CN2915818Y - Self-lifting type drilling well platform block lifting system - Google Patents

Self-lifting type drilling well platform block lifting system Download PDF

Info

Publication number
CN2915818Y
CN2915818Y CN 200620022806 CN200620022806U CN2915818Y CN 2915818 Y CN2915818 Y CN 2915818Y CN 200620022806 CN200620022806 CN 200620022806 CN 200620022806 U CN200620022806 U CN 200620022806U CN 2915818 Y CN2915818 Y CN 2915818Y
Authority
CN
China
Prior art keywords
platform
fixed pulley
spud leg
group
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620022806
Other languages
Chinese (zh)
Inventor
杨安平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620022806 priority Critical patent/CN2915818Y/en
Application granted granted Critical
Publication of CN2915818Y publication Critical patent/CN2915818Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A pulley lifting system which main includes: at least three pile legs, which are vertically sleeved in a platform; along a circle of every pile leg, angle is average distributed and fixed with at least two groups pile legs fixed pulley, each group pile leg fixed pulley is two which are respectively fixed on the upper and bottom of the pile leg; one end of the platform near the pile leg which upper and bottom surface correspond to the pile leg fixed pulley position, are respectively arranged with a platform fixed pulley, constitute the platform fixed pulley group; at the other end of the platform corresponding to each platform fixed pulley group, is arranged with a winch, the wire rope or chain or rope made by other synthetic materials on the winch back and forth several times pass through between the pile leg fixed pulley group and platform fixed pulley group. By the lifting system, can easily drive the pile leg or platform, manufacturers can achieve the ability to produce the platform lifting system in order to tackle the current supply and demand balance, but also reduce the cost. The utility model can be applied to the relevant platform operations on sea or other water such as the drilling, work over, testing, oil extraction etc.

Description

Jack-up drilling unit pulley jacking system
Technical field
The utility model belongs to the jacking system of the jack-up platform of marine or other operation at sea engineerings, relates to a kind of jack up drilling well particularly, well workover, test, relevant flat-bed pulley jacking systems such as oil recovery.
Technical background
At present, marine jack-up platform jacking system adopts pinion and-rack and fluid pressure type more.With No. 3 platforms of Shengli Oil Field is example (specifically can consult ' Wang Yunan: Jack-up System Design of Shengli Work-over Platform ' " in April, 2003, Chinese platform, the 18th volume, the 2nd phase "), and its basic structure is:
Every pile leg symmetric arrangement two toothed rack are arranged with two gear tank towers (wedge bracket), and three groups of HM Hydraulic Motor transmission devices are installed on each gear tank tower, comprise parts such as HM Hydraulic Motor, epicyclic reduction gear, miniature gears, brake system.Two gear tank towers and wedge bracket form a closed circle, with the spud leg cover therein.Power passes to and tooth bar ingear miniature gears then by stake limit motor driven gear reduction box, thereby drives lifting platform (seeing also shown in Figure 1).
The pinion and-rack manufacture process requirement is higher, and the special steel material of making this equipment is present also very in short supply; Hydraulic pressure is higher to technical requirements, produces to be difficult for realizing.
The utility model content
The purpose of this utility model is to provide a kind of drilling well that can be applicable to sea or other operation at sea, well workover, test, relevant flat-bed jacking systems such as oil recovery.
For achieving the above object, the jacking system that the utility model provides, it mainly comprises:
Article at least three, spud leg, vertical sleeve is located in the platform;
Be fixed with at least two group spud leg fixed pulleys along each spud leg one circle, every group of spud leg fixed pulley is two, is separately fixed at the upper and lower part of spud leg with dividing equally angle;
Platform respectively is equipped with a platform fixed pulley near the corresponding spud leg fixed pulley place, end top and bottom of spud leg, forms platform fixed pulley group; Corresponding each the platform fixed pulley group of this flat-bed other end is mounted with a winch, and the hawser on this winch is arranged between spud leg fixed pulley group and the platform fixed pulley group.
Described jacking system, wherein the cross-sectional plane of spud leg is a different shape.
Described jacking system wherein is equipped with computing machine and signal monitoring feedback system on the platform.
Described jacking system, wherein winch is provided with latching device.
Described jacking system wherein has the multiple tracks pulley groove on each pulley, and the hawser on the winch repeatedly is arranged between corresponding spud leg fixed pulley and the platform fixed pulley back and forth, and the power that can bear of assembly pulley will be the several times of the power that can bear of a rope like this.
Described jacking system, wherein the hawser on the winch is the rope made from steel rope or chain or other synthetic materiaies
By above-mentioned jacking system, motion platform or spud leg can make more producers can reach the ability of production platform jacking system simultaneously easily, solve present equilibrium of supply and demand problem, have also reduced cost simultaneously.
Description of drawings
Fig. 1 is a known technology lifting platform system schematic.
Fig. 2 is a lateral plan of the present utility model.
Fig. 3 is a birds-eye view of the present utility model.
The specific embodiment
Please in conjunction with Fig. 2 and 3, main body of the present utility model is to be bracing frame by several spud legs 1, vertically is sheathed in the platform 2.Around every 1 one weeks of spud leg, be fixed with three groups of spud leg fixed pulleys 30 with dividing equally angle; The cross-sectional plane of spud leg 1 can be a different shape, if quadrangle, then every spud leg can cooperate one group in each face totally four groups of assembly pulleys and winch, if the spud leg cross section is other polygons or the circular quantity that also can decide assembly pulley and winch according to the intensity needs, generally be provided with two groups at least, spud leg is subjected to equilibrium of forces when guaranteeing its application of force.Have the multiple tracks pulley groove on each pulley, repeatedly be arranged in repeatedly back and forth between the cooresponding pulley for rope, the power that can bear of assembly pulley will be the several times (wear back and forth in theory and be several times several times) of the power that can bear of a rope like this.The quantity of concrete each pulley top sheave groove and the number of times that rope wears are repeatedly back and forth decided by magnitude of load and line strength.The transversal surface that present embodiment shows with Fig. 3 is that the triangle spud leg is the example explanation, fixes one group of spud leg fixed pulley on each face of triangle spud leg.Every group of spud leg fixed pulley is made up of two fixed pulleys again, is separately fixed at the upper and lower part of spud leg 1, i.e. the upper side of platform 2 and downside (as shown in Figure 2).At the end of platform 2 by spud leg 1, side and downside are fixed with platform fixed pulley 31 and 32 respectively thereon with dividing equally angle; The other end of platform 2, its upper side and downside are divided equally angle ground and are fixed with three winches 6 respectively.The platform fixed pulley 31 of platform 2 upper sides concerns with the corresponding one by one one-tenth of spud leg fixed pulley 30 vertical lines on spud leg top respectively, (this hawser 5 can be the hawser that steel rope or chain or other synthetic materiaies are made to its each winch 6 by hawser 5, concrete which kind of rope that adopts, by intensity, weight, the life-span of cord material, stormy waves, the depth of water in work waters, the length and the economy of spud leg are taken all factors into consideration) wear around a corresponding platform fixed pulley and a spud leg fixed pulley for several times back and forth.The platform fixed pulley 31 of platform 2 downsides concerns that with the corresponding one by one one-tenth of spud leg fixed pulley 30 vertical lines of spud leg bottom its each winch 6 is worn around a corresponding platform fixed pulley and a spud leg fixed pulley back and forth by hawser 5 for several times respectively.By winch pulling hawser, realize the relative lifting of spud leg peace interstation.
The utility model principle of work is that each spud leg is by each three totally three groups of pulleys realization liftings up and down.When the relative platform of spud leg rises, start three winches of platform downside, the rolling hawser spurs the fixed pulley of spud leg bottom fixed pulley and platform downside, unclamps the hawser of three winches of platform upper side simultaneously, at this moment be support with the buoyancy of hull, spud leg is gone up in the sea.
When the relative platform of spud leg descends, start three winches of platform upper side, the rolling hawser spurs the fixed pulley of spud leg top fixed pulley and platform upper side, unclamps the hawser of three winches of platform downside simultaneously, makes spud leg drop to the predetermined degree of depth.
When the relative platform of spud leg is made rising or down maneuver, horizontal stroke, the trim of the signal control jacking condition lower platform of the signal monitoring feedback system of passing through by computing machine 4, the rising or falling speed of spud leg or hull, and the purpose of the working load that single pile bore, to guarantee elevating safety, stable carrying out, additional simultaneously latching device positions spud leg or platform.Computing machine and signal monitoring feedback system that the utility model adopts, and its structure of latching device and principle of work be known technology, promptly widely-used at present marine jack-up platform, therefore it is not described specifically.

Claims (6)

1. a jack-up drilling unit pulley jacking system is characterized in that, comprising:
Article at least three, spud leg, vertical sleeve is located in the platform;
Be fixed with at least two group spud leg fixed pulleys along each spud leg one circle, every group of spud leg fixed pulley is two, is separately fixed at the upper and lower part of spud leg with dividing equally angle;
Platform respectively is equipped with a platform fixed pulley near the corresponding spud leg fixed pulley place, end top and bottom of spud leg, forms platform fixed pulley group; Corresponding each the platform fixed pulley group of this flat-bed other end is mounted with a winch, and the hawser on this winch is arranged between spud leg fixed pulley group and the platform fixed pulley group.
2. jacking system as claimed in claim 1 is characterized in that, the cross-sectional plane of described spud leg is triangle, quadrangle, polygon or circle.
3. jacking system as claimed in claim 1 is characterized in that, computing machine and signal monitoring feedback system are installed on the described platform.
4. jacking system as claimed in claim 1 is characterized in that described winch is provided with latching device.
5. jacking system as claimed in claim 1, it is characterized in that, have the multiple tracks pulley groove on described each pulley, the hawser on the winch repeatedly is arranged between corresponding spud leg fixed pulley and the platform fixed pulley back and forth, and the power that can bear of assembly pulley will be the several times of the power that can bear of a rope like this.
6. as claim 1 or 5 described jacking systems, its special sheet is, the hawser on the described winch is the rope that steel rope or chain or other synthetic materiaies are made.
CN 200620022806 2006-03-08 2006-03-08 Self-lifting type drilling well platform block lifting system Expired - Fee Related CN2915818Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620022806 CN2915818Y (en) 2006-03-08 2006-03-08 Self-lifting type drilling well platform block lifting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620022806 CN2915818Y (en) 2006-03-08 2006-03-08 Self-lifting type drilling well platform block lifting system

Publications (1)

Publication Number Publication Date
CN2915818Y true CN2915818Y (en) 2007-06-27

Family

ID=38186725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620022806 Expired - Fee Related CN2915818Y (en) 2006-03-08 2006-03-08 Self-lifting type drilling well platform block lifting system

Country Status (1)

Country Link
CN (1) CN2915818Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101709646B (en) * 2009-12-02 2012-12-26 江苏省无锡探矿机械总厂有限公司 Floating drilling device of offshore drill

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101709646B (en) * 2009-12-02 2012-12-26 江苏省无锡探矿机械总厂有限公司 Floating drilling device of offshore drill

Similar Documents

Publication Publication Date Title
CN100476197C (en) Supporting structures for water current turbine comprising turbine assembly
CN103228530B (en) Floating structure operating system, floating structure, operation ship and floating structure operational method
CN202007400U (en) Marine foundation construction platform for jacket construction
CN201999671U (en) Cable-type pulley lifting system for friction winch
MXPA06003907A (en) Extensible semi-submersible platform.
CN105544457B (en) Small wharf capable of automatically adapting to tide level
CN101983894B (en) Pretension and lay-off method and device of crane jib for ship
CN101811563A (en) Salvage method of sinking ship on the sea
CN103600817B (en) Jack up mounting ship of offshore wind turbine
CN203546694U (en) Novel elevator mechanism of self-elevating drilling platform
NL2024729B1 (en) Ship cradle elevating/lowering apparatus
CN103373446A (en) Jacket removing ship and removing method
CN2915818Y (en) Self-lifting type drilling well platform block lifting system
CN212272198U (en) Self-balancing ore mixed transportation system easy to transfer
CN208980248U (en) A kind of guide tracked jacking system
CN2388170Y (en) Floating base crane
CN108791738B (en) A kind of Large marine blower entirety floating support mounting method
CN109319686A (en) A kind of guide tracked jacking system
CN202899140U (en) Riprap operation device of lifting hopper
CN212543336U (en) Computer cable protection device for offshore oil platform
CN106498918A (en) A kind of gravity platform jacking system
CN108945317B (en) Cabin-mounted submerged full-hydraulic horizontal release device
KR102093265B1 (en) Tidal generator that generates into buoyancy board movement through tidal tide difference
CN202557747U (en) Dismounting ship for jacket
CN202164066U (en) Hoisting device for large-scale articles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070627