CN2816038Y - Quick catching blocking up system for cement preheater - Google Patents

Quick catching blocking up system for cement preheater Download PDF

Info

Publication number
CN2816038Y
CN2816038Y CN 200520031511 CN200520031511U CN2816038Y CN 2816038 Y CN2816038 Y CN 2816038Y CN 200520031511 CN200520031511 CN 200520031511 CN 200520031511 U CN200520031511 U CN 200520031511U CN 2816038 Y CN2816038 Y CN 2816038Y
Authority
CN
China
Prior art keywords
pipe
water
water inlet
valve
preheater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520031511
Other languages
Chinese (zh)
Inventor
张干通
翟强
曹海涛
李宗旭
尚银明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIAOZUO ZHONGJING CEMENT Co Ltd
Original Assignee
JIAOZUO ZHONGJING CEMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAOZUO ZHONGJING CEMENT Co Ltd filed Critical JIAOZUO ZHONGJING CEMENT Co Ltd
Priority to CN 200520031511 priority Critical patent/CN2816038Y/en
Application granted granted Critical
Publication of CN2816038Y publication Critical patent/CN2816038Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model relates to a quick blocking poking system for a cement pre-heater. A cone of a pre-heater cylinder and a straight pipe part are at least provided with a water inlet pipe; the outer part of the pre-heater cylinder is provided with blisters, and each blister is a cavity body; a water inlet pipe, a high pressure air inlet pipe and an exhaust pipe which are controlled by a valve gate are arranged on the cavity body; the lower part of the cavity body is provided with a water outlet pipe, and the valve gate and a one-way valve are orderly arranged on the water outlet pipe; an outlet of the one-way valve is communicated with the water inlet pipe entering the pre-heater. A plurality of water inlet pipes can be communicated with the cone of the pre-heater cylinder or / and the straight pipe part, and a plurality of water inlet pipes are arranged in an annular mode so as to reach the optimal blocking poking effect. In order to realize automatic control, valve gates for controlling the water inlet pipe, the high pressure air inlet pipe and the exhaust pipe are electric control valve gates, and the three electric control valve gates are respectively connected with a DCS controller; a valve gate which is arranged on a water outlet pipeline is also an electric control valve gate, and the electric control valve gate is connected with the DCS controller. A water level controller is arranged on the water outlet pipeline, and the water level controller is connected with the DCS controller.

Description

The cement preheater is disclosed stifled system fast
Technical field
The utility model belongs to cement clinker production line auxiliary facility, refers to the clearing device of the preheater obstruction of cement clinker production line especially.
Background technology
At present, the novel concrete clinker production line all adopts the suspension preheating technology, and its item key equipment is a preheater.In the production, material reduces effective barrel dliameter, even stops up fully because complicated physicochemical change very easily articulates accumulation on preheater inner barrel, greatly influences the continous-stable operation of production line, reduces the yield and quality of grog.Preheater is stopped up, and normally used method for cleaning has following several: 1, manually disclose stifled, exactly with instruments such as high pressure gas, drill rods directly with skinning or stop up material and clean out, time-consuming, the effort of this method operates being absolutely unsafe again; 2, use the water blast gun block clearing, this method only is applicable to stops clearing up skinning during the kiln, and the equipment manufacturing cost costliness, and failure rate is also high; 3, air cannon block-removing, this method fast and safely, but that equipment is installed is more, and bad to serious obstruction and skinning block clearing effect.
Summary of the invention
For the accumulation hidden danger of in time removing on the preheater inner barrel that articulates is carried out pre-treatment and is removed obstruction fully, make effective barrel dliameter works better, to adapt to of an urgent demand of modern cement producing line to the lasting running of continuous high-efficient, while is simple to operate again, installation is easy to make, to improve the validity of this system, also to take into account cheaply, reduce cost of investment.
The cement preheater is disclosed stifled system fast, at least feed a water inlet pipe in preheater tube cone and straight-tube portion, at preheater tube outer setting water cannon, water cannon is a cavity, water inlet pipe, high-pressure pipe and vapor pipe by valve control are set on the cavity, the cavity bottom sets out water pipe, sets gradually valve and check valve on the rising pipe, and the water inlet pipe that feeds preheater is connected in the check valve outlet.
Feed preheater tube cone or/and straight-tube portion can be a plurality of water inlet pipes, a plurality of water inlet pipes preferably are provided with ringwise, and preheater tube cone is or/and the water inlet of straight-tube portion is concentrated like this, and expanded by heating effect maximum can reach the best and disclose stifled effect.
In order to realize automatic control, the valve of control water inlet pipe, high-pressure pipe and vapor pipe is an electric control valve, these three electric control valves are connected with the DCS controller respectively, the valve that is provided with on the outlet conduit also is an electric control valve, this electric control valve is connected with the DCS controller, on outlet conduit, water monitor is set, this water monitor is connected with the DCS controller.
The principle of work of native system is: utilize water expand rapidly 1000 times the phenomenon of back of vaporizing in high-temperature material, water is passed through a water filling device, directly squeeze into water in the high-temperature material fast by high-pressure air, make it expand blast, it is broken to utilize explosion energy will stop up that material washes away, skinning shakes, and realizes the block clearing purpose, when expanding blast, closed check valve prevents the airflow influence water cannon.Control section is, utilize pressure transmitter, monitor the preheater internal pressure in real time and change, grasp the materials inside flow state, by articulating accumulation and stopping state in the DCS data processing judgement passage, carry out real-time block clearing according to setup parameter control water cannon system then.But this system not only can control but also manual operation automatically.
This system is applicable to all cement production enterprises and is similar to the suspended preheater system that cement clinker is produced.With respect to conventional block clearing method, native system has tangible advantage: safety, and efficient, economy, reliable, construction is simple, and the operative technique difficulty is little.Through the use of enterprise's several years, prove that it can effectively reduce preheater obstruction number of times and shortening is disclosed the stifled time more than 2/3, be a kind of utility model invention that metallurgical building material industry is promoted that is highly suitable for.Safety, it is splendid to disclose stifled effect, and can effectively reduce and stop up number of times what result in blockage, can create considerable economic for enterprise.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 is the utility model automatic control structure synoptic diagram
Embodiment
Embodiment 1, as Fig. 1, cone 1-1 and straight tube 1-2 part at preheater tube 1 respectively feed a water inlet pipe 2, at preheater tube outer setting water cannon 3, water cannon 3 is a cavity 3-1, cavity 3-1 goes up the water inlet pipe 3-3 that is provided with and is controlled by valve 3-6 by valve 3-4 control, vapor pipe 3-7 by valve 3-2 control, high-pressure pipe 3-5, cavity 3-1 bottom sets out waterpipe 3-8, set gradually valve 3-9 and check valve 3-10 on the outlet conduit 3-8, the water inlet pipe 2 that feeds preheater is connected in check valve 3-10 outlet.
Under the normal circumstances, be full of water in the cavity 3-1 of water cannon 3, valve 3-2 on the water inlet pipe 3-3, the valve 3-4 of high-pressure pipe 3-5, the valve 3-6 of vapor pipe 3-7 is closing condition, material has stopped up in finding preheater tube 1, at this moment, the valve 3-4 of high-pressure pipe 3-5 opens, after the several seconds time-delay, valve 3-9 on the outlet conduit 3-8 opens, high pressure gas are squeezed into the water in the cavity 3-1 of water cannon 3 in the preheater tube 1 at cone 1-1 and straight tube 1-2 place, water explosion of expanding under the high temperature of nearly thousand degree of material, to stop up material washes away, skinning shakes broken, realizes the block clearing purpose, when expanding blast, check valve 3-10 closes automatically, prevents that the refluence of air-flow and material from influencing water cannon.After the water in the water cannon is discharged, valve 3-9 on the outlet conduit 3-8 and the valve 3-4 of high-pressure pipe 3-5 close, and the valve 3-6 of valve 3-2 on the water inlet pipe 3-3 and vapor pipe 3-7 opened, water in water cannon 3 cavity 3-1 is full of and when vapor pipe 3-7 flows out, valve 3-2 on the water inlet pipe 3-3 and the valve 3-6 of vapor pipe 3-7 close, system is ready, and forms a working cycle.
Embodiment 2, as Fig. 2, the valve 3-2 among Fig. 1 on the water inlet pipe 3-3 is electric control valve 3-2-1, electric control valve 3-2-1 is connected with DCS controller 5 by lead 4-1; The valve 3-4 of high-pressure pipe 3-5 is electric control valve 3-4-1, and electric control valve 3-4-1 is connected with DCS controller 5 by lead 4-2; The valve 3-6 of vapor pipe 3-7 is electric control valve 3-6-1, and electric control valve 3-6-1 is connected with DCS controller 5 by lead 4-3; It also is electric control valve 3-9-1 that outlet conduit 3-8 goes up the valve 3-9 that is provided with, this electric control valve 3-9-1 is connected with DCS controller 5 by lead 4-4, on vapor pipe 3-7, water monitor 6 is set, this water monitor 6 is connected with DCS controller 5 by lead 4-5, pressure transmitter 7 is set in the preheater tube 1, and this pressure transmitter 7 is connected with DCS controller 5 by lead 4-6.
Under the normal circumstances, be full of water in the cavity 3-1 of water cannon 3, electric control valve 3-2-1 on the water inlet pipe 3-3, the electric control valve 3-4-1 of high-pressure pipe 3-5, the electric control valve 3-6-1 of vapor pipe 3-7 is closing condition, negative pressure is crossed low or when not having negative pressure in pressure transmitter 7 detects preheater tube 1, illustrate that material has stopped up in the preheater tube 1, at this moment, the electric control valve 3-4-1 of DCS controller 5 control high-pressure pipe 3-5 opens, after the several seconds time-delay, electric control valve 3-9-1 on the DCS controller 5 control outlet conduit 3-8 opens, high pressure gas are squeezed into the water in the cavity 3-1 of water cannon 3 in the preheater tube 1 at cone 1-1 place, water explosion of expanding under the high temperature of nearly thousand degree of material, to stop up material washes away, skinning shakes broken, realize the block clearing purpose, when expanding blast, check valve 3-10 closes automatically, prevents that the refluence of air-flow and material from influencing water cannon.After the water in the water cannon is discharged, electric control valve 3-9-1 on the DCS controller 5 control outlet conduit 3-8 and the electric control valve 3-4-1 of high-pressure pipe 3-5 close, and the electric control valve 3-6-1 of electric control valve 3-2-1 on the water inlet pipe 3-3 and vapor pipe 3-7 opened, water in water cannon 3 cavity 3-1 is full of and is detected by water monitor 6 through vapor pipe 3-7, the signal that water monitor 6 is filled with water with detected water cannon sends DCS controller 5 to, electric control valve 3-2-1 on the DCS controller 5 control water inlet pipe 3-3 and the electric control valve 3-6-1 of vapor pipe 3-7 close, system is ready, and forms a working cycle.This process also can manually be controlled.
Feeding preheater tube part can be a plurality of water inlet pipes, and a plurality of water inlet pipes evenly are provided with on the annulus at cone 1-1 place, and the water inlet of preheater tube cone 1-1 part is concentrated like this, and expanded by heating effect maximum can reach the best and disclose stifled effect.Also can feed the preheater straight-tube portion can be a plurality of water inlet pipes, and a plurality of water inlet pipes are evenly shape setting on the annulus at straight tube 1-2 place, and the water inlet of preheater straight-tube portion is concentrated like this, and the expanded by heating effect is also very big, also can reach the best and disclose stifled effect.The cone 1-1 and the straight tube 1-2 part that can also feed the preheater cylindrical shell all are a plurality of water inlet pipes, a plurality of water inlet pipes evenly are provided with respectively on the annulus at cone 1-1 and straight tube 1-2 place, the water inlet of preheater cylindrical shell and straight-tube portion is concentrated like this, the expanded by heating effect is bigger, can reach the better stifled effect of disclosing.This situation can be arranged on each water inlet pipe with water inlet pipe as much check valve.
The utility model can be installed on multistage preheater simultaneously.

Claims (3)

1, the cement preheater is disclosed stifled system fast, it is characterized in that: feed a water inlet pipe at least in preheater tube cone and straight-tube portion, at preheater tube outer setting water cannon, water cannon is a cavity, water inlet pipe, high-pressure pipe and vapor pipe by valve control are set on the cavity, the cavity bottom sets out water pipe, sets gradually valve and check valve on the rising pipe, and the water inlet pipe that feeds preheater is connected in the check valve outlet.
2, cement preheater as claimed in claim 1 is disclosed stifled system fast, it is characterized in that: the valve of control water inlet pipe, high-pressure pipe and vapor pipe is an electric control valve, these three electric control valves are connected with the DCS controller respectively, the valve that is provided with on the outlet conduit also is an electric control valve, this electric control valve is connected with the DCS controller, on outlet conduit, water monitor is set, this water monitor is connected with the DCS controller, in the preheater tube pressure transmitter is set, this pressure transmitter is connected with the DCS controller by lead.
3, disclose stifled system fast as claim 1,2 described cement preheaters, it is characterized in that: feed preheater tube cone or/and straight-tube portion is a plurality of water inlet pipes, a plurality of water inlet pipes are provided with ringwise.
CN 200520031511 2005-08-12 2005-08-12 Quick catching blocking up system for cement preheater Expired - Fee Related CN2816038Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520031511 CN2816038Y (en) 2005-08-12 2005-08-12 Quick catching blocking up system for cement preheater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520031511 CN2816038Y (en) 2005-08-12 2005-08-12 Quick catching blocking up system for cement preheater

Publications (1)

Publication Number Publication Date
CN2816038Y true CN2816038Y (en) 2006-09-13

Family

ID=36995840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520031511 Expired - Fee Related CN2816038Y (en) 2005-08-12 2005-08-12 Quick catching blocking up system for cement preheater

Country Status (1)

Country Link
CN (1) CN2816038Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115032A (en) * 2019-12-23 2020-05-08 张顺元 Device for removing material accumulated in bin of preheater
CN114754593A (en) * 2022-04-13 2022-07-15 河北科技大学 Blockage clearing mechanical device for preheater of cement kiln

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115032A (en) * 2019-12-23 2020-05-08 张顺元 Device for removing material accumulated in bin of preheater
CN114754593A (en) * 2022-04-13 2022-07-15 河北科技大学 Blockage clearing mechanical device for preheater of cement kiln
CN114754593B (en) * 2022-04-13 2023-10-20 河北科技大学 Clear stifled mechanical device of cement kiln pre-heater

Similar Documents

Publication Publication Date Title
CN2816038Y (en) Quick catching blocking up system for cement preheater
CN108212959A (en) A kind of device and method of tube inner wall cleaning
CN113503151B (en) Sand removal and gas production integrated system for tight gas well wellhead and process method thereof
CN206716868U (en) A kind of bending mould auxiliary heating forming structure
CN102564148A (en) Heat exchange system of sleeve kiln
CN206290502U (en) A kind of large aperture flow-controllable siphoning installation
CN210022332U (en) High-efficient sand mill
CN210442219U (en) Sand-containing shale gas gathering and transportation pipeline erosion experiment loop platform
CN209602574U (en) A kind of INBA Handling Blast Furnace Granulated Slag device
CN113323646B (en) High-pressure buffering sand separation device for wellhead of compact gas well
CN208070831U (en) A kind of zinc abstraction calcine trans-portation device
CN206694705U (en) Exhaust snap joint for irrigation
CN205762764U (en) A kind of inner chamber cleaning systems of air pipeline
CN205781083U (en) A kind of double safety valve with flange
CN210105821U (en) Wellhead device for intermittent gas lift liquid drainage and gas production assisted by plunger
CN204974635U (en) Continuous quick cleaning device of reforming tube
CN205533271U (en) Closed pump filling device for liquefied gas
CN204162088U (en) A kind of storage tank discharging recoiling device
CN204529738U (en) A kind of semicoke dry colling device
CN206676117U (en) A kind of dust-precipitator blockage-clearing device
CN202485471U (en) Heat exchange system of sleeve kiln
CN202516681U (en) Ore pulp shunting device
CN209603945U (en) A kind of mined out well pressurization high shutdown system of the anti-row pressure of unit extraction equipment
CN206113756U (en) Water circle device of steerable temperature
CN201521756U (en) Plugging device for on-line replacement of first valve of metallurgy gas pipe drainer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee