DE102010006142A1 - Energy portal for controlling and/or regulating energy supply in power distribution network of wind power plant, has control device controlling and/or regulating parameters as variables based on variables, factors and information - Google Patents
Energy portal for controlling and/or regulating energy supply in power distribution network of wind power plant, has control device controlling and/or regulating parameters as variables based on variables, factors and information Download PDFInfo
- Publication number
- DE102010006142A1 DE102010006142A1 DE102010006142A DE102010006142A DE102010006142A1 DE 102010006142 A1 DE102010006142 A1 DE 102010006142A1 DE 102010006142 A DE102010006142 A DE 102010006142A DE 102010006142 A DE102010006142 A DE 102010006142A DE 102010006142 A1 DE102010006142 A1 DE 102010006142A1
- Authority
- DE
- Germany
- Prior art keywords
- energy
- feed
- factors
- information
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/22—Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
Abstract
Description
Gebiet der ErfindungField of the invention
Die vorliegende Erfindung betrifft ein Energieportal, und insbesondere ein Energieportal zur Steuerung beziehungsweise Regelung einer Energieeinspeisung aus einem Erzeugernetz in ein Energieverteilungsnetz, wodurch vorgebare Einspeisefaktoren eingehalten werden können zur Einhaltung von Regelvorgaben.The present invention relates to an energy portal, and in particular an energy portal for controlling or regulating an energy supply from a generator network in an energy distribution network, whereby vorgebare feed factors can be met to comply with regulatory requirements.
Hintergrund der ErfindungBackground of the invention
Dezentrale erzeugte elektrische Energie, wie beispielsweise elektrische Energie aus Windkraftanlagen, Biogas- oder Photovoltaikanlagen, wird in die öffentlichen Netze der Verteilnetzbetreiber bzw. Übertragungsnetzbetreiber (ÜNB) eingespeist. In der Regel erfolgt die Einspeisung in die Mittel- oder Hochspannungsebenen der Verteilnetzbetreiber. Die Nennspannung der Mittelspannungsnetze ist in Bereichen von 6 KV bis 30 KV vorgesehen. Die Spannungsebenen der Hochspannungsnetze sind in der Regel 110 KV. In seltenen Fällen erfolgt die Einspeisung in die Höchstspannungsebene auf beispielsweise 220 KV oder 400 KV.Distributed electrical energy generated, such as electrical energy from wind turbines, biogas or photovoltaic systems, is fed into the public networks of the distribution system operators or transmission system operators (TSOs). As a rule, the feed-in takes place in the medium or high-voltage levels of the distribution system operators. The rated voltage of the medium-voltage networks is provided in the range from 6 KV to 30 KV. The voltage levels of the high voltage networks are usually 110 kV. In rare cases, it is fed into the maximum voltage level at, for example, 220 kV or 400 kV.
Der Punkt, an dem eine Gesellschaft elektrische Energie in das Netz eines Verteilnetzbetreibers einspeist wird als Netzverknüpfungspunkt-NVP bezeichnet. Die Voraussetzungen und Regeln der Einspeisung dezentral erzeugter elektrischer Energie in einen Netzverknüpfungspunkt des Verteilnetzbetreibers werden in einem Netzeinspeisevertrag zwischen dem Verteilnetzbetreiber und dem Betreiber des Energieerzeugungsnetzes geregelt. Ferner sind Netzanschlussrichtlinien des Verteilnetzbetreibers einzuhalten. Die
Ferner ist die Einhaltung eines Leistungsfaktors am Netzverknüpfungspunkt geregelt. Der Leistungsfaktor kann in verschiedenen physikalischen Größen vom Verteilnetzbetreiber vorgegeben werden. In der Regel wird ein variabler Leistungsfaktor als cosφ (über- bis untererregter Größe) vereinbart. Speisen mehrere dezentrale elektrische Energieerzeuger, wie beispielsweise Windparks mit einer oder mehreren Windenergieanlagen ihre Energie in einen Netzverknüpfungspunkt, so sind die vertraglich geregelten elektrischen Größen am Netzverknüpfungspunkt einzuhalten. Dabei ist zu beachten, dass alle Komponenten berücksichtigt werden, die Einfluss auf die elektrischen Größen am Netzverknüpfungspunkt haben. Zu den Komponenten gehören neben den Generatoren von beispielsweise Windenergieanlagen auch die Kabelanlagen und erforderlichen Transformatoren. Diese Gesamtheit wird als Netzanschlussanlage bezeichnet.In addition, compliance with a power factor is regulated at the grid connection point. The power factor can be specified in different physical quantities by the distribution system operator. As a rule, a variable power factor is agreed as cosφ (over- or under-excited size). If several decentralized electrical energy producers, such as wind farms with one or more wind turbines, feed their energy into a grid connection point, the contractually regulated electrical quantities at the grid connection point must be adhered to. It should be noted that all components are considered that have an influence on the electrical quantities at the network connection point. In addition to the generators of, for example, wind turbines, the components also include the cable systems and required transformers. This whole is referred to as grid connection system.
Seit dem 1.1.2009 ist das
Um die Energieeinspeisung von einem Energieerzeugungsnetz in ein Netz des Verteilnetzbetreibers zu steuern beziehungsweise zu regeln werden Energieportale verwendet. Derartige Energieportale sind beispielsweise beschrieben in
Darüber hinaus sind beispielsweise Verfahren und ein System zur Vorhersage einer Solarenergieproduktion bekannt aus
Zusammenfassung der ErfindungSummary of the invention
Es kann als eine Aufgabe der vorliegenden Erfindung betrachtet werden ein Energieportal bereitzustellen, das in der Lage ist auf der Grundlage verschiedener Information eine Anpassung der Betriebsgrößen eines Energieerzeugungsnetzes vorzunehmen, um vorgebbare Einspeisefaktoren einzuhalten, bei gleichzeitiger Optimierung einer Wirkleistungs- und Blindleistungseinspeisung (Leistungsfaktor) in ein Energieverteilungsnetz.It may be considered as an object of the present invention to provide an energy portal capable of adapting the operation quantities of a power generation network based on various information to comply with predetermined injection factors while optimizing a real power and reactive power injection (power factor) power distribution network.
Die vorliegende Erfindung betrifft dabei eine Vorrichtung in Form eines Energieportals, ein zugehöriges Verfahren, ein Computerprogramm und ein computerlesbares Speichermedium, gemäß den unabhängigen Ansprüchen, wobei weitere Ausführungsformen in den abhängigen Ansprüchen verkörpert sind. Es sollte dabei verstanden werden, dass sich die im Folgenden beschriebenen Ausführungsformen der Erfindung gleichermaßen auf die Vorrichtung, das Verfahren, das Computerprogramm und das computerlesbare Speichermedium beziehen.The present invention relates to a device in the form of an energy portal, an associated method, a computer program and a computer-readable storage medium, according to the independent claims, wherein further embodiments are embodied in the dependent claims. It should be understood that the embodiments of the invention described below relate equally to the apparatus, method, computer program and computer-readable storage medium.
Gemäß einer Ausführungsform der Erfindung wird ein Energieportal zur Steuerung beziehungsweise Regelung einer Energieeinspeisung aus einem Erzeugernetz in ein Energieverteilungsnetz bereitgestellt, wobei das Energieportal umfasst: eine Einspeisefaktoren-Empfangsvorrichtung zum Empfangen von vorgebbaren Einspeisefaktoren eines Energieverteilungsnetzbetreibers, eine Erzeugermessgrößen-Empfangsvorrichtung zum Empfangen von Messgrößen eines Erzeugernetzes, eine Prognoseinformations-Empfangsvorrichtung zum Empfangen von Prognoseinformation, eine Auswertevorrichtung zum Auswerten der Messgrößen, Einspeisefaktoren und Prognoseinformation, und eine Betriebsparameterregelvorrichtung zum Steuern beziehungsweise Regeln von Betriebsparametern des Erzeugernetzes auf der Grundlage der ausgewerteten Messgrößen, Einspeisefaktoren und Prognoseinformation mit den Einspeisefaktoren als Regelgröße.According to one embodiment of the invention, an energy portal is provided for controlling a power feed from a generator network to a power distribution network, the power portal comprising: a feed factor receiving device for receiving predetermined feed factors of a power distribution system operator, a generator size receiving device for receiving measurements of a generator network, a forecast information receiving device for receiving forecast information, an evaluation device for evaluating the measured variables, feed factors and forecast information, and an operating parameter control device for controlling operating parameters of the generator network on the basis of the evaluated measured variables, feed factors and forecast information with the feed factors as controlled variable.
Auf diese Weise kann erreicht werden, dass die von einem z. B. Energieverteilnetzbetreiber vorgegebenen Einspeisefaktoren eingehalten werden können, beziehungsweise diese Einspeisefaktoren möglichst genau getroffen werden, um auf diese Weise eine effiziente Einspeisung zu ermöglichen. Dies ermöglicht im Rahmen der vorgebbarenbeziehungsweise vorgegebenen Einspeisefaktoren im Rahmen der zulässigen maximalen Einspeisung einen möglichst hohen Energieanteil in das Energieverteilungsnetz einzuspeisen, was zur Netzstabilität des Energieverteilungsnetzes beiträgt.In this way it can be achieved that the z. B. energy distribution network operator predetermined feed factors can be met, or these feed factors are met as accurately as possible, to allow in this way an efficient feed. In the context of the predeterminable feed-in factors given in the context of the permissible maximum feed, this allows the highest possible proportion of energy to be fed into the energy distribution network, which contributes to the grid stability of the energy distribution network.
Gemäß einer Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem die Erzeugernetzmessgrößen-Empfangsvorrichtung zum Empfangen von Messgrößen bezüglich Blindleistung des Erzeugernetzes ausgelegt ist, wobei die Betriebsparameterregelvorrichtung zum dynamischen Steuern beziehungsweise Regeln von Blindleistungskompensation ausgelegt ist.According to an embodiment of the invention, there is provided an energy portal in which the generator grid measure receiving means is arranged to receive reactive power measurements of the generator grid, the operating parameter controller being adapted to dynamically control reactive power compensation.
Auf diese Weise kann eine sich verändernde Blindleistungskomponente dynamisch so ausgeglichen werden, dass die eingespeiste Energie einen möglichst hohen Wirkanteil aufweist, der maßgeblich ist für die Effizienz der Energieeinspeisung.In this way, a changing reactive power component can be dynamically balanced so that the energy fed in has the highest possible active component, which is decisive for the efficiency of the energy feed.
Gemäß einer Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem die Erzeugernetzmessgrößen-Empfangsvorrichtung ausgelegt ist zum Empfangen von Erzeugernetzmessgrößen mehrerer Sub-Erzeugernetze.According to one embodiment of the invention, there is provided an energy portal in which the generator grid measurer is adapted to receive generator grid metrics of a plurality of subgenerator networks.
Auf diese Weise kann das Energieportal auch mehrere Erzeugernetze, die hier als Sub-Erzeugernetze bezeichnet werden, an einem Netzverknüpfungspunkt managen. Dies ist insbesondere dann relevant, wenn die mehreren Sub-Erzeugernetze geographisch unterschiedlich liegen, und beispielsweise bei Windparks einer unterschiedlichen Windsituation ausgesetzt sind.In this way, the energy portal can also manage multiple producer networks, referred to herein as subgenerator networks, at a network connection point. This is particularly relevant if the multiple sub-generation networks are geographically different, and are exposed to a different wind situation, for example, in wind farms.
Gemäß einer Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem die Betriebsparameter-Regelvorrichtung ausgelegt ist zum Steuern beziehungsweise Regeln von Betriebsparametern des Erzeugernetzes auf der Grundlage von jeweils notwendiger Blindleistungskompensation unterschiedlicher Sub-Erzeugernetze in Abhängigkeit der jeweils von den Sub-Erzeugernetzen bereitgestellten Energie.According to one embodiment of the invention, there is provided an energy portal in which the operating parameter control device is adapted to control operating parameters of the generating network based on respectively required reactive power compensation of different sub-generating networks depending on the respective energy provided by the sub-generating networks.
Auf diese Weise kann insbesondere eine Anpassung der notwendigen Blindleistungskompensation bei geographisch unterschiedlich gelegenen Sub-Erzeugungsnetzen erreicht werden, die auf Grund beispielsweise unterschiedlich langer Zuleitungen zu dem Netzverknüpfungspunkt unterschiedliche Reaktanzen aufweisen. Liegen bei diesen unterschiedlichen Reaktanzen auch noch geographisch bedingt unterschiedliche Windsituationen vor, so variiert die notwendige Blindleistungskompensation in der Abhängigkeit nicht nur vom Sub-Erzeugernetz, sondern auch von der dort vorherrschenden Windsituation, so dass eine entsprechend dynamische Anpassung der Blindleistungskompensation in Abhängigkeit der jeweils von den Sub-Erzeugernetzen bereitgestellten Energie vorgenommen werden kann.In this way, in particular an adaptation of the necessary reactive power compensation can be achieved with geographically different sub-generation networks, which have different reactances due to, for example, different lengths of leads to the network connection point. If, at these different reactances, different wind situations also exist geographically, the necessary reactive power compensation in the dependence varies not only from the subgenerator network but also from the prevailing wind situation there, so that a correspondingly dynamic adaptation of the reactive power compensation depending on the respective Sub-generation networks provided energy can be made.
Gemäß einer Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem die Einspeisefaktoren-Empfangsvorrichtung zum wiederholten beziehungsweise zyklischen oder dynamischen Empfangen von vorgebbaren Einspeisefaktoren eines Betreibers des Energieverteilungsnetzes ausgelegt ist.According to one embodiment of the invention, an energy portal is provided in which the feed-factor receiving device is designed for the repeated or cyclic or dynamic reception of predefinable feed-in factors of an operator of the energy distribution network.
Auf diese Weise kann das Erzeugernetz beziehungsweise die mehreren Sub-Erzeugernetze dynamisch an die veränderte Einspeisefaktoren des Betreibers des Energieverteilungsnetzes angepasst werden, ohne dass die Gefahr besteht, bei wechselnden Einspeisefaktoren mit den Betriebsparametern den erlaubten Einspeisefaktorenbereich zu verlassen und damit einer Abschaltung des Erzeugernetzes beziehungsweise der mehreren Sub-Erzeugernetze zu entgehen.In this way, the generator network or the plurality of sub-generator networks can be dynamically adapted to the changed feed factors of the operator of the power distribution network, without the risk to leave the permitted feed factor range with changing feed factors with the operating parameters and thus a shutdown of the generator network or more Escape sub-producer networks.
Gemäß einer beispielhaften Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem die Erzeugernetzmessgrößen-Empfangsvorrichtung ausgelegt ist zum Empfangen von herstellerspezifischen Messgrößen eines Erzeugernetzes.According to an exemplary embodiment of the invention, an energy portal in which the generator set measurement quantity receiving device is designed to receive manufacturer-specific measured variables of a generator network.
Da sich in einem Erzeugernetz Komponenten bzw. Baugruppen unterschiedlicher Hersteller befinden können, beziehungsweise bei unterschiedlichen Sub-Erzeugernetzen diese von unterschiedlichen Herstellern dominiert sein können, kann mit einer derartigen Erzeugernetzmessgrößen-Empfangsvorrichtung dynamisch auf die herstellerspezifischen Messgrößen eingegangen werden können, die beispielsweise unterschiedliche Datenformate sowie unterschiedliche Bezugsgrößen aufweisen können. Insbesondere können die Messgrößen beispielsweise auch in unterschiedlichen Messintervallen vorliegen beziehungsweise Formate aufweisen, die herstellerspezifisch ausgelegt sind, so dass mit einer derartigen Erzeugernetzmessgrößen-Empfangsvorrichtung auch derartige Unterschiede aufgefangen werden können. Dies kann beispielsweise mit unterschiedlichen herstellerspezifischen Programmelementen realisiert werden, bzw. mit einer Datenbank mit herstellerspezifischen Datensätzen, die als Grundlage für eine weitere Verarbeitung dienen können. Gemäß einer Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem die Prognoseinformations-Empfangsvorrichtung ausgelegt ist zum Empfangen von Information aus einer Gruppe von Prognoseinformation, wobei die Gruppe aus einer Bedarfsprognoseinformation, einer Einspeisehistorieprognoseinformation, einer Leistungsprognose, einer Arbeitsprognose und einer Wetterprognoseinformation besteht.Since components or modules of different manufacturers can be located in a generator network or, in the case of different sub-generator networks, these can be dominated by different manufacturers, the generator-specific measured variables can be dynamically entered into with such a generator network measurement receiver, for example, different data formats and different Reference variables may have. In particular, the measured variables can also be present, for example, in different measuring intervals or have formats that are designed manufacturer-specifically, so that such differences can also be compensated with such a generator set measuring quantity receiving device. This can be realized, for example, with different manufacturer-specific program elements, or with a database with manufacturer-specific data records, which can serve as a basis for further processing. According to one embodiment of the invention, there is provided an energy portal in which the forecast information receiving apparatus is configured to receive information from a group of forecast information, the group consisting of demand forecasting information, feed-in history forecasting information, power forecasting, work forecasting, and weather forecasting information.
Auf diese Weise kann das Energieportal auf eine bevorstehende Änderung der Energieerzeugung auf der Grundlage einer prognostizierten Änderung reagieren. Insbesondere können entsprechende Vorbereitungen beziehungsweise Anpassungen vorgenommen werden, die beispielsweise auf einen geänderten Bedarf schnell reagieren können. Analog kann aus der Einspeisehistorie eine Prognose hergeleitet werden, auf Grund der eine geänderte beziehungsweise Energiebereitstellung vorgenommen werden kann. Bei wetterabhängigen Energieerzeugungsnetzen, insbesondere bei Windkraftanlagen ist die Einspeiseprognose eine wichtige Information, auf Grund der, der Rahmen einer möglichen Energieerzeugung in der nahen bis mittleren Zukunft abgeschätzt werden kann. Die unterschiedlichen Prognoseinformationen können selbstverständlich auch kombiniert berücksichtigt und verarbeitet werden.In this way, the energy portal can respond to an impending change in power generation based on a predicted change. In particular, appropriate preparations or adjustments can be made, which can react quickly, for example, to a changed need. Similarly, a prognosis can be derived from the feed-in history, on the basis of which a modified or energy provision can be made. In weather-dependent power generation networks, especially in wind power plants, the feed-in forecast is an important piece of information on the basis of which the scope of possible energy production in the near to medium future can be estimated. Of course, the different prognosis information can also be considered and processed in combination.
Gemäß einer Ausführungsform der Erfindung wird ein Energieportal bereitgestellt, bei dem das Erzeugernetz wenigstens einen Teil Winderzeugungskomponenten aufweist, wobei die Erzeugernetzmessgrößen-Empfangsvorrichtung ausgelegt ist zum Empfangen von Windenergieanlagen-Messgrößen.According to one embodiment of the invention, an energy portal is provided in which the generator grid has at least a portion of wind generating components, the generator grid measuring apparatus being configured to receive wind turbine measured quantities.
Auf diese Weise kann insbesondere auf die besonderen bei Windenergieanlagen vorliegenden Messgrößen eingegangen werden um eine entsprechende Regelung beziehungsweise Steuerung der Betriebsparameter vornehmen zu können.In this way, it is possible in particular to discuss the particular measured variables present in wind turbines in order to be able to carry out a corresponding regulation or control of the operating parameters.
Gemäß einer Ausführungsform der Erfindung wird ein Verfahren bereitgestellt zur Einhaltung von Einspeisefaktoren eines Energieverteilungsnetzbetreibers bei einer Energieeinspeisung aus einem Erzeugernetz in einer Energieverteilungsnetz, wobei das Verfahren umfasst: Empfangen von vorgebbaren Einspeisefaktoren eines Energieverteilungsnetzbetreibers, Empfangen von Messgrößen eines Erzeugernetzes, Empfangen von Prognoseinformation, Auswerten der Messgrößen, der Einspeisefaktoren und der Prognoseinformation, und Steuern beziehungsweise Regeln von Betriebsparametern des Erzeugernetzes auf der Grundlage der ausgewerteten Messgrößen, Einspeisefaktoren und Prognoseinformation mit den Einspeisefaktoren als Regelgröße.According to one embodiment of the invention, a method is provided for compliance with feed-in factors of an energy distribution system operator when feeding energy from a generator network in an energy distribution network, the method comprising: receiving predeterminable feed-in factors of an energy distribution system operator, receiving measurements of a generator network, receiving prognosis information, evaluating the measured variables , the feed factors and the forecast information, and controlling or regulating operating parameters of the generator network on the basis of the evaluated measured variables, feed factors and forecast information with the feed factors as the controlled variable.
Auf diese Weise kann ein Verfahren bereitgestellt werden, das die Einhaltung von Einspeisefaktoren eines Energieverteilungsnetzbetreibers einhalten kann, um auf diese Weise eine optimiertere Energieeinspeisung vornehmen zu können, um nicht der Gefahr zu unterliegen, dass das Erzeugernetz beziehungsweise Sub-Erzeugernetze seitens des Energieverteilungsnetzbetreibers vom Netz getrennt werden und auf diese Weise keine Energie mehr in das Versorgungsnetz einspeisen können.In this way, a method can be provided which can comply with the feed-in factors of an energy distribution system operator, in order to be able to carry out a more optimized energy supply in order not to run the risk of disconnecting the producer network or sub-producer networks from the grid by the energy distribution system operator and in this way can no longer feed energy into the supply network.
Gemäß einer Ausführungsform der Erfindung wird ein Computerprogramm bereitgestellt, welches, wenn es durch einen Prozessor ausgeführt wird, ausgelegt ist, um das Verfahren zur Einhaltung von Einspeisefaktoren eines z. B Energieverteilungsnetzbetreibers durchzuführen.According to one embodiment of the invention, a computer program is provided which, when executed by a processor, is adapted to implement the method of maintaining feed factors of e.g. B energy distribution system operator.
Auf diese Weise können die unterschiedlichen angegebenen Schritte des Verfahrens zur Einhaltung von Einspeisefaktoren eines Energieverteilungsnetzbetreibers über Software beziehungsweise Programmbausteine ausgeführt werden, um auf diese Weise eine Implementierbarkeit auf unterschiedlichen Rechnerplattforen durchführen zu können.In this way, the different specified steps of the method for compliance with feed-in factors of an energy distribution network operator can be executed via software or program modules, in order to be able to implement implementability on different computer platform forums in this way.
Gemäß einer Ausführungsform der Erfindung wird ein computerlesbares Medium bereitgestellt, auf dem das erfindungsgemäße Computerprogramm gespeichert ist.According to one embodiment of the invention, a computer-readable medium is provided on which the computer program according to the invention is stored.
Gemäß einer Ausführungsform der Erfindung wird eine Verwendung des Verfahrens bzw. der Vorrichtung zur Einhaltung von Einspeisefaktoren eines Energieverteilungsnetzbetreibers in einem Energieerzeugungsnetz angegeben mit wenigstens einem Teil Windenergieerzeugungskomponenten, wobei die Prognoseinformation eine Wetterprognose umfasst.According to one embodiment of the invention, a use of the method or the device for maintaining feed-in factors of an energy distribution system operator in one A power generation network specified with at least a portion of wind power generation components, the forecast information comprising a weather forecast.
Die einzelnen angegebenen Merkmale können selbstverständlich auch untereinander kombiniert werden, wodurch sich zum Teil auch vorteilhafte Wirkungen einstellen können, die über die Summe der Einzelwirkungen hinausgehen.Of course, the individual characteristics given may also be combined with one another, which may in some cases also result in advantageous effects which exceed the sum of the individual effects.
Diese und andere Aspekte der vorliegenden Erfindung werden durch die Bezugnahme auf die hiernach beschriebenen beispielhaften Ausführungsformen erläutert und verdeutlicht.These and other aspects of the present invention are illustrated and clarified by reference to the exemplary embodiments hereinafter described.
Kurze Beschreibung der ZeichnungenBrief description of the drawings
Beispielhafte Ausführungsformen werden im Folgenden mit Bezugnahme auf die folgenden Zeichnungen beschrieben.Exemplary embodiments will be described below with reference to the following drawings.
Detaillierte Beschreibung beispielhafter AusführungsformenDetailed description of exemplary embodiments
Anhand von
Das Energieportal weist ferner eine Auswertevorrichtung
Hierbei sei verstanden, dass die in
Analog der Komponenten
Mit Bezugnahme auf
Die in
In
Wird beispielsweise das Umspannwerk
Wenn jedoch einer der Windparks beziehungsweise der Sub-Energieerzeugungsnetze
Zum Erreichen eines vorgegebenen Leistungsfaktors an einem Netzverknüpfungspunkt
Vor dem Hintergrund dieser Betrachtungen ist es daher erforderlich die elektrischen Verhaltensweisen der einspeisenden Windparks im Umspannwerk zu messen. Die einspeisenden Windparks haben ihre Netzverknüpfungspunkte
Zur direkten Vermarktung von elektrischer Energie ist es erforderlich zu bestimmten Tageszeiten die Strommenge zu prognostizieren. Hierzu ist es erforderlich Informationen an dem Netzverknüpfungspunkt entgegen zu nehmen, zu verarbeiten, zu versenden und gegebenenfalls Regeleingriffe vorzunehmen. Zu diesem Zwecke kann beispielsweise über eine oder mehrere externe Datenbank
In dem Dokumentationsmodul
Zusammenfassend lässt sich die Funktion des Energieportals so beschreiben, dass eine Messwerterfassung der elektrischen Größen bezüglich aller relevanten Netzverknüpfungspunkte vorgenommen wird und diese Messwerte bei Bedarf über beliebige Zeiträume dokumentiert werden. Diese Messwerte sind beispielsweise der Strom und die Spannung an den Netzverknüpfungspunkten. Aus diesen Größen können alle relevanten elektrischen Einheiten errechnet werden.In summary, the function of the energy portal can be described in such a way that a measurement value recording of the electrical quantities is made with respect to all relevant network connection points and these measured values are documented over any periods of time if required. These measured values are, for example, the current and the voltage at the network connection points. From these quantities all relevant electrical units can be calculated.
Darüber hinaus können von dem Energieportal Signalgröße zur Leistungsreduzierung vom z, B. Verteilnetzbetreiber sowie der Signalgrößen zum Leistungsfaktor vom z. B. Verteilnetzbetreiber entgegengenommen werden und eine entsprechende Rückmeldung der Signalgrößen zur Leistungsreduzierung beziehungsweise des Leistungsfaktors an den Verteilnetzbetreibers gegeben werden. Ferner können die Signalgrößen zur Leistungsreduzierung beziehungsweise zum Leistungsfaktor an die einspeisenden Sub-Netzwerke gegeben werden sowie entsprechende Regelbefehle an die stationäre Blindleistungseinrichtung
Die Leistungsregelung kann dabei als ein ständiger Abgleich zwischen der Soll- und der Ist-Leistung durch das Energieportal erfolgen. Bei Anforderung einer Leistungsreduzierung durch den z. B. Verteilnetzbetreiber können die Leistungen der Einsgeiser auf Einhaltung der Leistungsreduzierung überwacht werden. Sofern ein oder mehrere Einsgeiser der Leistungsreduzierung nicht folgen, und dadurch ein Regelverstoß, d. h. eine Vertragsverletzung vorliegt, können die entsprechenden Einsgeiser der Leistungsreduzierung am Netzverknüpfungspunkt des Verteilnetzbetreibers reduziert werden, so dass die durch die angeforderte Leistungsreduzierung verminderte Maximalleistung des Verteilnetzbetreibers eingehalten wird. Dies kann auch dadurch erfolgen, dass beispielsweise das entsprechende Sub-Energieerzeugungsnetz
Zeitgleich kann eine Aufzeichnung der zusätzlich reduzierten Leistungen als Wertermittlung mit einem Zeitstempel der zusätzlichen Leistungsreduzierung weiterer Einspeiser oder des vertragsverletzenden Einsgeisers aufgezeichnet werden, um auf diese Weise eine entsprechende Verrechnung der geschuldeten elektrischen Arbeit beziehungsweise der geschuldeten Minderung der elektrischen Arbeit vornehmen zu können. Dies kann durch ein entsprechendes Verrechnungstool des Energieportals vorgenommen werden. Für eine Blindleistungsregelung kann ein ständiger Abgleich der Soll- und Istwerte des Leistungsfaktors am Netzverknüpfungspunkt des Verteilnetzbetreibers und dem Netzverknüpfungspunkten der Einspeiser erfolgen. Zur Einhaltung des Leistungsfaktors kann das Energieportal ständig durch eine entsprechende Werteausgabe die Masterrechner der Einspeiser regeln und den Blindleistungsbedarf überwachen. Zur Einhaltung des Leistungsfaktors kann bei Bedarf die Ansteuerung stationärer Blindleistungsbaugruppen (kontinuierlich sowie stufenweise) sowie deren Überwachung am Netzverknüpfungspunkt erfolgen. Sofern ein oder mehrere Einspeiser beispielsweise nicht den geforderten Blindleistungsbedarf erbringen, so kann beispielsweise ein Regelverstoß, d. h. eine Vertragsverletzung vorliegen, so dass weitere Einspeiser zur Veränderung des Blindleistungsbedarfes aufgefordert werden können. Sofern eine relevante Blindleistungserbringung eines Einspeisers zur Kompensation eines Regelverstoßes eines anderen vorliegt, werden die Blindleistungsbereitstellungen mit einem Zeitstempel versehen und dokumentiert, so dass eine anschließende Verrechnung der unterschiedlichen Einspeiser erfolgen kann. Eine derartige Verrechnung der geschuldeten elektrischen Arbeit kann beispielsweise durch ein entsprechendes Verrechnungstool am Energieportal erfolgen.At the same time, a record of the additionally reduced services can be recorded as value determination with a time stamp of the additional power reduction of further feeders or the infringer infringing the contract, in order to be able to make a corresponding set-off of the owed electrical work or the due reduction of the electrical work. This can be done by a corresponding accounting tool of the energy portal. For reactive power control, a constant comparison of the setpoint and actual values of the power factor at the grid connection point of the distribution system operator and the grid connection points of the feeders can be carried out. In order to comply with the power factor, the energy portal can constantly regulate the master computers of the feeders by means of an appropriate value output and monitor the reactive power demand. If required, the control of stationary reactive power modules (continuously and stepwise) as well as their monitoring at the grid connection point can be carried out to maintain the power factor. For example, if one or more feeders do not provide the required reactive power demand, for example, a rule violation, i. H. there is a breach of contract, so that additional feeders can be asked to change the reactive power demand. If there is a relevant reactive power provision of one feeder to compensate for a rule violation of another, the reactive power provisions are provided with a time stamp and documented, so that a subsequent settlement of the different feeders can take place. Such a settlement of the owed electrical work can be done for example by a corresponding Verrechnungstool the energy portal.
Ferner können die elektrischen Leistungen der Einspeiser vom Energieportal aufgezeichnet werden. Bei einer Übermittlung von Einflussgrößen, beispielsweise Windgeschwindigkeiten, zur Energieerzeugung durch den Masterrechner der Erzeugungsanlagen können durch das Energieportal Tendenzrechnungen erfolgen. Diese Tendenzrechnungen lassen einen Rückschluss auf die tatsächliche Leistungsfähigkeit der Energieerzeugungsanlage zu.Furthermore, the electrical power of the feeders can be recorded by the energy portal. When transmitting influencing variables, for example wind speeds, for the generation of energy by the master computer of the production plants, the energy portal can make calculations for the future. These trend calculations allow a conclusion on the actual performance of the power generation plant.
Über ein Prognosetool kann beispielsweise eine Prognose der Tagesproduktion durch die Berücksichtigung durch Windvorhersagen erfolgen. Darüber hinaus kann beispielsweise eine Verfügbarkeit der Erzeugungsanlagen aus beispielsweise historischen Daten der Produktionen erfolgen, um eine entsprechende Prognose zu erstellen. Dabei können derartige Prognosen sowohl automatisch als auch manuell beeinflusst beziehungsweise korrigiert für den Steuerungs- beziehungsweise Regelmechanismus verwendet werden. Die entsprechenden Prognosen können dabei beispielsweise auch (beispielsweise in genormten Dateiformaten) weiter gesendet werden, um diese beispielsweise einen Stromhändler zur Verfügung zu stellen.By means of a forecasting tool, for example, a forecast of the daily production can be made by taking into account wind forecasts. In addition, for example, an availability of the production facilities from, for example, historical data of the productions can be made in order to create a corresponding forecast. In this case, such predictions can be both automatically and manually influenced or corrected used for the control or regulating mechanism. The corresponding forecasts can, for example, also be forwarded (for example in standardized file formats) in order, for example, to make these available to a power trader.
Es sollte angemerkt werden, dass die vorliegende Erfindung neben der Anwendung in Windkraftanlagen auch beispielsweise bei Photovoltaik- oder Wasserkraftanlagen angewendet werden kann.It should be noted that the present invention, in addition to application in wind turbines, can also be used for example in photovoltaic or hydropower plants.
Es sei angemerkt, dass der Begriff „umfassend” weitere Elemente oder Verfahrensschritte nicht ausschließt, ebenso wie der Begriff „ein” und „eine” mehrere Elemente und Schritte nicht ausschließt.It should be noted that the term "comprising" does not exclude other elements or method steps, just as the term "a" and "an" does not exclude multiple elements and steps.
Die verwendeten Bezugszeichen dienen lediglich zur Erhöhung der Verständlichkeit und sollen keinesfalls als einschränkend betrachtet werden, wobei der Schutzbereich der Erfindung durch die Ansprüche wiedergegeben wird.The reference numerals used are for convenience of reference only and are not to be considered as limiting, the scope of the invention being indicated by the claims.
ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- DE 602004010281 T2 [0007] DE 602004010281 T2 [0007]
Zitierte Nicht-PatentliteraturCited non-patent literature
- Netzanschlussrichtlinien sowie die Netzeinspeiseverträge, sowie das EEG (Erneuerbare Energien Gesetz01.01.2009) [0003] Grid connection guidelines and the grid feed-in contracts, as well as the EEG (Renewable Energies Act01.01.2009) [0003]
- Erneuerbare Energien Gesetz (EEG) [0005] Renewable Energy Law (EEG) [0005]
-
Windkraftjournal, Ausgabe 1/2007, Seiten 58 bis 61, beziehungsweise Ausgabe 4/2008, Seiten 40 bis 41 [0006] Windkraftjournal, issue 1/2007, pages 58 to 61, and issue 4/2008,
pages 40 to 41 [0006]
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010006142A DE102010006142A1 (en) | 2010-01-29 | 2010-01-29 | Energy portal for controlling and/or regulating energy supply in power distribution network of wind power plant, has control device controlling and/or regulating parameters as variables based on variables, factors and information |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010006142A DE102010006142A1 (en) | 2010-01-29 | 2010-01-29 | Energy portal for controlling and/or regulating energy supply in power distribution network of wind power plant, has control device controlling and/or regulating parameters as variables based on variables, factors and information |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102010006142A1 true DE102010006142A1 (en) | 2011-08-04 |
Family
ID=44315931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102010006142A Withdrawn DE102010006142A1 (en) | 2010-01-29 | 2010-01-29 | Energy portal for controlling and/or regulating energy supply in power distribution network of wind power plant, has control device controlling and/or regulating parameters as variables based on variables, factors and information |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102010006142A1 (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102013106393A1 (en) | 2012-06-22 | 2013-12-24 | Sma Solar Technology Ag | Network planning and management |
DE102012012750A1 (en) * | 2012-06-27 | 2014-01-02 | Konrad Marek | Method for enhancing weather forecasting and climate prediction calculations on mainframe computers, involves performing weather forecast and/or climate prediction calculation, and providing target values to control wind power station |
DE102012105721A1 (en) * | 2012-06-28 | 2014-01-02 | Sma Solar Technology Ag | Controlling a plurality of inverters connected to a common grid transfer point |
WO2014071948A1 (en) * | 2012-09-17 | 2014-05-15 | Vestas Wind Systems A/S | A method of determining individual set points in a power plant controller, and a power plant controller |
DE102013009793A1 (en) | 2013-06-12 | 2014-12-18 | Konrad Marek | Improvement of weather forecasts - and ocean - atmosphere - calculation models |
WO2015018613A1 (en) | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Method for controlling wind turbines |
DE102013215398A1 (en) * | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Method for controlling wind turbines |
WO2015022206A1 (en) * | 2013-08-15 | 2015-02-19 | Wobben Properties Gmbh | Method for feeding electric power into a supply grid |
WO2015018509A3 (en) * | 2013-08-05 | 2015-04-09 | Technische Universität Dortmund | System and method for controlling the frequency stability and/or voltage stability of the distribution network |
DE202017100343U1 (en) | 2017-01-24 | 2017-02-27 | EWC Weather Consult GmbH | System for generating real-time information and forecasting of power regulations due to network bottlenecks in a power grid |
EP3352326A1 (en) | 2017-01-24 | 2018-07-25 | Ubimet GmbH | System for generating real-time information and forecasting power rules due to network bottlenecks in a power supply network |
DE102017101265A1 (en) | 2017-01-24 | 2018-07-26 | UBIMET GmbH | System for generating real-time information and forecasting of power regulations due to network bottlenecks in a power grid |
DE102017120946A1 (en) * | 2017-09-11 | 2019-03-14 | Innogy Se | Control and / or regulation of power generation plants |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE602004010281T2 (en) | 2003-08-20 | 2008-10-02 | New Energy Options, Inc., Littleton | METHOD AND SYSTEM FOR PREDICTING SOLAR ENERGY PRODUCTION |
-
2010
- 2010-01-29 DE DE102010006142A patent/DE102010006142A1/en not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE602004010281T2 (en) | 2003-08-20 | 2008-10-02 | New Energy Options, Inc., Littleton | METHOD AND SYSTEM FOR PREDICTING SOLAR ENERGY PRODUCTION |
Non-Patent Citations (5)
Title |
---|
Erneuerbare Energien Gesetz (EEG) |
Netzanschlussrichtlinien sowie die Netzeinspeiseverträge, sowie das EEG (Erneuerbare Energien Gesetz01.01.2009) |
PFEIL, F.: Das EP-Grid, ein Energieportal für ein 100MW Umspannwerk * |
ROSIN,M.: Erzeugungsmanagement - Herausforderung für den Netzbetreiber. ETG-Tagung>Technische Innovation in Verteilungsnetzen< Würzburg, 01.-02.03.2005. Im Internet: http://www.blitzschutz-blitzforschung.de/de/fg/ETG/Exklusiv-Mitglieder/verteilungsnetze2005/Documents/MCMS/42rosin.pdf [abger. am 01.12.2010] * |
Windkraftjournal, Ausgabe 1/2007, Seiten 58 bis 61, beziehungsweise Ausgabe 4/2008, Seiten 40 bis 41 |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10247537B2 (en) | 2012-06-22 | 2019-04-02 | Sma Solar Technology Ag | Grid diagram creation and operation control |
WO2013189967A2 (en) | 2012-06-22 | 2013-12-27 | Sma Solar Technology Ag | Network diagram creation and management |
CN104396111A (en) * | 2012-06-22 | 2015-03-04 | 艾思玛太阳能技术股份公司 | Network diagram creation and management |
WO2013189967A3 (en) * | 2012-06-22 | 2014-02-20 | Sma Solar Technology Ag | Network diagram creation and management |
CN104396111B (en) * | 2012-06-22 | 2017-03-29 | 艾思玛太阳能技术股份公司 | Electrical network figure builds and runs guiding |
DE102013106393A1 (en) | 2012-06-22 | 2013-12-24 | Sma Solar Technology Ag | Network planning and management |
DE102012012750A1 (en) * | 2012-06-27 | 2014-01-02 | Konrad Marek | Method for enhancing weather forecasting and climate prediction calculations on mainframe computers, involves performing weather forecast and/or climate prediction calculation, and providing target values to control wind power station |
US10027123B2 (en) | 2012-06-28 | 2018-07-17 | Sma Solar Technology Ag | Control of a plurality of inverters connected to a common grid connection point |
DE102012105721A1 (en) * | 2012-06-28 | 2014-01-02 | Sma Solar Technology Ag | Controlling a plurality of inverters connected to a common grid transfer point |
DE102012105721B4 (en) | 2012-06-28 | 2017-02-09 | Sma Solar Technology Ag | Controlling a plurality of inverters connected to a common grid transfer point |
US9556852B2 (en) | 2012-09-17 | 2017-01-31 | Vestas Wind Systems A/S | Method of determining individual set points in a power plant controller, and a power plant controller |
WO2014071948A1 (en) * | 2012-09-17 | 2014-05-15 | Vestas Wind Systems A/S | A method of determining individual set points in a power plant controller, and a power plant controller |
EP2896102B1 (en) | 2012-09-17 | 2017-02-22 | Vestas Wind Systems A/S | A method of determining individual set points in a power plant controller, and a power plant controller |
DE102013009793A1 (en) | 2013-06-12 | 2014-12-18 | Konrad Marek | Improvement of weather forecasts - and ocean - atmosphere - calculation models |
WO2015018509A3 (en) * | 2013-08-05 | 2015-04-09 | Technische Universität Dortmund | System and method for controlling the frequency stability and/or voltage stability of the distribution network |
DE102013215398A1 (en) * | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Method for controlling wind turbines |
RU2662238C2 (en) * | 2013-08-06 | 2018-07-25 | Воббен Пропертиз Гмбх | Method for controlling wind turbines |
US10724500B2 (en) | 2013-08-06 | 2020-07-28 | Wobben Properties Gmbh | Method for controlling wind power plants |
US10320315B2 (en) | 2013-08-06 | 2019-06-11 | Wobben Properties Gmbh | Method for controlling wind turbines |
WO2015018612A1 (en) | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Method for controlling wind power plants |
AU2014304829B2 (en) * | 2013-08-06 | 2017-08-10 | Wobben Properties Gmbh | Method for controlling wind power plants |
AU2014304830B2 (en) * | 2013-08-06 | 2017-08-31 | Wobben Properties Gmbh | Method for controlling wind turbines |
AU2014304830C1 (en) * | 2013-08-06 | 2018-04-12 | Wobben Properties Gmbh | Method for controlling wind turbines |
DE102013215396A1 (en) * | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Method for controlling wind turbines |
CN105453368A (en) * | 2013-08-06 | 2016-03-30 | 乌本产权有限公司 | Method for controlling wind turbines |
WO2015018613A1 (en) | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Method for controlling wind turbines |
US10132294B2 (en) | 2013-08-15 | 2018-11-20 | Wobben Properties Gmbh | Method for feeding electric power into a supply grid |
WO2015022206A1 (en) * | 2013-08-15 | 2015-02-19 | Wobben Properties Gmbh | Method for feeding electric power into a supply grid |
DE102017101265A1 (en) | 2017-01-24 | 2018-07-26 | UBIMET GmbH | System for generating real-time information and forecasting of power regulations due to network bottlenecks in a power grid |
EP3352326A1 (en) | 2017-01-24 | 2018-07-25 | Ubimet GmbH | System for generating real-time information and forecasting power rules due to network bottlenecks in a power supply network |
DE202017100343U1 (en) | 2017-01-24 | 2017-02-27 | EWC Weather Consult GmbH | System for generating real-time information and forecasting of power regulations due to network bottlenecks in a power grid |
US10581250B2 (en) | 2017-01-24 | 2020-03-03 | UBIMET GmbH | System for generating real-time information and forecasts on power output regulation due to grid congestion in at least one power grid |
DE102017120946A1 (en) * | 2017-09-11 | 2019-03-14 | Innogy Se | Control and / or regulation of power generation plants |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102010006142A1 (en) | Energy portal for controlling and/or regulating energy supply in power distribution network of wind power plant, has control device controlling and/or regulating parameters as variables based on variables, factors and information | |
EP2084801B1 (en) | Method for operating a low-voltage electrical system | |
EP2467920B1 (en) | Power regulation for solar power station | |
EP2495838B1 (en) | Method and device for stabilising the power supply operation of an energy supply network | |
EP3336995B1 (en) | Method, control device and system for determining state values for describing operating states in a subnetwork of an energy supply network | |
EP2463980B1 (en) | Operation of an energy producer in an energy supply network | |
EP3031112B1 (en) | System and method for controlling the transmission grid frequency and/or voltage from the distribution network | |
DE102015201085A1 (en) | Method for controlling an electrical power distribution network | |
DE102010056456A1 (en) | Wind farm and method for operating a wind farm | |
WO2018122405A1 (en) | Method for controlling an electrical distribution network | |
DE102011106114A1 (en) | Method for distributing electrical energy in a power network having a plurality of distribution cells | |
DE102018001763A1 (en) | Method and system for servicing a wind turbine from a group of wind turbines | |
EP3042428A1 (en) | Device and method for controlling the stability of a local network using an adjustable local network transformer | |
EP3092697B1 (en) | Method and control device for controlling an operating frequency of an energy source in an ac voltage network | |
DE102011122580B4 (en) | Method for operating an electrical supply network and associated control unit | |
DE102011078895A1 (en) | Energy network system useful for generating and transferring electrical energy between primary energy producers and consumers, comprises e.g. primary energy generating units, energy consumption units, and frequency control units | |
DE102010023113A1 (en) | System for dynamic regulation of regenerative energy generation installation with multiple energy generation units, has signal input for receiving pre-determined nominal value | |
DE102014101809A1 (en) | Method for controlling a regenerative power generation plant and regenerative power generation plant | |
AT514766B1 (en) | Method for stabilizing an energy distribution network | |
DE102016217748A1 (en) | Provision of primary control power | |
WO2020104450A1 (en) | Feed-in method for a wind power system, and wind power system | |
EP3621169A1 (en) | Isolated network and method for operating same | |
EP4022731B1 (en) | Method for operating an electrical storage station | |
DE102018124612A1 (en) | Control of a local network area to implement a local energy community with a timetable | |
EP2930812B1 (en) | Reactive power management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R016 | Response to examination communication | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20130801 |