CZ19267U1 - Combined grouting hose for day-work joints - Google Patents
Combined grouting hose for day-work joints Download PDFInfo
- Publication number
- CZ19267U1 CZ19267U1 CZ200820534U CZ200820534U CZ19267U1 CZ 19267 U1 CZ19267 U1 CZ 19267U1 CZ 200820534 U CZ200820534 U CZ 200820534U CZ 200820534 U CZ200820534 U CZ 200820534U CZ 19267 U1 CZ19267 U1 CZ 19267U1
- Authority
- CZ
- Czechia
- Prior art keywords
- perforation
- section
- day
- hose
- base body
- Prior art date
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
Kombinovaná injektážní hadice pro pracovní spáryCombined grouting hose for working joints
Oblast technikyTechnical field
Technické řešení se týká injektážní hadice, zejména pro výstup tlakového injektážního materiálu k utěsnění pracovních spár u podzemních staveb.The technical solution relates to an injection hose, in particular for the outlet of pressure injection material for sealing work joints in underground structures.
Dosavadní stav technikyBACKGROUND OF THE INVENTION
Známé injektážní hadice pro výstup tlakového injektážního materiálu jsou tvořeny hadicí s perforací a hadicí bez perforace, které jsou propojeny spojovacími prostředky, např. šrouby, čímž dochází k různým chybám:Known grouting hoses for the outlet of pressure grouting material are formed by a perforated hose and a non-perforated hose, which are interconnected by means of connection, e.g. screws, causing various errors:
- nesprávná montáž z důvodu lidského faktoru, ío - díky nezbytným spojovacím šroubům, které bylo nutno zašroubovat dovnitř hadiček dochází k nežádoucímu zmenšení vnitřní světlosti hadiček a tím špatné prostupnosti a ucpávání injektážního média,- incorrect assembly due to human factors, o - due to the necessary connecting screws which had to be screwed inside the tubing, the inner clearance of the tubing is undesirably reduced and thus the permeability and blockage of the injection medium is poor,
- větší finanční nároky z důvodu spojovací prvků,- greater financial demands due to fasteners,
- větší časová náročnost při instalaci.- higher installation time.
Podstata technického řešeníThe essence of the technical solution
Známé nevýhody odstraňuje kombinovaná injektážní hadice pro pracovní spáry se základním tělesem nepropustným pro tekutinu vytvořeným z flexibilního materiálu obepínajícím průchozí kanál podle technického řešení. Postata technického řešení spočívá v tom, že základní těleso sestává z úseku s perforací a z úseku bez perforace. Úsek s perforací a úsek bez perforace jsou stejné nebo nestejné délky.The known drawbacks are eliminated by the combined grouting hose for working joints with a liquid-impermeable base body formed of a flexible material surrounding the passageway according to the invention. The principle of the technical solution consists in that the basic body consists of a section with perforation and a section without perforation. The perforated section and the non-perforated section are of equal or uneven length.
Výhodou technického řešení je, že injektážní hadice je vyrobena z jednoho kusu flexibilního materiálu, na kterém jsou vytvořeny úseky s perforací a úseky bez perforace, proto není nutné tyto úseky spojovat a propojovat spojovacími prostředky.The advantage of the technical solution is that the injection hose is made of one piece of flexible material, on which the sections with perforation and sections without perforation are formed, therefore it is not necessary to connect and connect these sections with connecting means.
Přehled obrázku na výkreseOverview of the figure in the drawing
Na obr. je znázorněn řez injektážní hadičkou tvaru dutého válce.FIG. 1 shows a cross-section of a hollow-cylinder injection tube.
Příklad provedeníExemplary embodiment
Kombinovaná injektážní hadice 1 sestává ze základového tělesa 2, které má ostění v podobě dutého válce, ve kterém je vytvořen válcový průchozí kanál 3. Základové tčleso 2 podle účelu použití injektážní hadice může být vytvořeno ve tvaru osmiúhelníku, ětyřlístku, obdélníku, případně ío jiného geometrického tvaru. Také průchozí kanál 3 může mít jiné tvary, např. trojúhelník, čtverec, elipsa apod. Průchozím kanálem 3 se z jeho jednoho nebo z obou konců injektážní hadice 1 vede později tvrdnoucí injektovaná směs např. cementová směs, polyuretanová pryskyřice apod. a to do prostoru k utěsnění pracovních spár u podzemních staveb. Základové těleso 2 sestává z úseku z úseku 4 s perforací 5 a z úseku 6 bez perforace. Perforace 5 je vytvořena např. kuželovi35 tými radiálními otvory 5_1_, které mohou být na základovém tělese 2 rozmístěny v pravidelných vzdálenostech, jak je patrno z obr., nevylučuje se však jejich rozmístění i nepravidelných vzdálenostech. Úseky 4 s perforací 5 mohou být na základovém tělese 2 stejné délky jako úseky 6 bez perforace. Podle účelu použití injektážní hadice 1 mohou být úseky 4 s perforací 5 a úseky 6 na základovém tělese 2 různé délky.The combined grouting hose 1 consists of a base body 2 having a lining in the form of a hollow cylinder in which a cylindrical passageway 3 is formed. The base body 2 can be in the shape of an octagon, quadrilateral, rectangle or other shape. Also, the through duct 3 may have other shapes, such as triangle, square, ellipse and the like. Through the through duct 3, a later hardening injected mixture (eg cementitious compound, polyurethane resin, etc.) is fed from one or both ends of the injection hose 1. for sealing work joints in underground structures. The base body 2 consists of a section 4 with a perforation 5 and a section 6 without a perforation. The perforation 5 is formed, for example, by conical 35 radial openings 51, which can be spaced on the base body 2 at regular distances, as shown in FIG., But their spacing even at irregular distances is not excluded. The sections 4 with perforation 5 may be on the base body 2 of the same length as the sections 6 without perforation. Depending on the purpose of the injection hose 1, the sections 4 with the perforation 5 and the sections 6 on the base body 2 can be of different lengths.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CZ200820534U CZ19267U1 (en) | 2008-11-12 | 2008-11-12 | Combined grouting hose for day-work joints |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CZ200820534U CZ19267U1 (en) | 2008-11-12 | 2008-11-12 | Combined grouting hose for day-work joints |
Publications (1)
Publication Number | Publication Date |
---|---|
CZ19267U1 true CZ19267U1 (en) | 2009-01-26 |
Family
ID=40325882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CZ200820534U CZ19267U1 (en) | 2008-11-12 | 2008-11-12 | Combined grouting hose for day-work joints |
Country Status (1)
Country | Link |
---|---|
CZ (1) | CZ19267U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ306292B6 (en) * | 2011-12-09 | 2016-11-16 | Metrostav A. S. | Device for mixing at least two-component grouting mixture in grouting pipe within boom tunneller shield envelope |
-
2008
- 2008-11-12 CZ CZ200820534U patent/CZ19267U1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ306292B6 (en) * | 2011-12-09 | 2016-11-16 | Metrostav A. S. | Device for mixing at least two-component grouting mixture in grouting pipe within boom tunneller shield envelope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATE512331T1 (en) | INTEGRAL PIPE AND FITTING ASSEMBLY MADE OF POLYMER MATERIAL AND PRODUCTION METHOD THEREOF | |
US20130300103A1 (en) | Riser cap and irrigation piping system using same | |
DE602009000473D1 (en) | Safety splice system for aligned tubes against expansion or contraction | |
KR102196531B1 (en) | Valve joint unit with compatibility and convenience of installation, excellent airtightness and seismic performance | |
BR112018001702A2 (en) | well casing, method for casing a well, and well casing structure | |
ATE352744T1 (en) | PIPE COUPLING FOR SCREW CONNECTION OF SECOND PIPES | |
CZ19267U1 (en) | Combined grouting hose for day-work joints | |
CN103403289B (en) | Connector with adhesive surface | |
US20090146414A1 (en) | Method and system for joining pipeline components | |
DE202015106967U1 (en) | connection system | |
JP2010084794A (en) | Self-close functional type pipe-enlarging device | |
JP6808533B2 (en) | Blocking device | |
ES1195183U (en) | Set for unclog (Machine-translation by Google Translate, not legally binding) | |
US780789A (en) | Pipe. | |
EP3670996A1 (en) | Bladder, device for inflating bladder and arrangement | |
JP6982673B2 (en) | Blocking device | |
DE1739300U (en) | PIPE CONNECTION FOR PLASTIC PIPES. | |
KR102705244B1 (en) | Sprinkler Flexible Pipe With Joint Part Of CPVC Pipe Connection | |
CN109185579A (en) | A kind of flange metal tube through walls | |
CN211773931U (en) | Pipe joint waterproof structure for piping lane construction | |
JP2001269997A (en) | Method for repairing existing pipe line, and pipe line | |
CN208503740U (en) | A kind of irrigation water pipe connection and system | |
IT201600095972A1 (en) | COAXIAL TYPE GEOTHERMAL PROBE AND METHOD TO REALIZE IT | |
KR20240117320A (en) | Pipes Coupler | |
CN207646731U (en) | A kind of anchor cable strand structure suitable on rock foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG1K | Utility model registered |
Effective date: 20090126 |
|
ND1K | First or second extension of term of utility model |
Effective date: 20120926 |
|
MK1K | Utility model expired |
Effective date: 20151112 |