DE10065949A1 - Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot - Google Patents

Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot

Info

Publication number
DE10065949A1
DE10065949A1 DE10065949A DE10065949A DE10065949A1 DE 10065949 A1 DE10065949 A1 DE 10065949A1 DE 10065949 A DE10065949 A DE 10065949A DE 10065949 A DE10065949 A DE 10065949A DE 10065949 A1 DE10065949 A1 DE 10065949A1
Authority
DE
Germany
Prior art keywords
foot
post
retaining ring
plate
railing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE10065949A
Other languages
German (de)
Inventor
Reiner Laubach
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BBM SYSTEMTECHNIK GMBH, 64579 GERNSHEIM, DE
Original Assignee
Reiner Laubach
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Reiner Laubach filed Critical Reiner Laubach
Priority to DE10065949A priority Critical patent/DE10065949A1/en
Publication of DE10065949A1 publication Critical patent/DE10065949A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F2011/1868Miscellaneous features of handrails not otherwise provided for
    • E04F2011/187Miscellaneous features of handrails not otherwise provided for lengthwise adjustable, e.g. telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

Railing comprises a foot (10) fixable on a plate (2) projecting out from the structural body, and a post (30) which can be anchored vertically on the foot. The foot has at least one retaining ring (24, 26) which surrounds the post and which is provided with anchorage means (25, 27) e.g. bolts to secure the post in the set vertical position. The end of the foot projecting sideways under the plate is fitted with a vertical guide part having a retaining ring at the top end and a further aligned ring at the lower end.

Description

Die Erfindung betrifft ein an einer aus einem Baukörper vorstehenden Platte befestigbares Geländer mit mindestens einem an der Platte befestigbaren Fuß sowie mindestens einem an dem Fuß vertikal stehend verankerbaren Pfosten, an dessen freiem oberem Ende ein Handlauf zu befestigen ist.The invention relates to a plate protruding from a structure attachable railing with at least one foot attachable to the plate and at least one post that can be anchored vertically to the foot, on the post a handrail must be attached to the free upper end.

Ein Balkongeländer besteht üblicherweise aus mehreren vertikalen Pfosten, an deren oberen Enden ein durchgehender Handlauf befestigt ist, wobei die zwischen Handlauf, Pfosten und Platte verbleibenden Felder mit Querstreben oder geschmacklich ansprechenden Zierplatten ausgefüllt sind. Wenigstens einige der Pfosten sind auf je einem Fuß verankert, welcher an die Unterseite der Platte angebolzt ist.A balcony railing usually consists of several vertical posts the upper ends of which are attached to a continuous handrail, the between Handrail, post and plate remaining fields with cross struts or tasteful decorative panels are filled. At least some of the Posts are anchored to one foot each, which is on the underside of the plate is bolted on.

Der Handlauf muß auf die Horizontale exakt einnivelliert sein. Andererseits ist die Unterfläche der üblicherweise aus Beton gegossenen Platte selten eben. Die Folge ist, dass die in die Füße gegen einen Anschlag eingesteckten Pfosten über der Platte in unterschiedlichen Höhen enden, so dass sie erst durch Abtrennen der über das Horizontalmaß hinausragenden Abschnitte auf Maß gebracht werden müssen. Das Einrichten und Befestigen eines Balkongeländer-Handlaufs ist daher zeitraubend und aufwendig.The handrail must be leveled exactly to the horizontal. On the other hand, it is The surface of the slab usually cast from concrete is rarely flat. The consequence is that the posts inserted into the feet against a stop above the plate end at different heights so that they can only be separated by Sections protruding horizontally must be brought to size. The Setting up and attaching a balcony railing handrail is therefore time consuming and expensive.

Mit der Erfindung soll das Einrichten des Handlaufs an einem Balkongeländer vereinfacht werden.The invention is intended to set up the handrail on a balcony railing be simplified.

Dazu ist bei dem eingangs genannten Geländer erfindungsgemäß vorgesehen, dass der Fuß wenigstens einen den Pfosten umfassenden Haltering aufweist, welcher mit Mitteln zum Verankern des Pfostens in einer eingestellten Vertikalposition ausgerüstet ist. Nach der Erfindung erfolgt der erforderliche Höhenausgleich der Pfosten in einfacher Weise dadurch, indem jeder Pfosten in dem zugehörigen Haltering in jeweils erforderlichem Ausmaß nach oben oder unten verschoben wird. Steht der Pfosten in einer eingestellten Vertikalposition, kann er mit den am Haltering vorgesehenen Mitteln in dieser Position verankert werden. Die Erfindung bringt den Vorteil, dass das Geländer komplett in der Werkstatt vorgefertigt werden kann, wodurch sich die Montagezeiten des Geländers auf der Baustelle erheblich verkürzen, und zwar bis zu etwa 70%.For this purpose, it is provided according to the invention in the railing mentioned at the outset that the foot has at least one retaining ring which surrounds the post and which Means for anchoring the post in a set vertical position is equipped. According to the invention, the required height compensation takes place Post in a simple manner by placing each post in the associated one  Retaining ring moved up or down to the extent necessary becomes. If the post is in a set vertical position, you can use the am Retaining ring provided means are anchored in this position. The invention brings the advantage that the railing is completely prefabricated in the workshop can be, which increases the assembly times of the railing on the construction site significantly shorten, up to about 70%.

In bevorzugter Ausgestaltung der Erfindung ist an dem unter der Platte seitlich vorstehenden Ende des Fußes ein vertikales Führungsteil befestigt, welches am oberen Ende den Haltering und am unteren Ende einen weiteren, fluchtenden Haltering aufweist, so dass der Pfosten durch beide Halteringe gesteckt werden kann. Weiter empfiehlt es sich, als Mittel zum Verankern des Pfostens in der eingestellten Vertikalposition einen sich quer durch den Haltering erstreckenden und in den Pfosten eingreifenden Haltebolzen vorzusehen. Eine zusätzliche Arretierschraube kann an dem weiteren Haltering vorgesehen sein. Besteht der Pfosten aus einem Metallrohr, kann der Bolzen zweckmäßig eine Blechtreibschraube sein.In a preferred embodiment of the invention is on the side under the plate protruding end of the foot attached a vertical guide member, which on upper end of the retaining ring and another, aligned at the lower end Has retaining ring so that the post can be inserted through both retaining rings can. It is also recommended as a means of anchoring the post in the set vertical position extending across the retaining ring and provide retaining bolts engaging in the post. An additional Locking screw can be provided on the further retaining ring. Does the Post made of a metal tube, the bolt can conveniently be a Tin driving screw.

Im übrigen sind bevorzugte Ausgestaltungen der Erfindung in den Unteransprüchen angegeben. Die Erfindung wird nachstehend anhand des in der beigefügten Zeichnung dargestellten Ausführungsbeispiels im einzelnen beschrieben. Es zeigen:Otherwise, preferred embodiments of the invention are in the Subclaims specified. The invention is illustrated below in the attached drawing embodiment shown in detail described. Show it:

Fig. 1 eine schematische Seitenansicht einer Pfostenbefestigung bisheriger Art an einem Balkongeländerfuß; Figure 1 is a schematic side view of a post attachment of the previous type on a balcony railing base.

Fig. 2 eine Seitenansicht einer neuen Pfostenbefestigung; und Fig. 2 is a side view of a new post attachment; and

Fig. 3 eine schematische Draufsicht auf einen Fuß für ein Balkongeländer. Fig. 3 is a schematic plan view of a foot for a balcony railing.

Die Figuren zeigen die für die Erfindung wesentlichen Teile eines Balkongeländers mit bauseitig erstellter, aus einem nicht dargestellten Baukörper vorstehenden Platte 2, die normalerweise aus gegossenem und bewehrtem Beton besteht. Gemäß Fig. 1 ist an der Unterseite 3 der Platte 2 ist ein im Ganzen mit a bezeichneter Fuß in noch zu erläuternder Weise befestigt, welcher an seinem unter der Platte 2 seitlich vorstehenden Ende b eine Halterung c für ein vertikal zu montierendes Pfostenrohr d trägt. Auf dem oberen, freien Ende des Pfostenrohres d ist ein Handlauf 40 in üblicher Weise befestigt. Die Unterseite 3 ist oft sehr uneben, so dass das Pfostenrohr d, das üblicherweise eine vorgefertigte Länge hat, über die Horizontallinie 50 für den Handlauf 40 mehr oder weniger hinausragt, wie die in Fig. 1 schematisch angedeuteten Positionen e, f, g und h in übertriebener Darstellung zeigen. Da der Handlauf 40 sich längs der Horizontalen 50 erstrecken muß, müssen die über die Horizontale 50 sich erhebenden Abschnitte e, f, g und h der jeweiligen Pfostenrohre abgetrennt werden.The figures show the parts of a balcony railing that are essential to the invention, with a plate 2 , which is provided by the customer and protrudes from a building, not shown, and which normally consists of cast and reinforced concrete. FIG. 1 is at the bottom 3 of the plate 2 is designated as a whole by a foot secured in manner to be explained, which at its laterally projecting below the plate 2 end b a holder c for a vertically contributes to assemble post tube d. On the upper, free end of the post tube d, a handrail 40 is attached in the usual way. The underside 3 is often very uneven, so that the post tube d, which usually has a prefabricated length, protrudes more or less beyond the horizontal line 50 for the handrail 40 , as the positions e, f, g and h indicated schematically in FIG. 1 show in exaggerated representation. Since the handrail 40 must extend along the horizontal 50 , the sections e, f, g and h rising above the horizontal 50 of the respective post tubes must be separated.

Bei der in Fig. 2 und 3 dargestellten Erfindung weist der Fuß 10 an seinem unter der Platte 2 vorstehenden Ende 12 ein im wesentlichen aufrechtstehendes Führungsteil 20 auf, welches einen oberen, im wesentlichen mit der Oberseite der Platte 2 abschließenden Haltering 24 und am unteren Ende einen unteren Haltering 26 besitzt. Der obere Haltering 24 sowie der untere Haltering 26 haben gleiche Mittellinie, ihre Öffnungen fluchten also. Jeder der beiden Halteringe 24, 26 umfaßt das Trägerrohr 30 formschlüssig. Ist die Außenkontur des Trägerrohrs 30 rund, sind auch die Öffnungen der Halteringe 24, 26 rund. Ist die Außenkontur des Pfosten 30 kantig, sind auch die Durchlässe des oberen Halterings 24 und des unteren Halterings 26 entsprechend kantig ausgeführt. Auf diese Weise kann das Pfostenrohr 30 innerhalb der Ringe 24, 26 vertikal nach Belieben verschoben und in einer gewünschten Vertikallage durch Mittel verankert werden, die im dargestellten Ausführungsbeispiel eine den oberen Ring 24 durchsetzende Blechtreibschraube sind. Dazu weist der obere Ring 24 eine Querbohrung 25 auf, durch die die Blechtreibschraube in Richtung auf das Pfostenrohr 30 vorgetrieben werden kann und in das Pfostenrohr 30 eindringt. Die Wandstärke des oberen Halteringes 24, des Trägerrohres 30 sowie die Stärke der Blechtreibschraube sind durch das Gewicht des Balkongeländers sowie diejenige Kraft bestimmt, die sich auf dem Handlauf 40 abstützende Personen maximal aufbringen können. Der untere Haltering 26 braucht dann lediglich noch eine Madenschraube 27 aufzuweisen, die den unteren Haltering 26 quer durchdringt und das Pfostenrohr 30 zusätzlich sichert.In the invention shown in FIGS. 2 and 3, the foot 10 has at its end 12 protruding below the plate 2 a substantially upright guide part 20 which has an upper retaining ring 24 which essentially closes with the top of the plate 2 and at the lower end has a lower retaining ring 26 . The upper retaining ring 24 and the lower retaining ring 26 have the same center line, so their openings are aligned. Each of the two retaining rings 24 , 26 comprises the support tube 30 in a form-fitting manner. If the outer contour of the carrier tube 30 is round, the openings of the retaining rings 24 , 26 are also round. If the outer contour of the post 30 is angular, the passages of the upper retaining ring 24 and the lower retaining ring 26 are also angular. In this way, the post tube 30 can be displaced vertically as desired within the rings 24 , 26 and anchored in a desired vertical position by means which, in the exemplary embodiment shown, are a sheet metal driving screw penetrating the upper ring 24 . For this purpose, the upper ring 24 has a transverse bore 25 through which the sheet metal driving screw can be driven in the direction of the post tube 30 and penetrates into the post tube 30 . The wall thickness of the upper retaining ring 24 , the support tube 30 and the thickness of the sheet metal driving screw are determined by the weight of the balcony railing and the force that people supporting the handrail 40 can maximally apply. The lower retaining ring 26 then only needs to have a grub screw 27 which penetrates the lower retaining ring 26 transversely and additionally secures the post tube 30 .

Der Anbau eines den erfindungsgemäßen Fuß 10 sowie das Pfostenrohr 30 umfassenden Balkongeländerteiles erfolgt in der Weise, dass der Fuß 10 mittels eines einen Längsschlitz 15 im Fuß 10 durchsetzenden Bolzens in grober Ausrichtung an die Unterseite 3 angeschraubt wird. Der Fuß 10 weist einander gegenüberliegende seitliche Laschen 11, 13 auf, mit denen der Fuß 10 so an der Unterseite 3 mittels entsprechender Stellschrauben befestigt werden kann, dass der Fuß 10 um seine Längsachse derart justiert wird, das das Führungsteil 20 vertikal nach oben weist.A balcony railing part comprising the foot 10 according to the invention and the post tube 30 is attached in such a way that the foot 10 is screwed onto the underside 3 in a rough alignment by means of a bolt passing through a longitudinal slot 15 in the foot 10 . The foot 10 has mutually opposite lateral tabs 11 , 13 , with which the foot 10 can be fastened to the underside 3 by means of corresponding adjusting screws that the foot 10 is adjusted about its longitudinal axis in such a way that the guide part 20 points vertically upwards.

An dem dem Führungsteil 20 gegenüberliegenden Ende weist der Fuß 10 eine weitere Öffnung 14 auf, durch die eine weitere Schraube gegen die Unterseite 3 vortreibbar ist, so dass der Fuß 10 um die die Laschen 11, 13 verbindende Achse so justiert werden kann, dass das Führungsteil 20 genau vertikal steht.At the end opposite the guide part 20 , the foot 10 has a further opening 14 through which a further screw can be driven against the underside 3 , so that the foot 10 can be adjusted about the axis connecting the tabs 11 , 13 so that the Guide part 20 is exactly vertical.

Danach wird das Pfostenrohr 30 durch den oberen Haltering 24 und den unteren Haltering 26 soweit eingeführt, bis sein oberes Ende genau mit der Horizontalebene 50 abschließt. Danach wird das Tragrohr 30 mittels der Blechtreibschraube in der eingestellten Vertikalposition verankert und durch die Madenschraube 27 zusätzlich gesichert. Wie in Fig. 2 deutlich zu erkennen ist, kann ein unteres freies Ende 32 des Trägerrohres aus dem unteren Haltering 26 nach unten vorstehen, ohne dass dadurch der optische Eindruck des angebauten Balkongeländers leidet.The post tube 30 is then inserted through the upper retaining ring 24 and the lower retaining ring 26 until its upper end is exactly flush with the horizontal plane 50 . Then the support tube 30 is anchored in the set vertical position by means of the sheet metal driving screw and additionally secured by the grub screw 27 . As can be clearly seen in FIG. 2, a lower free end 32 of the support tube can protrude downward from the lower retaining ring 26 without the visual impression of the attached balcony railing thereby being impaired.

Daher können alle für das Balkongeländer notwendigen Trägerrohre von vorne herein so in dem jeweiligen oberen Ring 24 und unteren Ring 26 verankert werden, dass ihre oberen Enden genau in der Horizontalebene 50 liegen. Der Handlauf 40 kann dann auf die oberen Enden der Tragrohre aufgesetzt werden, der dann automatisch in der Horizontalebene sich erstreckt.Therefore, all the support tubes required for the balcony railing can be anchored from the front in the respective upper ring 24 and lower ring 26 such that their upper ends lie exactly in the horizontal plane 50 . The handrail 40 can then be placed on the upper ends of the support tubes, which then automatically extends in the horizontal plane.

Claims (4)

1. An einer aus einem Baukörper vorstehenden Platte (2) befestigbares Geländer mit mindestens einem an der Platte (2) befestigbaren Fuß (10) sowie mindestens einem an dem Fuß vertikal stehend verankerbaren Pfosten (30), an dessen freiem oberem Ende ein Handlauf (40) zu befestigen ist, dadurch gekennzeichnet, dass der Fuß (10) wenigstens einen den Pfosten (30) umfassenden Haltering (24; 26) aufweist, welche mit Mitteln (25, 27) zum Verankern des Pfostens (30) in einer eingestellten Vertikalposition ausgerüstet ist.1. On a protruding from a building plate ( 2 ) can be attached railing with at least one on the plate ( 2 ) attachable foot ( 10 ) and at least one vertically anchored post ( 30 ), on the free upper end of a handrail ( 40 ) to be fastened, characterized in that the foot ( 10 ) has at least one retaining ring ( 24 ; 26 ) surrounding the post ( 30 ), which has means ( 25 , 27 ) for anchoring the post ( 30 ) in a set vertical position is equipped. 2. Geländer nach Anspruch 1, dadurch gekennzeichnet, dass an dem unter der Platte (2) seitlich vorstehenden Ende (12) des Fußes (10) ein vertikales Führungsteil (20) befestigt ist, welches am oberen Ende den Haltering (24) und am unteren Ende einen weiteren fluchtenden Haltering (26) aufweist.2. Railing according to claim 1, characterized in that at the under the plate ( 2 ) laterally projecting end ( 12 ) of the foot ( 10 ) a vertical guide part ( 20 ) is attached, which at the upper end of the retaining ring ( 24 ) and has another aligned retaining ring ( 26 ) at the lower end. 3. Geländer nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Mittel zum Verankern des Pfostens (30) in der eingestellten Vertikalposition einen sich quer durch den Haltering erstreckenden und in den Pfosten eingreifenden Haltebolzen, beispielsweise eine Blechtreibschraube, aufweisen.3. Railing according to claim 1 or 2, characterized in that the means for anchoring the post ( 30 ) in the set vertical position have a retaining bolt extending transversely through the retaining ring and engaging in the post, for example a sheet metal driving screw. 4. Geländer nach einem der Ansprüche 2 oder 3, dadurch gekennzeichnet, dass den weiteren Haltering (26) eine Arretierschraube für den Pfosten (30) durchsetzt.4. Railing according to one of claims 2 or 3, characterized in that the further retaining ring ( 26 ) passes through a locking screw for the post ( 30 ).
DE10065949A 2000-12-27 2000-12-27 Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot Ceased DE10065949A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE10065949A DE10065949A1 (en) 2000-12-27 2000-12-27 Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE10065949A DE10065949A1 (en) 2000-12-27 2000-12-27 Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot

Publications (1)

Publication Number Publication Date
DE10065949A1 true DE10065949A1 (en) 2002-07-25

Family

ID=7669557

Family Applications (1)

Application Number Title Priority Date Filing Date
DE10065949A Ceased DE10065949A1 (en) 2000-12-27 2000-12-27 Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot

Country Status (1)

Country Link
DE (1) DE10065949A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT17277U1 (en) * 2020-10-08 2021-11-15 Elea Gmbh BRACKETS FOR FALL PROTECTION

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29517360U1 (en) * 1995-11-02 1995-12-21 Foerster Norbert Alignable post bracket
DE19604174A1 (en) * 1996-02-06 1997-08-07 Sks Stakusit Kunststoff Gmbh Method and device for fastening railing posts to a concrete slab

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29517360U1 (en) * 1995-11-02 1995-12-21 Foerster Norbert Alignable post bracket
DE19604174A1 (en) * 1996-02-06 1997-08-07 Sks Stakusit Kunststoff Gmbh Method and device for fastening railing posts to a concrete slab

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT17277U1 (en) * 2020-10-08 2021-11-15 Elea Gmbh BRACKETS FOR FALL PROTECTION

Similar Documents

Publication Publication Date Title
DE1910357A1 (en) Support, preferably for attachment to posts
DE102010006560A1 (en) Carrying device and formwork system
AT523944B1 (en) railing module
DE4309041A1 (en) Balustrade or fence post assembly - with column base located over stud projection and screw connected through slots in column
DE10065949A1 (en) Railing for fixing on structural plate comprises foot fixable on plate and with retaining ring to surround post which is to be anchored vertically on foot
DE3220918C2 (en)
DE3401906A1 (en) Apparatus for the suspended fastening of a scaffold element
DE3246725A1 (en) Suspension device for wall-covering panels and panel anchorages constructed using such suspension devices
DE3909181A1 (en) Stairway which is for temporary use in the carcass of a building
DE19602758C2 (en) Device for fastening a basement well
EP2275625B1 (en) Scaffolding structure for main scaffolding and secondary scaffolding, particularly a scaffolding stairway
DE3303070A1 (en) Boundary like a railing or a fence
DE2651566A1 (en) Lift guide rail installation system - mounts and aligns rails in prefabricated shaft lying horizontally
DE202006009323U1 (en) Profile frame for balcony safety screen around safety glass panel has slide-fit attachments to C-profile
DE202019107206U1 (en) Kit for retrofitting a balcony or a winter garden to a house wall
CH693553A5 (en) Cat ladder, for a cat to reach an upper balcony from the ground, has tube sections fitted together to form a pole, to carry spacers and stepping boards leading to an upper board at the balcony or its railing
EP0577004A1 (en) Anchoring device
DE3340941C2 (en) Component set
DE6908130U (en) WINDOW SILL
DE4134244C2 (en) Fastening device for a wooden balcony parapet and associated balcony parapet
DE3120735A1 (en) Inter-floor staircase comprising tread boards
DE3200262A1 (en) Anchoring device for a supporting framework of an outer wall or of a bearing partition of an erectable building consisting of prefabricated parts
DE19827670B4 (en) Natural stone support and balconies made therewith
DE7733030U1 (en) PREFABRICATED ASSEMBLY STAIRS
DE2501263A1 (en) Guardrail column adjustable mounting - has toroidal surface on foot underside resting on complementary filler piece

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: BBM SYSTEMTECHNIK GMBH, 64579 GERNSHEIM, DE

8181 Inventor (new situation)

Inventor name: LAUBACH, REINER, 64579 GERNSHEIM, DE