CN2848865Y - Air blast branch pipe of blast furnace - Google Patents
Air blast branch pipe of blast furnace Download PDFInfo
- Publication number
- CN2848865Y CN2848865Y CN 200520095870 CN200520095870U CN2848865Y CN 2848865 Y CN2848865 Y CN 2848865Y CN 200520095870 CN200520095870 CN 200520095870 CN 200520095870 U CN200520095870 U CN 200520095870U CN 2848865 Y CN2848865 Y CN 2848865Y
- Authority
- CN
- China
- Prior art keywords
- pipe
- inner lining
- cooling jacket
- water cooling
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
The utility model relates to a pipeline which is used for air blast for a blastfurnace. The pipeline comprises a metallic pipeline and an inner lining fireproof material of the metallic pipeline, wherein the metallic pipeline is composed of a bent pipe 6, corrugated pipes 2 and a belly pipe 9, wherein the corrugated pipes 2 are arranged at both ends of the bent pipe 6. The pipes are connected with flanges 3. Dilatation joints 1 are arranged in the corrugated tube 2 and the inner lining material, wherein the dilatation joints 1 are sealed by aluminium silicate fibre. The utility model is characterized in that a water cooling jacket 10 is arranged at the end part of the belly pipe 9; one end of the water cooling jacket 10 is communicated with a water ingress pipe 11, and the other end of the water cooling jacket 1 is communicated with a water egress pipe 12. The water cooling jacket 10 is installed on the outer circle of the inner lining material of the metallic pipeline, and the cross section of the water cooling jacket 10 is in the shape of a broken ring. A cooling system, which is additionally arranged at the end part of the belly pipe of the utility model, enables the blast branch pipe not to glow in use and enables the service life of the blast branch pipe to be obviously prolonged. Therefore, the regular production of the blastfurnace is guaranteed.
Description
One, technical field
The utility model relates to a kind of pipeline of blast furnace air-supply usefulness.
Two, background technology
Existing blast branch pipe of blast furnace is made of metal tube and internal lining pipe material.The internal lining pipe material that uses generally adopts clay matter water glass or phosphoric acid bonded ramming mass at present, large blast furnace generally adopts high alumina matter or corundum fireproof mould material, and these materials all do not match with metal tube, poor heat stability, the non-refractory airflow scouring, intensity is lower, and crackle easily takes place, and causes airduct in use easily rubescent, its work-ing life is short, be generally 1~2 month, and needed in the production process often to change, influenced the ordinary production of blast furnace.
Novel mould material has been adopted in " blast branch pipe of blast furnace " (ZL2003 2 0126279.5), though improved the operating mode of blowpipe, but variation because of wind pushing temperature, the belly pipe end of blowpipe, especially blowpipe still rubescent phenomenon can occur, not only influence its work-ing life, also influence the ordinary production of blast furnace.
Three, summary of the invention
The purpose of this utility model provides a kind of can improve work-ing life, can avoid the novel blast-furnace blowpipe that rubescent phenomenon occurs, can make the blast furnace ordinary production.
For achieving the above object, design philosophy of the present utility model is to set up water-cooling system in the belly pipe end described in the patented technology of " blast branch pipe of blast furnace " (ZL20032 0126279.5).
Concrete technical scheme is: the utility model is made of metallic conduit and metallic conduit inner lining refractory, metallic conduit is made of corrugated tube, the belly pipe at bend pipe and two ends, connect with flange between pipe, in corrugated tube and the inner lining material dilatation joint is arranged, dilatation joint is sealed with aluminum silicate fiber; Be provided with water jacket in the belly pipe end, an end of water jacket communicates with water inlet pipe, and the other end of water jacket communicates with rising pipe.
Wherein, water jacket is installed on the cylindrical of metallic conduit end, and the transverse section of water jacket is for separating ring-type.
Owing to adopt technique scheme, metallic conduit inner lining refractory that the utility model adopted and good, high, the high temperature resistant airflow scouring of intensity of metallic conduit coupling.Added dilatation joint in corrugated tube and metallic conduit inner lining refractory, the thermal distortion that fine alleviation airduct liner of energy and corrugated tube Yin Gaowen are produced; Especially the cooling system of being set up in the belly pipe end makes that blowpipe is in use not rubescent, obviously improve work-ing life, guaranteed the ordinary production of blast furnace.
Four, description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the A-A sectional structure chart of Fig. 1.
Five, embodiment
Present embodiment comprises metal conduit and metallic conduit inner lining refractory as shown in Figure 1, and metallic conduit is made of corrugated tube [2], the belly pipe [8] at bend pipe [6] and two ends, connects with flange [3] between pipe, and flange face seals with metal packing washer [5].Dilatation joint [1] is arranged in corrugated tube [2] and the inner lining material, and dilatation joint [1] is sealed with aluminum silicate fiber.Locate to be provided with vision slit [4] at bend pipe [6], belly pipe [8] is provided with coal spouting gun [7]
As shown in Figure 2, belly pipe [9] end is provided with water jacket [10], and an end of water jacket [10] communicates with water inlet pipe [11], and the other end of water jacket [10] communicates with rising pipe [12].Water jacket [10] is installed on the cylindrical of metallic conduit inner lining material [7], and the transverse section of water jacket [10] is for separating ring-type.
The metallic conduit inner lining refractory of present embodiment and good, high, the high temperature resistant airflow scouring of intensity of metallic conduit coupling.Especially the cooling system of being set up in the belly pipe end makes that blowpipe is in use not rubescent, obviously improve work-ing life, guaranteed the ordinary production of blast furnace.
Claims (2)
1, a kind of blast furnace blowpipe, comprise metallic conduit and metallic conduit inner lining refractory, metallic conduit is made of corrugated tube [2], the belly pipe [9] at bend pipe [6] and two ends, connect with flange [3] between pipe, dilatation joint [1] is arranged in corrugated tube [2] and the inner lining material, and dilatation joint [1] is sealed with aluminum silicate fiber, it is characterized in that being provided with water jacket [10] in belly pipe [9] end, one end of water jacket [10] communicates with water inlet pipe [11], and the other end of water jacket [10] communicates with rising pipe [12].
2, blast furnace blowpipe according to claim 1 is characterized in that described water jacket [10] is installed on the cylindrical of metallic conduit, and the transverse section of water jacket [10] is for disconnecting ring-type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520095870 CN2848865Y (en) | 2005-04-11 | 2005-04-11 | Air blast branch pipe of blast furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520095870 CN2848865Y (en) | 2005-04-11 | 2005-04-11 | Air blast branch pipe of blast furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2848865Y true CN2848865Y (en) | 2006-12-20 |
Family
ID=37521346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520095870 Expired - Fee Related CN2848865Y (en) | 2005-04-11 | 2005-04-11 | Air blast branch pipe of blast furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2848865Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI488972B (en) * | 2011-08-01 | 2015-06-21 | A blast pipe for introducing hot air into a shaft furnace and a method for manufacturing the same | |
CN105238900A (en) * | 2015-10-19 | 2016-01-13 | 安徽宁火新材料有限公司 | Cotton-attached water diversion hot blast pipe |
-
2005
- 2005-04-11 CN CN 200520095870 patent/CN2848865Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI488972B (en) * | 2011-08-01 | 2015-06-21 | A blast pipe for introducing hot air into a shaft furnace and a method for manufacturing the same | |
CN105238900A (en) * | 2015-10-19 | 2016-01-13 | 安徽宁火新材料有限公司 | Cotton-attached water diversion hot blast pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201212040Y (en) | Combined cooling stave | |
CN2848865Y (en) | Air blast branch pipe of blast furnace | |
CN102559972A (en) | Blast furnace air port sleeve | |
CN2745934Y (en) | Blast furnace air intake device | |
CN2775419Y (en) | Triple air pipe valve | |
CN2804114Y (en) | Inlet device of blast furnace | |
CN108774071A (en) | A kind of air pipe of blast furnace castable and preparation method thereof | |
CN203363462U (en) | Gas inlet pipe connecting high-temperature gathered fuel gas and spray tower | |
CN2656427Y (en) | Blast furnace air blow branch pipe | |
CN2437944Y (en) | Wear-resistant wave enamel composite expansion joint | |
CN2127996Y (en) | Corrosion resistant columm pipe type heat exchanger | |
CN201424481Y (en) | Soft water closed circulating cooling wall | |
CN2127973Y (en) | Sleeve expansion joint | |
CN2673876Y (en) | Air inlet device for blast-furnace | |
CN2859416Y (en) | Cupola blast-heating chamber | |
CN216764783U (en) | Novel bridge pipe for coke oven | |
CN219829124U (en) | Preheating pipeline for hot blast stove | |
CN215947336U (en) | Hot air pipeline structure of blast furnace | |
CN217208131U (en) | Anti-skid stainless steel pipe | |
CN210196747U (en) | Energy-saving expansion joint for carbon black production | |
CN2586950Y (en) | Vanadium extracting revolving furnace bottom blowing air brick | |
CN219264925U (en) | Sealing structure for tertiary air duct smoke chamber | |
CN203231296U (en) | U-type radiant tube assembly structure | |
CN2711660Y (en) | Hot air cupola | |
CN2148892Y (en) | Streamlined ceramic wear preventive casing in air prheating device for boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20061220 |