Method of pre-stressing a concrete ceiling beam Download PDFInfo
- Publication number
- CZ307783B6 CZ307783B6 CZ2013-195A CZ2013195A CZ307783B6 CZ 307783 B6 CZ307783 B6 CZ 307783B6 CZ 2013195 A CZ2013195 A CZ 2013195A CZ 307783 B6 CZ307783 B6 CZ 307783B6
- Authority
- CZ
- Czechia
- Prior art keywords
- concrete
- metal element
- prestressing
- crossbars
- ceiling
- Prior art date
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 25
- 238000000034 method Methods 0.000 title claims description 9
- 239000002184 metal Substances 0.000 claims abstract description 18
- 238000004519 manufacturing process Methods 0.000 claims abstract description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000005452 bending Methods 0.000 abstract 1
- 238000009435 building construction Methods 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 239000000919 ceramic Substances 0.000 description 1
- 238000005352 clarification Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
- B28B23/06—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
- E04C3/26—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members prestressed
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Oblast technikyTechnical field
Vynález se týká stropního betonového nosníku použitelného pro ohýbané prvky stavebních konstrukcí.BACKGROUND OF THE INVENTION The present invention relates to a ceiling concrete beam usable for bent elements of building structures.
Dosavadní stav technikyBACKGROUND OF THE INVENTION
Pro ohýbané prvky stavebních konstrukcí se používají železobetonové nosníky, jejichž nevýhodou je průhyb, který se časem zvětšuje ztrátou tuhosti betonové hmoty - dotvarováním betonu, což je dosud nevyřešeným problémem betonových a železobetonových nosníků. Tomu se čelí předepínáním ocelovými pruty zavádějícími do betonového nosníku tlakovou sílu v oblasti budoucího tahového napětí. Tento způsob je provázen známými ztrátami předpětí v důsledku dotvarování betonu, prokluzu drátů v napínacích prvcích a jiné. To vyžaduje vysokou kvalitu betonu a oceli napínacích prutů, aby byla potlačena závažnost ztrát předpětí.Reinforced concrete beams are used for the bent elements of building constructions, the disadvantage of which is the deflection, which over time is increased by the loss of the stiffness of the concrete mass - by creeping of concrete, which is an unresolved problem of concrete and reinforced concrete beams. This is counteracted by pre-stressing with steel bars that introduce a compressive force in the area of the future tensile stress into the concrete beam. This method is accompanied by known losses of prestressing due to the creep of the concrete, the slip of the wires in the tensioning elements and others. This requires high quality concrete and steel tension bars in order to overcome the severity of the bias losses.
Jiný způsob předpětí nosníku spočívá v tom, že předpětí jev nosníku vyvoláno osazením uměle prohnutého ohybově tuhého kovového prvku, který je vložen do formy před zabetonováním. Zařízení zajišťující prohnutí je po zatvrdnutí betonu odstraněno. Princip je uveden v patentu č. CZ 297559. Prohnutí kovového prvku je provedeno mimo nosník prostřednictvím vnějšího zařízení složeného z pomocného kovového prvku, rozpěr a stahovacího zařízení. Mezi kovový prvek a pomocný kovový prvek jsou vloženy rozpěry přibližně ve čtvrtinách rozpětí a stažením stahovacího zařízení, umístěného na koncích obou prvků je kovový prvek prohnut do požadovaného tvaru. Tento postup vyžaduje pomocný prvek a stahovací zařízení. Výška prohnutého prvku je přitom dána výškou formy, což je zvláště u deskových nosníků omezující faktor.Another method of preloading the beam is that the preload of the beam is induced by the fitting of an artificially bent bending-rigid metal element which is inserted into the mold before the concrete is concreted. The deflection device is removed after the concrete has set. The principle is given in the patent No. CZ 297559. The deflection of the metal element is performed outside the beam by means of an external device composed of an auxiliary metal element, spacers and a clamping device. Spacers are inserted between the metal member and the auxiliary metal member in approximately quarters of the span and by pulling the puller located at the ends of the two members, the metal member is bent to the desired shape. This procedure requires an auxiliary element and a pulling device. The height of the curved element is determined by the height of the mold, which is a limiting factor, especially for plate beams.
Podstata vynálezuSUMMARY OF THE INVENTION
Předpětí stropního betonového nosníku se dosahuje prohnutím kovového prvku, jehož tendence k návratu do původního tvaru po zabetonování se vyrovná s budoucí tendencí nosníku k průhybu od zatížení a tím dojde k vymizení napětí a deformace v betonu. Podstata vynálezu používajícího nejméně jeden ohybově tuhý kovový prvek vyrobený v lomeném resp. zakřiveném tvaru umístěný uvnitř nosníku, spočívá vtom, že do výrobní formy se vloží ohybově tuhý kovový prvek v zakřiveném lomeném stavu a následně se narovná do přímého tvaru dotlačením dvou příčníků k bokům formy utažením svorníků. Po zabetonování formy a zatvrdnutí betonu se příčníky odstraní. Tendence kovového prvku k narovnání do původního zakřiveného tvaru po zabetonování se vyrovná s budoucí tendencí nosníku v průhybu od zatížení, a tím dojde k vymizení napětí a deformace v betonu a tedy k žádanému předpětí nosníku.The prestressing of the ceiling concrete beam is achieved by deflection of the metal element, whose tendency to return to its original shape after concreting is compared with the future tendency of the beam to deflect from the load and thus the stress and deformation in the concrete disappear. SUMMARY OF THE INVENTION using at least one flexurally rigid metal element produced in a refracted resp. A curvilinear shape located within the beam consists in placing a flexurally rigid metal element in a curved broken state into the manufacturing mold and then straightens it into a straight shape by pressing two crossbars to the sides of the mold by tightening the studs. After concreting the mold and setting the concrete, the crossbars are removed. The tendency of the metal element to straighten to its original curved shape after concreting is matched with the future tendency of the beam to deflect from the load, thereby relieving the stress and deformation in the concrete and hence the desired prestressing of the beam.
Objasnění výkresůClarification of drawings
Na přiložených výkresech je blíže vysvětlena podstata vynálezu, kde na obr. 1 je betonový panel s předpjatými prvky z tenkostěnných ocelových U profilů v lomeném tvaru, na obr. 2 je keramický panel s předpjatými prvky z prutových nosníků v lomeném tvaru, na obr. 3 je betonový střešní vazník s předpjatým prutovým prvkem a na obr. 4 je znázorněn postup předpínání betonového nosníku: A prohnutý vložený kovový prvek a B narovnaný kovový prvek pomocí dvou příčníků a po zabetonování.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a concrete panel with prestressed elements made of thin-walled U-shaped profiles in a broken shape; FIG. 2 is a ceramic panel with prestressed elements made of a beam-shaped elements in a broken shape; Fig. 4 shows the procedure of prestressing a concrete beam: A bent intermediate metal element and B straightened metal element by means of two cross members and after concreting.
- 1 CZ 307783 B6- 1 GB 307783 B6
Příklady uskutečnění vynálezuDETAILED DESCRIPTION OF THE INVENTION
Předpětí stropního betonového nosníku 1, jak je znázorněno na obr. 4 je provedeno pomocí ohybově tuhých prvků 2 z prutových nosníků, které jsou narovnány do přímého tvaru přitlačením dvěma příčníky 3 k bokům formy 4 pomocí svorníků 5. Po zabetonování prvků 2 a po zatvrdnutí betonu jsou příčníky 3 a svorníky 5 odstraněny.The prestressing of the ceiling concrete beam 1 as shown in Fig. 4 is carried out by means of bending-rigid members 2 of beam members, which are straightened to a straight shape by pressing two crossbars 3 against the sides of the mold 4 using bolts 5. the crossbars 3 and bolts 5 are removed.
Průmyslová využitelnostIndustrial applicability
Způsob předpětí stropního betonového nosníku podle vynálezu je využitelný pro stavební konstrukce pro výstavbu bytů i větších objektů.The method of prestressing of the ceiling concrete beam according to the invention is applicable to building constructions for the construction of flats and larger buildings.
PATENTOVÉ NÁROKYPATENT CLAIMS
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CZ2013-195A CZ307783B6 (en) | 2013-03-18 | 2013-03-18 | Method of pre-stressing a concrete ceiling beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CZ2013-195A CZ307783B6 (en) | 2013-03-18 | 2013-03-18 | Method of pre-stressing a concrete ceiling beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CZ2013195A3 CZ2013195A3 (en) | 2014-10-01 |
CZ307783B6 true CZ307783B6 (en) | 2019-05-02 |
Family
ID=51617973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CZ2013-195A CZ307783B6 (en) | 2013-03-18 | 2013-03-18 | Method of pre-stressing a concrete ceiling beam |
Country Status (1)
Country | Link |
---|---|
CZ (1) | CZ307783B6 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4006523A (en) * | 1974-01-22 | 1977-02-08 | Mauquoy Jean Baptiste | Method of producing a pre-stressed beam of steel and concrete |
JPH05287842A (en) * | 1992-04-14 | 1993-11-02 | Daiwa House Ind Co Ltd | Prestressed synthetic beam |
FI991375A (en) * | 1999-06-16 | 2000-12-17 | Kyyjaerven Sementtituote Oy Be | Tensioned composite beam |
JP2001214571A (en) * | 2000-02-02 | 2001-08-10 | Ohbayashi Corp | Prestressed concrete beam and its constructing method |
KR20040010852A (en) * | 2001-11-12 | 2004-02-05 | 이형훈 | Method for protecting the loss of prestress in prestressed beam by temporary load |
-
2013
- 2013-03-18 CZ CZ2013-195A patent/CZ307783B6/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4006523A (en) * | 1974-01-22 | 1977-02-08 | Mauquoy Jean Baptiste | Method of producing a pre-stressed beam of steel and concrete |
JPH05287842A (en) * | 1992-04-14 | 1993-11-02 | Daiwa House Ind Co Ltd | Prestressed synthetic beam |
FI991375A (en) * | 1999-06-16 | 2000-12-17 | Kyyjaerven Sementtituote Oy Be | Tensioned composite beam |
JP2001214571A (en) * | 2000-02-02 | 2001-08-10 | Ohbayashi Corp | Prestressed concrete beam and its constructing method |
KR20040010852A (en) * | 2001-11-12 | 2004-02-05 | 이형훈 | Method for protecting the loss of prestress in prestressed beam by temporary load |
Also Published As
Publication number | Publication date |
---|---|
CZ2013195A3 (en) | 2014-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100541965B1 (en) | Manufacturing apparatus for steel composite girder whose self weight is loaded on steel girder and manufacturing method thereof | |
JP2016102323A (en) | Design method of prestress concrete girder | |
CN104408245A (en) | Bearing capacity design method for prestressed concrete structure | |
KR101585594B1 (en) | Dual-prestressing composite beam and the construction method therewith | |
KR101244219B1 (en) | Prestressed concrete beam, steel confined prestressed concrete girder using the same and manufacturing method thereof | |
KR20090068526A (en) | Construction method of bridge structure and steel composite girder using the same | |
US9410320B2 (en) | Reinforced concrete structure | |
KR101203815B1 (en) | Method for strengthening girder using prestressed steel plate | |
KR101209063B1 (en) | Pre-stressed girder by plate and method thereof | |
CZ307783B6 (en) | Method of pre-stressing a concrete ceiling beam | |
KR101248564B1 (en) | Tendon setting method for pre tension typed psc-beam and psc beam thereby | |
Kozak et al. | Effect of the pre-stressed reinforcement curvature on the bearing capacity of inclined sections of monolithic beams | |
KR20170046562A (en) | Precast Prestressed Concrete Slab and Manufacturing Method of the same | |
KR101807234B1 (en) | Apparatus for introducing compressive force in slab of a bridge and method for constructing a bridge having the same | |
KR101664165B1 (en) | Construction method of prestressed steel composite girder bridge | |
CZ27356U1 (en) | Prestressed concrete overhead beam | |
KR102283753B1 (en) | Mobile manufacturing mold for manufacturing precast concrete using the pretension method and manufacturing method of precast concrete using the manufacturing mold | |
KR200215054Y1 (en) | Composite beam made by using the additional compressive materials | |
KR101627278B1 (en) | Deformation girder recovery method and device using section stiffiness and hydraulic jack | |
CZ2004380A3 (en) | Concrete beam subjected to bending and process for producing thereof | |
KR101259139B1 (en) | Steel composite prestressed concrete beam and method of manufacturing the same | |
CN106013516A (en) | Prefabricated reinforced concrete shear wall | |
CZ20031577A3 (en) | Flat suffix, doubly prestressed, composite, roof-ceiling construction for large span industrial buildings | |
RU2457259C1 (en) | Method to strengthen reinforcement bar from material with yield plateau | |
KR20170043687A (en) | Apparatus for introducing compressive force in slab of a bridge and method for constructing a bridge having the same |