ist eine Diagnose bzw. Überprüfung der Zwischenkreiskapazität im Fahrzeug erforderlich.An inverter usually consists of a semiconductor bridge circuit and an intermediate circuit which, as an energy buffer, smoothes the current or voltage ripple during the switching operation of the inverter. In the mentioned intermediate circuit is an electrical device, which consists of capacitors and as an energy storage several electrical networks on a common voltage level via inverter electrically couples. A fully or partially defective DC link will lead to the failure of the inverter and often to the failure of the safety function of the drive. Therefore, a diagnosis or check of the DC link capacity in the vehicle is required.

Daher werden Verfahren zur Diagnose der Zwischenkreiskapazität seitens des Inverters eingesetzt. Ein solches Verfahren ist bspw. in der Druckschrift DE 10 2011 076 709 A1 beschrieben. Die Druckschrift beschreibt ein Verfahren zur Strommessung bei einer mehrphasigen Maschine, die einen mit einem Zwischenkreiskondensator versehenen Zwischenkreis und pro Phase einen Highside- und Lowside-Schalter aufweist. Die Strommessung wird dabei im Zwischenkreis vorgenommen. Aufgrund vieler technischer Einschränkungen innerhalb des Inverters ist das Verfahren jedoch nur bedingt einsetzbar. Therefore, methods are used to diagnose the DC link capacity of the inverter. Such a method is, for example, in the document DE 10 2011 076 709 A1 described. The document describes a method for current measurement in a multi-phase machine having a provided with a link capacitor intermediate circuit and per phase has a highside and lowside switch. The current measurement is carried out in the DC link. Due to many technical limitations within the inverter, however, the method is only conditionally applicable.

Offenbarung der ErfindungDisclosure of the invention

Vor diesem Hintergrund werden ein Verfahren nach Anspruch 1 und eine Anordnung mit den Merkmalen des Anspruchs 8 vorgestellt. Ausführungen ergeben sich aus den abhängigen Ansprüchen und der Beschreibung. Against this background, a method according to claim 1 and an arrangement with the features of claim 8 are presented. Embodiments result from the dependent claims and the description.

Mit dem vorgestellten Verfahren ist es möglich, in einem Mehrspannungsnetz bzw. Mehrspannungsbordnetz mit Hilfe des Gleichspannungswandlers den Zwischenkreis des elektrischen Antriebs zu diagnostizieren und damit dessen Funktionsfähigkeit zu überprüfen. Das Mehrspannungsnetz umfasst dabei zumindest ein Niedervolt- und ein Hochvoltnetz bzw. -Bordnetz. With the presented method, it is possible to diagnose the intermediate circuit of the electric drive in a multi-voltage network or multi-voltage vehicle electrical system with the aid of the DC-DC converter and thus to check its functionality. The multi-voltage network comprises at least one low-voltage and one high-voltage network or on-board network.

Weiterhin können bei dem vorgestellten Verfahren alle an dem Hochvolt-Bordnetz angeschlossenen Kapazitäten in die Diagnose miteinbezogen werden, wenn deren eigene Zwischenkreiskapazität bzw. Eingangskapazität bekannt ist. Dies sind bspw. angeschlossene Hochvolt-Verbraucher oder auch ein als Pufferspeicher verwendeter Zweischichtkondensator. Dadurch wird sich die entsprechend zu diagnostizierende Zwischenkreiskapazität erhöhen.Furthermore, in the presented method, all the capacitors connected to the high-voltage electrical system can be included in the diagnosis if their own DC link capacitance or input capacitance is known. These are, for example, connected high-voltage consumers or a two-layer capacitor used as a buffer memory. As a result, the corresponding intermediate circuit capacity to be diagnosed will increase.

Die Kapazität eines Kondensators kann grundsätzlich mit der folgenden Gleichung berechnet werden:

Figure DE102013211567A1_0002
The capacitance of a capacitor can basically be calculated with the following equation:
Figure DE102013211567A1_0002

Mit einem konstanten Ladestrom kann der Ausdruck dU/dt in diskreter Form gebildet werden, d. h.

Figure DE102013211567A1_0003
With a constant charging current, the term dU / dt can be formed in discrete form, ie
Figure DE102013211567A1_0003

Mit Hilfe der Funktion Rückspeisung mit Stromregelmöglichkeit des Gleichspannungswandlers kann die Diagnose des Gesamt-Zwischenkreises realisiert werden. Dabei ist das Verfahren einfach zu implementieren. Außerdem kann die Messgenauigkeit erhöht werden.With the aid of the function feedback with current control option of the DC-DC converter, the diagnosis of the overall DC link can be realized. The process is easy to implement. In addition, the measurement accuracy can be increased.

In Ausführung des vorgestellten Verfahrens führt der Gleichspannungswandler die Diagnose des Zwischenkreises wie folgt aus:

  • – Der Gleichspannungswandler stellt einen festen Strom ein, bspw. 20 A, mit dem der Zwischenkreis beaufschlagt wird.
  • – Der Gleichspannungswandler misst mehrmals die Spannung UHV, die Spannung im Zwischenkreis, und die Zeitabstände zwischen den Abtastpunkten bei dem eingestellten Strom IHV, dem Strom im Zwischenkreis.
  • – Der Gleichspannungswandler berechnet aus den Spannungsmessungen und Zeitabständen die Ableitung der Spannungsänderung.
  • – Der Gleichspannungswandler berechnet die Kapazität des Zwischenkreises nach der folgenden Gleichung:
    Figure DE102013211567A1_0004
  • – Ist die berechnete Kapazität kleiner als der definierte Schwellenwert x, so wird der Gleichspannungswandler einen Fehler des Zwischenkreises melden.
In the implementation of the presented method, the DC-DC converter carries out the diagnosis of the DC link as follows:
  • - The DC-DC converter sets a fixed current, eg. 20 A, with which the DC link is applied.
  • - The DC-DC converter measures several times the voltage U HV , the voltage in the DC link, and the time intervals between the sampling points at the set current I HV , the current in the DC link.
  • - The DC-DC converter calculates the derivative of the voltage change from the voltage measurements and time intervals.
  • - The DC-DC converter calculates the capacitance of the DC link according to the following equation:
    Figure DE102013211567A1_0004
  • - If the calculated capacity is smaller than the defined threshold value x, the DC-DC converter will report an error of the DC link.

Es ist weiterhin zu berücksichtigen, dass die Kapazität eines Kondensators in der Regel eine Herstellungstoleranz, eine Temperaturabhängigkeit und altersbedingte Veränderungen aufweist. Ein Schwellenwert wird nach dem kleinstmöglichen Wert der Kapazität unter den definierten Randbedingungen festgelegt. Der Zwischenkreis ist defekt, wenn seine Kapazität kleiner als dieser Schwellenwert x ist.It is further to be considered that the capacitance of a capacitor usually has a manufacturing tolerance, a temperature dependence and age-related changes. A threshold value is set according to the smallest possible value of the capacity under the defined boundary conditions. The DC link is defective if its capacity is smaller than this threshold x.

Das vorgestellte Verfahren weist, zumindest in einigen der Ausführungen, folgende Vorteile auf:

  • – Die Erfassung der Zwischenkapazität ist viel genauer, da der Gleichspannungswandler den Ladestrom selbst einstellen und gleichzeitig die Spannungsänderung messen kann. Außerdem ist die Messtechnik besser beherrschbar als bei anderen Verfahren. Dadurch wird die fehlerhafte Diagnose vermindert und gleichzeitig die Sicherheit erhöht.
  • – Die Diagnose der Zwischenkreiskapazität ist zudem genauer, da der Innenwiderstand der Kondensatoren, der sich in der Regel altersbedingt und temperaturabhängig verändert, keinen Einfluss auf die Messung der Kapazität bei dem vorgeschlagenen Verfahren hat.
  • – Das Verfahren ist weniger komplex als bekannte Verfahren. Der konstante Strom wird vom Gleichspannungswandler geregelt und nach Bedarf eingestellt. Den Spannungsverlauf kann der Gleichspannungswandler exakt beobachten und den günstigen Messpunkt auswählen. Außerdem ist keine komplexe Signalfilterung erforderlich. Vielmehr ist eine einfache Mittelwertbildung zur Erhöhung der Messsicherheit ausreichend.
  • – Der Messvorgang des vorgeschlagenen Verfahrens ist kürzer als derjenige anderer Verfahren. Zumal kann die Diagnose in der Zeitphase des Aufladen des Zwischenkreises bzw. Pre-Charging durchgeführt werden, ohne eine spezielle Diagnosezeit vorzuhalten. Diese Phase ist notwendig, um zu hohe Ströme während der Zuschaltung von Hochvolt-Energiespeichern in den Zwischenkreiskondensator aufgrund hoher Differenzspannung zu vermeiden. Deshalb wird vor Zuschaltung auf einen gewissen Wert aufgeladen und die Differenzspannung verringert.
  • – Gerade weil die Diagnose des Zwischenkreises in der Zeitphase des Aufladens bzw. Hochlaufens durchgeführt werden kann, kann die mögliche Gefährdung aufgrund des defekten Zwischenkreises besser abgewandt bzw. die Sicherheitsfunktion besser gewährleistet werden. Der Fehler in der sicherheitsrelevanten Situation wird frühzeitig verhindert, bevor das Fahrzeug in Bewegung gesetzt wird.
  • – Die Diagnose des Zwischenkreises mit dem vorgeschlagenen Verfahren kann ebenfalls in der Zeitphase des Nachlaufs durchgeführt werden. Der Gleichspannungswandler arbeitet in dem normalen Modus "Wandlung vom Hochvolt- ins Niedervolt-Bordnetz" mit dem geregelten Entladestrom. Der Zwischenkreis wird dadurch geregelt entladen. Mit dem gleichen Algorithmus kann ebenfalls die Zwischenkapazität berechnet werden.
  • – Das geregelte Entladen des Zwischenkreises kann auch gleichzeitig als eine Sicherheitsfunktion, um den Hochvolt-Zwischenkreis mit einer Hochspannung von höher als 60 V beim Ausschalten schnell zu entladen, verwendet werden.
The presented method has the following advantages, at least in some of the embodiments:
  • - The detection of the intermediate capacity is much more accurate because the DC-DC converter can adjust the charging current itself and at the same time measure the voltage change. In addition, the measurement technique is better manageable than other methods. This reduces the faulty diagnosis while increasing safety.
  • - The diagnosis of the DC link capacity is also more accurate because the internal resistance of the capacitors, which usually changes due to age and temperature, has no influence on the measurement of the capacitance in the proposed method.
  • The method is less complex than known methods. The constant current is regulated by the DC-DC converter and adjusted as needed. The DC voltage converter can observe the voltage curve exactly and select the favorable measuring point. Besides, it is not complex Signal filtering required. Rather, a simple averaging to increase the measurement reliability is sufficient.
  • The measuring process of the proposed method is shorter than that of other methods. In particular, the diagnosis can be carried out in the time phase of the charging of the intermediate circuit or pre-charging without holding up a special diagnosis time. This phase is necessary to avoid high currents during the connection of high-voltage energy storage in the DC link capacitor due to high differential voltage. Therefore, it is charged to a certain value before connection and the differential voltage is reduced.
  • - Just because the diagnosis of the DC link in the time phase of charging or startup can be performed, the potential danger due to the defective DC link can be better averted or the safety function can be better ensured. The error in the safety-relevant situation is prevented at an early stage before the vehicle is set in motion.
  • - The diagnosis of the DC link with the proposed method can also be performed in the time phase of the caster. The DC-DC converter operates in the normal mode "conversion from high-voltage to low-voltage on-board electrical system" with the regulated discharge current. The DC link is discharged in a regulated manner. The intermediate capacity can also be calculated using the same algorithm.
  • - The controlled discharge of the DC link can also be used simultaneously as a safety function to quickly discharge the high-voltage DC link with a high voltage of higher than 60 V when switched off.

Weitere Vorteile und Ausgestaltungen der Erfindung ergeben sich aus der Beschreibung und den beiliegenden Zeichnungen.Further advantages and embodiments of the invention will become apparent from the description and the accompanying drawings.

Es versteht sich, dass die voranstehend genannten und die nachstehend noch zu erläuternden Merkmale nicht zur in der jeweils angegebenen Kombination, sondern auch in anderen Kombinationen oder in Alleinstellung verwendbar sind, ohne den Rahmen der vorliegenden Erfindung zu verlassen.It is understood that the features mentioned above and those yet to be explained below can not be used for the combinations specified in each case, but also in other combinations or alone, without departing from the scope of the present invention.

Kurze Beschreibung der ZeichnungenBrief description of the drawings

1 zeigt in einem Flussdiagramm eine mögliche Ausführung des beschriebenen Verfahrens. 1 shows in a flow chart a possible embodiment of the method described.

2 zeigt eine Ausführung der Anordnung zur Durchführung des Verfahrens in einem Mehrspannungsbordnetz. 2 shows an embodiment of the arrangement for performing the method in a multi-voltage vehicle electrical system.

Ausführungsformen der ErfindungEmbodiments of the invention

Die Erfindung ist anhand von Ausführungsformen in den Zeichnungen schematisch dargestellt und wird nachfolgend unter Bezugnahme auf die Zeichnungen ausführlich beschrieben.The invention is schematically illustrated by means of embodiments in the drawings and will be described in detail below with reference to the drawings.

1 zeigt einen möglichen Ablauf des vorgestellten Verfahrens in einem Flussdiagramm. In einem ersten Schritt 10 wird ein Strom eingestellt, mit dem ein Zwischenkreis eines Hochvoltnetzes in einem Mehrspannungsnetz beaufschlagt wird. Das bedeutet, dass je nach Betriebssituation der Zwischenkreis mit diesem Strom aufgeladen oder entladen wird. Das Einstellen des Stroms kann von einem Gleichspannungswandler bzw. von einer Einheit in diesem Gleichspannungswandler vorgenommen werden. 1 shows a possible sequence of the presented method in a flow chart. In a first step 10 a current is set, which is applied to a DC link of a high-voltage network in a multi-voltage network. This means that, depending on the operating situation, the DC link is charged or discharged with this current. The adjustment of the current can be made by a DC-DC converter or by a unit in this DC-DC converter.

In einem nächsten Schritt 12 wird eine Messung der Spannung im Zwischenkreis vorgenommen werden. Diese Messung wird n-mal wiederholt (Pfeil 14), wobei n eine ganze Zahl ist, die vorab vorgegeben werden kann. Jeder Messung ist ein Abtastpunkt zugeordnet. n kann aber auch in Abhängigkeit der erfassten Spannungswerte während des Ablaufs des Verfahrens angepasst werden. Die zeitlichen Abstände zwischen den Abtastpunkten sind vorgegeben oder werden gemessen.In a next step 12 a measurement of the voltage in the DC link will be made. This measurement is repeated n times (arrow 14 ), where n is an integer that can be predetermined in advance. Each measurement is assigned a sampling point. However, n can also be adapted as a function of the detected voltage values during the course of the method. The time intervals between the sampling points are predetermined or are measured.

Anschließend wird in einem Schritt 16 die Kapazität des Zwischenkreises berechnet. Die berechnete Kapazität wird in einem darauffolgenden Schritt 18 mit einem Schwellenwert verglichen. Wird der Schwellenwert überschritten, erfolgt eine Fehlermeldung in Schritt 20. Andernfalls kann das Verfahren wieder mit Schritt 10 begonnen werden, wie dies mit Pfeil 22 verdeutlicht ist.Subsequently, in one step 16 the capacity of the DC link is calculated. The calculated capacity will be in a subsequent step 18 compared with a threshold. If the threshold is exceeded, an error message is issued in step 20 , Otherwise, the process may go back to step 10 to be started, as with arrow 22 is clarified.

Der Vorgang wird beendet, sobald die definierte obere bzw. untere Spannungsschwelle des Zwischenkreises erreicht wird oder eine Anweisung zum Beenden der Diagnose aus dem übergeordneten System angekommen ist.The process is terminated as soon as the defined upper or lower voltage threshold of the DC link is reached or an instruction to terminate the diagnosis has arrived from the higher-level system.

Es werden somit an zeitlich aufeinanderfolgenden Abtastpunkten Spannungswerte ermittelt. Thus, voltage values are determined at temporally successive sampling points.

Das Verfahren zur Diagnose des Zwischenkreises mit Hilfe des Gleichspannungswandlers kann in zwei unterschiedlichen Situationen durchgeführt werden.The method for the diagnosis of the DC link with the aid of the DC-DC converter can be carried out in two different situations.

1. In der Zeitphase Aufladens des Zwischenkreises:1. In the time phase of charging the DC link:

Voraussetzungen für die Diagnose mit dem Verfahren:Prerequisites for the diagnosis with the procedure:

  • – Die Hochvolt-Batterie ist noch nicht an dem Hochvolt-Bordnetz eingeschaltet.- The high-voltage battery is not yet switched on to the high-voltage electrical system.
  • – Der Gleichspannungswandler ist betriebsbereit nach der aktiven Weckbedin- The DC-DC converter is ready for operation after the active Weckbedin
  • gung.supply.
  • – Das Hochvolt-Bordnetz ist bereits entladen, d. h. die Zwischenkreisspannung ist kleiner als 5 V.- The high-voltage electrical system is already discharged, d. H. the DC link voltage is less than 5 V.
  • – Die Leistungsverbraucher im Hochvolt-Bordnetz sind im ausgeschalteten Zustand bzw. vom Bordnetz getrennt oder deren eigene Zwischenkreiskapazität bedingt durch ihre Eingangskondensatoren ist bekannt und kann in die Berechnung mit einbezogen werden.- The power consumers in the high-voltage on-board electrical system are disconnected or disconnected from the electrical system or their own DC link capacitance due to their input capacitors is known and can be included in the calculation.
  • – Der Inverter ist noch im ausgeschalteten Zustand oder im Standby-Zustand, d. h. keine Leistungsbelastung ist aktiviert. Der Logikstromverbrauch für den Inverter kann gegenüber dem Ladestrom vernachlässigt werden.- The inverter is still in the off state or in the standby state, ie. H. no power load is activated. The logic power consumption for the inverter can be neglected compared to the charging current.
  • – Eine Forderung zum Aufladen des Zwischenkreises vom übergeordneten System, z. B. dem Elektrischen Energie-Management (EEM), ist bereits angekommen, unabhängig davon, über welchen Kommunikationsweg der Befehl am Gleichspannungswandler vorgegeben wird.- A request to charge the DC link from the parent system, z. As the electrical energy management (EEM), has already arrived, regardless of what communication path the command is specified on the DC-DC converter.

Danach aktiviert der Gleichspannungswandler die Betriebsart "Wandlung von Niedervolt- ins Hochvolt-Netz" mit der Stromregelung. Der Zwischenkreis wird mit einem konstant geregelten Strom von bspw. 20 A aufgeladen.Then the DC-DC converter activates the operating mode "Conversion from low-voltage to high-voltage network" with the current control. The DC link is charged with a constant current of, for example, 20 A.

Der Mikrocontroller tastet die Zwischenkreisspannung über eine Spannungsmesseinrichtung ab und nimmt den Messwert mit dem zugehörigen Zeitstempel auf. Gemäß der Gleichung (2) werden die zeitlichen Ableitungen der Zwischenkreisspannung hintereinander berechnet. Nachdem die Zwischenkreisspannung eine definierte Schwelle erreicht hat oder die definierte Abtastzahl erreicht wird, stoppt die Messung. Im Mikrocontroller des Gleichspannungswandler oder alternativ im Controller des anderen Systems, z. B. dem Inverter, wenn die Messdaten dorthin übertragen werden, wird der Mittelwert der Spannungsableitung gebildet und die Zwischenkreiskapazität gemäß der Gleichung (3) berechnet. Sollte die berechnete Zwischenkreiskapazität die definierte minimale Kapazitätsgrenze unterschreiten, so wird eine Fehlermeldung über den Zwischenkreis gemeldet.The microcontroller samples the DC link voltage via a voltage measuring device and records the measured value with the associated time stamp. According to the equation ( 2 ), the time derivatives of the intermediate circuit voltage are calculated one after the other. After the DC link voltage has reached a defined threshold or the defined sampling number is reached, the measurement stops. In the microcontroller of the DC-DC converter or alternatively in the controller of the other system, eg. As the inverter, when the measured data are transmitted there, the mean value of the voltage derivative is formed and the DC link capacitance according to the equation ( 3 ). If the calculated DC link capacitance falls below the defined minimum capacity limit, an error message is signaled via the DC link.

2. In der Zeitphase des Entladens des Zwischenkreises:2. In the time phase of discharging the DC link:

Voraussetzung für die Diagnose mit dem Verfahren:Prerequisite for the diagnosis with the procedure:

  • – Die Hochvolt-Batterie ist vom Hochvolt-Bordnetz abgetrennt.- The high-voltage battery is disconnected from the high-voltage electrical system.
  • – Der Gleichspannungswandler ist noch aktiv.- The DC-DC converter is still active.
  • – Die Leistungsverbraucher im Hochvolt-Bordnetz sind ausgeschaltet bzw. vom Bordnetz abgetrennt oder deren eigene Zwischenkreiskapazität bedingt durch ihre Eingangskondensatoren ist bekannt und kann in die Berechnung mit einbezogen werden.- The power consumers in the high-voltage on-board electrical system are switched off or disconnected from the electrical system or their own DC link capacity due to their input capacitors is known and can be included in the calculation.
  • – Der Inverter ist ausgeschaltet oder im Standby-Zustand, d. h. alle Leistungsbelastungen sind deaktiviert. Der Logikstromverbrauch für den Inverter kann gegenüber den Entladestrom vernachlässigt werden.- The inverter is switched off or in standby mode, ie. H. all power loads are disabled. The logic power consumption for the inverter can be neglected compared to the discharge current.
  • – Eine Forderung zum Entladen des Zwischenkreises vom übergeordneten System, bspw. dem Elektrischen Energie-Management (EEM), ist bereits angekommen, unabhängig davon, über welchen Kommunikationsweg der Befehl an den Gleichspannungswandler vorgegeben wird.- A demand for discharging the DC link from the parent system, eg. The Electric Energy Management (EEM), has already arrived, regardless of which communication path the command is given to the DC-DC converter.

Der Gleichspannungswandler stellt die Betriebsart "Wandlung von Hochvolt- ins Niedervolt-Bordnetz" ein und regelt einen konstanten Entladestrom vom Zwischenkreis. Der Mikrocontroller des Gleichspannungswandler tastet die Zwischenkreisspannung über eine Spannungsmesseinrichtung ab und nimmt den Messwert mit dem zugehörigen Zeitstempel auf. Gemäß der Gleichung (2) werden die zeitlichen Ableitungen der Zwischenkreisspannung hintereinander berechnet. Nachdem die Zwischenkreisspannung eine definierte Schwelle unterschritten hat oder die definierte Abtastzahl erreicht wird, stoppt die Messung. Im Mikrocontroller des Gleichspannungswandler oder alternativ im Controller des anderen Systems, z. B. des Inverters, wenn die Messdaten dorthin übertragen werden, wird der Mittelwert der Spannungsableitung gebildet und die Zwischenkreiskapazität gemäß Gleichung (3) berechnet. Sollte die berechnete Zwischenkreiskapazität die definierte minimale Kapazitätsgrenze unterschreiten, so wird eine Fehlermeldung über den Zwischenkreis gemeldet.The DC-DC converter sets the operating mode "Conversion from high-voltage to low-voltage on-board electrical system" and regulates a constant discharge current from the DC link. The microcontroller of the DC-DC converter samples the DC link voltage via a voltage measuring device and records the measured value with the associated time stamp. According to the equation ( 2 ), the time derivatives of the intermediate circuit voltage are calculated one after the other. After the intermediate circuit voltage has fallen below a defined threshold or the defined sampling number is reached, the measurement stops. In the microcontroller of the DC-DC converter or alternatively in the controller of the other system, eg. B. of the inverter, when the measured data is transmitted there, the mean value of the voltage derivative is formed and the DC link capacity according to equation ( 3 ). If the calculated DC link capacitance falls below the defined minimum capacity limit, an error message is signaled via the DC link.

Zur weiteren Steigung der Messgenauigkeit können die Strommessung und Spannungsmessung mit Temperaturkompensation vorgesehen werden. In diesem Fall sind Temperatursensoren an dem entsprechenden Strom- und Spannungssensor zu platzieren. To further increase the measuring accuracy, the current measurement and voltage measurement with temperature compensation can be provided. In this case, temperature sensors should be placed on the corresponding current and voltage sensor.

Das Verfahren ist leicht realisierbar. Eine mögliche Anwendung ist in einem Boost-Rekuperationssystem gegeben.The process is easy to implement. One possible application is given in a boost recuperation system.

2 zeigt ein Mehrspannungsnetz, in diesem Fall ein Mehrspannungsbordnetz, das insgesamt mit der Bezugsziffer 50 bezeichnet ist. Dieses Mehrspannungsnetz 50 umfasst ein Niedervoltnetz 52 und ein Hochvoltnetz 54, die über einen Gleichspannunsgwandler 56 miteinander verbunden ist. Dieser Gleichspannungswandler 56 ist mit Klemme 31, mit Bezugsziffer 58 bezeichnet, eines Kraftfahrzeugs verbunden. 2 shows a multi-voltage network, in this case a multi-voltage electrical system, the whole by the reference numeral 50 is designated. This multi-voltage network 50 includes a low voltage network 52 and a high voltage network 54 that have a DC voltage transformer 56 connected to each other. This DC-DC converter 56 is with clamp 31 , with reference number 58 referred to, connected to a motor vehicle.

Das Hochvoltnetz 54 umfasst einen Zwischenkreis 60 in einem Inverter 62, dem eine Kapazität CZK 64 zugeordnet ist, eine elektrische Maschine 66, die als Motor oder Generator betrieben wird, einen Hochvoltspeicher 68 und einen Hochleistungsverbraucher 70. Das Niedervoltnetz 52 umfasst einen Niedervoltspeicher 72, eine Reihe von Widerständen 74, von denen hier nur drei gezeigt sind, und einen optionalen Starter 76.The high voltage network 54 includes a DC link 60 in an inverter 62 which has a capacity C ZK 64 is assigned, an electric machine 66 , which is operated as a motor or generator, a high-voltage storage 68 and a heavy duty consumer 70 , The low voltage network 52 includes a low-voltage storage 72 , a series of resistors 74 of which only three are shown here, and an optional starter 76 ,

In dem Gleichspannungswandler 56 ist eine erste Einheit 80 zum Einstellen eines festen Stroms bzw. Stromwerts vorgesehen, mit dem das Hochvoltnetz 54 beaufschlagt werden kann. Weiterhin ist eine zweite Einheit 82 zum Messen von Spannungen im Hochvoltnetz 54 und eine dritte Einheit 84 zum Berechnen der Kapazität 64 des Zwischenkreises 60 vorgesehen. Diese Einheiten 80, 82 und 84 können auch außerhalb des Gleichspannungswandlers 56 vorgesehen sein.In the DC-DC converter 56 is a first unit 80 for setting a fixed current or current value, with which the high-voltage network 54 can be applied. Furthermore, a second unit 82 for measuring voltages in the high-voltage network 54 and a third unit 84 to calculate the capacity 64 of the DC link 60 intended. These units 80 . 82 and 84 can also outside the DC-DC converter 56 be provided.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102011076709 A1 [0008] DE 102011076709 A1 [0008]

Claims (9)

Verfahren zum Überprüfen der Funktionsfähigkeit eines Zwischenkreises (60) in einem Mehrspannungsnetz (50), das ein Hochvoltnetz (54) und ein Niedervoltnetz (52) sowie einen Gleichspannungswandler (56) umfasst, wobei ein fester Strom eingestellt wird, mit dem der Zwischenkreis (60) beaufschlagt wird, und eine Spannung, die am Zwischenkreis (60) anliegt, an zeitlich aufeinanderfolgenden Abtastpunkten gemessen wird, wobei aus den gemessenen Spannungswerten unter Berücksichtigung von Zeitabständen zwischen den Abtastpunkten eine Kapazität (64) des Zwischenkreises (60) berechnet wird. Method for checking the functionality of a DC link ( 60 ) in a multi-voltage network ( 50 ), which is a high-voltage network ( 54 ) and a low-voltage network ( 52 ) and a DC-DC converter ( 56 ), wherein a fixed current is set with which the intermediate circuit ( 60 ) is applied, and a voltage at the DC link ( 60 ) is measured at temporally successive sampling points, wherein from the measured voltage values, taking into account time intervals between the sampling points, a capacitance ( 64 ) of the DC link ( 60 ) is calculated. Verfahren nach Anspruch 1, bei dem die berechnete Kapazität (64) mit einem Schwellenwert verglichen wird.Method according to Claim 1, in which the calculated capacity ( 64 ) is compared with a threshold. Verfahren nach Anspruch 2, bei dem bei Unterschreiten des Schwellenwerts eine Fehlermeldung gegeben wird.Method according to Claim 2, in which an error message is given if the threshold value is undershot. Verfahren nach einem der Ansprüche 1 bis 3, das während eines Aufladens des Zwischenkreises (60) durchgeführt wird und der Strom, mit dem der Zwischenkreis (60) beaufschlagt wird, dazu dient, den Zwischenkreis (60) aufzuladen.Method according to one of claims 1 to 3, which during a charging of the intermediate circuit ( 60 ) and the current with which the DC link ( 60 ) is used, the intermediate circuit ( 60 ) to charge. Verfahren nach einem der Ansprüche 1 bis 3, das während eines Entladens des Zwischenkreises (60) durchgeführt wird und der Strom, mit dem der Zwischenkreis (60) beaufschlagt wird, dazu dient, den Zwischenkreis (60) zu entladen.Method according to one of claims 1 to 3, which during a discharge of the intermediate circuit ( 60 ) and the current with which the DC link ( 60 ) is used, the intermediate circuit ( 60 ) to unload. Verfahren nach einem der Ansprüche 1 bis 5, bei dem bei der Spannungsmessung eine Temperaturkompensation vorgenommen wird. Method according to one of claims 1 to 5, wherein in the voltage measurement, a temperature compensation is performed. Verfahren nach einem der Ansprüche 1 bis 5, bei dem bei einer Messung des Stroms, mit dem der Zwischenkreis (60) beaufschlagt wird, eine Temperaturkompensation vorgenommen wird.Method according to one of claims 1 to 5, wherein when measuring the current with which the intermediate circuit ( 60 ) is applied, a temperature compensation is made. Anordnung zum Überprüfen der Funktionsfähigkeit eines Zwischenkreises (60) in einem Mehrspannungsnetz (50), das ein Hochvoltnetz (54) und ein Niedervoltnetz (52) sowie einen Gleichspannungswandler (56) umfasst, mit einer ersten Einheit (80) zum Einstellen eines festen Stroms, mit dem der Zwischenkreis (60) beaufschlagt wird, einer zweiten Einheit (82) zum Messen von Spannungen am Zwischenkreis (60) und einer dritten Einheit (84) zum Berechnen einer Kapazität des Zwischenkreises (60).Arrangement for checking the functionality of a DC link ( 60 ) in a multi-voltage network ( 50 ), which is a high-voltage network ( 54 ) and a low-voltage network ( 52 ) and a DC-DC converter ( 56 ), with a first unit ( 80 ) for setting a fixed current, with which the intermediate circuit ( 60 ), a second unit ( 82 ) for measuring voltages on the DC link ( 60 ) and a third unit ( 84 ) for calculating a capacitance of the intermediate circuit ( 60 ). Anordnung nach Anspruch 8, bei der die erste Einheit (80), die zweite Einheit (82) und die dritte Einheit (84) in dem Gleichspannungswandler (56) vorgesehen sind.Arrangement according to Claim 8, in which the first unit ( 80 ), the second unit ( 82 ) and the third unit ( 84 ) in the DC-DC converter ( 56 ) are provided.
DE102013211567.9A 2013-06-19 2013-06-19 Method for checking the functionality of a DC link Withdrawn DE102013211567A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102013211567.9A DE102013211567A1 (en) 2013-06-19 2013-06-19 Method for checking the functionality of a DC link
PCT/EP2014/060526 WO2014202326A1 (en) 2013-06-19 2014-05-22 Method for testing the working order of a dc link

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102013211567.9A DE102013211567A1 (en) 2013-06-19 2013-06-19 Method for checking the functionality of a DC link

Publications (1)

Publication Number Publication Date
DE102013211567A1 true DE102013211567A1 (en) 2014-12-24

Family

ID=50771294

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102013211567.9A Withdrawn DE102013211567A1 (en) 2013-06-19 2013-06-19 Method for checking the functionality of a DC link

Country Status (2)

Country Link
DE (1) DE102013211567A1 (en)
WO (1) WO2014202326A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015003227A1 (en) 2015-03-13 2015-08-27 Daimler Ag Method for simulating an on-board ripple of an electrical system of a motor vehicle
WO2017041977A1 (en) * 2015-09-07 2017-03-16 Robert Bosch Automotive Steering Gmbh Determination of intermediate circuit capacitance
WO2017186393A1 (en) * 2016-04-29 2017-11-02 Robert Bosch Gmbh Method and device for determining a capacitance of a dc link capacitor
DE102016006318A1 (en) 2016-05-21 2017-11-23 Audi Ag Control device and method for adjusting an engine load of an internal combustion engine, in particular for a vehicle diagnosis
EP3502722A1 (en) * 2017-12-22 2019-06-26 KONE Corporation Method for maintenance of a frequency converter and software program realizing the same
DE102018204227A1 (en) 2018-03-20 2019-09-26 Robert Bosch Gmbh Device and method for monitoring a DC link capacitor and electric power converters
DE102019201151A1 (en) * 2019-01-30 2020-07-30 Robert Bosch Gmbh Method for determining an electrical capacitance in an intermediate circuit of an electrical drive system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105329190B (en) * 2015-11-10 2016-08-24 福建省汽车工业集团云度新能源汽车股份有限公司 A kind of electric automobile high-voltage block terminal

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011076709A1 (en) 2011-05-30 2012-12-06 Robert Bosch Gmbh Method for measuring current in five-phase rotary field electric machine in vehicle, involves providing intermediate circuit with capacitor and switches, and measuring current in intermediate circuit using shunt resistor

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0919003A (en) * 1995-06-27 1997-01-17 Honda Motor Co Ltd Deterioration discriminating device for capacitor in motor-driven vehicle
US7148697B2 (en) * 2004-06-04 2006-12-12 Doljack Frank A System and method for measuring electrical characteristics of a capacitor
JP4797488B2 (en) * 2005-07-26 2011-10-19 パナソニック株式会社 Vehicle power supply
DE102005058719A1 (en) * 2005-12-08 2007-06-14 Conti Temic Microelectronic Gmbh Autonomous capacitor testing circuit arrangement for motor vehicle, has measuring circuit measuring voltage characteristics at capacitor, and evaluation circuit testing capacitance of capacitor by evaluation of measured characteristics
FI120280B (en) * 2008-01-21 2009-08-31 Switch High Power Converters O Method for monitoring the condition of DC capacitors

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011076709A1 (en) 2011-05-30 2012-12-06 Robert Bosch Gmbh Method for measuring current in five-phase rotary field electric machine in vehicle, involves providing intermediate circuit with capacitor and switches, and measuring current in intermediate circuit using shunt resistor

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015003227A1 (en) 2015-03-13 2015-08-27 Daimler Ag Method for simulating an on-board ripple of an electrical system of a motor vehicle
WO2017041977A1 (en) * 2015-09-07 2017-03-16 Robert Bosch Automotive Steering Gmbh Determination of intermediate circuit capacitance
WO2017186393A1 (en) * 2016-04-29 2017-11-02 Robert Bosch Gmbh Method and device for determining a capacitance of a dc link capacitor
DE102016006318A1 (en) 2016-05-21 2017-11-23 Audi Ag Control device and method for adjusting an engine load of an internal combustion engine, in particular for a vehicle diagnosis
DE102016006318B4 (en) 2016-05-21 2019-07-11 Audi Ag Control device and method for adjusting an engine load of an internal combustion engine, in particular for a vehicle diagnosis
EP3502722A1 (en) * 2017-12-22 2019-06-26 KONE Corporation Method for maintenance of a frequency converter and software program realizing the same
CN109959878A (en) * 2017-12-22 2019-07-02 通力股份公司 The maintaining method of frequency converter and the software program for realizing it
US10598738B2 (en) 2017-12-22 2020-03-24 Kone Corporation Method for maintenance of a frequency converter and software program realizing the same
DE102018204227A1 (en) 2018-03-20 2019-09-26 Robert Bosch Gmbh Device and method for monitoring a DC link capacitor and electric power converters
DE102019201151A1 (en) * 2019-01-30 2020-07-30 Robert Bosch Gmbh Method for determining an electrical capacitance in an intermediate circuit of an electrical drive system
US11072299B2 (en) * 2019-01-30 2021-07-27 Robert Bosch Gmbh Method for determining an electrical capacitance in an intermediate circuit of an electric drive system

Also Published As

Publication number Publication date
WO2014202326A1 (en) 2014-12-24

Similar Documents

Publication Publication Date Title
DE102013211567A1 (en) Method for checking the functionality of a DC link
DE102007048620B4 (en) System and method for monitoring a high voltage energy storage connection
DE102009018601A1 (en) Ground fault detection system for vehicles with a high-voltage power grid
DE102017205521B4 (en) Power conversion device and method for diagnosing abnormality in voltage sensor characteristics
EP3022568B1 (en) Onboard power supply and method for operating an onboard power supply
DE102013204159A1 (en) Method and apparatus for high voltage isolation monitoring in a vehicle
DE102012204866A1 (en) Method and device for diagnosing a discharge circuit of an electrical system
EP3342629B1 (en) Technique for variable connection of a traction energy storage system
DE102016207033A1 (en) Electrical energy storage device for a vehicle electrical system, vehicle electrical system
DE102013208968A1 (en) Motor vehicle electrical system with active bridge rectifier and overvoltage protection during load shedding, rectifier arrangement, associated operating method and means for its implementation
DE102010045514A1 (en) Method for operating a motor vehicle
DE102016207378A1 (en) Method and device for determining a capacitance of a DC link capacitor
EP2840253B1 (en) On-board electrical system of a motor vehicle and vehicle with such an on-board electrical system
DE102020202468A1 (en) Method for operating an on-board network for an electric vehicle and electric vehicle
DE102005025616A1 (en) Energy store`s fuel cell voltage monitoring/controlling method for motor vehicle on-board supply system, involves charging/discharging cells based on difference between determined voltage of group of cells and regulated reference voltage
WO2011080001A2 (en) Device and method for detecting a polarity reversal on a low-voltage side of a dc/dc converter in a dual-voltage onboard power supply system
WO2011045188A2 (en) Energy storage system for the electrical energy supply of consumers in a vehicle
WO2016177488A1 (en) Method for detecting a proper connection of at least one energy store to an on-board electrical system
DE10309937A1 (en) Vehicle capacitor test and diagnosis circuit measures voltage and current during charge and discharge for processing to determine internal impedance
DE102014212572B4 (en) Method for obtaining information, in particular initial information on a possible faulty load condition of a polyphase electric motor
EP3380855B1 (en) Method for determining performance information of a battery of a motor vehicle on-board power system that is connected to a direct current converter, and motor vehicle
DE102021117959A1 (en) DEVICE FOR DETECTING INSULATION ANOMALIES
DE102016223511A1 (en) Method for detecting a failure of a parallel-connected semiconductor
DE102018105505A1 (en) Method for detecting a malfunction, in particular a short-circuit current, in a traction battery arrangement
DE102020213771A1 (en) Method for monitoring an energy source in an on-board network

Legal Events

Date Code Title Description
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee