Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Colegio Mayor De AntioquiafiledCriticalColegio Mayor De Antioquia
Priority to CONC2017/0006877ApriorityCriticalpatent/CO2017006877A1/en
Publication of CO2017006877A1publicationCriticalpatent/CO2017006877A1/en
La presente invención corresponde a un sistema de generación de energía mediante un amortiguador magnético axial y un transformador mono inducido. La presente invención entrega un dispositivo con un diseño específico de funcionamiento y distribución espacial de los elementos, que logra un aumento en la eficiencia de aprovechamiento de la energía mecánica para producción de energía eléctrica.The present invention corresponds to a power generation system by means of an axial magnetic damper and an induced mono transformer. The present invention provides a device with a specific design of operation and spatial distribution of the elements, which achieves an increase in the efficiency of utilization of mechanical energy for the production of electrical energy.
CONC2017/0006877A2017-07-102017-07-10
Power generation system from an axial magnetic damper and an induced mono transformer
CO2017006877A1
(en)
Electromagnetic energy extraction system within a cable to illuminate said cables among other uses, comprising a power cable and an energy extraction device; manufacturing method and repair method of the energy extraction system; method of manufacturing the energy extraction device.
Enclosure containing: a control compartment, a transformer compartment and a compartment of energy cells to receive a plurality of energy cells, energy supply and electrical energy distribution system.
Procedure for controlling an arrangement for introducing electrical energy into an electrical supply network, which has a wind energy installation, where the method comprises generating electrical energy with the installation from the wind, introducing a first power generated in the supply network, supplying a second power to a consumer that partially or partially reduces the power driven to the consumer and is added to the first part; and said provision
Procedure for controlling a wind power installation, which comprises a generator for the supply of electrical energy to an electricity supply network, but which is not yet connected to the electricity supply network, said method comprises the steps of producing electrical energy with the generator, and feed the electrical elements of the wind power installation with the energy produced; wind power installation.
Solar generator with microlupas and current multiplier, with thermovoltaic cell with a thousand pairs of cables (Machine-translation by Google Translate, not legally binding)