CN2884220Y - Device for checking electric relay - Google Patents

Device for checking electric relay Download PDF

Info

Publication number
CN2884220Y
CN2884220Y CN 200520047028 CN200520047028U CN2884220Y CN 2884220 Y CN2884220 Y CN 2884220Y CN 200520047028 CN200520047028 CN 200520047028 CN 200520047028 U CN200520047028 U CN 200520047028U CN 2884220 Y CN2884220 Y CN 2884220Y
Authority
CN
China
Prior art keywords
relay
wave band
switch
time
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520047028
Other languages
Chinese (zh)
Inventor
刘海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yongshun Electric (Group) Co., Ltd.
Original Assignee
Shanghai Baosteel Equipment Maintenance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baosteel Equipment Maintenance Co Ltd filed Critical Shanghai Baosteel Equipment Maintenance Co Ltd
Priority to CN 200520047028 priority Critical patent/CN2884220Y/en
Application granted granted Critical
Publication of CN2884220Y publication Critical patent/CN2884220Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model relates to a relay loop calibration device, in particular to a calibration device which can simultaneously perform the calibration of single relay and a plurality of relays and accurately test the contact resistance, aimed at the technical problem that the prior relay cannot perform the calibration. To settle the hidden trouble, the utility model adopts the technical proposal that: the power supply of the relay circuit calibration device is connected with the main power switch and passes through fuse, the 220V alternating current power supply is outputted and then passes through a voltage regulation device and a voltage reduction isolation transformer, the 110V alternating current power supply is obtained and then is rectified by bridge pattern rectifier circuit, so the 110V direct current power supply is obtained. The output terminal of the bridge pattern rectifier circuit is connected with a preceding stage rotary wave band transfer switch which is connected with the wire wrap of the relay to be calibrated, if the relay to be calibrated is a time relay, the contact point of the time relay is connected into K4 rear stage rotary wave band transfer switch loop, and the rear stage rotary wave band transfer switch is connected with an electronic stopwatch so as to calibrate the counting time of the time relay. The utility model is mainly applied for the performance test of the relay.

Description

The relay calibration equipment
Technical field: the utility model relates to the relay circuit calibration equipment, especially can carry out the relay calibration equipment that verification and docking point resistance are tested exactly simultaneously at single relay and a plurality of relay.
Background technology: the unit interlock protection device and the field control loop of power plant all use various types of relays to realize the control and the protection in loop at present, and the specification kind differs, and quantity is also very huge.And these relays are not checked at ordinary times, also have no idea to detect and judge its performance in annual overhaul, only judge simply just whether relay moves when the unit protection loop is debugged, and the field control loop does not have method to go to detect especially.So in a single day important equipment break down, and relay is failure to actuate during with on-line operation, time relay actuation time is incorrect and contact resistance increases and causes that the loop action is undesired and the most see more.If relay is failure to actuate in the control loop at the scene, can cause the normally start and stop of pump, blower fan and motor, in interlock protection device, will directly cause shutdown or load down, so production and safe operation are had the greatest impact in case break down.If because a slight carelessness causes shutting down, user's unit-economy benefit will be taken a bath, and power plant is used in the big and small relay in each place, just as many time bombs, the time of usefulness is long more, and the probability that breaks down is big more.So, will how to solve this type of hidden danger? when relay is overhauled, we find all kinds of relays since frequent movement and service time permanent after, it is insensitive that coil motion will become, and the increase that contact resistance also can be at double.By market survey, find to be widely used at present all kinds of relays in fields such as oil, chemical industry, electric power, metallurgy, unexpectedly there is not a kind of equipment to carry out verification and inspection to it, it being carried out and judge, and there is not this type of device effectively to test and verification on the market to relay yet.
Summary of the invention: the purpose of this utility model provides a kind of relay calibration equipment that can judge relay performance, mainly solves the technical matters that present relay can't detection check.For there is hidden danger in solution, key be the performance to relay comprise coil the operation voltage during dead electricity is judged, the slower and bigger relay of contact resistance is changed for those actions.The technical solution of the utility model is: the relay calibration equipment, power supply connects total power switch, total power switch connects fuse and connects regulator and step-down isolation transformer again, the output terminal of step-down isolation transformer connects bridge rectifier circuit, the output termination prime rotation wave band change-over switch loop of bridge rectifier circuit, prime rotation wave band change-over switch connects by school relay line bag.The input end of bridge rectifier circuit connects the AC relay seat after connecting ganged switch, and the output terminal of bridge rectifier circuit connects the DC relay seat after connecting ganged switch.When being the time relay by the school relay, level was rotated wave band change-over switch loop after time relay contact was connected to K4, and a back level rotation wave band change-over switch connects electrical secondmeter, thus the numeration time of checking time relay.The beneficial effects of the utility model are: by effective verification and the inspection to relay, can judge in advance relay, do or be failure to actuate or loop fault that poor contact of contacts causes thereby reduce unnecessary because relay misoperation.To the safe operation of field apparatus, and the safe operation of unit has extremely important meaning.
Description of drawings:
Accompanying drawing is the key wiring diagram of this practical relay calibration equipment
Embodiment: with reference to accompanying drawing, K3 is a measured relay type selecting switch, wherein: 0-expression room, 1-expression direct current time relay, 2-expression direct current auxiliary reclay, 3-expression exchange time relay, 4-expression AC intermediate relay.K4 is tested time relay contact type selecting switch, wherein: 0-expression room, 1-expression excitation time closing normal opened contact, the time-delay of 2-expression excitation disconnects normally closed contact, the time-delay of 3-expression loss of excitation disconnects normal opened contact, 4-expression loss of excitation time closing normally closed contact.Rotation wave band change-over switch K3 is divided into three layers, a, and b, c, when switch switches to contact 1, K3-A, K3-B, K3-C switch to contact 1 simultaneously; When should switch switching to contact 2, K3-A, K3-B, K3-C switch to contact 2 simultaneously; When switch switches to contact 3, K3-A, K3-B, K3-C switch to contact 3 simultaneously; When switch switches to contact 4, K3-A, K3-B, K3-C switch to contact 4 simultaneously; In like manner the effect of K4 is with the K3 unanimity.QL2A is the bridge rectifier element, effect: alternating voltage is converted to DC voltage.Relay principle of work: input 220V AC power, total power switch closes, pass through switch-fuse, directly export one road 220V AC power, pass through regulator and step-down isolation transformer again, obtain the 110V AC power,, obtain the 110V direct supply by rectification, carry out the selection of relay types by rotation wave band change-over switch: coil motion: (1), when switching to 1, rotation wave band change-over switch K3 selects the direct current time relay, DC relay J action, contact J-1 closes, and K3-C makes contact 1 simultaneously, K3-b makes contact 1, if this moment, K switch 2 was closed, the 110V AC power affacts on the K5, if this moment, K5 got to actuation coil, measured relay is with regard to excitation, if by the school relay is twin coil, get to resetting coil by K5, carry out the switching of loss of excitation/excitation between two groups of coils.(2), when switching to 2, rotation wave band change-over switch K3 selects the direct current auxiliary reclay, K3-b makes contact 2, if this moment, K switch 2 was closed, the 110V AC power affacts on the K5, if this moment, K5 got to actuation coil, measured relay is with regard to excitation, if be twin coil by the school relay, get to resetting coil by K5, carry out the switching of loss of excitation/excitation between two groups of coils.(3), when switching to 3, rotation wave band change-over switch K3 selects the exchange time relay, DC relay J action, contact J-1 closes, and K3-C makes contact 3 simultaneously, K3-b makes contact 3, if this moment, K switch 2 was closed, the 110V AC power affacts on the K5, if this moment, K5 got to actuation coil, measured relay is with regard to excitation, if by the school relay is twin coil, get to resetting coil by K5, carry out the switching of loss of excitation/excitation between two groups of coils.(4), when switching to 4, rotation wave band change-over switch K3 selects AC intermediate relay, K3-b makes contact 4, if this moment, K switch 2 was closed, the 110V AC power affacts on the K5, if this moment, K5 got to actuation coil, measured relay is with regard to excitation, if be twin coil by the school relay, get to resetting coil by K5, carry out the switching of loss of excitation/excitation between two groups of coils.
If detected is the time relay, connect an electrical secondmeter again, rotation wave band change-over switch K4 selects the contact type of the tested time relay: (1), selection excitation time-delay when rotation wave band change-over switch K4 switches to 1, after the relay J action, relay tip J-3 closure, electrical secondmeter picks up counting, because the tested time relay belongs to excitation time closing normal opened contact, the timing of equal time relay finishes, the normal opened contact closure, this moment the electrical secondmeter dead electricity, thereby the actuation time of having write down the tested time relay simultaneously.(2), when rotation wave band change-over switch K4 switches to 2, electrical secondmeter is received time-delay 0N and COM end, select the excitation time-delay to disconnect the normally closed contact relay, after the measured relay excitation, electrical secondmeter picks up counting simultaneously, after the action of the tested time relay, disconnects normally closed contact, electrical secondmeter does not stop timing owing to coil has power supply, thereby has write down the actuation time of the tested time relay.(3), when rotation wave band change-over switch K4 switches to 3, electrical secondmeter is received time-delay ON and COM end, selects loss of excitation time-delay disconnection normally closed contact, K2 closes, electrical secondmeter picks up counting, and when the tested time relay was delayed time the disconnection normally closed contact owing to loss of excitation after, counting finished.(4), when rotation wave band change-over switch K4 switches to 4, select loss of excitation time closing normal opened contact, draw back K2, electrical secondmeter picks up counting, when the tested time relay because loss of excitation and behind the time closing normal opened contact, counting finishes.
Relay detects step: 1, now relay is correctly inserted base by dissimilar and socket pin.2, select voltage model (exchanging or DC voltage) correctly according to relay types, corresponding switch is closed.3, the close power supply of relay calibration equipment, slowly rotate handwheel (regulator 0~250VAC), up to the actuating of relay, voltage during the record excitation, voltage when in like manner measuring loss of excitation (rated operational voltage according to each relay regulation is as the criterion, and the relay that exceeds voltage range will be in operation and have serious hidden danger).4, often opening of measuring relay respectively, the contact resistance of normally closed contact (contact resistance just often is bold and unconstrained ohm level).This device also can carry out verification to increase work efficiency to several relays simultaneously, can also carry out verification to part control loop or field control loop.Because the utility model also has one group of voltage tap, so can the dissimilar relay of verification.

Claims (3)

1, relay calibration equipment, it is characterized in that: power supply connects total power switch, total power switch connects regulator and step-down isolation transformer through fuse, the output terminal of step-down isolation transformer connects bridge rectifier circuit, the output termination prime rotation wave band change-over switch loop of bridge rectifier circuit, prime rotation wave band change-over switch connects by school relay line bag.
2, relay calibration equipment according to claim 1 is characterized in that: when being the time relay by the school relay, level was rotated wave band change-over switch loop after time relay contact was connected to K4, and a back level rotation wave band change-over switch connects electrical secondmeter.
3, relay calibration equipment according to claim 1 is characterized in that: the input end of bridge rectifier circuit connects the AC relay seat after connecting ganged switch, and the output terminal of bridge rectifier circuit connects the DC relay seat after connecting ganged switch.
CN 200520047028 2005-11-29 2005-11-29 Device for checking electric relay Expired - Fee Related CN2884220Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520047028 CN2884220Y (en) 2005-11-29 2005-11-29 Device for checking electric relay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520047028 CN2884220Y (en) 2005-11-29 2005-11-29 Device for checking electric relay

Publications (1)

Publication Number Publication Date
CN2884220Y true CN2884220Y (en) 2007-03-28

Family

ID=37957280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520047028 Expired - Fee Related CN2884220Y (en) 2005-11-29 2005-11-29 Device for checking electric relay

Country Status (1)

Country Link
CN (1) CN2884220Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998616A (en) * 2012-10-23 2013-03-27 上海市电力公司 Online calibrating method for transformer sudden-change pressure relay
CN103245872A (en) * 2013-05-22 2013-08-14 湘潭电机股份有限公司 State detection device for alternating current fuse
CN103339520A (en) * 2011-01-28 2013-10-02 赞特雷克斯科技公司 Fuse continuity detection
CN104483625A (en) * 2014-12-16 2015-04-01 贵州天义汽车电器有限公司 Relay detection device
CN104614671A (en) * 2015-02-02 2015-05-13 苏州市计量测试研究所 Calibration aiding device for time relay and calibration method
CN104865521A (en) * 2015-06-12 2015-08-26 中国南方电网有限责任公司超高压输电公司南宁局 Instrument and method for testing action time of hand-held time relay
CN106054071A (en) * 2016-08-11 2016-10-26 国家电网公司 Relay calibration instrument
CN106707158A (en) * 2017-02-22 2017-05-24 江苏信息职业技术学院 Time relay calibration device and calibration method thereof
CN107576906A (en) * 2017-09-19 2018-01-12 国家电网公司 A kind of portable relay checking platform and its application method
CN108152725A (en) * 2017-12-14 2018-06-12 国网宁夏电力有限公司电力科学研究院 A kind of electric switch Interruption experimental rig

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103339520A (en) * 2011-01-28 2013-10-02 赞特雷克斯科技公司 Fuse continuity detection
CN103339520B (en) * 2011-01-28 2016-03-02 施耐德电气太阳能逆变器美国股份有限公司 Fuse continuity detects
CN102998616B (en) * 2012-10-23 2014-12-17 上海市电力公司 Online calibrating method for transformer sudden-change pressure relay
CN102998616A (en) * 2012-10-23 2013-03-27 上海市电力公司 Online calibrating method for transformer sudden-change pressure relay
CN103245872A (en) * 2013-05-22 2013-08-14 湘潭电机股份有限公司 State detection device for alternating current fuse
CN103245872B (en) * 2013-05-22 2015-09-30 湘潭电机股份有限公司 AC fuse condition checkout gear
CN104483625B (en) * 2014-12-16 2017-08-25 贵州天义技术有限公司 A kind of electric relay detection device
CN104483625A (en) * 2014-12-16 2015-04-01 贵州天义汽车电器有限公司 Relay detection device
CN104614671A (en) * 2015-02-02 2015-05-13 苏州市计量测试研究所 Calibration aiding device for time relay and calibration method
CN104865521A (en) * 2015-06-12 2015-08-26 中国南方电网有限责任公司超高压输电公司南宁局 Instrument and method for testing action time of hand-held time relay
CN104865521B (en) * 2015-06-12 2018-03-09 中国南方电网有限责任公司超高压输电公司南宁局 A kind of hand-held time relay actuation time tester and method
CN106054071A (en) * 2016-08-11 2016-10-26 国家电网公司 Relay calibration instrument
CN106707158A (en) * 2017-02-22 2017-05-24 江苏信息职业技术学院 Time relay calibration device and calibration method thereof
CN107576906A (en) * 2017-09-19 2018-01-12 国家电网公司 A kind of portable relay checking platform and its application method
CN108152725A (en) * 2017-12-14 2018-06-12 国网宁夏电力有限公司电力科学研究院 A kind of electric switch Interruption experimental rig

Similar Documents

Publication Publication Date Title
CN2884220Y (en) Device for checking electric relay
US9088152B2 (en) Leakage detection protection circuit
CN102457042B (en) Novel electricity leakage detection protection circuit
CN203787366U (en) Residual current circuit breaker
CN206618845U (en) Power supply module for communication test system
CN207624566U (en) It is a kind of to throw the intelligent pressure plate set of giving up the throne using spring link output
CN113533841A (en) Non-invasive detection method for power of high-voltage isolating switch driving motor
CN108011348B (en) Low-voltage intelligent power distribution control protection system and control protection method thereof
CN2909504Y (en) Simple high-tension circuit breaker analog device
CN105529698B (en) A kind of Intelligent electric gas holder of band self-checking function
CN101109787A (en) Intelligent detecting device for under-voltage releasing equipment of breaker
CN206117155U (en) Safe supply control circuit of each unit load of examination assembly line
CN204462294U (en) A kind of test fixture testing room
CN112285447A (en) Switch drawer test circuit and test equipment
CN202975315U (en) Temperature influence test board equipment and experimental platform equipment for single-phase intelligent electric meter
CN100353175C (en) Test device for small breaker reliability
CN205898968U (en) Electronic relay coil overload detection test bench
CN107785217A (en) A kind of Intelligent electronic optical pole breaker of plastic casing
CN101911418B (en) Module mechanically linkable to a circuit breaker
CN201515205U (en) Earth leakage checking protective circuit
CN100368819C (en) Reliability tester for electric leakage protector
CN205622313U (en) Two power automatic transfer switch controllers
CN106451430A (en) Safe power supply control circuit of each unit load of verification production line
CN208334617U (en) A kind of binding clip verifying transformer station direct current system leakage current mutual inductor
CN208060673U (en) A kind of direct current calibration equipment suitable for rotor over-voltage protection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI YONGSHUN ELECTRIC ROUP CO.,LTD.

Free format text: FORMER OWNER: SHANGHAI BAOSTEEL EQUIPMENT MAINTENANCE CO., LTD

Effective date: 20100623

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201900 JIWU ROAD, BAOGANG FACTORY AREA, BAOSHAN DISTRICT, SHANGHAI CITY, WEI 1 ROAD TO: 201812 NO.338, BAOYUAN 7 ROAD, JINBAO INDUSTRIAL PARK, JIANGQIAO TOWN, JIADING DISTRICT, SHANGHAI CITY

TR01 Transfer of patent right

Effective date of registration: 20100623

Address after: 201812, No. seven, No. 338, Bao garden, Jinbao Industrial Park, Jiading District Town, Shanghai

Patentee after: Shanghai Yongshun Electric (Group) Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Baosteel five road, Weiyi machine

Patentee before: Shanghai Baogang Equipment Overhaul Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070328

Termination date: 20121129