CN2869135Y - Power line rush-repair pole foundation - Google Patents

Power line rush-repair pole foundation Download PDF

Info

Publication number
CN2869135Y
CN2869135Y CN 200520116172 CN200520116172U CN2869135Y CN 2869135 Y CN2869135 Y CN 2869135Y CN 200520116172 CN200520116172 CN 200520116172 CN 200520116172 U CN200520116172 U CN 200520116172U CN 2869135 Y CN2869135 Y CN 2869135Y
Authority
CN
China
Prior art keywords
pole
tower
pedestal
base
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520116172
Other languages
Chinese (zh)
Inventor
包建强
张勇
许金明
周建强
吕伟宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tianhong Power Appliance Co Ltd
Original Assignee
Ningbo Tianhong Power Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianhong Power Appliance Co Ltd filed Critical Ningbo Tianhong Power Appliance Co Ltd
Priority to CN 200520116172 priority Critical patent/CN2869135Y/en
Application granted granted Critical
Publication of CN2869135Y publication Critical patent/CN2869135Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

An electric line first aid repair pole-tower foundation served as the foundation for the temporary pole-tower in the electric power system circuit first aid repair work is provided. The pole-tower foundation has a pedestal to connect the pole-tower, wherein the pedestal comprises a pedestal plate and a cardinal axis support plate welded on the pedestal plate; wherein the support plate is connected to a cardinal axis which is connected to the bottom of the pole-tower, and a through hole is vertically positioned on the cardinal axis which is used to perforate through and lock on the pole-tower bottom inserted at two sides of the cardinal axis and the pin connected with the cardinal axis; the utility model is characterized in that: a splicing pedestal plate is firmly fixed under the pedestal plate to enlarge the supporting area; the pedestal is welded with an opening connecting ring which can connect the pedestals of two symmetrical pole-towers with a steel rope to prevent the door type pole-tower bottom from moving outside. According to the geological condition of the installation environment, the utility model can adopt the slicing pedestal plates of different forms and various sizes connected under the pedestal to increase the supporting area of the pedestal base, and have the advantages of light weight, convenient installation, easy assembly and strong bearing capacity.

Description

Power circuit repairing pole and tower foundation
Technical field
The utility model relates to the basic technology field, especially relates to the basic technology field of the interim shaft tower in the circuit on power system repairing.
Background technology
In power system, the accident of falling the shaft tower of overhead transmission line happens occasionally, and causes power failure, and repairing fast restored electricity in the short as far as possible time.And the shaft tower in the transmission line of electricity is generally all higher, lift repairing, and highly equal or higher interim shaft tower need be arranged, the shaft tower that also has the temporary transient replacement of the interim shaft tower of direct usefulness to be fallen.In a short period of time higher interim shaft tower is installed, its basis is crucial, and it is different to fall shaft tower environment of living in, landform, exhales height, span, wind speed, icing and geological condition etc. also to have nothing in common with each other, for installation has brought difficulty.The method that adopts is that for the hard ground, the base that directly will connect shaft tower is fixed in ground with drill rod at present; For resembling soft foundations such as rice terrace, sandy soil ground, then in that to connect under the base of shaft tower lining wood etc. fixing again.This way of temporarily piecing together, the reason condition restriction, often insecure, leave accident potential.
Summary of the invention
The purpose of this utility model is for overcoming the deficiency of prior art, provide a kind of easy to assembly, can be according to the geological condition of erecting bed, select the power circuit repairing pole and tower foundation of different big or small assembly unit bases, easy construction when making the shaft tower repairing, install firmly, the accident of stopping takes place.
For achieving the above object, the new technical scheme of this practicality is such: a kind of power circuit repairing pole and tower foundation, the base that one connection shaft tower is arranged, base comprises bed plate and the hinge base plate that welds thereon, be hinged with the hinge of coupling bar tower bottom on the base plate, one through hole perpendicular to the axle center is arranged on this hinge, be used for passing and locking shaft tower bottom and the joining pin of hinge that inserts the hinge both sides; It is characterized in that being fixedly connected under base increases the splicing bed plate of bearing surface, with the bearing area on enlarged base basis; Also be welded with root on the said base and open connecting ring, two shaft tower bases of symmetry can be connected with wire rope, outside both sides, move to prevent gate-type shaft tower bottom.
Owing to adopted technique scheme, the utility model can adopt multi-form in the base lower link and splicing bed plate different sizes according to the geological conditions of installation environment, to strengthen the bearing area of footing foundation, have in light weight, easy for installation, assembly unit is easy, the characteristics that supporting capacity is strong.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further described.
Fig. 1 is the structural representation of the utility model embodiment 1.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the structural representation of the utility model embodiment 2.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 is the structural representation of the utility model embodiment 3.
Fig. 6 is the schematic diagram of the parts 12 enlarged base plates of Fig. 5.
Among the figure: 1, hinge base plate, 2, hinge, 3, through hole, 4, stiffener, 5, root opens connecting ring, 6, bed plate, 7, the splicing bed plate, 8, connect horizontal stripe, 9, through hole, 10, reinforcing rib, 11, assembly unit bolt hole, 12, the enlarged base plate, 13, the assembly unit bolt hole, 14, through hole.
The specific embodiment
Embodiment 1:
By Fig. 1--shown in Figure 2, a kind of power circuit repairing pole and tower foundation of the present utility model, the base that one connection shaft tower is arranged, base comprises bed plate 6 and the hinge base plate 1 that welds thereon, be hinged with the hinge 2 of coupling bar tower bottom on the base plate, one through hole 3 perpendicular to the axle center is arranged on this hinge, be used for passing and locking shaft tower bottom and the joining pin of hinge that inserts the hinge both sides; It is characterized in that being fixedly connected under base increases the splicing bed plate 7 of bearing surface, and its cross sectional shape is two square frame shapes, hollow, and the two ends open-work can insert the lumps of wood, in case sink in the basis; Also be welded with root on the said base and open connecting ring 5, two shaft tower bases of symmetry can be connected with wire rope, outside both sides, move to prevent gate-type shaft tower bottom; For improving intensity, between bed plate 6 and hinge base plate 1, be fixed with stiffener 4.
Embodiment 2:
Splicing bed plate 7 among the embodiment 1 is made into by polylith trough slab splicing, and Open Side Down, on have the horizontal stripe 8 of connection fixing with it, on trough slab, have and can insert the through hole 9 that drill rod and ground are fixed; All the other repeat embodiment 1.
Embodiment 3:
Make the splicing bed plate 7 among the embodiment 1 into disc, be welded with reinforcing rib 10 between itself and base, the nearly disk periphery of splicing bed plate is along being evenly equipped with assembly unit bolt hole 11, the plate of assembly unit enlarged base again 12; Said enlarged base plate 12 is 120 ° sector shape, which is provided with and assembly unit bolt hole 11 corresponding assembly unit bolts hole 13, will splice bed plate 7 with bolt and fix with enlarged base plate 12, also is provided with thereon to insert the fixing through hole 14 of drill rod and ground; All the other repeat embodiment 1.

Claims (4)

1, a kind of power circuit repairing pole and tower foundation, the base that one connection shaft tower is arranged, base comprises bed plate (6) and the hinge base plate (1) that welds thereon, be hinged with the hinge (2) of coupling bar tower bottom on the base plate, one through hole perpendicular to the axle center (3) is arranged on this hinge, and it is characterized in that being fixedly connected under base increases the splicing bed plate (7) of bearing surface; Also be welded with root on the said base and open connecting ring (5).
2, a kind of power circuit repairing pole and tower foundation according to claim 1, it is characterized in that: said splicing bed plate (7), its cross sectional shape are two square frame shapes, hollow, the two ends open-work can insert the lumps of wood.
3, a kind of power circuit repairing pole and tower foundation according to claim 1, it is characterized in that: said splicing bed plate (7), by the splicing of polylith trough slab, Open Side Down, on have connection horizontal stripe (8) fixing with it, on trough slab, have and can insert the through hole (9) that drill rod and ground are fixed.
4, a kind of power circuit repairing pole and tower foundation according to claim 1, it is characterized in that: said splicing bed plate (7), be disc, be welded with reinforcing rib (10) between itself and base, the nearly disk periphery of splicing bed plate is along being evenly equipped with assembly unit bolt hole (11), the plate of assembly unit enlarged base again (12); Said enlarged base plate (12) is 120 ° sector shape, which is provided with and the corresponding assembly unit bolt hole of assembly unit bolt hole (11) (13); Also be provided with thereon and can insert the fixing through hole (14) of drill rod and ground.
CN 200520116172 2005-10-19 2005-10-19 Power line rush-repair pole foundation Expired - Lifetime CN2869135Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520116172 CN2869135Y (en) 2005-10-19 2005-10-19 Power line rush-repair pole foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520116172 CN2869135Y (en) 2005-10-19 2005-10-19 Power line rush-repair pole foundation

Publications (1)

Publication Number Publication Date
CN2869135Y true CN2869135Y (en) 2007-02-14

Family

ID=37724069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520116172 Expired - Lifetime CN2869135Y (en) 2005-10-19 2005-10-19 Power line rush-repair pole foundation

Country Status (1)

Country Link
CN (1) CN2869135Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159056A (en) * 2019-04-11 2019-08-23 广东电网有限责任公司 One kind being used for transmission line of electricity rapid rush-repair pole and tower foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159056A (en) * 2019-04-11 2019-08-23 广东电网有限责任公司 One kind being used for transmission line of electricity rapid rush-repair pole and tower foundation

Similar Documents

Publication Publication Date Title
CN201495027U (en) Hoisting tool for mill housing
WO2012040307A2 (en) Adjustable racking system for solar array and method of construction of a solar array
CN215053034U (en) Dustproof work shed for foundation pit
CN2869135Y (en) Power line rush-repair pole foundation
CN106504674A (en) Billboard
CN107654106B (en) Electric power pylon column foot replacing options
CN215254761U (en) Steel structure frame body for hanging dust screen
TWM634299U (en) Combination structure with tall and short concrete piles combined with steel members
CN114319935A (en) Temporary back-jacking support construction method
CN220441440U (en) Truss suspension beam suspension column type film sunlight greenhouse
CN111119222A (en) Assembling device for ultra-high voltage direct current transmission line iron tower in alpine region
CN220953440U (en) Quick-mounting foundation pit supporting structure
CN215629426U (en) Cast-in-place box girder steel pipe support that stability is good
CN213390842U (en) Local bearing and supporting structure of steel truss
CN218779348U (en) Bridge foundation pile reinforced structure
CN220434329U (en) Temporary steel support for mounting oversized-section steel mast
CN213900533U (en) Bottom platform structure for wind power display tower
CN218150982U (en) Umbrella type middle partition wall supporting structure for controlling tunnel vault integral settlement
CN210529709U (en) Deep foundation pit tool type suspension berm
CN216429657U (en) Device for fixing fan at hole
CN211776310U (en) Novel composite electric pole
CN218183284U (en) Photovoltaic support for oil-water well site
CN220747242U (en) Rail-mounted steel structure factory building
CN219119983U (en) Construction support is built in room
CN217460900U (en) Assembled steel construction building system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070214

EXPY Termination of patent right or utility model