CN2926486Y - Fast wellhead for oil-gas water well - Google Patents

Fast wellhead for oil-gas water well Download PDF

Info

Publication number
CN2926486Y
CN2926486Y CN 200620092577 CN200620092577U CN2926486Y CN 2926486 Y CN2926486 Y CN 2926486Y CN 200620092577 CN200620092577 CN 200620092577 CN 200620092577 U CN200620092577 U CN 200620092577U CN 2926486 Y CN2926486 Y CN 2926486Y
Authority
CN
China
Prior art keywords
well
oil
fast
water well
guiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620092577
Other languages
Chinese (zh)
Inventor
张景利
邰德军
李贵库
倪荣发
杜丽东
钟连权
苏荣斌
李晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CN 200620092577 priority Critical patent/CN2926486Y/en
Application granted granted Critical
Publication of CN2926486Y publication Critical patent/CN2926486Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a fast mounting head of an oil vapor well used for operation underground of oil, gas and water well to avoid a blowout, comprising a stopcock1, a lifting sub2, a flange3, a guiding shoe4, and a lower short section5. An upper end and a lower end of the lifting pipe nipple2 are relatively connected with a lower end of the stopcock1 and an upper end of the flange3 by means of thread. a lower end of the flang3 is connected with the guiding shoe4 by means of inner thread. a lower end of the guiding shoe is connected with a upper end of the lower pipe nipple5 by means of inner thread. The fast installation well head has advantages of reasonable design, light weight, easy installation and operation and can shorten snatch installation time at the time of a well kick occurring during underground operation in oil vapor and water well to guarantee a success of snatch jet and a smooth construction.

Description

A kind of oil gas water well fast-assembling well head
Technical field:
The utility model relates to a kind of wellhead assembly that oil, gas, well increasing yield and injection measure underground work prevent blowout that is used for, and belongs to oil recovery downhole operation equipment class.
Background technology:
Along with oil field development enters the middle and later periods, increasing oil, gas, well need carry out measures to reach the purpose of increasing yield and injection.For safeguard measure well construction safety is carried out smoothly, wellhead blowout preventor is housed usually, but in a single day when blowout taking place, this kind wellhead blowout preventor can only seal oil casing annular space when rountrip, oil pipe still is in opening-wide state, and that need rob dress sealing oil pipe fluid course robs gusher mouth device.At present, field by using to rob the gusher mouth relatively heavy, button partially is difficult to quick operation easily, robs and pretends industry length consuming time, influences carrying out smoothly of well construction operation.
Summary of the invention:
But the utility model purpose is to provide oil, gas, the well fast-assembling well head of a kind of not only light blowout prevention performance but also good and Fast Installation.
The utility model purpose is to realize like this.This kind fast-assembling well head is made up of plug valve, lifting sub, flange, guide shoe and following pipe nipple, the lifting sub upper and lower end is connected with flange with plug valve with screw thread respectively, the flange below is connected with guide shoe with screw thread, and the guide shoe lower end is connected with following pipe nipple with screw thread.During the oil gas water well normal construction, the fast-assembling well head vertically is placed on the special stand, plug valve is placed opening, following pipe nipple should select for use with well in the pin thread of tubing string coupling, be used for connecting tubing string in the well; When construction well generation well kick, after this fast-assembling well head winched to well head and the interior tubing string of well is connected buckle, take elevator with carrying 100-200mm on the tubing string in the well with lifting card on the workover rig, transfer the fast-assembling well head; Because guide shoe has and leads the oblique angle, can enter big four automatically when guide shoe partly enters the well head big four, flange lower plane steel ring then enters well head big four steel ring slot automatically, and tighten corner bolt 4 this moment; Behind 90 ° on the cut-out tap valve all the other 8 bolts are tightened, can wash the kill job operation this moment; Washing kill-job finishes to carry on the back well head and can go on foot construction operation down.Because this fast-assembling well head adopts plug valve to replace 250 gates that existing fast-assembling well head adopts usually, makes weight alleviate greatly, and is easy to install.Because lifting sub is with being threaded in valve below and having snap ring, direct poppet when promoting well head, flat, thickening elevator can be general.In addition, guide shoe has leads the oblique angle and can make the well head automatic centering, and steel ring is gone into groove automatically, makes to rob that to pretend industry convenient and swift, saves time.
The utility model is reasonable in design, and is in light weight, installation, convenient to operation, and blowout prevention is respond well, utilizes it to shorten when oil, gas, well rountrip generation well kick and robs ETL estimated time of loading, guarantees to rob to be sprayed into carrying out smoothly of merit and construction operation.
Description of drawings:
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment:
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in the figure, the utility model is made up of plug valve 1, lifting sub 2, flange 3, guide shoe 4 and following pipe nipple 5, its structure, assembled relation are as follows: lifting sub 2 upper and lower ends are connected with flange 3 upper ends with plug valve 1 lower end with screw thread respectively, flange 3 lower internal thread are connected with guide shoe 4, and guide shoe 4 lower end internal threads are connected with following pipe nipple 5 upper ends.Wherein, lifting sub 2 upper and lower ends are respectively equipped with to be connected with flange 3 with plug valve 1 uses external screw thread, and the top periphery is provided with to be beaten elevator and promote and use round platform.Flange 3 is evenly equipped with 12 screws along periphery, and each screw is dolioform increasing along central axis, so that bolt alleviates own wt to neutralization.Guide shoe 4 bottoms have leads the oblique angle, is convenient to well head automatic centering and steel ring and goes into groove automatically, and external week of guide shoe is evenly equipped with 6 groove millings and is beneficial to weight reduction, and the guide shoe lower end is
Figure Y20062009257700051
Regular upset drilling rod button can connect the change button that is applicable to operating tool string in the well.

Claims (1)

1, a kind of oil gas water well fast-assembling well head, form by plug valve (1), lifting sub (2), flange (3), guide shoe (4) and following pipe nipple (5), it is characterized in that: lifting sub (2) upper and lower end is connected with flange (3) upper end with plug valve (1) lower end with screw thread respectively, flange (3) lower internal thread is connected with guide shoe (4), and guide shoe (4) lower end internal thread is connected with following pipe nipple (5) upper end.
CN 200620092577 2006-07-25 2006-07-25 Fast wellhead for oil-gas water well Expired - Fee Related CN2926486Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620092577 CN2926486Y (en) 2006-07-25 2006-07-25 Fast wellhead for oil-gas water well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620092577 CN2926486Y (en) 2006-07-25 2006-07-25 Fast wellhead for oil-gas water well

Publications (1)

Publication Number Publication Date
CN2926486Y true CN2926486Y (en) 2007-07-25

Family

ID=38280730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620092577 Expired - Fee Related CN2926486Y (en) 2006-07-25 2006-07-25 Fast wellhead for oil-gas water well

Country Status (1)

Country Link
CN (1) CN2926486Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761525A (en) * 2016-12-19 2017-05-31 中国石油天然气股份有限公司 Blowout control wellhead and blowout control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761525A (en) * 2016-12-19 2017-05-31 中国石油天然气股份有限公司 Blowout control wellhead and blowout control method

Similar Documents

Publication Publication Date Title
CN201486515U (en) Switch type releasing packer
CN106369236B (en) A kind of vertical clamping hoop type connector of subsea manifold
CN2926486Y (en) Fast wellhead for oil-gas water well
CN2916116Y (en) Separated double-plug casing cement head
CN201924865U (en) Slip type casing head sealing device
CN2816339Y (en) Well controlled blowout-proof device
CN210087252U (en) Underground continuous pipe cable separation sealing adapter
CN202202835U (en) Multifunctional wellhead device used for down-hole operation in oil-gas well
CN201705287U (en) Anti-backflow oil nozzle of oil pumping well head
CN2816341Y (en) Pressure-relief type well-plugging device
CN204941377U (en) A kind of multi-functional Compound Water tap
CN203347732U (en) Well mouth blowout preventing device and well mouth pitching device
CN103670310A (en) Releasing tool for releasing string
CN2849129Y (en) Lift short connecting type rotary operation water tap
CN201474626U (en) Reverse buckle double joint
CN203066888U (en) Blockage-preventing safety joint
CN207420528U (en) A kind of new oil tube head conversion connector
CN209083249U (en) A kind of split type oil pipe self-sealing blowout preventer
CN209195272U (en) A kind of quick drill plug tubing string
CN108798594B (en) Dedicated pressure relief device in Downhole Construction
CN204663452U (en) Totally-enclosed blowout preventer borehole apparatus
CN201902191U (en) Blowout preventer with side opening door
CN101936144B (en) Uphole pressure-bearing protective device
CN2695619Y (en) Quick assembling blow-out preventer
CN201771463U (en) Well mouth bearing protection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070725