CN2937289Y - Hang ceiling keel joint - Google Patents
Hang ceiling keel joint Download PDFInfo
- Publication number
- CN2937289Y CN2937289Y CN 200620044482 CN200620044482U CN2937289Y CN 2937289 Y CN2937289 Y CN 2937289Y CN 200620044482 CN200620044482 CN 200620044482 CN 200620044482 U CN200620044482 U CN 200620044482U CN 2937289 Y CN2937289 Y CN 2937289Y
- Authority
- CN
- China
- Prior art keywords
- hole
- stopple
- chovr body
- holding section
- conjugant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a keel connector of suspended ceiling to be combined with an aluminum alloy keel frame and to form the ceiling with a plurality of cover boards; wherein the connector comprises a reset body, several connecting bodies and a hole plug, a through hole is provided on the reset body, the connecting bodies are arranged on the reset body with the integral connect method, the connecting bodies are in a spaced alignment on the reset body and along the radial direction of the through hole, and the hole plug matches the through hole to be inserted and buckled into the through hole. The utility model can prevent the structural damage which is caused by drilling on the cover board or the aluminum alloy keel frame, has a good dust prevention performance and is quick and convenient to assemble.
Description
Technical field
The utility model relates to a kind of channel structure, relate in particular to a kind of channel joint, do not need in cover plate or aluminium alloy joist framework to get into the cave during objects such as its installing light fixture or water sprinkler, and promote structural strength and dustproof effect, and make assembling convenient more rapidly.
Background technology
Now when house interior architectural applications or decoration, ceiling all is to be made of aluminium alloy joist framework, joint and cover plate, and will install light fixture or water jet the time, just must on aluminium alloy joist framework or cover plate, hole and to install, but can cause the damage of aluminium alloy joist framework or covering plate structure after the boring and reduce support force, add if use the place of needing air cleaner at dust free room etc. badly, have the puzzlement that break flour and dust fall via the boring finedraw after the boring, therefore still have great room for improvement.
A kind of design of being convenient to install just appears in the market, as number of patent application is 089204349 TaiWan, China patent application " the built-up joint structure-improved of light steelframe ", as shown in Figure 1, this built-up joint 10 comprises a reinforcing body 11, four combinations 12 and a blind nut 13, this reinforcing body 11 is offered a screw 111,12 pairs of four combinations should screw 111 direction radially be arranged at this reinforcing body 11, and this reinforcing body 11 and 12 windings of four combinations form cross, and these blind nut 13 corresponding screw locks are in the screw 111 of this reinforcing body 11.
When this built-up joint 10 is used in ceiling, the built-up joint 10 of objects such as installing light fixture or water jet screws off its blind nut 13, and with the screw 111 of screw locks such as light fixture or water jet in this reinforcing body 11, again pipeline is passed the pipeline that this screw 111 connects the building, needn't on light steelframe or cover plate, hole.
When but light fixture or water jet are arranged at this built-up joint 10, this light fixture or water jet are that the mode with screw lock is fixed in this reinforcing body 11, and the fixing general general fixing speed of speed of screw lock is come slowly, therefore inconvenient and take time in installing and construction, though therefore solve disadvantage for a long time, the problem of deriving also and making new advances.
Thereby in order effectively to solve above-mentioned all problems, the utility model based on the past in the technology and the experience of being accumulated aspect building and the decoration, from the facility of constructing, gain in strength and promote direction such as dustproof effect and set about improvement, design a kind of joint of brand-new channel.
The utility model content
The technical problems to be solved in the utility model provides a kind of channel joint, can avoid on cover plate or aluminium alloy joist framework boring and causes the damage of structure, and dustproof effect is good, and assembling is convenient rapidly.
For solving the problems of the technologies described above, channel joint of the present utility model, it is used for and the winding of aluminium alloy joist framework, and constitutes ceiling after cover plate is set, and this channel joint comprises a chovr body, some conjugants and a stopple, wherein:
This chovr body, it offers a through hole, has at least one holding section on this through hole;
This conjugant, its mode with the one joint is arranged at described chovr body, and this conjugant on this chovr body with to should through hole direction radially being spaced;
This stopple, at least one keeper of the forming through holes of its corresponding described chovr body, and this keeper has a holding section in addition, the location of corresponding engaging with the holding section of described through hole, this holding section, and this stopple is positioned this through hole.
The quantity of described conjugant is two, and engages formation L font with described chovr body one.
The quantity of described conjugant is three, and engages formation T font with described chovr body one.
The quantity of described conjugant is four, and engages the formation cross with described chovr body one.
The holding section quantity of described chovr body is four, and the keeper quantity of described stopple is four, and the holding section of described stopple respectively is provided with a trip, and the holding section of this chovr body each trip that should stopple is provided with a Button Block.
The adjacent of through hole between four keepers of the corresponding described chovr body of described stopple respectively is provided with a ring wall, and establishes corresponding screw thread in Fourth Ring wall inner edge, and the corresponding Fourth Ring of this stopple wall is offered a perforation.
Compare with prior art, the utlity model has following beneficial effect: adopt the utility model channel joint, when installing light fixture or washing head, select the stopple of suitable correspondence for use, the electric wire of this light fixture or the water pipe of water sprinkler are connected with the pipeline in building via this stopple, and avoid on cover plate or aluminium alloy joist framework boring and cause the damage of structure, and boring has the puzzlement that break flour and dust fall via the boring finedraw.In addition, light fixture or water jet must be holed or screw lock is fixed unlike installed in the past, and the utility model is simplified the program of assembling in the mode of buckle, reached simple and convenient assembly, the purpose rapidly of constructing.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is described in further detail:
Fig. 1 is the stereogram of existing built-up joint;
Fig. 2 is the embodiment of the utility model channel joint and the schematic diagram of aluminium alloy joist framework assembling;
Fig. 3 is the exploded perspective view of the utility model embodiment;
Fig. 4 is the exploded perspective view that the utility model uses another kind of stopple embodiment;
Fig. 5 is the schematic perspective view of the utility model embodiment and light fixture assembling;
Fig. 6 is the schematic perspective view of the utility model embodiment and water jet assembling.
The specific embodiment
As shown in Figure 2, the utility model is used for the winding with aluminium alloy joist framework A, and after being set, cover plate becomes ceiling, 20 of this joints as shown in Figure 3, it comprises a chovr body 21, four conjugants 22 and a stopple 23, wherein: this chovr body 21 offers a through hole 211, have four holding sections 212 on this through hole 211, and four holding sections 212 all is provided with a Button Block 213.
This conjugant 22 be arranged at this chovr body 21 in the mode of one joint and in order to this aluminium alloy joist framework A winding, and four conjugants 22 on this chovr body 21 with to should through hole 211 direction radially being spaced, four conjugants 22 are engaged with these chovr body 21 one form cross, this conjugant 22 comprises an inclined-plane 221 and a location protruding 222, these 221 these conjugant 22 upper ends of sealing, inclined-plane, make this conjugant 22 externally for hermetically sealed, design like this can reduce dust and drop in this conjugant 22, use can further reach the dustproof effect at dust free room (toilet), this is located protruding 222 and is positioned at winding place with this aluminium alloy joist framework A, and, avoid unstable and problem rotation with this aluminium alloy joist framework A winding in order to strengthen positioning function.
23 pairs of this stopples should through hole 211 moulding four keepers 231, and has a holding section 232 on this four keeper 231 respectively in order to holding section 212 that should through hole 211, the holding section 232 of this keeper 231 is provided with a trip 233 to Button Block 213 that should through hole 211 holding sections 212 again, this stopple 23 is filled in established in the through hole 211 that is snapped in this chovr body 21.
And the stopple 23 of this joint 20, corresponding different purposes also have various kenel, as shown in Figure 3, stopple 23 in order to the through hole 211 that hides this chovr body 21, or stopple as shown in Figure 4 23,23 pairs of this stopples should respectively be provided with a ring wall 234 by the adjacent of through hole 211 between four keepers 231, and establish corresponding screw thread in Fourth Ring wall 234 inner edges, and these stopple 23 corresponding Fourth Ring walls 234 are offered a perforation 235, and the screw thread of Fourth Ring wall 234 inner edges of stopple 23, can corresponding installing light fixture electric wire seat X etc. the object of the corresponding screw thread of tool, as shown in Figure 5, or as shown in Figure 6, do not install this stopple 23, but be located at this through hole 211, and install a washing head Z in this water pipe W with water pipe W plug; Above-mentionedly be structure of the present utility model and describe in detail, and the variation of the utility model aspect enforcement.
The through hole 211 that this joint 20 is offered with its chovr body 21 cooperates the stopple 23 of different kenels, and is installed the object of all kinds of correspondences, as light fixture, cable or sprinkle water first-classly, does not therefore need as in the past at aluminium alloy joist framework or ceiling upper drill hole; Compare with this built-up joint 10, the utility model is when objects such as assembling light fixture or cable, in advance light fixture or cable are arranged at this stopple 23, again this stopple 23 plugs are established and be snapped in this through hole 211 and can finish the location, do not need light fixture or the direct screw lock of cable on this built-up joint 10; Therefore the utility model can avoid causing at ceiling or aluminium alloy joist framework upper drill hole the damage of structure, and the boring of ceiling has break flour and dust via the puzzlement that the boring finedraw falls, and has assembling effect easily rapidly.
Above-mentioned only is several embodiment of the present utility model, engage the kenel that forms as the quantity of conjugant 22 and with chovr body 21 one, be not only to be fixed as foregoing, this conjugant 22 can be two or three, engages the kenel that forms with these chovr body 21 one and corresponds to L type or T type; In addition, the quantity of the keeper 231 of this stopple 23 is not to be defined as aforesaid four, can be made as one, two or three etc. according to fixed demand; And the quantity of the holding section 212 of the through hole 211 of this chovr body 21 also is not only to be fixed as aforesaid four, but according to user demand different choice is arranged, and as one, two or three etc., so the utility model is looked the construction demand and had multiple different kenel.
In sum, a kind of channel joint of the utility model, it is used for and the winding of aluminium alloy joist framework, and after being set, cover plate constitutes ceiling, this joint comprises a chovr body, some conjugants and a stopple, this chovr body offers a through hole, each conjugant is arranged at this chovr body in the mode of one joint, and this conjugant on this chovr body with to should through hole direction radially being spaced, this stopple to should through hole and plug establish and be snapped in wherein, when installing light fixture or water sprinkler, select the stopple of suitable correspondence for use, the electric wire of this light fixture or the water pipe of water sprinkler are connected with the pipeline in building via this stopple, this kind design can be avoided on cover plate or aluminium alloy joist framework boring and cause the damage of structure, and the puzzlement that falls via the boring finedraw of break flour and dust, and assembling is convenient rapidly.
Claims (6)
1, a kind of channel joint, it is used for and the winding of aluminium alloy joist framework, and constitutes ceiling after cover plate is set, and it is characterized in that, and this channel joint comprises a chovr body, some conjugants and a stopple, wherein:
This chovr body, it offers a through hole, has at least one holding section on this through hole;
This conjugant, its mode with the one joint is arranged at described chovr body, and this conjugant on this chovr body with to should through hole direction radially being spaced;
This stopple, at least one keeper of the forming through holes of its corresponding described chovr body, and this keeper has a holding section in addition, the location of corresponding engaging with the holding section of described through hole, this holding section, and this stopple is positioned this through hole.
2, channel joint as claimed in claim 1 is characterized in that, the quantity of described conjugant is two, and engages formation L font with described chovr body one.
3, channel joint as claimed in claim 1 is characterized in that, the quantity of described conjugant is three, and engages formation T font with described chovr body one.
4, channel joint as claimed in claim 1 is characterized in that, the quantity of described conjugant is four, and engages the formation cross with described chovr body one.
5, as each described channel joint of claim 2-4, it is characterized in that, the holding section quantity of described chovr body is four, the keeper quantity of described stopple is four, the holding section of described stopple respectively is provided with a trip, and the holding section of this chovr body each trip that should stopple is provided with a Button Block.
6, channel joint as claimed in claim 5, it is characterized in that, the adjacent of through hole between four keepers of the corresponding described chovr body of described stopple respectively is provided with a ring wall, and establishes corresponding screw thread in Fourth Ring wall inner edge, and the corresponding Fourth Ring of this stopple wall is offered a perforation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620044482 CN2937289Y (en) | 2006-08-02 | 2006-08-02 | Hang ceiling keel joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620044482 CN2937289Y (en) | 2006-08-02 | 2006-08-02 | Hang ceiling keel joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2937289Y true CN2937289Y (en) | 2007-08-22 |
Family
ID=38361313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620044482 Expired - Fee Related CN2937289Y (en) | 2006-08-02 | 2006-08-02 | Hang ceiling keel joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2937289Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102500518A (en) * | 2011-11-29 | 2012-06-20 | 东莞百进五金塑料有限公司 | Manufacturing method of cylinder body for vacuum spraying |
CN102943527A (en) * | 2012-11-07 | 2013-02-27 | 苏州杰科洁净技术有限公司 | Cross connecting piece |
CN104314263A (en) * | 2014-11-10 | 2015-01-28 | 广州市广京装饰材料有限公司 | Clamping part structure and ceiling module |
CN107217776A (en) * | 2017-07-13 | 2017-09-29 | 苏州奇硕节能科技有限公司 | A kind of heavy aluminium roof keel furred ceiling |
-
2006
- 2006-08-02 CN CN 200620044482 patent/CN2937289Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102500518A (en) * | 2011-11-29 | 2012-06-20 | 东莞百进五金塑料有限公司 | Manufacturing method of cylinder body for vacuum spraying |
CN102943527A (en) * | 2012-11-07 | 2013-02-27 | 苏州杰科洁净技术有限公司 | Cross connecting piece |
CN104314263A (en) * | 2014-11-10 | 2015-01-28 | 广州市广京装饰材料有限公司 | Clamping part structure and ceiling module |
CN107217776A (en) * | 2017-07-13 | 2017-09-29 | 苏州奇硕节能科技有限公司 | A kind of heavy aluminium roof keel furred ceiling |
CN107217776B (en) * | 2017-07-13 | 2019-06-04 | 苏州奇硕节能科技有限公司 | A kind of heavy aluminium roof keel furred ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6911597B2 (en) | Architectural moldings for protecting, concealing and accessing indoor wiring and cables | |
US6951079B2 (en) | System and method of panelized construction | |
CN2937289Y (en) | Hang ceiling keel joint | |
KR100841357B1 (en) | Bracket assembly for supporting balcony parapet | |
CN111910821A (en) | Assembled furred ceiling and wall detachable structure | |
CN200961345Y (en) | Combined skirting | |
CN207998930U (en) | Mobile house | |
CN210857599U (en) | Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof | |
CN210092799U (en) | Special junction box for light steel partition wall | |
CN211396370U (en) | Wall structure is hung to engineering house | |
CN210738149U (en) | Combined simple house | |
CN220620822U (en) | External corner hanging structure for assembled wallboard | |
CN209975958U (en) | Internal corner closing line | |
CN217580972U (en) | Energy-conserving outer wall wallboard for building | |
CN211200818U (en) | Detachable steel keel partition wall module | |
CN213390828U (en) | Assembled building wallboard | |
CN219528279U (en) | Assembly skirting line capable of being wired | |
CN212897084U (en) | Mounting structure of assembled bathroom top surface | |
CN113374147B (en) | Keel hanging piece matched with assembly type suspended ceiling and installation method | |
CN220133237U (en) | Assembled type drop-level suspended ceiling mounting structure | |
CN107611724A (en) | A kind of round switch socket base and its convenient construction installation method | |
CN216787938U (en) | Energy-saving toilet device prepared from energy-saving wall boards | |
CN210421521U (en) | Connection structure of assembled steel construction siding wall | |
CN210947503U (en) | Carbon composite material top plate | |
CN113530067B (en) | Eye-splice falling-stage suspended ceiling module, suspended ceiling assembly and installation method of suspended ceiling assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070822 |