CN2888289Y - Hermetic slag crusher - Google Patents

Hermetic slag crusher Download PDF

Info

Publication number
CN2888289Y
CN2888289Y CN 200620023829 CN200620023829U CN2888289Y CN 2888289 Y CN2888289 Y CN 2888289Y CN 200620023829 CN200620023829 CN 200620023829 CN 200620023829 U CN200620023829 U CN 200620023829U CN 2888289 Y CN2888289 Y CN 2888289Y
Authority
CN
China
Prior art keywords
water
sinter
pipe
sealing
slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620023829
Other languages
Chinese (zh)
Inventor
刘俊刚
郝善富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANYOU GROUP CO Ltd TANGSHAN
Original Assignee
SANYOU GROUP CO Ltd TANGSHAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANYOU GROUP CO Ltd TANGSHAN filed Critical SANYOU GROUP CO Ltd TANGSHAN
Priority to CN 200620023829 priority Critical patent/CN2888289Y/en
Application granted granted Critical
Publication of CN2888289Y publication Critical patent/CN2888289Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

A close sinter crusher belongs to the sinter crushing machine technology field, contains an oven cooling ash hopper, a sinter well located under the oven ash hopper. Under the sinter well is hung with a single roller sinter crusher, the upper of which is connected with the sinter well by the connection element, the bottom is connected with a water sealed pipe by the connection element, on the rear of the water sealed pipe is connected with an ash splashing pipe, on the outlet of the water sealed pipe is installed with a mobile door. The utility model doesn't use the sinter meshing device, but decreases the ash nozzle quantity, reduces the cost of the capital investment and the maintenance, saves the water and electricity power resource, lessens the labor effort, and ensures the oven running safely and economically.

Description

Sealed slag crusher
Technical field
The utility model relates to a kind of slag crusher, the sealed slag crusher that specifically a kind of power plant dry ash extraction pulverized-coal fired boiler deslagging is used.
Background technology
Existing boiler is the dry ash extraction pulverized-coal fired boiler, adopts dragveyer (submerged slag conveyor or screw cinder cleaner) deslagging, carries with waterpower after the fragmentation of single roller slag crusher then.Here the purpose of using dragveyer is to form water seal at boiler bottom, solves the boiler bottom problem of leaking out.And now use submerged slag conveyor quick abrasion, maintenance big, and screw cinder cleaner blocks and causes shaft coupling to damage after easily advancing hard thing, influence the normal operation of boiler, and power consumption is big, and water resource waste is serious.
Summary of the invention
The technical problems to be solved in the utility model is at the deficiencies in the prior art, provides a kind of deslagging not use dragveyer, and maintenance is little, the sealed slag crusher of high efficiency.
Solve the problems of the technologies described above by the following technical solutions: a kind of sealed slag crusher, comprise the boiler furnace hopper, be positioned at the slag well of boiler furnace hopper bottom, it is characterized in that, the below suspention of described slag well has single roller slag crusher, and the top of this list roller slag crusher is connected with the slag well with connector, and the bottom is connected with water sealing (sealing water) pipe with connector, the rear portion of this water sealing (sealing water) pipe is connected with towards grey water pipe, and valve is equipped with in the exit of water sealing (sealing water) pipe.
According to technique scheme, compared with prior art, the utility model does not use dragveyer, reduces grey ditch nozzle quantity, can reduce investment and maintenance cost, and the conserve water electric resources reduces labour intensity, and guarantees the safe and economical boiler operation.The three friendly groups 6 in Tangshan #After boiler adopted two band sealing slag crushers to carry out deslagging, it was normal to slag tap, and boiler operatiopn is not affected; Reduced by two grey ditch nozzles, reduce water consumption; Because of not using dragveyer, power consumption reduces; Maintenance cost and time decreased; Labor strength reduces; The site environment health is improved.Every used dragveyer of stove is pressed the 6kw power calculation, year economize on electricity 52560kwh, and 0.32 yuan/kwh of electric cost price, the Spring Festival holidays electricity charge are with 16819 yuan; Reduce by two nozzles, about 70080 tons of year water saving is pressed towards 0.20 yuan of/ton calculating of buck, and Spring Festival holidays water rate is with 14016 yuan; Annual about 20000 yuan of maintenance cost; To reduce expenses every year be 50835 yuan to every stove like this, and can to reduce expenses every year be 305010 yuan if six boilers are all used instead behind the band sealing slag crusher.
Description of drawings
Fig. 1 is the utility model overall structure schematic diagram.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described.
The utility model is improvements over the prior art, and improved position is to have cancelled the screw cinder cleaner of prior art.Concrete structure is referring to accompanying drawing 1, the utility model is by boiler furnace hopper 1, slag well 2, single roller slag crusher 4 compositions such as grade, slag well 2 is positioned at boiler furnace hopper 1 below, with steel wire rope and single roller slag crusher 4 of turnbuckle 3 suspentions, single roller slag crusher 4 is connected with slag well 2 usefulness flanges 9, adds asbestos board between single roller slag crusher 4 and slag well 2 and the water sealing (sealing water) pipe 5 below each boiler furnace hopper 1 slag well 2.The bottom of single roller slag crusher 4 is connected with water sealing (sealing water) pipe 5 with flange 8, water sealing (sealing water) pipe 5 back be connected towards grey water pipe 6, use towards grey water pipe 6 and carry out flushing cinder, valve 7 is installed in the outlet of water sealing (sealing water) pipe 5 additional, valve 7 is closed voluntarily because of gravity when anhydrous, slag.Broken laggard to go into water sealing (sealing water) pipe 5 washed away through single roller slag crusher 4 for the lime-ash that boiler combustion produces, and the valve 7 of closing automatically guarantees that again burner hearth bottom does not leak out.

Claims (2)

1, a kind of sealed slag crusher, comprise the boiler furnace hopper, be positioned at the slag well of boiler furnace hopper bottom, it is characterized in that, the below suspention of described slag well has single roller slag crusher, and the top of this list roller slag crusher is connected with the slag well with connector, and the bottom is connected with water sealing (sealing water) pipe with connector, the rear portion of this water sealing (sealing water) pipe is connected with towards grey water pipe, and valve is equipped with in the exit of water sealing (sealing water) pipe.
2, sealed slag crusher according to claim 1 is characterized in that, the top of described single roller slag crusher is connected with the slag well with flange, and the bottom is connected with water sealing (sealing water) pipe with flange.
CN 200620023829 2006-03-17 2006-03-17 Hermetic slag crusher Expired - Fee Related CN2888289Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620023829 CN2888289Y (en) 2006-03-17 2006-03-17 Hermetic slag crusher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620023829 CN2888289Y (en) 2006-03-17 2006-03-17 Hermetic slag crusher

Publications (1)

Publication Number Publication Date
CN2888289Y true CN2888289Y (en) 2007-04-11

Family

ID=38046859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620023829 Expired - Fee Related CN2888289Y (en) 2006-03-17 2006-03-17 Hermetic slag crusher

Country Status (1)

Country Link
CN (1) CN2888289Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013930A (en) * 2017-06-01 2017-08-04 深圳市能源环保有限公司 A kind of anti-blocking water replanishing device of garbage incinerating power plant dragveyer
CN108571744A (en) * 2018-06-15 2018-09-25 江苏国信泗阳生物质发电有限公司 It can prevent intermittent control system and the control method of slagging tap of boiler of airborne dust

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013930A (en) * 2017-06-01 2017-08-04 深圳市能源环保有限公司 A kind of anti-blocking water replanishing device of garbage incinerating power plant dragveyer
CN108571744A (en) * 2018-06-15 2018-09-25 江苏国信泗阳生物质发电有限公司 It can prevent intermittent control system and the control method of slagging tap of boiler of airborne dust

Similar Documents

Publication Publication Date Title
CN201163151Y (en) Residual heat utilization apparatus of gangue brick tunnel kiln
CN201241109Y (en) Powder coal gasification lock bucket slag discharging apparatus of pressurization circulating fluid bed
CN2888289Y (en) Hermetic slag crusher
CN205347468U (en) Blast furnace stave prosthetic devices
CN201836849U (en) Recovery unit for waste heat of high-temperature industrial slag
CN206188828U (en) Smelt stove cinder cooling device that iron and steel was used
CN202092472U (en) Novel residual-heat atmospheric pressure hot water boiler
CN202675262U (en) Package boiler with plug reciprocal grate
CN202109505U (en) Boiler water power deslagging system
CN202543247U (en) Improved converter charging port device
CN201625781U (en) Energy-saving, environment-friendly and stokehole casting furnace
CN204079999U (en) A kind of novel blast-furnace Coalblowing system
CN203938678U (en) A kind of blast furnace ferronickel flushing cinder system
CN210425070U (en) Tertiary conveying system of coal fired power plant boiler dry slag removal
CN202253690U (en) Slag extractor
CN203159642U (en) Air quantity regulation device of blast furnace
CN204369911U (en) A kind of liquid high temperature sludge residual heat using device
CN2782687Y (en) Direct combustion type gas generation furnace
CN202962943U (en) Flushing system of dry slag discharge type boiler full-furnace heating surface of generator unit
CN201665685U (en) Cooling system for steel brick soft water of blast furnace throat
CN2717960Y (en) Fixed layer batch-type gas generating furnace
CN219906105U (en) Water flushing type tail Jiao Qing conveyer
CN205077075U (en) Can be effectively dash sediment facility with furnace slag water particleization
CN202432244U (en) Pipeline structure ranging from vacuum flash tank to settling tank
CN204495083U (en) A kind of iron/steel slag waste heat utilizes device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee