CN2923822Y - Sand-fixing net-grid-type hollow brick capable of filling material - Google Patents

Sand-fixing net-grid-type hollow brick capable of filling material Download PDF

Info

Publication number
CN2923822Y
CN2923822Y CNU2005200221886U CN200520022188U CN2923822Y CN 2923822 Y CN2923822 Y CN 2923822Y CN U2005200221886 U CNU2005200221886 U CN U2005200221886U CN 200520022188 U CN200520022188 U CN 200520022188U CN 2923822 Y CN2923822 Y CN 2923822Y
Authority
CN
China
Prior art keywords
brick body
sand
utility
model
barrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2005200221886U
Other languages
Chinese (zh)
Inventor
王瑞忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai Donghong
Original Assignee
Tai Donghong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tai Donghong filed Critical Tai Donghong
Priority to CNU2005200221886U priority Critical patent/CN2923822Y/en
Application granted granted Critical
Publication of CN2923822Y publication Critical patent/CN2923822Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a mesh fillable type hollow brick body for sand fixation. The hollow brick body has a mesh-shape brick wall, can be inserted by a septal gate and can be filled by a filler of plant straw, Kobresia, etc. The production raw material is an ash emitted by coal-fired thermal power plant, the production mode is die and mould production, the function is used to form a sand barrier, the beneficial effect is consumption a plurality of ash emitted by coal-fired thermal power plant to protect environment while realize a aim of controlling desert at the same time. According to the practical needs of sand fixation, the shape, volume and weight of the brick body can be designed and produced flexibly.

Description

But fix the sand with grid type packing type hollow brick body
Affiliated technical field
But the utility model relates to a kind of fixing the sand with grid type packing type hollow brick body, and especially a kind of body wall is latticed, and inside is hollow, and inwall is provided with the draw-in groove that can install barrier and leaves the space that can insert straw.The related brick body of the utility model be a kind of lime-ash production that can utilize coal-fired station discharging in a large number, can be widely used for constituting the desert and fix the sand the brick body of sand-protecting barrier of usefulness.The integrated environment protection field that belongs to comprehensive utilization of coal fired thermal power plant powdered coal cinder and desert sand prevention.
Background technology:
The main method that machinery fixes the sand is the thing that places all sorts of obstacles in the desert, catch blowing sand, and when stream during through obstruction, grains of sand sedimentation, wind speed reduce, take husky ability drop, and this obstruction is commonly called as sand-protecting barrier.At present, the method that sand-protecting barrier is set is a lot, but easily being buried of having, and the weather-proof ability that has, life-span are short, and ubiquity the problem that difficulty is set.On the other hand, the lime-ash that coal-fired station produced has been used for producing the brick body, and production technology is quite ripe, and just the design of brick body also only is to consider from building occupancy.
Summary of the invention
In order to overcome all disadvantages that have sand-protecting barrier now and to solve coal-fired station's utilization of ash and slag, minimizing pollution problems, but the utility model provides a kind of and fixes the sand with grid type packing type hollow brick body, the production of this kind brick body not only can consume the lime-ash that coal-fired station produces in a large number, but also can constitute better sand-protecting barrier.
The technical scheme that its technical problem that solves the utility model adopts is: design a kind of body wall and be latticed, inside and be the hollow brick body that hollow, inwall is provided with the draw-in groove that can install barrier and leaves the space that can insert fillers such as straw.This brick body is thrown in the desert, when stream during through the brick body since the grid type brick wall of brick body, inner barrier and filler stop that can make a large amount of sedimentations of the grains of sand, wind speed reduces greatly, the husky ability of taking of wind weakens greatly.So possessed the function of sand-protecting barrier with the obstruction of the related brick body formation of the utility model.The related brick body of the utility model is a kind of coagulating cement goods, weather-proof ability is strong, and mobility is strong, so the sand-protecting barrier that constitutes with the related brick body of the utility model, can have long, anti-burying property of life-span strong, advantage flexibly is set, this be in the past sand-protecting barrier can not than; Because the brick body is produced outside the desert, only need the scene to throw in, carry and moving simultaneously, this has also reduced the difficulty that is provided with of sand-protecting barrier greatly.The related brick body of the utility model is a kind of can production according to the production technology and the hollow brick manufacturing technology of existing pulverized fuel ash cement, the lime-ash that utilizes coal-fired station to discharge on the other hand.The feature of this brick body is as follows:
1. this brick body is a kind of hollow brick body, and its wall body is latticed.Wall right-angle view such as Fig. 1, Fig. 2.The basic profile of this brick body has two kinds: a kind of hexahedron of the upper and lower opening of forming by rectangle wall shown in Figure 1, as shown in Figure 3; A kind of tetrahedron of the single face opening of forming by triangle wall shown in Figure 2, as shown in Figure 4.
2. this brick body inside is empty, is hexahedron shaped brick body as shown in Figure 3, and wall is provided with the guide groove that can insert and fix " barrier " within it, and the compound mode of brick body and barrier as shown in Figure 5.
3. but the filler feature of this brick body is meant: can put into straw or wormwood in brick body inner space as shown in Figure 4; In the space that as shown in Figure 3 brick body inwall and barrier constitute, also can put into straw or wormwood, also can insert the multilayer barrier, not add stalk and wormwood.
4. related " barrier " all refers to the paling form brick body that usefulness and brick body same material are made in above-mentioned narration, and its right-angle view as shown in Figure 6.
5. as Fig. 3, on the brick wall of the opening part of brick body shown in Figure 4, be equipped with and insert and fixedly be used for preventing the hole of blocking thing that straw or wormwood are overflowed.Hexahedral suitable for reading to as shown in Figure 3 also can add barrier female cap plate, as shown in Figure 7.
6. the related brick body of the utility model, raw materials for production mainly are the lime-ash of coal-fired station's discharging, and the mode of production is mold production, and the support of its production is existing " pulverized fuel ash cement " production technology and hollow brick production technology.This brick body is a kind of coagulating cement goods.
But the utility model is related fix the sand with the beneficial effect that grid type packing type hollow brick body uses be: there is the abundant in coal resource in the three northern areas of China of China and the Inner Mongol, for coal is transformed to electric energy, country has built up and large quantities of coal-fired stations under construction, how to handle the emission of these power plant--and-lime-ash is a big problem.Simultaneously, three northern areas of China and area, the Inner Mongol are again the areas that China desert distributes and concentrates, and administer the desert is a difficult task always.But this fixing the sand that the utility model is related with grid type packing type hollow brick body; when producing, can consume a large amount of lime-ash; fix the sand that in the desert peculiar effect is arranged again, so the related brick body of the utility model puts into production use the purpose that can realize administering the desert in the protection environment.
Description of drawings
Fig. 1 is the wall shape figure of the utility model hexahedron shaped brick body
Fig. 2 is the wall shape figure of the utility model tetrahedron shaped brick body
Fig. 3 is the schematic perspective view of the utility model hexahedron shaped brick body
Fig. 4 is the schematic perspective view of the utility model tetrahedron shaped brick body
Fig. 5 is the schematic perspective view that the utility model hexahedron shaped brick body inserts barrier
Fig. 6 is the schematic diagram of the utility model barrier
Fig. 7 is that the utility model hexahedron shaped brick body adds barrier female cap plate schematic diagram
The specific embodiment
Shown in Figure 1 is the wall shape of hexahedron shaped brick body, middle little box indicating small square hole.Fig. 3 is the schematic perspective view of the utility model hexahedron shaped brick body, and hexahedral four sides all around all is grid type walls shown in Figure 1, and upper and lower is opening, and the centre is hollow.Fig. 5 is the schematic perspective view that hexahedron shaped brick body inserts barrier, can put into straw or wormwood in the space that brick body inwall and barrier constitute, and is used for catch blowing sand.In order to prevent that straw or wormwood are blown out, can add barrier type cover plate shown in Figure 6 brick body shown in Figure 5 suitable for reading, as shown in Figure 7.
Fig. 2 is the wall shape figure of the utility model tetrahedron shaped brick body, and wherein three faces are arranged is shape shown in Figure 2 to tetrahedron, and it is opening that a face is arranged, and its inside is hollow.Fig. 4 is the schematic perspective view of the utility model tetrahedron shaped brick body.

Claims (2)

1. but one kind is fixed the sand with grid type packing type hollow brick body, and it is characterized in that: the brick body wall is latticed, and its inside is hollow.
2. but according to claim 1 fixing the sand with grid type packing type hollow brick body, it is characterized in that: inside is provided with the draw-in groove that can insert barrier, and leaves the space that can put into fillers such as straw.
CNU2005200221886U 2005-12-21 2005-12-21 Sand-fixing net-grid-type hollow brick capable of filling material Expired - Fee Related CN2923822Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2005200221886U CN2923822Y (en) 2005-12-21 2005-12-21 Sand-fixing net-grid-type hollow brick capable of filling material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2005200221886U CN2923822Y (en) 2005-12-21 2005-12-21 Sand-fixing net-grid-type hollow brick capable of filling material

Publications (1)

Publication Number Publication Date
CN2923822Y true CN2923822Y (en) 2007-07-18

Family

ID=38260251

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2005200221886U Expired - Fee Related CN2923822Y (en) 2005-12-21 2005-12-21 Sand-fixing net-grid-type hollow brick capable of filling material

Country Status (1)

Country Link
CN (1) CN2923822Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012009966A1 (en) * 2010-07-22 2012-01-26 兰州金福乐生物工程有限公司 New use of triangular cylinder
CN103410137A (en) * 2013-08-21 2013-11-27 青海省水利水电科学研究所 Structural type sand prevention and control technology
CN104314065A (en) * 2014-09-16 2015-01-28 兰州大学 Brick array sand barrier for preventing and blocking sand
CN110670570A (en) * 2019-08-21 2020-01-10 河北建筑工程学院 Novel trompil sand stabilization sand barrier
CN110526643B (en) * 2019-08-21 2021-11-23 河北建筑工程学院 Brick capable of taking salty aeolian sand as raw material and preparation method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012009966A1 (en) * 2010-07-22 2012-01-26 兰州金福乐生物工程有限公司 New use of triangular cylinder
CN103069080A (en) * 2010-07-22 2013-04-24 兰州金福乐生物工程有限公司 New use of triangular cylinder
CN103069080B (en) * 2010-07-22 2015-06-17 兰州金福乐生物工程有限公司 New use of triangular cylinder
CN103410137A (en) * 2013-08-21 2013-11-27 青海省水利水电科学研究所 Structural type sand prevention and control technology
CN103410137B (en) * 2013-08-21 2015-11-25 青海省水利水电科学研究所 A kind of structural type is defended and controlled sand method
CN104314065A (en) * 2014-09-16 2015-01-28 兰州大学 Brick array sand barrier for preventing and blocking sand
CN110670570A (en) * 2019-08-21 2020-01-10 河北建筑工程学院 Novel trompil sand stabilization sand barrier
CN110526643B (en) * 2019-08-21 2021-11-23 河北建筑工程学院 Brick capable of taking salty aeolian sand as raw material and preparation method thereof

Similar Documents

Publication Publication Date Title
CN2923822Y (en) Sand-fixing net-grid-type hollow brick capable of filling material
CN203492456U (en) Combined green body
CN202219240U (en) Separator for waste and old solid particle powder
CN206701455U (en) A kind of closed flyash production system
CN201776275U (en) Urban household waste treatment system
CN107298275A (en) A kind of circular stockyard
CN203612483U (en) Storage device for storage field and enclosed storage field
CN207878778U (en) A kind of sound insulation Environment Protecting Mode Wall Brick
CN201232288Y (en) Straw wall tile
CN108002781B (en) Composite sound-absorbing low wall and manufacturing method thereof
CN203486484U (en) Novel biomass uniformizing conveying device
CN102979240A (en) Large-dosage coal ash composite self-insulation building block and preparation method thereof
CN203097083U (en) Waste residue concrete sandwich building block
CN108787124A (en) A kind of closed flyash production system
CN101912869A (en) City and town household garbage treatment system and processing method thereof
CN208810794U (en) A kind of lime-ash plasma melting proportioner and lime-ash plasma melting system
CN206747573U (en) A kind of slab lattice accmulator mould
CN203034669U (en) Waste residue concrete cored block
CN101684674A (en) Straw wall brick
CN105133776B (en) A kind of new profit is given up energy-saving and environment-friendly hollow/composite block
CN206705976U (en) A kind of enclosed cement production system
CN204510826U (en) Vertical transport concrete chute descending lifeline
CN217411880U (en) Clout recovery unit is used in hollow brick production
CN217102233U (en) Unpowered pyramid grid distributing device for squat silo
CN207299961U (en) A kind of exhaust passage of refractory material kiln

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070718

Termination date: 20100121