CN2816331Y - Pipe-slip type sleeve pipe head - Google Patents

Pipe-slip type sleeve pipe head Download PDF

Info

Publication number
CN2816331Y
CN2816331Y CN 200520107003 CN200520107003U CN2816331Y CN 2816331 Y CN2816331 Y CN 2816331Y CN 200520107003 CN200520107003 CN 200520107003 CN 200520107003 U CN200520107003 U CN 200520107003U CN 2816331 Y CN2816331 Y CN 2816331Y
Authority
CN
China
Prior art keywords
slip
sleeve pipe
built
slips
lockpin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520107003
Other languages
Chinese (zh)
Inventor
王雄鹰
杨树林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd
Original Assignee
Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute of Xinjiang Petroleum Administration filed Critical Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority to CN 200520107003 priority Critical patent/CN2816331Y/en
Application granted granted Critical
Publication of CN2816331Y publication Critical patent/CN2816331Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a well head control mechanical device for an oil (gas) extraction well in the production of an oil field. In particular to a slip type sleeve pipe head. The utility model is mainly composed of a built-in slip (3), a slip seat (4), a main body (5), etc., wherein the built-in slip (3) is positioned in the slip seat (4), the lower end of the slip seat (4) is designed with an outer step, and the slip seat (4) is arranged on an inner step of the main body (5). The built-in slip (3) is fixed on a spring locking ring (2) by a slip fixing screw (1), and the upper part of the spring locking ring (2) is evenly distributed with screw holes of which the quantity is the same as the slips. The upper part of the opening of a lock ring is designed with two pin holes of which the upper part and the lower part are symmetrical, a lockpin (6) is inserted in each pin hole, the upper end of the lockpin (6) is processed with a rope threading hole, and the corresponding position of the slip seat is also processed with a through hole. The utility model adopts the matching structural design of the spring locking ring and the lockpin, a rope can be threaded by the rope threading hole of the lockpin and the state of the spring locking ring can be controlled by the method that the lockpin is controlled and drown out. Consequently, the utility model can realize the hanging operation of the well head control sleeve pipe in a long distance and ensure the safety when the sleeve pipe is in hanging operation.

Description

A kind of slip-type casing tube head
Technical field
The utility model relates to the well head control plant equipment of (gas) well that recovers the oil in the field produces, and particularly a kind of slip-type casing tube head belongs to oil drilling bank head machinery device.
Background technology
At present, in oil drilling (well cementation) operation process, can finish the suspension Job Operations after when suspension sleeve, all blowout preventer need being dismantled, this will cause, and well head is in no control state in the operation process, bring hidden danger to safety in production, the blowout preventer of dismounting simultaneously labour intensity is big, and holding time is long, brings very big inconvenience for the construction of drilling team.And be used for the thermal extraction casing head of thick oil thermal extraction special cementing, though its slip-type hangs to have realized both can having controlled on rig floor the seat of sleeve pipe is hung and be need not to dismantle blowout preventer, guaranteed that thermal production well band preventer carries out prestressing force the control well cementation is arranged, reduced difficulty of construction, but when rig floor carries out the sleeve pipe suspension operational, still need operate carrying under 30 tons~50 tons prestressed elevators, have certain potential safety hazard.
Summary of the invention
Safety during for assurance sleeve pipe suspension operational, the utility model provides a kind of slip-type casing tube head, can carry out the sleeve pipe suspension operational away from well head, has eliminated the potential safety hazard of present existence.
The utility model mainly partly is made up of built-in slips 3, slip spider 4, body 5 etc., built-in slips 3 is positioned at slip spider 4, the design of slip spider 4 lower ends has outer step, seat is on the interior step of body 5, it is characterized in that: slips hold-down screw 1 is fixed on built-in slips 3 on the snap ring 2, be evenly equipped with the screw hole identical on the snap ring 2 with slips quantity, design has laterally zygomorphic two pin-and-holes at the shackle openings place, lock pin 6 is inserted in the pin-and-hole, lock pin (6) upper end is processed with a lacing hole, and slip spider (4) correspondence position also is processed with through hole.
The structure design that the utility model adopts snap ring 2 to cooperate with lock pin 6, can put on rope by the lacing hole of lock pin 6, extract the state that lock pin 6 comes control spring lock ring 2 by control, thereby realize hanging operation, the safety when having guaranteed the sleeve pipe suspension operational away from well head control sleeve pipe.
Description of drawings
Fig. 1 the utility model structural representation
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.The utility model mainly partly is made up of built-in slips 3, slip spider 4, body 5 etc., built-in slips 3 is positioned at slip spider 4, the design of slip spider 4 lower ends has outer step, seat is on the interior step of body 5, it is characterized in that: slips hold-down screw 1 is fixed on built-in slips 3 on the snap ring 2, be evenly equipped with the screw hole identical on the snap ring 2 with slips quantity, design has laterally zygomorphic two pin-and-holes at the shackle openings place, lock pin 6 is inserted in the pin-and-hole, lock pin 6 upper ends are processed with a lacing hole, and slip spider 4 correspondence positions also are processed with through hole.When install and use at the scene, when after finishing drilling (or in intact), being lowered to oil reservoir (or technology) sleeve pipe, before last root, at first built-in slips 3 is fixed on the snap ring 2 with slips hold-down screw 1, strutting snap ring 2 then makes it be in unlocking condition and inserts the back with lock pin 6 fixing (this moment, snap ring was under unlocking condition, be slightly larger than the cover external diameter of pipe by slips around the interior latus rectum that forms), again snap ring 2 is installed in the slip spider 4, to assemble slip spider 4 then from the pin end of sleeve pipe cover upwards, and connect sleeve pipe and made 4 of slip spiders on the box cupling of second from the bottom sleeve pipe.One end of operation rope passes the pre-drilled through hole in upper surface and lock pin 6 corresponding sections of slip spider 4 earlier, is that the operation rope other end is positioned at the rig floor face on the annulus with lock pin 6 again.Utilization connects landing joint and transfers sleeve pipe, with the box cupling of last root sleeve pipe slip spider 4 is pressed in the body 5, and slip spider 4 can be positioned on the step surface in the body 5.Need only be during conventional cementing on request with after mentioning the height of requirement on the sleeve pipe, carrying the rope that lies on the lock pin 6 on (away from the position of well head) on the rig floor, lock pin 6 is extracted, make built-in slips 3 under the effect of snap ring 2 convergent forces, hold sleeve pipe tightly, slowly transfer sleeve pipe, till built-in slips 3 locking oil reservoir (or technology) sleeve pipes 7, finish suspension operation to sleeve pipe; , if the heavy crude heat extraction special cementing, when lifting prestressing force, carry sleeve pipe on palpus is slow, make suspending weight increase to the tensile load of design, carrying the rope that lies on the lock pin 6 on (away from the position of well head) on the rig floor, lock pin 6 is extracted, made built-in slips 3 under the effect of snap ring 2 convergent forces, hold sleeve pipe tightly.Slowly transfer sleeve pipe, till built-in slips 3 locking oil reservoir (or technology) sleeve pipes 7, can finish suspension operation sleeve pipe.

Claims (1)

1. slip-type casing tube head, mainly by built-in slips (3), slip spider (4), part such as body (5) is formed, built-in slips (3) is positioned at slip spider (4), the design of slip spider (4) lower end has outer step, seat is on the interior step of body (5), it is characterized in that: slips hold-down screw (1) is fixed on built-in slips (3) on the snap ring (2), be evenly equipped with the screw hole identical on the snap ring (2) with slips quantity, design has laterally zygomorphic two pin-and-holes at the shackle openings place, lock pin (6) is inserted in the pin-and-hole, lock pin (6) upper end is processed with a lacing hole, and slip spider (4) correspondence position also is processed with through hole.
CN 200520107003 2005-08-17 2005-08-17 Pipe-slip type sleeve pipe head Expired - Lifetime CN2816331Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520107003 CN2816331Y (en) 2005-08-17 2005-08-17 Pipe-slip type sleeve pipe head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520107003 CN2816331Y (en) 2005-08-17 2005-08-17 Pipe-slip type sleeve pipe head

Publications (1)

Publication Number Publication Date
CN2816331Y true CN2816331Y (en) 2006-09-13

Family

ID=36996138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520107003 Expired - Lifetime CN2816331Y (en) 2005-08-17 2005-08-17 Pipe-slip type sleeve pipe head

Country Status (1)

Country Link
CN (1) CN2816331Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578482A (en) * 2019-10-11 2019-12-17 谢耀志 Wellhead casing pipe dismounting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578482A (en) * 2019-10-11 2019-12-17 谢耀志 Wellhead casing pipe dismounting device

Similar Documents

Publication Publication Date Title
EP1354122B1 (en) Collar load support system and method
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN102777156A (en) Fracturing method for multi-interval oil and gas wells
CN102953724B (en) Horizontal wellbore logging anti-top tripper
CN102953702A (en) Horizontal well logging hanging unlocking device
CN109138880B (en) Bidirectional anchor
CN208073422U (en) A kind of cold soluble bridge plug
CN104612612B (en) Hanging and tensioning device, production tubular column and tensioning and tie-back method of coiled tubing
CN2816331Y (en) Pipe-slip type sleeve pipe head
CN203081365U (en) Horizontal-well-logging top-proof unlocking apparatus
CN107780862A (en) Underground throttle device fishing device
CN201273169Y (en) High-pressure fishing type suspension packing tool
CN201924865U (en) Slip type casing head sealing device
CN101368474B (en) Mechanical dragging type anti-propping slips
CN203081367U (en) Large drift diameter hollow ground anchor for oil and gas well cementation and completion practice
CN102561988A (en) Small-diameter water-swelling setting plug
CN202745769U (en) Under-pressure tripping-in device of continuous tube overlong drilling tool
CN205532421U (en) Oil field borehole operation water conservancy anchor
CN109798087A (en) A kind of retrievable hanging packer of double packing elements
CN201103379Y (en) Oil tube discharging device
CN211258555U (en) Lifting type spray-proof anchor
CN110145268B (en) Oil pump anchor
CN208518626U (en) A kind of pipe elevator
CN2580096Y (en) Underwell hydraulic pulling releasing device
CN201358744Y (en) Well head pressing and sealing device of oil-water well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081212

Address after: Hongyan Karamay Road, the Xinjiang Uygur Autonomous Region No. 80, zip code: 834000

Patentee after: Western Drilling Kelamayi Drilling Technology Institute

Address before: Hongyan Karamay Road, the Xinjiang Uygur Autonomous Region No. 80, zip code: 834000

Patentee before: Research Inst of Drilling Technology, Xinjiang Petroleum Administration

ASS Succession or assignment of patent right

Owner name: WEST DRILLING KARAMAY DRILLING CRAFT RESEARCH INST

Free format text: FORMER OWNER: DRILLING WELL TECHNOLOGY INSTITUTE, PETROLEUM ADMINISTRATION BUREAU, XINJIANG

Effective date: 20081212

CX01 Expiry of patent term

Expiration termination date: 20150817

Granted publication date: 20060913

EXPY Termination of patent right or utility model