CN2844415Y - 电控欠平衡井下封井器 - Google Patents

电控欠平衡井下封井器 Download PDF

Info

Publication number
CN2844415Y
CN2844415Y CN 200520115310 CN200520115310U CN2844415Y CN 2844415 Y CN2844415 Y CN 2844415Y CN 200520115310 CN200520115310 CN 200520115310 CN 200520115310 U CN200520115310 U CN 200520115310U CN 2844415 Y CN2844415 Y CN 2844415Y
Authority
CN
China
Prior art keywords
assembly
well
hole
electrically
urceolus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520115310
Other languages
English (en)
Inventor
陈若铭
李晓军
宁世品
高本文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd
Original Assignee
Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute of Xinjiang Petroleum Administration filed Critical Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority to CN 200520115310 priority Critical patent/CN2844415Y/zh
Application granted granted Critical
Publication of CN2844415Y publication Critical patent/CN2844415Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型属于欠平衡钻井及完井的井下工具。主要由电控装置总成、封井器总成两部分组成,封井器总成由套管接箍、套管短节A、上外筒、内筒、下外筒、管阀总成、套管短节B等组成,电控装置总成安装在套管短节A上的长槽内,外部焊接有有盖板,电缆接头下端与井下电泵相连,井下电泵一端连接在油箱上,另一端通过管线连接在电磁控制阀上,电磁控制阀一端通过五通阀门与管阀总成与上外筒的两个液流孔相连接,另一端与压力传感器相连,电磁控制阀的另一出口与油箱相连。本实用新型通过在套管短节A内设计电控装置总成,可以在地面通过电信号控制欠平衡井下封井器的舌板开启与关闭,由于电缆的下深不受固并及井深的影响,所以该工具具有更广阔的应用范围。

Description

电控欠平衡井下封井器
技术领域
本实用新型用于欠平衡钻井、完井作业,属于欠平衡钻井及完井的井下封井工具。
背景技术
近几年来欠平衡钻井技术有了迅速的发展,但是就目前的欠平衡钻井工艺来说,对油气层的保护仍不完善,如:在钻井管柱提钻时先要在产层上部注入重泥浆以平衡井筒压力。由于重泥浆的注入,尽管整个产层段注入有非损害性流体,但对产层仍会产生损害。目前欠平衡井下封井器在国内的研究刚刚起步,其产品尚属空白,国外,虽然对该类产品进行了开发,但尚处于开发试验阶段,没有大面积的投入推广应用。2004年我院研制成功欠平衡井下封井器,并获得实用新型专利权,专利号为:ZL2004200503214,该实用新型专利采用伴生液压副管的液压控制欠平衡井下封井器舌板的开启与关闭,由于液压副管需要下入两层套管的环空内,这种结构设计使得欠平衡井下封井器的井下可下入深度受到一定的限制,制约了这种欠平衡井下封井器的全面推广使用。
发明内容
本实用新型的目的在于提供一种电控欠平衡井下封井器,可以通过地面控制电源开关实现欠平衡井下封井器舌板的开启与关闭。
本实用新型主要由电控装置总成以及封井器总成两大部分组成,封井器总成由套管接箍1、套管短节A2、上外筒11、内筒15、下外筒14、管阀总成10、套管短节B17等组成,其中管阀总成10主要包括管阀总成本体及可旋转的舌板;上外筒11的内腔有一装有密封圈的凸台,在内筒15的外表面也有一装有密封圈的凸台,上外筒11与内筒15为间隙配合,上外筒11的内腔装有密封圈的凸台与内筒15的外表面装有密封圈的凸台形成一液压腔,在内筒15的凸台下部分与上外筒11的内腔也形成一液压腔;上外筒11上端的轴向上加工有两个细长孔12及18;并有两个分别与两个细长孔相连的径向上孔13与19,孔13与细长孔12、孔19与细长孔18分别与上述的液压腔相通,其特征在于:电控装置总成安装在套管短节A2上的长槽内,外部焊接有有盖板5,电缆接头3一端与电缆相连,另一端与井下电泵4相连,井下电泵4一端连接在油箱6上,另一端通过管线连接在电磁控制阀7上,电磁控制阀7一端通过五通阀门8与管阀总成10上外筒11的两个液流孔相连接,另一端与压力传感器9相连,电磁控制阀7的另一出口与油箱6相连。
本实用新型通过在套管短节2内设计电控装置总成,可以在地面通过电信号控制欠平衡井下封井器的舌板开启与关闭,由于电缆的下深不受固井及井深的影响,所以该工具具有更广阔的应用范围。
附图说明
图1本实用新型结构示意图
图2图1的A-A剖视图
图3图2的D-D旋转剖视图
图4本实用新型电路控制原理图
具体实施方式
下面结合附图对本实用新型做进一步详细的说明。
如附图所示,本实用新型主要由电控装置总成以及封井器总成两大部分组成,封井器总成由套管接箍1、套管短节A2、上外筒11、内筒15、下外筒14、管阀总成10、套管短节B17等组成,其中管阀总成10主要包括管阀总成本体及可旋转的舌板;上外筒11的内腔有一装有密封圈的凸台,在内筒15的外表面也有一装有密封圈的凸台,上外筒11与内筒15为间隙配合,上外筒11的内腔装有密封圈的凸台与内筒15的外表面装有密封圈的凸台形成一液压腔,在内筒15的凸台下部分与上外筒11的内腔也形成一液压腔;上外筒11上端的轴向上加工有两个细长孔12及18;并有两个分别与两个细长孔相连的径向上孔13与19,孔13与细长孔12、孔19与细长孔18分别与上述的液压腔相通。电控装置总成安装在套管短节A2上的长槽内,外部焊接有有盖板5,电缆接头3一端与电缆相连,另一端与井下电泵4相连,井下电泵4一端连接在油箱6上,另一端通过管线连接在电磁控制阀7上,电磁控制阀7一端通过五通阀门8与管阀总成10上外筒11的两个液流孔相连接,另一端与压力传感器9相连,电磁控制阀7的另一出口与油箱6相连。
在下入技术套管时,预先在技术套管上接入本实用新型,在本实用新型与上一级套管的环空接有电缆。揭开产层时,从技术套管中下入直径小一级的钻头采用欠平衡钻井技术钻穿油层,下钻时,当钻头下至封井器顶部位置时,循环泥浆,通过循环泥浆平衡封井器管阀总成中舌板上下泥浆压力。然后,地面启动电源,电流通过电缆传至井下封井器电控装置,启动井下电泵,液压压力经上外筒11的细长孔12、孔13进入液压腔推动内筒15向下运动,内筒15推动管阀总成上的舌板打开。舌板打开后,压力升高,通过压力传感器9采集数据,再经过电缆传至地面控制系统,关闭电源。提钻时,当钻头提至封井器以上位置时,地面再次启动电源,电流通过电缆传至井下封井器电控装置,启动井下电泵,液压经上外筒11的细长孔18、孔19进入液压腔推动内筒15向上运动,管阀总成上的舌板在辅助弹簧的作用下关闭。同时,在内筒15到达极限位置后,压力再次升高,通过压力传感器9采集数据,再经过电缆传至地面控制系统,关闭电源。

Claims (1)

1、一种电控欠平衡井下封井器,主要由电控装置总成以及封井器总成两大部分组成,封井器总成由套管接箍(1)、套管短节A(2)、上外筒(11)、内筒(15)、下外筒(14)、管阀总成(10)、套管短节B(17)等组成,其中管阀总成(10)主要包括管阀总成本体及可旋转的舌板;上外筒(11)的内腔有一装有密封圈的凸台,在内筒(15)的外表面也有一装有密封圈的凸台,上外筒(11)与内筒(15)为间隙配合,上外筒(11)的内腔装有密封圈的凸台与内筒(15)的外表面装有密封圈的凸台形成一液压腔,在内筒(15)的凸台下部分与上外筒(11)的内腔也形成一液压腔;上外筒(11)上端的轴向上加工有两个细长孔(12)及(18);并有两个分别与两个细长孔相连的径向上孔(13)与(19),孔(13)与细长孔(12)、孔(19)与细长孔(18)分别与上述的液压腔相通,其特征在于:电控装置总成安装在套管短节A(2)上的长槽内,外部焊接有有盖板(5),电缆接头(3)一端与电缆相连,另一端与井下电泵(4)相连,井下电泵(4)一端连接在油箱(6)上,另一端通过管线连接在电磁控制阀(7)上,电磁控制阀(7)一端通过五通阀门(8)与管阀总成(10)上外筒(11)的两个液流孔相连接,另一端与压力传感器(9)相连,电磁控制阀(7)的另一出口与油箱(6)相连。
CN 200520115310 2005-07-22 2005-07-22 电控欠平衡井下封井器 Expired - Lifetime CN2844415Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520115310 CN2844415Y (zh) 2005-07-22 2005-07-22 电控欠平衡井下封井器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520115310 CN2844415Y (zh) 2005-07-22 2005-07-22 电控欠平衡井下封井器

Publications (1)

Publication Number Publication Date
CN2844415Y true CN2844415Y (zh) 2006-12-06

Family

ID=37486367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520115310 Expired - Lifetime CN2844415Y (zh) 2005-07-22 2005-07-22 电控欠平衡井下封井器

Country Status (1)

Country Link
CN (1) CN2844415Y (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11708738B2 (en) 2020-08-18 2023-07-25 Schlumberger Technology Corporation Closing unit system for a blowout preventer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11708738B2 (en) 2020-08-18 2023-07-25 Schlumberger Technology Corporation Closing unit system for a blowout preventer

Similar Documents

Publication Publication Date Title
RU2307920C1 (ru) Установка и способ заканчивания подземных скважин
US6142236A (en) Method for drilling and completing a subsea well using small diameter riser
CN202338294U (zh) 自喷与机采一体化智能完井管柱
US8157015B2 (en) Large bore vertical tree
CA2583443A1 (en) Downhole safety valve apparatus and method
CA2444555A1 (en) Apparatus and methods for drilling with casing
WO2006069247A3 (en) Method and apparatus for fluid bypass of a well tool
NZ607028A (en) Apparatus and method for downhole steam generation and enhanced oil recovery
US6691787B2 (en) Gas operated pump for use in a wellbore
CN109736737B (zh) 一种储层气体钻井不压井起下钻的方法
WO2009038999A4 (en) Annular pressure monitoring during hydraulic fracturing
CN207437005U (zh) 带扶正棱式延时开启固井滑套
CN103291271B (zh) 一种可多次开关的压裂滑套
NO321687B1 (no) Fremgangsmate for utforelse av nede-i-hulls kompletteringsrengjoring og tilhorende anordning for samme
DE60127287D1 (de) Untertageventilvorrichtung
CN107288580A (zh) 一种基于电势差通讯的远程控制套管滑套
AU2011353019A1 (en) Method and apparatus for controlling fluid flow into a wellbore
CN2844415Y (zh) 电控欠平衡井下封井器
CN202832408U (zh) 用于排水采气的潜油螺杆泵气举复合管柱
CN112627778A (zh) 分支井双管完井管柱系统及其施工方法和采油方法
CN100412313C (zh) 一种无塞注水泥固井方法
CN2539840Y (zh) 多功能防砂管柱
CN2690586Y (zh) 欠平衡井下套管阀
CN201031661Y (zh) 一种液压控制的欠平衡井下套管阀
CA2858664A1 (en) Steam injection and production completion system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081212

Address after: Hongyan Karamay Road, the Xinjiang Uygur Autonomous Region No. 80, zip code: 834000

Patentee after: Western Drilling Kelamayi Drilling Technology Institute

Address before: Hongyan Karamay Road, the Xinjiang Uygur Autonomous Region No. 80, zip code: 834000

Patentee before: Research Inst of Drilling Technology, Xinjiang Petroleum Administration

ASS Succession or assignment of patent right

Owner name: WEST DRILLING KARAMAY DRILLING CRAFT RESEARCH INST

Free format text: FORMER OWNER: DRILLING WELL TECHNOLOGY INSTITUTE, PETROLEUM ADMINISTRATION BUREAU, XINJIANG

Effective date: 20081212

CX01 Expiry of patent term

Expiration termination date: 20150722

Granted publication date: 20061206

EXPY Termination of patent right or utility model