CN2912821Y - Container japanning room system with waste gas treatment facilities - Google Patents

Container japanning room system with waste gas treatment facilities Download PDF

Info

Publication number
CN2912821Y
CN2912821Y CN 200520064049 CN200520064049U CN2912821Y CN 2912821 Y CN2912821 Y CN 2912821Y CN 200520064049 CN200520064049 CN 200520064049 CN 200520064049 U CN200520064049 U CN 200520064049U CN 2912821 Y CN2912821 Y CN 2912821Y
Authority
CN
China
Prior art keywords
room
exhaust
gas treatment
container
treatment facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520064049
Other languages
Chinese (zh)
Inventor
周远大
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN 200520064049 priority Critical patent/CN2912821Y/en
Application granted granted Critical
Publication of CN2912821Y publication Critical patent/CN2912821Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model relates to a painting house system for containers with waste gas treatment systems, comprising a bottom painting house, an interlayer painting house, a surface painting house, and a mending OK house, a flowing flat house, a pre-painting house, a baking house, and etc related to the bottom painting house, the interlayer painting house, and the surface painting house; each painting house is provided with a waste gas treatment system which is composed of air inlet pipes, a purifying treatment devices, and air discharge pipes; the utility model connects the bottom painting house, interlayer painting house, and surface painting house and the air inlet pipes and air outlet pipes of a plurality of waste gas treatment facilities in relevant painting houses in series, to achieve the technique proposal of reducing cost and enhancing defogging effect.

Description

Be provided with the container paint house system of exhaust-gas treatment facilities
Technical field
The utility model relates to environmental protection exhaust-gas treatment field, is specifically related to a kind of container paint house system that is provided with exhaust-gas treatment facilities.
Background technology
In the container production process, the lacquer spraying technique important step that is absolutely necessary, but in the painting process of container, can produce a large amount of paint waste gas, contain a large amount of noxious materials, particularly organic matter in these waste gas, this gas is to bring out cancer, cause one of root of breathing problem, therefore, as deal with improperly or handle not exclusively, can cause very big pollution to environment, further the health of harm humans.Therefore, the paint waste gas that the container painting process is produced also has a lot of improvement methods at present, and common improvement method is that each all disposes a cover governing system with several japanning rooms on the production line, as shown in Figure 1.In Fig. 1, the spray painting operation of paint spray booth produces a large amount of paint mist and pernicious gas, will paint mist by one-level treatment facility (revolving with cascade or water usually or other coating cloud treating apparatus) and handle clean; By the secondary purification treatment facility pernicious gas is handled totally, reached discharging standards and enter atmosphere.
But one bar the container production line has a lot of japanning room (more than at least 5), as priming paint room, middle level japanning room, finish paint room and respectively with as described in priming paint room, middle level japanning room, repairing OK room, levelling room, precoating room and drying room that the finish paint room is relevant or the like, if each japanning room all is provided with a treatment system, need a lot of governing system (see figure 2)s, need to drop into huge fund, cause waste.
Summary of the invention
The purpose of this utility model is intended to overcome the deficiencies in the prior art, import/exhaust pipeline series connection with a kind of japanning room (or priming paint or intermediate layer paint or finish paint) and associated other rooms, when a japanning room exhaust, the exhaust of another japanning room replenishes as the air inlet of this japanning room, by that analogy, reduce cost and improve purpose to reach except that fog effect.
The technical solution of the utility model is as follows:
A kind of container paint house system that is provided with exhaust-gas treatment facilities, comprise the priming paint room, the middle level japanning room, the finish paint room and respectively with described priming paint room, the middle level japanning room, the repairing OK room that the finish paint room is relevant, the levelling room, precoating room and drying room, in each japanning room, be provided with exhaust-gas treatment facilities, this exhaust-gas treatment facilities comprises admission line and discharge duct, wherein, the admission line in the relative repairing of the discharge duct in priming paint room or middle level japanning room or finish paint room OK room is communicated with, the discharge duct of repairing the OK room is communicated with the admission line in levelling room again, the discharge duct in levelling room is communicated with the admission line in precoating room, the discharge duct in precoating room is communicated with the admission line of drying room, also successively is provided with secondary purification treatment facility and exhaust chimney behind the blast pipe of drying room.
In container paint house system of the present utility model, also can one-level coating cloud treatment pond be set in each japanning room according to the content of coating cloud waste gas, the high japanning room of content that is coating cloud waste gas must be provided with one-level coating cloud treatment pond, by handling through the secondary purification treating apparatus again after the processing of one-level coating cloud treatment pond, the japanning room that the coating cloud waste gas content is low can be provided with one-level coating cloud treatment pond, also one-level coating cloud treatment pond can be set.
Container paint house system of the present utility model, the finish paint room can be divided into inner face japanning room and outside japanning room again, therefore, article one, the container production line can be provided with 3~4 container paint house systems that are arranged with exhaust-gas treatment facilities according to the quantity in finish paint room, accordingly, the quantity according to paint house system just is provided with 3~4 described exhaust chimneys.When japanning room was not established inside and outside japanning room face to face, a container production line just can be provided with 3 cover paint house systems, accordingly, is provided with 3 described exhaust chimneys; If the finish paint room is divided into inside and outside japanning room, then a container production line just can be provided with 4 cover paint house systems, and is corresponding, just is provided with 4 described exhaust chimneys.
In container paint house system of the present utility model, one-level coating cloud treatment system can be cascade device, water cyclone or other treating apparatus; The Purge gas treating apparatus can be devices such as breaking burning, burning and recovery.
The utility model is owing to connect the import/exhaust pipeline in a kind of japanning room (or priming paint or intermediate layer paint or finish paint) and associated other rooms, when a japanning room exhaust, the exhaust of another japanning room replenishes as the air inlet of this japanning room, by that analogy, one group of japanning room by a pipe-line system purified treatment after qualified discharge to atmosphere, total blast volume is constant substantially, the discharge capacity of secondary purification treatment system is constant, and content of harmful gas increases in the system, and the combustion furnace that helps in the purification facility has better burning condition.Therefore, improve the waste gas purification effect, reduced cost simultaneously.
Description of drawings
The utility model is described in further detail below in conjunction with the accompanying drawings and the specific embodiments, wherein:
Fig. 1 is prior art paint exhaust-gas treatment governance flowchart schematic diagram;
Fig. 2 is a prior art container production line paint exhaust treatment device schematic diagram;
Fig. 3 is provided with the relevant several japanning room air inlets/exhaust series connection schematic diagram of container paint house system of exhaust-gas treatment facilities for the utility model.
The specific embodiment
Specific embodiments of the present utility model as shown in Figure 3, a kind of container paint house system that is provided with exhaust-gas treatment facilities comprises priming paint room or middle level japanning room or finish paint room 1 and repairing OK room 2, levelling room 3, precoating room 4 and the drying room 5 relevant with priming paint room or middle level japanning room or finish paint room 1.Wherein, all be provided with exhaust-gas treatment facilities at each in its each japanning room, each exhaust-gas treatment facilities includes admission line, one-level coating cloud treatment pond and discharge duct, the discharge duct 13 of the exhaust-gas treatment facilities in priming paint room or middle level japanning room or finish paint room 1 is connected with the admission line 21 of repairing the OK room, the discharge duct 23 of repairing OK room 2 is connected with the admission line 31 in levelling room 3, the discharge duct 33 in levelling room 3 is connected with the admission line 41 in pre-figure room 4, the discharge duct 43 in precoating room 4 is connected with the admission line 51 of drying room 5, the discharge duct 53 of drying room 5 is connected with secondary purification treating apparatus 6, also is provided with exhaust chimney 7 after secondary purification treating apparatus 6.
The clean treatment process process of japanning room waste gas of the present utility model is as follows:
The waste gas that produces in the container painting process is entered by the admission line 11 in priming paint room or middle level japanning room or finish paint room 1, remaining waste gas enters the additional air inlet that next japanning room is promptly repaired in the OK room 2 and OK room 2 is repaired in conduct after removing the part coating cloud behind the one-level coating cloud treatment pond 12 by this room, remove remaining waste gas behind the part coating cloud behind the one-level coating cloud treatment pond 22 of waste gas in the OK room 2 to enter next japanning room be in the levelling room 3 and as the additional air inlet in levelling room 3 and repair by this room, by that analogy, one group of japanning room by japanning room paint waste gas pollution control and treatment after discharge duct 53 by drying room 5 enter secondary purification treating apparatus 6 again and further purify demists, as by being discharged into atmosphere by total exhaust chimney 7 again after the combustion furnace burning.
As known by the technical knowledge, the utility model can be realized by other the embodiment that does not break away from its spiritual essence or essential feature.Therefore, above-mentioned disclosed embodiment with regard to each side, all just illustrates, and is not only.All in the utility model scope or the change that is being equal in the scope of the present utility model all be included in the utility model.

Claims (8)

1, a kind of container paint house system that is provided with exhaust-gas treatment facilities, comprise the priming paint room in the container production line, the middle level japanning room, the finish paint room and respectively with described priming paint room, the middle level japanning room, the repairing OK room that the finish paint room is relevant, the levelling room, precoating room and drying room, wherein, in described each japanning room, be provided with exhaust-gas treatment facilities, described exhaust-gas treatment facilities comprises admission line and discharge duct, it is characterized in that, the admission line in the relative repairing of the discharge duct in described priming paint room or middle level japanning room or finish paint room OK room is communicated with, the discharge duct in described repairing OK room is communicated with the admission line in described levelling room, the discharge duct in described levelling room is communicated with the admission line in described precoating room, the discharge duct in described precoating room is communicated with the admission line of described drying room, also successively is provided with secondary purification treating apparatus and exhaust chimney behind the blast pipe of described drying room.
2, the container paint house system that is provided with exhaust-gas treatment facilities according to claim 1 is characterized in that, also further is provided with one-level coating cloud treatment pond in the described japanning room exhaust-gas treatment facilities.
3, the container paint house system that is provided with exhaust-gas treatment facilities according to claim 2 is characterized in that, described one-level coating cloud treatment pond can be cascade device or water cyclone.
4, the container paint house system that is provided with exhaust-gas treatment facilities according to claim 1 is characterized in that, described secondary purification treating apparatus can be catalytic combustion, burning and retracting device.
5, the container paint house system that is provided with exhaust-gas treatment facilities according to claim 1 is characterized in that, described finish paint room comprises inner face japanning room and outside japanning room.
6, the container paint house system that is provided with exhaust-gas treatment facilities according to claim 1 is characterized in that, a container production line comprises the described container paint house system that is provided with exhaust-gas treatment facilities of 1 cover at least.
7, the container paint house system that is provided with exhaust-gas treatment facilities according to claim 6 is characterized in that, a container production line comprises the described container paint house system that is provided with exhaust-gas treatment facilities of 3 covers.
According to claim 5 or the 6 described container paint house systems that are provided with exhaust-gas treatment facilities, it is characterized in that 8, a container production line comprises that 4 are arranged with the container paint house system of exhaust-gas treatment facilities.
CN 200520064049 2005-09-01 2005-09-01 Container japanning room system with waste gas treatment facilities Expired - Lifetime CN2912821Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520064049 CN2912821Y (en) 2005-09-01 2005-09-01 Container japanning room system with waste gas treatment facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520064049 CN2912821Y (en) 2005-09-01 2005-09-01 Container japanning room system with waste gas treatment facilities

Publications (1)

Publication Number Publication Date
CN2912821Y true CN2912821Y (en) 2007-06-20

Family

ID=38167422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520064049 Expired - Lifetime CN2912821Y (en) 2005-09-01 2005-09-01 Container japanning room system with waste gas treatment facilities

Country Status (1)

Country Link
CN (1) CN2912821Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100421815C (en) * 2005-09-01 2008-10-01 中国国际海运集装箱(集团)股份有限公司 Container paint house system with exhaust-gas treatment facilities
CN105436006A (en) * 2015-11-24 2016-03-30 无锡普瑞腾传动机械有限公司 Waste gas exhausting structure of painting line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100421815C (en) * 2005-09-01 2008-10-01 中国国际海运集装箱(集团)股份有限公司 Container paint house system with exhaust-gas treatment facilities
CN105436006A (en) * 2015-11-24 2016-03-30 无锡普瑞腾传动机械有限公司 Waste gas exhausting structure of painting line

Similar Documents

Publication Publication Date Title
CN204563868U (en) A kind of dicalcium powder process gas treating apparatus
CN102172468B (en) Three-pass dedusting devulcanizer
CN205886486U (en) Spray paint waste gas treatment system
CN204448395U (en) A kind of continous way paint line
CN102327719A (en) System and method for treating exhaust gas generated during varnish baking by using water for industrial cycle
CN203437005U (en) Spray paint waste gas purifying and treating system
WO2018036562A1 (en) Switching concentration-type regenerative catalytic combustion system for organic waste gas treatment
CN107042055B (en) Waste gas treatment system
CN106943838A (en) Alternative waste gas cleaning system
CN2912821Y (en) Container japanning room system with waste gas treatment facilities
CN202860343U (en) Novel smelly waste gas treatment device
CN104785057A (en) Environment-friendly type pump-free paint mist dust treatment equipment
CN105413408A (en) System and method of waste gas concentrated recycling treatment for reducing air pollution
CN200977446Y (en) Wet spraying waste gas treating device
CN203090725U (en) Waste gas treatment device
CN100421815C (en) Container paint house system with exhaust-gas treatment facilities
CN209828596U (en) Novel UV exhaust-gas treatment of paint spray booth device
CN104147885A (en) Paint-spraying waste gas integrated treatment method
CN208382195U (en) Novel VOCs exhaust gas intelligent treatment device
CN203777867U (en) Waste gas purification device
CN206566619U (en) Paint spraying waste gas separates adsorption cleaning equipment
CN212974602U (en) Automatic air-reducing and thickening system for waste gas of paint spray booth
CN205216476U (en) Waste gas processing system
CN203750757U (en) Paint mist treatment system
CN205323439U (en) Vent gas treatment system in that denitration catalyst powder was made

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Effective date of abandoning: 20081001

C25 Abandonment of patent right or utility model to avoid double patenting