DE102009035258A1 - Producing a three-dimensional object, comprises successively compacting layers of building material by electron beam, electromagnetic- or particle radiation, and introducing powdered materials into construction area by coating device - Google Patents
Producing a three-dimensional object, comprises successively compacting layers of building material by electron beam, electromagnetic- or particle radiation, and introducing powdered materials into construction area by coating device Download PDFInfo
- Publication number
- DE102009035258A1 DE102009035258A1 DE102009035258A DE102009035258A DE102009035258A1 DE 102009035258 A1 DE102009035258 A1 DE 102009035258A1 DE 102009035258 A DE102009035258 A DE 102009035258A DE 102009035258 A DE102009035258 A DE 102009035258A DE 102009035258 A1 DE102009035258 A1 DE 102009035258A1
- Authority
- DE
- Germany
- Prior art keywords
- section
- speed
- coater
- building material
- coating device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004566 building material Substances 0.000 title claims abstract description 44
- 238000000576 coating method Methods 0.000 title claims abstract description 40
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 239000011248 coating agent Substances 0.000 title claims abstract description 29
- 230000005855 radiation Effects 0.000 title claims abstract description 11
- 239000002245 particle Substances 0.000 title claims abstract description 8
- 238000010894 electron beam technology Methods 0.000 title claims abstract 4
- 239000012254 powdered material Substances 0.000 title 1
- 230000033001 locomotion Effects 0.000 claims abstract description 44
- 230000005670 electromagnetic radiation Effects 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 25
- 238000006073 displacement reaction Methods 0.000 claims description 14
- 230000001133 acceleration Effects 0.000 claims description 10
- 230000008859 change Effects 0.000 claims description 10
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 238000009826 distribution Methods 0.000 claims description 4
- 239000004035 construction material Substances 0.000 description 14
- 239000000463 material Substances 0.000 description 10
- 239000000843 powder Substances 0.000 description 9
- 230000008569 process Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 230000006870 function Effects 0.000 description 2
- BUHVIAUBTBOHAG-FOYDDCNASA-N (2r,3r,4s,5r)-2-[6-[[2-(3,5-dimethoxyphenyl)-2-(2-methylphenyl)ethyl]amino]purin-9-yl]-5-(hydroxymethyl)oxolane-3,4-diol Chemical compound COC1=CC(OC)=CC(C(CNC=2C=3N=CN(C=3N=CN=2)[C@H]2[C@@H]([C@H](O)[C@@H](CO)O2)O)C=2C(=CC=CC=2)C)=C1 BUHVIAUBTBOHAG-FOYDDCNASA-N 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000009969 flowable effect Effects 0.000 description 1
- 238000005469 granulation Methods 0.000 description 1
- 230000003179 granulation Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C64/00—Additive manufacturing, i.e. manufacturing of three-dimensional [3D] objects by additive deposition, additive agglomeration or additive layering, e.g. by 3D printing, stereolithography or selective laser sintering
- B29C64/10—Processes of additive manufacturing
- B29C64/141—Processes of additive manufacturing using only solid materials
- B29C64/153—Processes of additive manufacturing using only solid materials using layers of powder being selectively joined, e.g. by selective laser sintering or melting
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Herstellen eines dreidimensionalen Objektes durch aufeinanderfolgendes Verfestigen von Schichten eines mittels elektromagnetischer Strahlung oder Teilchenstrahlung verfestigbaren Aufbaumaterials, an den dem jeweiligen Querschnitt des Objektes entsprechenden Stellen, wobei während eines Beschichtungsvorganges pulverartiges Material mittels einer im Wesentlichen horizontal verfahrbaren Beschichtereinrichtung aus einem Dosierbereich in einem Baubereich verlagert wird.The The invention relates to a method for producing a three-dimensional Object by successively solidifying layers of a means solidify electromagnetic radiation or particle radiation Construction material, at the respective cross section of the object corresponding places, wherein during a coating process powdery material by means of a substantially horizontal movable coating device from a dosing in one Construction area is relocated.
Aus
dem Stand der Technik ist ein Verfahren zum Herstellen eines dreidimensionalen
Objektes durch aufeinanderfolgendes Verfestigen von Schichten eines
pulverartigen Materials bekannt, vgl.
Der
Erfindung liegt die Aufgabe zugrunde ein Verfahren zum Herstellen
eines dreidimensionalen Objektes mit den Merkmalen des Oberbegriffes
des Anspruches 1 derart weiterzubilden, dass der Aufbauprozess des
Objektes zeitlich schneller durchgeführt werden kann. Ferner
liegt die Aufgabe zugrunde, trotz des schnelleren Aufbaus des Objektes,
hohe Genauigkeiten am Objekt zu erzielen und gleichzeitig dies mit
einfachen Mitteln zu erreichen.Of the
Invention is the object of a method for manufacturing
a three-dimensional object with the characteristics of the generic term
of
Diese
Aufgabe wird durch die Merkmale des Anspruches 1 sowie der Vorrichtung
gemäß Anspruch 15 gelöst. Vorteilhafte
Weiterbildungen der Erfindung ergeben sich aus den Unteransprüchen 2–14.These
The object is achieved by the features of
Als Kern der Erfindung wird es angesehen, dass die Beschichtereinrichtung innerhalb eines Beschichtungsvorganges zum Auftrag einer Pulverlage mit wenigstens zwei unterschiedlichen Geschwindigkeiten verfahren wird, wobei der Beschichtungsvorgang sowohl eine zum Baubereich gerichtete Hinbewegung als auch eine Zurückbewegung der Beschichtereinrichtung umfasst und die Beschichtereinrichtung in wenigstens zwei Streckenabschnitten innerhalb der Hin- oder innerhalb der Zurückbewegung mit unterschiedlichen Geschwindigkeiten verfahren wird. Dadurch, dass die Beschichtereinrichtung während des Beschichtungsvorganges über wenigstens zwei Streckenabschnitte der Hin- oder der Zurückbewegung mit unterschiedlichen Geschwindigkeiten (mittlere Geschwindigkeit) verfahren wird, kann die Geschwindigkeit der Beschichtereinrichtung an die von der Beschichtereinrichtung zu leistenden Anforderungen des jeweiligen Streckenabschnittes angepasst werden.When At the heart of the invention it is considered that the coater within a coating process for applying a powder layer with at least two different speeds, the coating process being both directed to the construction sector Forward movement and a return movement of the coater and the coater in at least two sections within the outward or inward movement with different speeds. As a result of that the coater during the coating process over at least two sections of the way back or the return movement at different speeds (medium speed) can proceed, the speed of the coater to the requirements to be met by the coater be adapted to the respective section of the route.
Beispielsweise, wenn innerhalb der Hinbewegung die Beschichtereinrichtung an zwei Streckenabschnitten unterschiedliche Geschwindigkeiten aufweist, kann es ermöglicht werden, in einem ersten Streckenabschnitt, der bis zum Ende der Bauplattform reicht, eine geringere Geschwindigkeit zu fahren als in einem nachfolgenden Streckenabschnitt. Je langsamer die Beschichtungseinrichtung fährt, desto geringer ist die Gefahr, dass ein ungleichmäßiger Auftrag des Aufbaumaterials stattfindet. Insbesondere in Streckenabschnitten außerhalb des Baubereiches kann vorzugsweise eine relativ hohe Geschwindigkeit gefahren werden und während des Verfahrens der Beschichtereinrichtung über dem Baubereich eine relativ geringere Geschwindigkeit, da eine exakte ebene Auftragung des Baumaterials lediglich am Baubereich zum Erreichen eines genauen Objektes notwendig ist.For example, if within the forward movement, the coater on two Track sections have different speeds, it may be possible, in a first section of the route, which reaches to the end of the construction platform, a lower speed to drive than in a subsequent section. The slower the coating device moves, the less the danger that an uneven task of the Building material takes place. Especially in sections outside the construction area may preferably be a relative be driven high speed and during the procedure the coater over the construction area a relative lower speed, as an exact even application of the building material only at the construction area to reach an exact object is necessary.
Darüber hinaus hat es sich als vorteilhaft herausgestellt, die Beschichtereinrichtung in einem ersten Streckenabschnitt bis zum Bereich des zu verfestigten Querschnittes des Objektes eine erste Geschwindigkeit und in einem zweiten Streckenabschnitt, der im Wesentlichen dem zu verfestigten Querschnitts des Objektes entspricht, eine zweite Geschwindigkeit und in einem dritten Streckenabschnitt, der nach dem jeweiligen Querschnitt des Objektes beginnt und die Beschichtereinrichtung vom Objekt weg verfährt, eine dritte Geschwindigkeit aufweist, wobei die zweite Geschwindigkeit geringer ist als die erste und/oder die dritte Geschwindigkeit. Damit wird die Hinbewegung der Beschichtereinrichtung in wenigstens drei Streckenabschnitte unterteilt, wobei die erste das Pulver bis zum Objekt transportiert, die zweite Strecke das Pulver im Bereich des zu verfestigenden Objektes aufzieht und die dritte Schicht nach dem Bereich des Objektes die Beschichtereinrichtung vom Baubereich weg bewegt. Die Geschwindigkeit des zweiten Streckenabschnittes ist deshalb geringer zu wählen, da es in diesem Streckenabschnitt auf eine exakte Nivellierung des Baumaterials ankommt und diese durch langsameres Verfahren der Beschichtereinrichtung gewährleistet werden kann. Vorzugsweise ist die Geschwindigkeit des dritten Streckenabschnittes höher als die des ersten Streckenabschnittes. Da im ersten Streckenabschnitt noch mehr Baumaterial transportiert werden muss, soll die Geschwindigkeit dort geringer gewählt werden als im dritten Streckenabschnitt, so dass ein zuverlässiger Transport des Pulvermaterials gewährleistet wird. Im dritten Streckenabschnitt ist es dahingehend unproblematisch, die Beschichtereinrichtung schneller zu verfahren, da es dort weder auf eine gezielte Nivellierung des Baumaterials, noch auf einen derart zuverlässigen Transport des Pulvermaterials ankommt.About that In addition, it has proved to be advantageous, the coater in a first stretch to the area of the solidified Cross section of the object at a first speed and in one second stretch, which is substantially the solidified cross-section of the object corresponds to a second speed and in one third section of the track, which depends on the respective cross section of the Object begins and the coater moves away from the object, has a third speed, wherein the second speed is less than the first and / or the third speed. Thus, the forward movement of the coater in at least divided into three sections, the first being the powder up transported to the object, the second route the powder in the area of the object to be solidified and the third layer after the area of the object, the coater device from the construction sector moved away. The speed of the second stretch is therefore lower to choose, as it is in this section on an exact leveling of the building material arrives and this be ensured by slower procedure of the coater can. Preferably, the speed of the third stretch is higher than the first section of the route. Because in the first Section of the route requires even more building material to be transported, the speed should be chosen lower there than in the third stretch, leaving a more reliable Transport of the powder material is ensured. In the third Stretching section, it is unproblematic to that effect, the coater faster, because there is neither targeted leveling of the building material, nor on such a reliable transport the powder material arrives.
In Ausgestaltung der Erfindung erfährt die Beschichtereinrichtung zumindest in der zweiten Streckenhälfte des ersten Streckenabschnittes, insbesondere 2–50 mm vor dem zu verfestigenden Querschnitt des Objektes eine negative Beschleunigung oder stoppt dort zumindest für eine kurze Zeit (t = 0,1–3,0 s). Die zweite Streckenhälfte des ersten Streckenabschnittes, die vorzugsweise direkt dem zweiten Streckenabschnitt vorgelagert ist, dient zur „Beruhigung” des Baumaterials, insbesondere des pulverartigen Baumaterials. Dadurch, dass in der zweiten Streckenhälfte des ersten Streckenabschnittes die Beschichtereinrichtung eine Verzögerung erfährt, wird die kinetische Energie, die in das Baumaterial übertragen wird, reduziert und dadurch die Gefahr gemindert, dass trotz Geschwindigkeitswechsels(-reduktion) vom ersten zum zweiten Streckenabschnitt das Baumaterial unkontrolliert im Bereich des zweiten Streckenabschnittes „springt”. Dies kann insbesondere dann passieren, wenn die Beschichtereinrichtung vom Wechsel eines ersten Streckenabschnittes zu einem weiteren Streckenabschnitt zum Stillstand kommt. Es kann auch vorgesehen sein, dass die Geschwindigkeitsänderung der Beschichtereinrichtung von einem ersten in einen weiteren Streckenabschnitt kontinuierlich erfolgt, beispielsweise wird die Beschichtereinrichtung durch eine konstante Beschleunigung oder Verzögerung von einer ersten Geschwindigkeit eines ersten Streckenabschnittes in eine zweite Geschwindigkeit eines weiteren Streckenabschnittes verändert. Auch kann die Beschichtereinrichtung im dem Querschnitt des Objektes nachfolgenden Streckenabschnitt (z. B. 2–50 mm nach dem Objektquerschnitt) eine Beschleunigung, eine Verzögerung oder einen Stopp (Stillstand) erfahren.In an embodiment of the invention, the coater experiences at least in the second half of the first section, in particular 2-50 mm in front of the cross-section of the object to be solidified a negative acceleration movement or stop at least for a short time (t = 0.1-3.0 s). The second half of the first section of the route, which is preferably directly upstream of the second section, serves to "calm down" the building material, in particular the powdery building material. Characterized in that in the second half of the first stretch section of the coater experiences a delay, the kinetic energy that is transferred to the building material is reduced and thereby reduces the risk that despite speed change (-reduction) from the first to the second stretch of the building material uncontrolled in the area of the second stretch "jumps". This can happen in particular when the coater device comes to a standstill from the change of a first route section to a further route section. It can also be provided that the change in speed of the coater device takes place continuously from a first to a further section, for example, the coater is changed by a constant acceleration or deceleration from a first speed of a first section to a second section of another section. The coating device can also experience an acceleration, a deceleration or a stop (standstill) in the section of track following the cross-section of the object (eg 2-50 mm after the object cross-section).
Im Hinblick auf eine möglichst hohe Prozessgeschwindigkeit ist es vorteilhaft, wenn zusätzlich zur Geschwindigkeitsänderung innerhalb der Hin- oder Zurückbewegung die Geschwindigkeit zumindest in einem Streckenabschnitt der Hinbewegung geringer ist als die Geschwindigkeit bei einem Streckenabschnitt der Zurückbewegung. Ferner ist es vorteilhaft, wenn die Beschichtereinrichtung bei der Zurückfahrbewegung mit einer Geschwindigkeit verfahren wird, die im Wesentlichen der Geschwindigkeit des dritten Streckenabschnittes entspricht oder höher liegt. Beispielsweise kann es sich um eine Beschichtereinrichtung handeln, die nur in eine Verfahrrichtung Baumaterial transportiert und bei der Zurückfahrbewegung lediglich die Beschichtereinrichtung in ihre Ausgangsposition bringt, ohne dass sie dabei nach Art eines Rakels Pulvermaterial verlagert. Wenn dies der Fall ist, kann die Beschichtereinrichtung während der Zurückfahrbewegung eine Geschwindigkeit aufweisen, die gleich oder sogar höher liegt als die höchste Geschwindigkeit bei der Hinbewegung.in the With regard to the highest possible process speed It is advantageous if in addition to the speed change within the back and forth movement the speed is lower at least in a section of the forward movement as the speed at a section of the return movement. Furthermore, it is advantageous if the coating device in the Moving back motion at a speed which is essentially the speed of the third leg is equal to or higher. For example, it may be to act a coater, which only in one direction of travel Construction material transported and during the return movement only brings the coater in its original position, without that she moves it in the manner of a doctor blade powder material. If this is the case, the coater can during the return movement have a speed which is equal to or even higher than the highest speed on the way.
Ferner kann es vorgesehen sein, die Beschichtereinrichtung zumindest bereichsweise während der Zurückfahrbewegung aus ihrer horizontalen Beschichterebene anzuheben oder zu verschwenken. Dadurch, dass die Beschichtereinrichtung aus der horizontalen Beschichterebene der Hinbewegung angehoben oder „hochgeschwenkt” wird, kann bei der Zurückfahrbewegung der Beschichtereinrichtung eine Beeinflussung (Kontaktierung, Verwirbelung) des bei der Hinbewegung aufgebrachten Baumaterials vermieden und schließlich eine höhere oder maximale Geschwindigkeit der Beschichtereinrichtung gefahren werden. Durch die Zurückfahrbewegung der Beschichtereinrichtungen in einer angehobenen Ebene, kann die Zurückfahrbewegung der Beschichtereinrichtung und damit die Prozessgeschwindigkeit des gesamten Verfahrens erhöht werden. Es ist auch ausreichend, anstatt der gesamten Beschichtereinrichtung das Nivellierelement, z. B. ein Rakel aus dem Aufbauebenenniveau anzuheben.Further it can be provided, the coater at least partially during the return movement from its horizontal coater level raise or pivot. Thereby, that the coater device lifted from the horizontal coater plane of the forward movement or "swung" can, during the return movement the coater an influence (contacting, turbulence) avoided the applied during the forward movement building material and finally a higher or maximum speed the coater be driven. By the return movement the coater facilities in a raised plane, the Return movement of the coater and thus increases the process speed of the entire process become. It is also sufficient, rather than the entire coater facility the leveling element, z. B. a squeegee from the construction level to raise.
Darüber hinaus ist es vorteilhaft, wenn die Beschichtereinrichtung rechnergesteuert verlagerbar ist und in einen Datenspeicher oder über eine Eingabeeinheit Verlagerungsdaten, insbesondere Geschwindigkeitsdaten und/oder Beschichterpositionsdaten der jeweiligen Streckenabschnitte zugeordnet ausgelesen oder eingegeben werden können. Die Verlagerungsdaten können Daten über die Geschwindigkeit, die Beschleunigung, die Verzögerung und/oder die Positionen der einzelnen Streckenabschnitte umfassen. Beispielsweise berücksichtigen die Verlagerungsdaten aus dem Datenspeicher die Art des Baumaterials, die Objektgeometrie und/oder die Bauschichtdicke zur Steuerung der Verlagerung der Beschichtereinheit (Geschwindigkeit, Beschleunigung, Höhenniveau der Beschichtereinrichtung).About that In addition, it is advantageous if the coater device is computer-controlled is relocatable and in a data store or via a Input unit displacement data, in particular velocity data and / or coater position data of the respective route sections can be read out or entered assigned. The relocation data can provide data about the speed, the acceleration, the delay and / or the positions of the individual sections include. For example, consider the relocation data from the data store the type of building material, the object geometry and / or the construction layer thickness for controlling the displacement of the coater unit (Speed, acceleration, height level of the coater).
Die Verlagerungsdaten können sowohl für einzelne als auch für Gruppen von Aufbauschichten zur Steuerung der Beschichtereinrichtung verwendet werden. Dies bedeutet, dass beispielsweise die Verlagerungsdaten, wie die Geschwindigkeit, Beschleunigung und/oder das Höhenniveau der Beschichtereinrichtung in einzelnen Streckenabschnitten über mehrere Gruppen von nacheinander aufzubauenden Aufbauschichten gleich ist.The Displacement data can be used for both individual and also for groups of training levels to control the Coater device can be used. This means that, for example the displacement data, such as the speed, acceleration and / or the height level of the coater in individual Track sections over several groups of consecutive to be built-up layers is the same.
Die Art des Baumaterials kann die Körnung, Fließfähigkeit, Dichte und/oder Kornverteilung betreffen. Diese Spezifikationen des Baumaterials geben Aufschluss über das Verhalten des Baumaterials während dessen Verlagerung mittels der Beschichtereinrichtung. Deshalb ist es vorteilhaft bei den Verlagerungsdaten der Beschichtereinrichtung die Spezifikation des Baumaterials mit einfließen zu lassen. Beispielsweise kann die Zurückfahrgeschwindigkeit einer aus der Beschichterebene angehobenen Beschichtereinrichtung abhängig von der Körnung, Fließfähigkeit, Dichte und/oder Kornverteilung eines Baumaterials gewählt werden, sodass bei Baumaterial, das sich „eher träger” verhält, eine höhere Verfahrgeschwindigkeit der Beschichtereinrichtung gewählt werden kann, da die durch diese hervorgerufenen Luft-/Gasverwirbelungen keine oder nur eine geringfügige Beeinflussung des bereits aufgebrachten Baumaterials hervorrufen.The type of building material may relate to grain size, flowability, density and / or grain distribution. These specifications of the building material provide information about the behavior of the building material during its displacement by means of the coater. Therefore, it is advantageous in the displacement data of the coater to incorporate the specification of the building material. For example, the retraction speed of a coater device raised from the coater plane can be selected as a function of the granulation, flowability, density and / or grain distribution of a building material, so that a higher traversing speed of the coater can be selected for building material which behaves "more sluggishly", since the caused by this air / gas turbulence no or only a slight effect on the already applied Cause building material.
Ferner umfasst die Erfindung eine Vorrichtung zur Herstellung eines dreidimensionalen Objektes, durch aufeinanderfolgendes Verfestigen von Schichten eines mittels elektromagnetischer Strahlung oder Teilchenstrahlung verfestigbaren Aufbaumaterials an den jeweiligen Querschnitten des Objektes, unter Verwendung einer Beschichtereinrichtung, die innerhalb eines Beschichtungsvorganges zum Auftragen einer Pulverlage mit wenigstens zwei unterschiedlichen Geschwindigkeiten innerhalb einer Hin- oder innerhalb einer Zurückbewegung verfahren wird. Dies bedeutet, dass die Vorrichtung vorzugsweise rechnergesteuert die Beschichtereinrichtung verlagert und in diese Ansteuerung Verlagerungsdaten einfließen.Further The invention comprises a device for producing a three-dimensional Object, by successively solidifying layers of a solidified by means of electromagnetic radiation or particle radiation Construction material at the respective cross sections of the object, below Use of a coater, which within a coating process for Applying a powder layer with at least two different Speeds within a backward or inward motion is moved. This means that the device preferably computer-controlled relocated the coater and in this Activation of displacement data.
In einer besonders vorteilhaften Ausführungsform wird nicht nur die in der aufzuziehenden Schicht einzulasernde Objektkontur für die Definition der einzelnen Streckenabschnitte der Beschichtereinrichtung in Betracht gezogen, sondern auch zumindest die nachfolgende Schicht. Dadurch, dass nicht nur die im jeweiligen Beschichtungsvorgang zu beschichtende und zu verfestigende Bauteilkontur, sondern zumindest auch die darauf folgende berücksichtigt wird, können bei Überhängen oder Auskragungen des Objektes die nachfolgenden Beschichtungsvorgänge zumindest im Bereich der in den nachfolgenden Schichten zu verfestigenden Objektbereiche präziser nivelliert und damit das Objekt präziser hergestellt werden.In a particularly advantageous embodiment will not only the object contour to be glazed in the layer to be applied for the definition of the individual sections of the Coater device considered, but also at least the following layer. Because not only in the respective Coating process to be coated and solidified component contour, but at least the following is also taken into account, can be overhangs or overhangs of the object, the subsequent coating operations at least in the area to be consolidated in the subsequent layers Object areas more precisely leveled and thus the object be made more precise.
Die Erfindung ist anhand von Ausführungsbeispielen in den Zeichnungsfiguren näher erläutert. Diese zeigenThe Invention is based on embodiments in the drawing figures explained in more detail. These show
Zeichnungsfigur
Das
Aufbauebenenniveau
Es
kann auch vorgesehen sein, dass an zwei gegenüberliegenden
Endbereichen des Baubereiches
In
den Zeichnungsfiguren
Der
Streckenabschnitt S3 beginnt am Endbereich
In
der in den Zeichnungsfiguren
Wenn
sich hingegen gemäß der Bereiche
Anhand
des Verfahrensablaufs gemäß der Zeichnungsfiguren
Grundsätzlich
ist es vorteilhaft, wenn die Beschichtereinrichtung
Insbesondere
die Geschwindigkeit v3 des dritten Streckenabschnittes
S3 soll höher eingestellt sein
als die Geschwindigkeit v1 des ersten Streckenabschnittes,
da die Beschichtereinrichtung
Ferner
kann es vorgesehen sein, dass die Beschichtereinrichtung
Der
Geschwindigkeitswechsel der Beschichtereinrichtung
Vorzugsweise
erfolgt die Veränderung der Geschwindigkeit v1,
v2, v3, v4, v5, v6 der
Beschichtereinrichtung
Die
Prozessdauer des gesamten Verfahrens kann dadurch reduziert werden,
dass die Beschichtereinrichtung
Die
Beschichtereinrichtung
Unter
der Art des Baumaterials können Informationen über
die Körnung, die Fließfähigkeit, die Dichte
und/oder die Kornverteilung umfassen, wobei die Auswirkungen dieser
jeweiligen Attribute des Baumaterials
In
Zeichnungsfigur
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- AA
- Hinbewegung v. 5forward movement v. 5
- BB
- Zurückbewegung v. 5back movement v. 5
- 11
- Objektobject
- 22
- Strahlungradiation
- 33
- Aufbaumaterialconstruction material
- 44
- Querschnittcross-section
- 55
- BeschichtereinrichtungBeschichtereinrichtung
- 66
- Dosierbereichdosing
- 77
- Baubereichconstruction industry
- 88th
- Trägerelementsupport element
- 99
- AufbauebenenniveauConstruction plane level
- 1010
- Rakeldoctor
- 1111
- Laserlaser
- 1212
- Trägercarrier
- 13, 13'13 13 '
- Anfangsbereich v. 4initial region v. 4
- 14, 14'14 14 '
- Endbereich v. 4end v. 4
- 1515
- Dosier- oder Überlaufbereichdosing or overflow area
- 1616
- Freies Ende v. 10Free End of v. 10
- 1717
- Rechnercomputer
- 1818
- Datenspeicherdata storage
- 1919
- Eingabeeinheitinput unit
- 2020
- Aktuator v. 5actuator v. 5
- S1–S6S1-S6
- Streckeroute
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- - DE 10300959 B4 [0002] DE 10300959 B4 [0002]
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102009035258A DE102009035258A1 (en) | 2009-07-29 | 2009-07-29 | Producing a three-dimensional object, comprises successively compacting layers of building material by electron beam, electromagnetic- or particle radiation, and introducing powdered materials into construction area by coating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102009035258A DE102009035258A1 (en) | 2009-07-29 | 2009-07-29 | Producing a three-dimensional object, comprises successively compacting layers of building material by electron beam, electromagnetic- or particle radiation, and introducing powdered materials into construction area by coating device |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102009035258A1 true DE102009035258A1 (en) | 2011-02-03 |
Family
ID=43402554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102009035258A Pending DE102009035258A1 (en) | 2009-07-29 | 2009-07-29 | Producing a three-dimensional object, comprises successively compacting layers of building material by electron beam, electromagnetic- or particle radiation, and introducing powdered materials into construction area by coating device |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102009035258A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012007791A1 (en) * | 2012-04-20 | 2013-10-24 | Universität Duisburg-Essen | Method and device for producing components in a jet melting plant |
WO2016177516A1 (en) * | 2015-05-07 | 2016-11-10 | Cl Schutzrechtsverwaltungs Gmbh | Device for producing three-dimensional objects by successively solidifying layers and an associated method |
EP3434394A1 (en) * | 2017-07-24 | 2019-01-30 | Matsuura Machinery Corporation | Three-dimensional object shaping method |
US20190039315A1 (en) * | 2017-08-02 | 2019-02-07 | Matsuura Machinery Corporation | Three-Dimensional Object Shaping Method |
CN109366981A (en) * | 2017-08-03 | 2019-02-22 | 株式会社松浦机械制作所 | Three-dimension object formative method |
US20190099807A1 (en) * | 2017-10-02 | 2019-04-04 | General Electric Company | Modified frame and recoating system |
WO2021249588A1 (en) * | 2020-06-13 | 2021-12-16 | Laempe Mössner Sinto Gmbh | Method for creating a 3d structure, wherein the speed of movement of working means, in particular of a scraper, is reduced in critical regions |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10300959B4 (en) | 2003-01-14 | 2007-03-01 | Cl Schutzrechtsverwaltungs Gmbh | Coater device for a building device for producing molded parts from building material |
-
2009
- 2009-07-29 DE DE102009035258A patent/DE102009035258A1/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10300959B4 (en) | 2003-01-14 | 2007-03-01 | Cl Schutzrechtsverwaltungs Gmbh | Coater device for a building device for producing molded parts from building material |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10035304B2 (en) | 2012-04-20 | 2018-07-31 | Eos Gmbh Electro Optical Systems | Method and device for producing components in a beam melting installation |
DE102012007791A1 (en) * | 2012-04-20 | 2013-10-24 | Universität Duisburg-Essen | Method and device for producing components in a jet melting plant |
WO2016177516A1 (en) * | 2015-05-07 | 2016-11-10 | Cl Schutzrechtsverwaltungs Gmbh | Device for producing three-dimensional objects by successively solidifying layers and an associated method |
DE102015107178A1 (en) * | 2015-05-07 | 2016-11-10 | Cl Schutzrechtsverwaltungs Gmbh | Device for producing three-dimensional objects by successive solidification of layers and an associated method |
US11571856B2 (en) | 2015-05-07 | 2023-02-07 | Concept Laser Gmbh | Device for producing three-dimensional objects by successively solidifying layers and an associated method and evasive return movement with coating device |
EP3434394A1 (en) * | 2017-07-24 | 2019-01-30 | Matsuura Machinery Corporation | Three-dimensional object shaping method |
US11465358B2 (en) * | 2017-08-02 | 2022-10-11 | Matsuura Machinery Corporation | Three-dimensional object shaping method |
US20190039315A1 (en) * | 2017-08-02 | 2019-02-07 | Matsuura Machinery Corporation | Three-Dimensional Object Shaping Method |
CN109366981A (en) * | 2017-08-03 | 2019-02-22 | 株式会社松浦机械制作所 | Three-dimension object formative method |
CN109366981B (en) * | 2017-08-03 | 2021-06-11 | 株式会社松浦机械制作所 | Method for three-dimensional object modeling |
US11273495B2 (en) * | 2017-10-02 | 2022-03-15 | General Electric Company | Modified frame and recoating system |
US20190099807A1 (en) * | 2017-10-02 | 2019-04-04 | General Electric Company | Modified frame and recoating system |
WO2021249588A1 (en) * | 2020-06-13 | 2021-12-16 | Laempe Mössner Sinto Gmbh | Method for creating a 3d structure, wherein the speed of movement of working means, in particular of a scraper, is reduced in critical regions |
CN115697593A (en) * | 2020-06-13 | 2023-02-03 | 兰佩莫斯纳新东有限公司 | Method for producing a 3D structure, in which the speed of movement of a working device, in particular a blade, is reduced in a critical region |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0738584B1 (en) | Apparatus and method to produce a three-dimensional object | |
EP3086919B1 (en) | Device and method for 3d printing methods, with accelerated execution | |
DE102009035258A1 (en) | Producing a three-dimensional object, comprises successively compacting layers of building material by electron beam, electromagnetic- or particle radiation, and introducing powdered materials into construction area by coating device | |
EP2496403B1 (en) | Device and method for producing a three-dimensional body | |
EP2083992B1 (en) | Continuous, generative method and apparatus for the production of a three-dimensional object | |
EP2301743B1 (en) | Method and apparatus for layerwise manufacturing of an object | |
DE102011111498A1 (en) | Device for the layered construction of models | |
DE102015219866A1 (en) | Device and method for producing a three-dimensional object | |
DE202006016477U1 (en) | Rapid prototyping apparatus for producing three-dimensional object, comprises carrier whose height is fixed and retaining wall whose height is adjusted by program-controlled adjuster | |
DE102012004213A1 (en) | Method and device for producing three-dimensional models | |
WO2008116518A1 (en) | Method and device for the production of a three-dimensional object | |
DE102006030350A1 (en) | Method for constructing a layer body | |
EP0634972A1 (en) | Process and device for producing a three-dimensional object | |
DE102009055966A1 (en) | Method and device for producing three-dimensional models | |
DE102010045850A1 (en) | Generatively producing component, preferably turbomachine, comprises solidifying powder bed in section-wise manner by energy input, to form local melt bath in powder bed, and vibrating powder bed for releasing gas components | |
EP3277481B1 (en) | Method and device for the layered construction of a shaped part | |
DE60031317T2 (en) | Stereolithographic method and apparatus for producing three-dimensional objects, wherein smoothing parameters apply to layer groups | |
DE102017213072A1 (en) | Additive manufacturing process | |
EP3277482B1 (en) | Method and device for the layered construction of a shaped part | |
DE102015223719A1 (en) | Method and device for building material requirement determination | |
WO2019068792A1 (en) | Method for layer-by-layer additive production of three-dimensionally formed components | |
WO2018172079A1 (en) | Overlap optimization | |
DE102021101984A1 (en) | METHOD AND DEVICE FOR THE LAYERY MANUFACTURE OF A COMPONENT | |
EP4238741A1 (en) | Method for additive manufacturing of a component using at least one volume chamber to be filled with filling material | |
EP2848392A1 (en) | Method for ensuring the quality of components made by means of generative production processes and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed |
Effective date: 20140417 |
|
R016 | Response to examination communication | ||
R081 | Change of applicant/patentee |
Owner name: CONCEPT LASER GMBH, DE Free format text: FORMER OWNER: CL SCHUTZRECHTSVERWALTUNGS GMBH, 96215 LICHTENFELS, DE |