CN2892273Y - Cobblestone coal transporting system in coal grinder working - Google Patents

Cobblestone coal transporting system in coal grinder working Download PDF

Info

Publication number
CN2892273Y
CN2892273Y CN 200620078939 CN200620078939U CN2892273Y CN 2892273 Y CN2892273 Y CN 2892273Y CN 200620078939 CN200620078939 CN 200620078939 CN 200620078939 U CN200620078939 U CN 200620078939U CN 2892273 Y CN2892273 Y CN 2892273Y
Authority
CN
China
Prior art keywords
coal
stone coal
gangue
stone
coal bunker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620078939
Other languages
Chinese (zh)
Inventor
王维东
苗承刚
周凤禄
周维尚
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingyuan No2 Electricity Generating Co Ltd
Original Assignee
Jingyuan No2 Electricity Generating Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingyuan No2 Electricity Generating Co Ltd filed Critical Jingyuan No2 Electricity Generating Co Ltd
Priority to CN 200620078939 priority Critical patent/CN2892273Y/en
Application granted granted Critical
Publication of CN2892273Y publication Critical patent/CN2892273Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model relates to a gangue delivery system during running of a coal grinding mill. The utility model comprises a coal grinding mill (1), a gangue hopper (2), a spiral conveyer (3), a first belt conveyer (4), a second belt conveyer (5), a hoister (6) and a gangue bin (7). The utility model is characterized in that one side of the coal grinding mill (1) is provided with the gangue hopper (2) and connected by pipes (12) with gangue hopper inlet pneumatic valves (11) between pipes. Outlet of the gangue hopper (2) is connected with the spiral conveyer (3) by pipes (13) with gangue hopper outlet pneumatic valves (8) between the pipes. Above the belt conveyer 5, the hoister (6) and the gangue bin (7) are equipped in turn. By introducing such a utility model, gangue discharged from the running of the coal grinding mill can be transported outside the boiler room, operational reliability of the coal grinding mill is improved, the problem that gangue releases dust is eliminated and production field environment is improved.

Description

Coal pulverizer stone coal delivery system in service
Technical field
The utility model relates to a kind of coal pulverizer, more specifically to a kind of coal pulverizer stone coal delivery system in service.
Background technology
Jingyuan No.2 Electricity Generating Co., Ltd.'s boiler milling system is selected 5 of the HP863 type coal pulverizers that Shanghai Heavy Machinery Plant produces for use.Coal pulverizer is in operation and nonabradable materials such as coal backbone grit piece, spoil will be discharged from coal pulverizer, and the material of discharge is referred to as the stone coal.The stone coal mainly contains foreign material such as broken coal piece, gangue, stone and coal dust to be formed, and granularity is not more than 50mm, and bulk density is 1.2~1.5 tons/m 3The stone coal amount of every coal pulverizer discharge is 1~1.5t/h, and the temperature when discharging in coal pulverizer is about 150 ℃.The manual emission mode is adopted in the discharging of stone coal at present, and the stone coal that is about to coal pulverizer is discharged in the other slag case of coal pulverizer, after the slag case is full, manually the slag case is transported with fork truck, the stone coal is discharged into the stone coal yard stacks.Discharging modes severe contamination site environment like this.It is more to contain foreign material such as gangue, stone in the used coal of my company, the stone coal amount that coal pulverizer gives off is bigger, discharge about 40~100 tons 24 hours every days, the interface of slag case and coal pulverizer is frequently dismantled, be difficult to connecting, a large amount of coal dusts emit outward in causing discharging, and make the production scene dust from flying, personnel's work under bad environment damages employee's health.Discharging modes are unreliable in addition, influence the safe and stable operation of coal pulverizer, if the discharging of stone coal is untimely, can cause in the coal pulverizer and catch fire, cause coal pulverizer skirt closure assembly and screeding device serious wear, sometimes even the stone coal can take place stop up coal pulverizer import air channel, cause coal pulverizer to stop transport, the coal pulverizer maintenance cost will improve like this, and has increased the line service amount.
The utility model content
The purpose of this utility model provides a kind of coal pulverizer stone coal delivery system in service, in time the stone coal with coal pulverizer discharge in service is transported to outside the boiler room, improve the coal pulverizer operational reliability, solve stone coal discharging airborne dust problem, improve production on-site environment.
The utility model comprises coal pulverizer, stone coal bunker, conveying worm, No. 1 rubber conveyer, No. 2 rubber conveyers, elevator, stone coal bunker, stone coal bunker outlet pneumatic operated valve and stone coal bunker import pneumatic operated valves, be characterized in: be equipped with the stone coal bunker in each coal pulverizer side, the employing pipeline connects, and is provided with stone coal bunker import pneumatic operated valve between the pipeline.The outlet of stone coal bunker adopts pipeline to be connected with conveying worm, is provided with stone coal bunker outlet pneumatic operated valve between the pipeline.Above No. 2 rubber conveyers, be provided with elevator, stone coal bunker successively.Stone coal bunker side is provided with mud hole, is provided with peep hole at an upper portion thereof.
The utility model has the advantages that: can be in time the stone coal of coal pulverizer discharge in service be transported to outside the boiler room, have improved the coal pulverizer operational reliability, solved stone coal discharging airborne dust problem, improved production on-site environment.
Description of drawings
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is that the utility model coal pulverizer stone coal delivery system in service is arranged schematic diagram;
Fig. 2 is a stone coal bunker connection diagram in the utility model coal pulverizer stone coal delivery system in service.
The specific embodiment
In Fig. 1,2: each coal pulverizer 1 side is provided with stone coal bunker 2, adopt pipeline 12 to connect, be provided with stone coal bunker import pneumatic operated valve 11 between the pipeline, 2 outlets of stone coal bunker adopt pipeline 13 to be connected with conveying worm 3, be provided with stone coal bunker outlet pneumatic operated valve 8 between the pipeline, be provided with elevator 6, stone coal bunker 7 above No. 2 rubber conveyers 5 successively, the stone coal bunker is high 8.5 meters.3, No. 1 rubber conveyer 4 of conveying worm and No. 2 rubber conveyers 5 are arranged in the underground delivery tunnel.Conveying worm 3 tunnels are 2300 * 2000mm, and No. 1 rubber conveyer 4 tunnels are 2300 * 2800mm, and No. 2 rubber conveyer 5 tunnels are 2300 * 3000mm, and the width in tunnel and the degree of depth can according to circumstances change.The tunnel ventilation facility has utilized the facility of the ventilating and purifying air system of former coal pulverizer 1, has adorned two ventilation blowers but increase, a draining pump, and its effect strengthens the draining in tunnel.On stone coal bunker 2 and belt conveyor, atomizer is housed, in order to temperature and the minimizing dust from flying that reduces the stone coal.Stone coal bunker 2 sides are provided with mud hole 9, and its effect is: in case when the stone coal delivery system breaks down, can in time the stone coal in the coal pulverizer 1 be discharged.Be provided with peep hole 10 at an upper portion thereof, its effect is: observe the material level in the stone coal bunker 2.
Coal pulverizer stone coal delivery system in service is work like this: the stone coal in the coal pulverizer 1 at first enters in the stone coal bunker 2 of coal pulverizer 1 side through stone coal bunker import pneumatic operated valve 11 by pipeline 12, enter conveying worm 3 by pipeline 13 through stone coal bunker outlet pneumatic operated valve 8 again, be transported to rubber conveyer 4 then successively No. 1, on No. 2 rubber conveyers 5, at last the stone coal is transported in the outer elevator 6 of factory building, elevator 6 rises to the stone coal overhead about 9 meters high positions again, enter in the stone coal bunker 7, stone coal in the stone coal bunker 7 regularly enters truck, is transported to the stone dump and puts the field.

Claims (2)

1, a kind of coal pulverizer stone coal delivery system in service, comprise coal pulverizer (1), stone coal bunker (2), conveying worm (3), No. 1 rubber conveyer (4), No. 2 rubber conveyers (5), elevator (6), stone coal bunker (7), stone coal bunker outlet pneumatic operated valve (8) and stone coal bunker import pneumatic operated valve (11), it is characterized in that: be provided with stone coal bunker (2) in each coal pulverizer (1) side, adopt pipeline (12) to connect, be provided with stone coal bunker import pneumatic operated valve (11) between the pipeline; Stone coal bunker (2) outlet adopts pipeline (13) to be connected with conveying worm (3), is provided with stone coal bunker outlet pneumatic operated valve (8) between the pipeline; Be provided with elevator (6), stone coal bunker (7) successively in No. 2 rubber conveyers (5) top.
2, according to the described coal pulverizer of claim 1 stone coal delivery system in service, it is characterized in that: stone coal bunker (2) side is provided with mud hole (9), is provided with peep hole (10) at an upper portion thereof.
CN 200620078939 2006-04-30 2006-04-30 Cobblestone coal transporting system in coal grinder working Expired - Lifetime CN2892273Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620078939 CN2892273Y (en) 2006-04-30 2006-04-30 Cobblestone coal transporting system in coal grinder working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620078939 CN2892273Y (en) 2006-04-30 2006-04-30 Cobblestone coal transporting system in coal grinder working

Publications (1)

Publication Number Publication Date
CN2892273Y true CN2892273Y (en) 2007-04-25

Family

ID=38060439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620078939 Expired - Lifetime CN2892273Y (en) 2006-04-30 2006-04-30 Cobblestone coal transporting system in coal grinder working

Country Status (1)

Country Link
CN (1) CN2892273Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101602026B (en) * 2009-07-03 2010-09-15 江苏瑞能电力设备有限公司 Pebble coal equal pressure discharge device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101602026B (en) * 2009-07-03 2010-09-15 江苏瑞能电力设备有限公司 Pebble coal equal pressure discharge device

Similar Documents

Publication Publication Date Title
CN103287857B (en) A kind of biomass micro-positive air-transport system
CN102753460A (en) Active solids supply system and method for supplying solids
CN201362508Y (en) Stone coal subpressure pneumatic conveying system
CN103030000B (en) Cassava raw material train unloading device
US20120183376A1 (en) System for extraction and transport of light ashes by means of a steel belt conveyor
CN101602026B (en) Pebble coal equal pressure discharge device
CN203255682U (en) Dry-type pebble coal pipe chain conveying system
CN104118703B (en) A kind of dry type pebble coal pipe chain induction system
CN2892273Y (en) Cobblestone coal transporting system in coal grinder working
CN201125092Y (en) Short stage dust conveying facility for dry type dust removing equipment
CN204182464U (en) Coal pulverizer stone coal discharge mechanism
CN204896866U (en) Dust arrester installation
CN205170896U (en) Thick grey air conveying system of converter dry process dust removal
CN102398784A (en) In-plant zero-distance tooth rope type pulverized fuel ash conveying system
CN204453859U (en) The defeated device for coal of a kind of Full-closed environment protection
CN103333985A (en) Converter gas dry dedusting coarse ash pneumatic conveying system
CN210504514U (en) Fuel storage and conveying system for biomass direct combustion
CN208361389U (en) A kind of automatic throwing powder device
CN204182466U (en) Coal pulverizer pebble coal equal pressure discharge device collecting box
CN217200835U (en) Anti-blocking pipeline of pneumatic conveying system
CN208250225U (en) Coke oven coal-charging dedusting pre-spray system
CN112387719A (en) Efficient dust-free slurry preparation, conveying and pipe washing system
CN206466724U (en) A kind of pneumatic transporting slag system
CN205170897U (en) Converter gas dry de -dusting cinder pneumatic conveying system
Shah Fundamentals, troubleshooting & maintenance of ash handling plants and pneumatic conveying systems for bulk materials

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070425

EXPY Termination of patent right or utility model