CN2883397Y - Oxygen supplying unit of oxygen-enriched smelting tech of lead blast furnace - Google Patents
Oxygen supplying unit of oxygen-enriched smelting tech of lead blast furnace Download PDFInfo
- Publication number
- CN2883397Y CN2883397Y CN 200520142095 CN200520142095U CN2883397Y CN 2883397 Y CN2883397 Y CN 2883397Y CN 200520142095 CN200520142095 CN 200520142095 CN 200520142095 U CN200520142095 U CN 200520142095U CN 2883397 Y CN2883397 Y CN 2883397Y
- Authority
- CN
- China
- Prior art keywords
- oxygen
- storage tank
- blast furnace
- furnace
- oxygen storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacture Of Iron (AREA)
Abstract
The utility model belongs to the technical field of lead smelting, in particular to an oxygen supply device for oxygen-enriched air smelting in lead blast furnace. An oxygen storage tank is communicated with the wind pipe of a Roots blower for feeding the blast furnace via an oxygen hose; the oxygen in the oxygen pipeline and air from the Roots blower are mixed evenly in the wind pipe and then fed to the blast furnace; a silicon brass oil-free valve is arranged on the oxygen hose to feed oxygen stably and evenly, thus greatly improving the furnace capacity and perfecting relevant economic index.
Description
Technical field
The utility model belongs to plumbous technical field of smelting, relates in particular to a kind of apparatus of oxygen supply of lead blowing-furnace oxygen-rich smelting process.
Background technology
Implement lead blowing-furnace oxygen-rich smelting process, the treatment capacity of raising stove that can be is by a relatively large margin also improved the correlation technique economic target, but the key point of implementing this technology is the assurance of oxygen concn, the oxygen concn frequent fluctuation not only can not make this technology normally be carried out, and also might cause such as comparatively serious negative impacts such as stove ore deposit unstability, index deteriorations.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art and a kind of treatment capacity of raising stove by a relatively large margin is provided and improves the apparatus of oxygen supply of guaranteeing the normal lead blowing-furnace oxygen-rich smelting process of implementing of oxygen-enriched air smelting technology of correlation technique economic target.
Technical solution adopted in the utility model is: by the oxygen channel connection oxygen storage tank is arranged at roots blower on the air fed pipeline of blast furnace.Oxygen in the oxygen channel and in roots blower the air of stable supplying, in airduct, send into blast furnace behind the uniform mixing, oxygen supply pipeline is provided with silicon brass does not have the fuel tap door.
Oxygen storage tank is connected by the oxygen installation of inlet pipe with the oxygen that produces, tensimeter and safety valve are installed on oxygen storage tank, set certain value according to specific requirement, safety valve is opened automatically when pressure is higher than this definite value, oxygen storage tank is connected oxygen channel by escape pipe, also has hand-hole and the wash water valve of making oxygen storage tank maintenance usefulness on oxygen storage tank.
Effective effect of the present utility model is: can realize the uniform and stable supply of oxygen, the treatment capacity of raising stove is by a relatively large margin also improved the correlation technique economic target.
Description of drawings
Fig. 1 is oxygen supply facility structure figure of the present utility model.
Fig. 2 is an oxygen storage tank structure iron of the present utility model.
Embodiment
As shown in Figure 1, 2, on blast furnace 10 air fed pipelines, oxygen storage tank 11 is arranged at roots blower 8 by the oxygen channel connection.
Oxygen in the oxygen channel and in roots blower the air of stable supplying in airduct 9, send into blast furnace 10 behind the uniform mixing, oxygen supply pipeline is provided with silicon brass does not have the fuel tap door.
Oxygen storage tank 11 is connected by the oxygen installation of inlet pipe 4 with the oxygen that produces, tensimeter 1 and safety valve 5 are installed on oxygen storage tank 11, set certain value according to specific requirement, safety valve 5 is opened automatically when pressure is higher than this definite value, oxygen storage tank 11 is connected oxygen channel by escape pipe 2, also is provided with hand-hole 6 and the wash water valve 7 of making oxygen storage tank maintenance usefulness on oxygen storage tank 11.Oxygen storage tank 11 is installed on the ground by support 3.
Oxygen that oxygen installation produces enters in the oxygen storage tank 11 from inlet pipe 4, and tensimeter 1 is set certain value according to specific requirement, and safety valve 5 is opened automatically when pressure is higher than this definite value, the oxygen emptying.Oxygen in the basin can stably enter into oxygen channel from escape pipe 2.Oxygen in the oxygen channel and in roots blower 8 fresh air of stable supplying, in airduct 9, send into blast furnace 10 behind the uniform mixing, make into the stove air oxygen concentration to reach the processing requirement value.
Between blast furnace and oxygen station, increase an oxygen storage tank, difference according to the different size stove requires to set different force value, the front and back of oxygen storage tank install special valve additional according to the suitable position of the different choice in actual production place, in order to adjust in good time.The concrete operations step: 1, the supply of oxygen should be carried out after 5 minutes at the roots blower air feed at least, should open the valve before the roots blower during air feed earlier, after open valve before the gas holder; 2, no matter which kind of reason causes the blast furnace blowing-out, before all must be with the valve closes before the gas holder, close the valve of closing behind the valve before the gas tank before the roots blower earlier.
Claims (4)
1, a kind of apparatus of oxygen supply of lead blowing-furnace oxygen-rich smelting process is characterized in that: by the oxygen channel connection oxygen storage tank (11) is arranged at roots blower (8) on the air fed pipeline of blast furnace (10).
2, the apparatus of oxygen supply of a kind of lead blowing-furnace oxygen-rich smelting process according to claim 1, it is characterized in that: oxygen in the oxygen channel and the air of stable supplying in roots blower, send into blast furnace (10) in airduct (9) behind the uniform mixing, oxygen supply pipeline is provided with silicon brass does not have the fuel tap door.
3, the apparatus of oxygen supply of a kind of lead blowing-furnace oxygen-rich smelting process according to claim 1, it is characterized in that: oxygen storage tank (11) is connected by the oxygen installation of inlet pipe (4) with the oxygen that produces, tensimeter (1) and safety valve (5) are installed on oxygen storage tank (11), set certain value according to specific requirement, safety valve 5 is opened automatically when pressure is higher than this definite value, oxygen storage tank (11) is connected oxygen channel by escape pipe (2), also is provided with hand-hole (6) and the wash water valve (7) of making oxygen storage tank maintenance usefulness on oxygen storage tank (11).
4, the apparatus of oxygen supply of a kind of lead blowing-furnace oxygen-rich smelting process according to claim 3 is characterized in that: oxygen storage tank (11) is installed on the ground by support (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520142095 CN2883397Y (en) | 2005-12-02 | 2005-12-02 | Oxygen supplying unit of oxygen-enriched smelting tech of lead blast furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520142095 CN2883397Y (en) | 2005-12-02 | 2005-12-02 | Oxygen supplying unit of oxygen-enriched smelting tech of lead blast furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2883397Y true CN2883397Y (en) | 2007-03-28 |
Family
ID=37956459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520142095 Expired - Fee Related CN2883397Y (en) | 2005-12-02 | 2005-12-02 | Oxygen supplying unit of oxygen-enriched smelting tech of lead blast furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2883397Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102043412A (en) * | 2010-12-31 | 2011-05-04 | 中国恩菲工程技术有限公司 | Control method for supplying fuel oil and oxygen in smelting system |
-
2005
- 2005-12-02 CN CN 200520142095 patent/CN2883397Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102043412A (en) * | 2010-12-31 | 2011-05-04 | 中国恩菲工程技术有限公司 | Control method for supplying fuel oil and oxygen in smelting system |
CN102043412B (en) * | 2010-12-31 | 2012-09-19 | 中国恩菲工程技术有限公司 | Control method for supplying fuel oil and oxygen in smelting system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102878822B (en) | Device and method for purifying and recycling furnace gas of hermetic ore smelting furnace | |
CN203728859U (en) | Oxygen supply device arranged in front of blast furnace blower | |
CN2883397Y (en) | Oxygen supplying unit of oxygen-enriched smelting tech of lead blast furnace | |
CN100491550C (en) | Lead blowing-furnace oxygen-rich smelting process | |
CN209210840U (en) | A kind of blast furnace injection device of producer gas pulverized coal conveying | |
CN203923225U (en) | Force to reclaim the device of blast furnace out-spreading coal gas | |
CN216712141U (en) | Dry type dust removal system of blast furnace | |
CN203214458U (en) | Air lifter | |
CN206915881U (en) | A kind of Fenton processing unit of batch (-type) waste water | |
CN203159642U (en) | Air quantity regulation device of blast furnace | |
CN211814525U (en) | Treatment device for diffused gas at top of blast furnace | |
CN201179392Y (en) | Improved upper-gas-intake blast furnace cloth bag dust remover | |
CN203291786U (en) | Tank body internal recycling gas stirring device of waste water adjusting tank and waste water adjusting tank | |
CN204039422U (en) | A kind of coal powder injection interlock control system | |
CN209098712U (en) | A kind of blast furnace stops environmental protection displacement apparatus again | |
CN201589057U (en) | Water changing device of wet-type gas holder | |
CN211546588U (en) | Blast furnace top pressure equalizing gas full recovery device | |
CN202768047U (en) | Adit assistant ventilation device | |
CN103898260A (en) | Automatic coal gas diffusion device with pressure stabilizing function | |
CN203820807U (en) | Automatic coal gas blow-off device with pressure stabilizing function | |
CN202070262U (en) | Low-pressure pulse bag type dust collector | |
CN220230791U (en) | Flue gas pressure measurement blowback configuration device | |
CN209325811U (en) | Ultra-large type fume afterheat reutilization system | |
CN215259755U (en) | Constant-speed boiler high-pressure feed pump recirculation pipeline flushing system | |
CN219824254U (en) | Blast furnace damping down gas recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070328 Termination date: 20131202 |