CN2913909Y CN 200620091500 CN200620091500U CN2913909Y CN 2913909 Y CN2913909 Y CN 2913909Y CN 200620091500 CN200620091500 CN 200620091500 CN 200620091500 U CN200620091500 U CN 200620091500U CN 2913909 Y CN2913909 Y CN 2913909Y
Authority
CN
China
Prior art keywords
water
pipe
pump
valve
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620091500
Other languages
Chinese (zh)
Inventor
徐立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Huaxiang Heating And Ventilating Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620091500 priority Critical patent/CN2913909Y/en
Application granted granted Critical
Publication of CN2913909Y publication Critical patent/CN2913909Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model relates to an enclosed combined heat supply device for high building, which comprises a water pump arranged on a base, pipes, and an electric cabinet. A before-pump water inlet pipe is connected with the water supply pipe of a municipal heat supply pipe network; an after-pump water outlet pipe is connected with the main heating water supply pipe of high building; a hydraulic water return valve is installed at a height below hydrostatic pressure line of low-region heating system, and has its water inlet pipe connected with main water return pipe of high region; a bypass pipe is arranged between the water inlet pipe of the hydraulic water return valve and check valve upper opening of the after-pump water outlet pipe; a check valve is arranged on the bypass pipe; a water pressure control pipe is arranged between the hydraulic water return valve and the water pump; and the hydraulic water return valve is connected with the water return pipe of municipal heat supply pipe network via pipeline. Butterfly valves may be arranged in the water supply and return pipes. The utility model has advantages of small land occupation, rapid adjustment and operation by connecting relevant pipelines, high safety and reliability, convenient maintenance, low cost, easy popularization, and great convenience for supplying heat to high buildings with municipal heat supply pipe network.

Description

Skyscraper enclosed mixed connection heating installation
Technical field the utility model relates to a kind of heating loop to be improved, and particularly one makes the skyscraper high low area adopt same heating system, realizes the direct-connected device of enclosed.
Background technology is along with the urban construction fast development of China, and the skyscraper of various places is on the increase.In north of china in winter heating is the subject matter of high building project design and operational management.The urban heating network, various places is generally all determined by low-rise building (seven layers).If the mode of the static pressure by improving heating system solves skyscraper heating problem, need to improve the pressure of existing heating system, transform existing systems, change the low pressure radiator, this is unpractical.If adopt partition-type to connect, because the heat supply water temperature is low, heat exchange area is big, need take a lot of construction areas, increases investment.The more important thing is because heating parameter reduction after the heat exchange can make constructure heating unit are radiator quantity heighten, the pipeline overstriking, thus improve cost.And in recent years, indoor heating system has all adopted plastic pipe, and the heat supply water temperature drops to 80/55 ℃ by original 95/70 ℃, particularly adopts the cooling water of thermoelectric plant exhaust heat heating system, makes that this scheme that adopts heat exchanger more is difficult to realize.In the last few years, realized round skyscraper heating system and urban heating network that many solutions had appearred in mixed connection this problem that heats.Distinguish by municipal heating network heat supply such as low, high district establishes cutout by the force (forcing) pump pressurization above the top layer return pipe, and rotary stop apparatus is installed in the below, and the centre connects with return pipe, follows a tube connector simultaneously, makes the high low area of skyscraper realize directly being incorporated into the power networks.Second kind is by the decompression pressure regulating valve.Adopt compressed air to control the device that quick isolating valve, disconnects system.But all there is defective in they, i.e. cutout, and it is big that rotary stop apparatus takies space, the cost height, specification is more numerous and diverse, and floor space is big, and equipment component is many, and water hammer etc. takes place when water pump is out of service, brings many inconveniences for operation, maintenance.
It is convenient that utility model content the technical problems to be solved in the utility model provides a kind of fabrication and installation, take up an area of few, noise is little, entrapped air not in the pipeline recirculated water, avoid of the corrosion of airborne oxygen to heating equipment, thereby need not carry out gas-water separation, pipeline can turn round, and occurs the integrated skyscraper enclosed mixed connection heating installation of water hammer when stopping termination of pumping.
In order to solve the problems of the technologies described above, the utility model has adopted following technical scheme: this skyscraper enclosed mixed connection heating installation, on the chassis, be provided with water pump, piping and electric cabinet, be provided with water inlet pipe before the pump of water pump, link to each other with the feed pipe of municipal heating network, be provided with outlet pipe behind the pump, link to each other with the heating main-supply in the high district of skyscraper, it is characterized in that: hydraulic pressure back-water valve (BWV) setting height(from bottom) is lower than below district's heating system hydrostatic line, its water inlet pipe is connected with the main water return tube in high district, be provided with bypass pipe between check-valves on the outlet pipe behind its water inlet pipe and the pump is suitable for reading, be provided with check-valves on this bypass pipe in addition, also be provided with the hydraulic pressure control valve between hydraulic pressure back-water valve (BWV) and the water pump, the hydraulic pressure back-water valve (BWV) links to each other with the return pipe of municipal heating network by pipeline.Water pump can be installed on the chassis, can be 2 parallel connections.Can be provided with butterfly valve in the water return pipeline.
Behind starting mode of pump, because increasing a boiling water, hydraulic pressure pushes back water valve, make the circulation of heating water system; When water pump was out of service, the hydraulic pressure of hydraulic pressure control valve disappeared, and the hydraulic pressure back-water valve (BWV) cuts out automatically.Be the water hammer of avoiding water pump to have a power failure or causing to system when out of service, establish the bypass pipe of a band check-valves on the check-valves of main-supply before the hydraulic pressure back-water valve (BWV) with behind the pump, like this, current can only flow to feed pipe by return pipe.Behind starting mode of pump, hydraulic pressure increases, the closure of check ring on the bypass pipe, and water can not flow to return pipe, makes the high district of current direction heating system, and the hydraulic pressure control valve backs down back-water valve (BWV), high district water system normal circulation.When water pump was out of service, because effect of inertia can produce very big impulsive force, the hydraulic pressure back-water valve (BWV) cut out, and high district and low district are disconnected, and bypass line check valve is opened simultaneously, and heating water is in height district inner loop.Because there are not hysteresis in water pump and hydraulic pressure back-water valve (BWV) synchronization action, have eliminated the Hydrostatic Transfer Device problem after the termination of pumping.Owing to installed bypass line check valve additional at Gao Qu, the destruction of having avoided water attack that system is caused for preventing the generation of water hammer, requires to install the regulation of the bypass pipe that has check-valves between being responsible for for backwater.The utility model floor space is little, only needs after the addressing associated lines connected get final product commissioning test, and is safe and reliable, keep in repair easyly, and cost is low simultaneously, is convenient to popularize, for skyscraper employing city's net heat supply brings great convenience.
Description of drawings
Fig. 1 is the utility model skyscraper enclosed mixed connection heating installation front view.
Fig. 2 is the utility model skyscraper enclosed mixed connection heating installation vertical view.
Fig. 3 is the utility model skyscraper enclosed mixed connection heating installation right view.
Fig. 4 is the utility model skyscraper enclosed mixed connection heating installation left view.
Fig. 5 is the A-A section of Fig. 1.
Fig. 6 is used for supplying the system schematic of mode next time for the utility model skyscraper enclosed mixed connection heating installation.
Fig. 7 is the system schematic that the utility model skyscraper enclosed mixed connection heating installation is used for keeping supplying back down mode.
The specific embodiment now is described further the utility model in conjunction with the accompanying drawings: Fig. 1 to Fig. 5 is the organigram of the utility model skyscraper enclosed mixed connection heating installation.And even two water pumps 2 are installed, electric cabinet 11 is fixed on the chassis 1.There is a suction pipeline section 3 to link to each other with the feed pipe of municipal heating network before the pump by flange.Outlet pipe 4 behind the pump can link to each other with the heating main-supply of skyscraper by flange.Also fix a hydraulic pressure back-water valve (BWV) 6 on the chassis 1, high district's heating main water return tube road is inserted by the flange of water inlet pipe 5 in its bottom.On the butterfly valve 10 of the outlet pipe 4 behind pipe 5 and the pump, be connected with the bypass pipe 7 of band check-valves 8; The high-end of hydraulic pressure back-water valve (BWV) 6 also has hydraulic pressure control valve 9 to link to each other with the delivery port of water pump 2; Hydraulic pressure back-water valve (BWV) 6 links to each other with the return pipe of municipal heating network by pipeline 15.Fig. 6 is used for supplying the system schematic of mode next time for the utility model skyscraper enclosed mixed connection heating installation.The low backwater that supplies of distinguishing heating system links to each other with city's net, and the main-supply that net in the city is taken from the heating in high district water supply, and after pump 2 pressurizations, the radiator 17 in the high district that flows through imports main water return tube then.Be provided with a hydraulic pressure back-water valve (BWV) 6 on main water return tube, its setting height(from bottom) should be lower than district's heating hydrostatic line; Its open and close are controlled from the hydraulic pressure control valve 9 of drawing between the outlet of water pump 2 and the check-valves 8 by one.System water is not full of, and hydraulic pressure back-water valve (BWV) 6 does not start, and after system water was full of, hydraulic pressure back-water valve (BWV) 6 started automatically.The setting of its starting pressure value can be regulated according to actual needs.System water can not form static pressure in the process that circulates.After water pump 2 was out of service, the pressure on the hydraulic pressure control valve 9 disappeared, and hydraulic pressure back-water valve (BWV) 6 cuts out under the pressure effect of height district water system automatically, and the high district and the backwater in low district are cut off mutually.In order to eliminate the water hammer that has a power failure or can occur during termination of pumping, for establishing a bypass pipe 7 that has a check-valves 8 between the return pipe, after water pump 2 was out of service, the check-valves 8 on the bypass pipe 7 was opened, and forms high district water system inner loop, reduces the impulsive force of water in the height district.Ensured the safe operation of system.What Fig. 7 represented is the system schematic of keeping supplying back mode under the utility model skyscraper enclosed mixed connection heating installation, and principle is the same.Dress Y shape dirt separator 14 is equipped with spring safety valve 16 on the water inlet segment 3 before the pump on pipeline 15, also is provided with in each accompanying drawing as lower member: butterfly valve 10, Pressure gauge 12, thermometer 13, radiator 17, automatic exhaust steam valve 18.

Claims (3)

1. skyscraper enclosed mixed connection heating installation, on chassis (1), be provided with water pump (2), piping and electric cabinet (11), be provided with water inlet pipe (3) before the pump of water pump (2), link to each other with the feed pipe of municipal heating network, be provided with outlet pipe (4) behind the pump, link to each other with the heating main-supply in the high district of skyscraper, it is characterized in that: hydraulic pressure back-water valve (BWV) (6) setting height(from bottom) is lower than below district's heating system hydrostatic line, its water inlet pipe (5) is connected with the main water return tube of high district's heating, be provided with bypass pipe (7) between check-valves (8) on the outlet pipe (4) behind its water inlet pipe (5) and the pump is suitable for reading, be provided with check-valves (8) on the bypass pipe (7) in addition, be provided with hydraulic pressure control valve (9) between hydraulic pressure back-water valve (BWV) (6) and the water pump (2), hydraulic pressure back-water valve (BWV) (6) links to each other with the return pipe of municipal heating network by pipeline (15).
2. skyscraper enclosed mixed connection heating installation according to claim 1, it is characterized in that: water pump (2) can be installed on the chassis (1), can be 2 parallel connections.
3. skyscraper enclosed mixed connection heating installation according to claim 1 and 2 is characterized in that: can be provided with butterfly valve (10) in the water return pipeline.
CN 200620091500 2006-06-08 2006-06-08 Closed mixing heating apparatus for high-rise building Expired - Fee Related CN2913909Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620091500 CN2913909Y (en) 2006-06-08 2006-06-08 Closed mixing heating apparatus for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620091500 CN2913909Y (en) 2006-06-08 2006-06-08 Closed mixing heating apparatus for high-rise building

Publications (1)

Publication Number Publication Date
CN2913909Y true CN2913909Y (en) 2007-06-20

Family

ID=38168506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620091500 Expired - Fee Related CN2913909Y (en) 2006-06-08 2006-06-08 Closed mixing heating apparatus for high-rise building

Country Status (1)

Country Link
CN (1) CN2913909Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452897C2 (en) * 2010-09-07 2012-06-10 Юрий Петрович Устименко Method to make-up heating system with hot water, preventing hydraulic shocks

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452897C2 (en) * 2010-09-07 2012-06-10 Юрий Петрович Устименко Method to make-up heating system with hot water, preventing hydraulic shocks

Similar Documents

Publication Publication Date Title
CN209129693U (en) A kind of novel lubricating petrol station system
CN205505149U (en) Intelligent height district's direct -furnish plate type regenerator group
CN201187824Y (en) Tall building direct connection heating unit
CN2913909Y (en) Closed mixing heating apparatus for high-rise building
CN202485278U (en) Hot spring bathing pool heat energy recycling system
CN100572931C (en) Skyscraper direct connection heating self-pressurization unit
CN101097074B (en) Low section overpressure directly connecting heater unit
CN201145344Y (en) Tall building direct connection heating auxiliary self-drive machine unit
CN201327103Y (en) Directly-connected pressurizing heat supply system for high-rise building
CN216114320U (en) Heating system based on direct connection-separation mode switching
CN109579316A (en) Energy automatic regulating system overheat and the control system of enclosed heat-exchange system fluid infusion pressure stabilizing
CN2594756Y (en) Automatic heat exchanger set
CN209229837U (en) A kind of low temperature double stage heat pump unit
CN2849349Y (en) Fast cut off valve
CN202757190U (en) Hydraulic module specially used for ground source heat pump unit
CN106196226A (en) Tall building direct connection heating energy conserving system
CN202692440U (en) Zero-pressure-bearing device of pressure-bearing water heater system
CN202253960U (en) Automatic control valve
CN206527158U (en) A kind of milling train high pressure backwater throttling arrangement
CN201448919U (en) High-rise building heating direct supply unit
CN201916975U (en) High-area and low-area heating system of carbon plant
CN203053069U (en) Unpressurized solar water heater system with gas-liquid mixed heat exchange
CN212029679U (en) Direct supply pressure reducing heat supply unit
CN219223449U (en) Hot water tank heat load balance adjusting device
CN106091174B (en) Special household-based geothermal water machine central air-conditioning system for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUAXIANG NUANTONG TECHNOLOGY CO., LTD., DALIAN CI

Free format text: FORMER OWNER: XU LIHUA

Effective date: 20080411

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080411

Address after: No. 17, Hua Hua Street, Shahekou District, Liaoning, Dalian Province, China: 116021

Patentee after: Dalian Huaxiang heating and ventilating Technology Co., Ltd.

Address before: 150-5, No. 54, Shahekou Road, Dalian District, Liaoning, 116021

Patentee before: Xu Lihua

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070620

Termination date: 20130608