DE102008025517B3 - Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters - Google Patents

Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters Download PDF

Info

Publication number
DE102008025517B3
DE102008025517B3 DE102008025517A DE102008025517A DE102008025517B3 DE 102008025517 B3 DE102008025517 B3 DE 102008025517B3 DE 102008025517 A DE102008025517 A DE 102008025517A DE 102008025517 A DE102008025517 A DE 102008025517A DE 102008025517 B3 DE102008025517 B3 DE 102008025517B3
Authority
DE
Germany
Prior art keywords
parameter
controlling
designing
computer
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE102008025517A
Other languages
German (de)
Inventor
Thomas Runkler
Hans Georg Seedig
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE102008025517A priority Critical patent/DE102008025517B3/en
Application granted granted Critical
Publication of DE102008025517B3 publication Critical patent/DE102008025517B3/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Feedback Control In General (AREA)

Abstract

The method involves providing a time series, and transforming the time series to data sets of input data and output data. An input data set is formed through the datasets of input data and an output data set is formed through the data sets of output data. Auto regression models for transformation of the input data set to the output data set are determined based on a classifier. Parameter for controlling and/or designing a technical system is predicted by using model parameter for the models and association parameter for characterizing association of the time series to the models. An independent claim is also included for a computer program product with a program code for executing a method for computer-aided prediction of a parameter.
DE102008025517A 2008-05-28 2008-05-28 Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters Expired - Fee Related DE102008025517B3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102008025517A DE102008025517B3 (en) 2008-05-28 2008-05-28 Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102008025517A DE102008025517B3 (en) 2008-05-28 2008-05-28 Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters

Publications (1)

Publication Number Publication Date
DE102008025517B3 true DE102008025517B3 (en) 2010-01-28

Family

ID=41428968

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102008025517A Expired - Fee Related DE102008025517B3 (en) 2008-05-28 2008-05-28 Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters

Country Status (1)

Country Link
DE (1) DE102008025517B3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016206243A1 (en) * 2016-04-14 2017-10-19 Siemens Aktiengesellschaft Method and forecasting system for the computer-aided prognosis of measured values
CN110991732A (en) * 2019-11-28 2020-04-10 武汉理工大学 Building material equipment manufacturing process optimization scheduling method based on energy consumption clustering

Non-Patent Citations (26)

* Cited by examiner, † Cited by third party
Title
C.Furlanello, D.Giuliani, S.Merler, E.Trentin: "Model selection of combined neural nets for speech recognition". A.J.C.Sharkey, editor, Combining Artificial Neural Nets - Ensemble and Modular Multi-Net Systems, 205-233, Springer, 1999 *
C.M.Bishop: "Neural Networks for Pattern Recognition." Oxford University Press, 1995 *
E.E.Gustafson, W.C.Kessel: "Fuzzy clustering with a covariance matrix". IEEE International Conference on Decision and Control, San Diego, 761-766, 1979 *
Euntai Kim, Minkee Park, Seunghwan Ji, Mignon Park: "A new approach to fuzzy modeling." Fuzzy Systems, IEEE Transactions on, Vol.5, No.3, pp.328-337, Aug 1997, doi: 10.1109/91.618271 *
F.Höppner, F.Klawonn: "Obtaining interpretable fuzzy models from fuzzy clustering and fuzzy regression". International Conferenze on Knowledge-Based Intelligent Engineering Systems and Allied Technologies, 162-165, Brighton, UK, 2000 *
G.Box, G.M.Jenkins, G.C.Reinsel: "Time Series Analysis: Forecasting and Control". Prentice Hall, 3rd edition, 1994 *
H.G.Zimmermann, R.Neuneier: "Modeling dynamical systems by recurrent neural networks". International Conference on Data Mining, 557-566, Cambridge, UK, 2000 *
J.Abonyi, F.Szeifert: "Supervised fuzzy clustering for the identification of fuzzy classifiers". Pattern Recognition Letters 24(14):2195-2207, 2003 *
J.Abonyi, R.Babuska, H.Verbruggen, F.Szeifert: "Incorporating prior knowledge in fuzzy model identification". International Journal of Systems Science, 31(5):657-667, 2000 *
J.C.Bezdek, C.Coray, R.Gunderson, J.Watson: "Detection and characterization of cluster substructure, I. Linear structure: Fuzzy c-lines". SIAM Journal on Applied Mathematics, 40(2):339- 357, April 1981 *
J.C.Bezdek, C.Coray, R.Gunderson, J.Watson: "Detection and characterization of cluster substructure, II. Fuzzy c-varieties and convex combinations thereof". SIAM Journal on Applied Mathematics, 40(2):358-372, April 1981 *
J.C.Bezdek: "Pattern Recognition with Fuzzy Objective Function Algorithms". Ple-num Press, New York, 1981 *
L.R.Medsker, L.C.Jain: "Recurrent Neural Networks: Design and Applications". CRC Press, Boca Raton, 2000 *
R.J.Hathaway, J.C.Bezdek: "Switching regression models and fuzzy clustering." IEEE Transactions on Fuzzy Systems, 1(3):195-204, August 1993. doi 10.1109/91.236552 *
R.J.Hathaway, J.W.Davenport, J.C.Bezdek: "Relational duals of the c-means algorithms". Pattern Recognition, 22:205-212, 1989 *
R.Krishnapuram, J.M.Keller: "A possibilistic approach to clustering". IEEE Transactions on Fuzzy Systems, 1(2):98-110, May 1993 *
R.N.Davé: "Characterization and detection of noise in clustering" Pattern Recognition Letters, 12:657-664, 1991 *
R.N.Davé: "Fuzzy shell clustering and application to circle detection in digital images". International Journal on General Systems, 16:343-355, 1990 *
Runkler,T.A., Seedig,H.G.: "Fuzzy c-auto regression models". IEEE International Conference on Fuzzy Systems, 1.-6. June 2008, 1818- 1825, doi 10.1109/FUZZY.2008.4630617 *
T.A.Runkler, J.C.Bezdek: "Alternating cluster estimation: A new tool for clustering an function approximation". IEEE Transactions on Fuzzy Systems, 7(4):377-393, August 1999 *
T.A.Runkler, R.H.Palm: "Identification of nonlinear systems using regular fuzzy c-elliptotype clustering". IEEE International Conference on Fuzzy Systems, 1026-1030, New Orleans, September 1996 *
T.A.Runkler: "Nonlinear system identification with global and local soft computing methods". GMA-Workshop Fuzzy Control, 163- 176, Dortmund, October 2000 *
T.Takagi, M.Sugeno: "Fuzzy identification of systems and its application to modeling and control". IEEE Transactions on Systems, Man, and Cybernetics, 15(1):116-132, 1985 *
Xiaozhe Wang, Wirth,A., Liang Wang: "Structure-Based Statistical Features and Multivariate Time Series Clustering." Data Mining, 2007. ICDM 2007. Seventh IEEE International Conference on, Vol., No., pp.351-360, 28-31 Oct. 2007, doi 10.1109/ICDM.2007.103 *
Yee Leung, Jiang-Hong Ma, Wen-Xiu Zhang: "A new method for mining regression classes in large data sets." Pattern Analysis and Machine Intelligence. IEEE Transactions on, Vol.23, No.1, pp.5-21 Jan 2001, doi: 10.1109/34.899943 *
Youchan Zhu, Yujun He: "Short-term Load Forecasting Model Using Fuzzy C Means Based Radial Basis Function Network." Intelligent Systems Design and Applications, 2006. ISDA '06. Sixth International Conference on, Vol.1, No., pp.579-582, Oct. 2006, doi: 10.1109/ISDA.2006.235 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016206243A1 (en) * 2016-04-14 2017-10-19 Siemens Aktiengesellschaft Method and forecasting system for the computer-aided prognosis of measured values
CN110991732A (en) * 2019-11-28 2020-04-10 武汉理工大学 Building material equipment manufacturing process optimization scheduling method based on energy consumption clustering

Similar Documents

Publication Publication Date Title
GB2493867A (en) Multi-stage process modeling method
WO2013038175A3 (en) Autonomous vehicle and task modelling
ATE414947T1 (en) TRANSFORMING PROCESS MODELS FOR EVENT-BASED COORDINATION OF COMPOSITE APPLICATIONS
ATE546794T1 (en) SYSTEM, METHOD AND COMPUTER PROGRAM FOR EARLY EVENT DETECTION
DE602006015445D1 (en) PREDICTIVE EMISSIONS MONITORING SYSTEM AND METHOD
ATE514980T1 (en) METHOD FOR COMPUTER-AIDED CONTROL AND/OR REGULATION OF A TECHNICAL SYSTEM
WO2009114309A3 (en) Apparatus for optimizing a chemical looping combustion plant using a model predictive controller
WO2012045496A3 (en) Probabilistic data mining model comparison engine
WO2008074382A8 (en) Obfuscating computer program code
WO2007021790A3 (en) Apparatus and method for simulating an analytic value chain
WO2014186302A3 (en) Predicting behavior using features derived from statistical information
EA200800359A3 (en) SYSTEM, METHOD AND DEVICE FOR OPTIMIZING THE DESIGN OF A PLAIN RIP
WO2012122234A9 (en) Systems and methods for optimizing energy and resource management for building systems
EA200801148A1 (en) IMPROVING THE EXTRACT OF HYDROCARBONS FROM A HYDROCARBON COLLECTOR
WO2006081084A3 (en) Remote component and connection architecture
WO2008000504A3 (en) Using status models with status transitions in a computer system
WO2007098087A3 (en) Method for history matching a simulation model using self organizing maps to generate regions in the simulation model
ATE473087T1 (en) METHOD FOR CONTROLLING AND OPERATING A PRODUCTION CELL AND A CONTROL DEVICE
WO2011084883A3 (en) Task list generation, parallelism templates, and memory management for multi-core systems
IN2013MU02853A (en)
WO2017098003A3 (en) Method and device for examining an input data set of a generative layer building device
WO2012162141A3 (en) Rundown blending optimization apparatus and method
WO2005111905A3 (en) Prediction of the dynamic behavior of a biological system
DE102008025517B3 (en) Method for computer-aided prediction of parameter for controlling and/or designing technical system i.e. manufacturing system, involves predicting parameter for controlling and/or designing system by model and association parameters
MX2015008690A (en) System and method for prescriptive analytics.

Legal Events

Date Code Title Description
8364 No opposition during term of opposition
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee