CN2816038Y - Quick catching blocking up system for cement preheater - Google Patents
Quick catching blocking up system for cement preheater Download PDFInfo
- Publication number
- CN2816038Y CN2816038Y CN 200520031511 CN200520031511U CN2816038Y CN 2816038 Y CN2816038 Y CN 2816038Y CN 200520031511 CN200520031511 CN 200520031511 CN 200520031511 U CN200520031511 U CN 200520031511U CN 2816038 Y CN2816038 Y CN 2816038Y
- Authority
- CN
- China
- Prior art keywords
- pipe
- water
- water inlet
- valve
- preheater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
The utility model relates to a quick blocking poking system for a cement pre-heater. A cone of a pre-heater cylinder and a straight pipe part are at least provided with a water inlet pipe; the outer part of the pre-heater cylinder is provided with blisters, and each blister is a cavity body; a water inlet pipe, a high pressure air inlet pipe and an exhaust pipe which are controlled by a valve gate are arranged on the cavity body; the lower part of the cavity body is provided with a water outlet pipe, and the valve gate and a one-way valve are orderly arranged on the water outlet pipe; an outlet of the one-way valve is communicated with the water inlet pipe entering the pre-heater. A plurality of water inlet pipes can be communicated with the cone of the pre-heater cylinder or / and the straight pipe part, and a plurality of water inlet pipes are arranged in an annular mode so as to reach the optimal blocking poking effect. In order to realize automatic control, valve gates for controlling the water inlet pipe, the high pressure air inlet pipe and the exhaust pipe are electric control valve gates, and the three electric control valve gates are respectively connected with a DCS controller; a valve gate which is arranged on a water outlet pipeline is also an electric control valve gate, and the electric control valve gate is connected with the DCS controller. A water level controller is arranged on the water outlet pipeline, and the water level controller is connected with the DCS controller.
Description
Technical field
The utility model belongs to cement clinker production line auxiliary facility, refers to the clearing device of the preheater obstruction of cement clinker production line especially.
Background technology
At present, the novel concrete clinker production line all adopts the suspension preheating technology, and its item key equipment is a preheater.In the production, material reduces effective barrel dliameter, even stops up fully because complicated physicochemical change very easily articulates accumulation on preheater inner barrel, greatly influences the continous-stable operation of production line, reduces the yield and quality of grog.Preheater is stopped up, and normally used method for cleaning has following several: 1, manually disclose stifled, exactly with instruments such as high pressure gas, drill rods directly with skinning or stop up material and clean out, time-consuming, the effort of this method operates being absolutely unsafe again; 2, use the water blast gun block clearing, this method only is applicable to stops clearing up skinning during the kiln, and the equipment manufacturing cost costliness, and failure rate is also high; 3, air cannon block-removing, this method fast and safely, but that equipment is installed is more, and bad to serious obstruction and skinning block clearing effect.
Summary of the invention
For the accumulation hidden danger of in time removing on the preheater inner barrel that articulates is carried out pre-treatment and is removed obstruction fully, make effective barrel dliameter works better, to adapt to of an urgent demand of modern cement producing line to the lasting running of continuous high-efficient, while is simple to operate again, installation is easy to make, to improve the validity of this system, also to take into account cheaply, reduce cost of investment.
The cement preheater is disclosed stifled system fast, at least feed a water inlet pipe in preheater tube cone and straight-tube portion, at preheater tube outer setting water cannon, water cannon is a cavity, water inlet pipe, high-pressure pipe and vapor pipe by valve control are set on the cavity, the cavity bottom sets out water pipe, sets gradually valve and check valve on the rising pipe, and the water inlet pipe that feeds preheater is connected in the check valve outlet.
Feed preheater tube cone or/and straight-tube portion can be a plurality of water inlet pipes, a plurality of water inlet pipes preferably are provided with ringwise, and preheater tube cone is or/and the water inlet of straight-tube portion is concentrated like this, and expanded by heating effect maximum can reach the best and disclose stifled effect.
In order to realize automatic control, the valve of control water inlet pipe, high-pressure pipe and vapor pipe is an electric control valve, these three electric control valves are connected with the DCS controller respectively, the valve that is provided with on the outlet conduit also is an electric control valve, this electric control valve is connected with the DCS controller, on outlet conduit, water monitor is set, this water monitor is connected with the DCS controller.
The principle of work of native system is: utilize water expand rapidly 1000 times the phenomenon of back of vaporizing in high-temperature material, water is passed through a water filling device, directly squeeze into water in the high-temperature material fast by high-pressure air, make it expand blast, it is broken to utilize explosion energy will stop up that material washes away, skinning shakes, and realizes the block clearing purpose, when expanding blast, closed check valve prevents the airflow influence water cannon.Control section is, utilize pressure transmitter, monitor the preheater internal pressure in real time and change, grasp the materials inside flow state, by articulating accumulation and stopping state in the DCS data processing judgement passage, carry out real-time block clearing according to setup parameter control water cannon system then.But this system not only can control but also manual operation automatically.
This system is applicable to all cement production enterprises and is similar to the suspended preheater system that cement clinker is produced.With respect to conventional block clearing method, native system has tangible advantage: safety, and efficient, economy, reliable, construction is simple, and the operative technique difficulty is little.Through the use of enterprise's several years, prove that it can effectively reduce preheater obstruction number of times and shortening is disclosed the stifled time more than 2/3, be a kind of utility model invention that metallurgical building material industry is promoted that is highly suitable for.Safety, it is splendid to disclose stifled effect, and can effectively reduce and stop up number of times what result in blockage, can create considerable economic for enterprise.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 is the utility model automatic control structure synoptic diagram
Embodiment
Under the normal circumstances, be full of water in the cavity 3-1 of water cannon 3, valve 3-2 on the water inlet pipe 3-3, the valve 3-4 of high-pressure pipe 3-5, the valve 3-6 of vapor pipe 3-7 is closing condition, material has stopped up in finding preheater tube 1, at this moment, the valve 3-4 of high-pressure pipe 3-5 opens, after the several seconds time-delay, valve 3-9 on the outlet conduit 3-8 opens, high pressure gas are squeezed into the water in the cavity 3-1 of water cannon 3 in the preheater tube 1 at cone 1-1 and straight tube 1-2 place, water explosion of expanding under the high temperature of nearly thousand degree of material, to stop up material washes away, skinning shakes broken, realizes the block clearing purpose, when expanding blast, check valve 3-10 closes automatically, prevents that the refluence of air-flow and material from influencing water cannon.After the water in the water cannon is discharged, valve 3-9 on the outlet conduit 3-8 and the valve 3-4 of high-pressure pipe 3-5 close, and the valve 3-6 of valve 3-2 on the water inlet pipe 3-3 and vapor pipe 3-7 opened, water in water cannon 3 cavity 3-1 is full of and when vapor pipe 3-7 flows out, valve 3-2 on the water inlet pipe 3-3 and the valve 3-6 of vapor pipe 3-7 close, system is ready, and forms a working cycle.
Under the normal circumstances, be full of water in the cavity 3-1 of water cannon 3, electric control valve 3-2-1 on the water inlet pipe 3-3, the electric control valve 3-4-1 of high-pressure pipe 3-5, the electric control valve 3-6-1 of vapor pipe 3-7 is closing condition, negative pressure is crossed low or when not having negative pressure in pressure transmitter 7 detects preheater tube 1, illustrate that material has stopped up in the preheater tube 1, at this moment, the electric control valve 3-4-1 of DCS controller 5 control high-pressure pipe 3-5 opens, after the several seconds time-delay, electric control valve 3-9-1 on the DCS controller 5 control outlet conduit 3-8 opens, high pressure gas are squeezed into the water in the cavity 3-1 of water cannon 3 in the preheater tube 1 at cone 1-1 place, water explosion of expanding under the high temperature of nearly thousand degree of material, to stop up material washes away, skinning shakes broken, realize the block clearing purpose, when expanding blast, check valve 3-10 closes automatically, prevents that the refluence of air-flow and material from influencing water cannon.After the water in the water cannon is discharged, electric control valve 3-9-1 on the DCS controller 5 control outlet conduit 3-8 and the electric control valve 3-4-1 of high-pressure pipe 3-5 close, and the electric control valve 3-6-1 of electric control valve 3-2-1 on the water inlet pipe 3-3 and vapor pipe 3-7 opened, water in water cannon 3 cavity 3-1 is full of and is detected by water monitor 6 through vapor pipe 3-7, the signal that water monitor 6 is filled with water with detected water cannon sends DCS controller 5 to, electric control valve 3-2-1 on the DCS controller 5 control water inlet pipe 3-3 and the electric control valve 3-6-1 of vapor pipe 3-7 close, system is ready, and forms a working cycle.This process also can manually be controlled.
Feeding preheater tube part can be a plurality of water inlet pipes, and a plurality of water inlet pipes evenly are provided with on the annulus at cone 1-1 place, and the water inlet of preheater tube cone 1-1 part is concentrated like this, and expanded by heating effect maximum can reach the best and disclose stifled effect.Also can feed the preheater straight-tube portion can be a plurality of water inlet pipes, and a plurality of water inlet pipes are evenly shape setting on the annulus at straight tube 1-2 place, and the water inlet of preheater straight-tube portion is concentrated like this, and the expanded by heating effect is also very big, also can reach the best and disclose stifled effect.The cone 1-1 and the straight tube 1-2 part that can also feed the preheater cylindrical shell all are a plurality of water inlet pipes, a plurality of water inlet pipes evenly are provided with respectively on the annulus at cone 1-1 and straight tube 1-2 place, the water inlet of preheater cylindrical shell and straight-tube portion is concentrated like this, the expanded by heating effect is bigger, can reach the better stifled effect of disclosing.This situation can be arranged on each water inlet pipe with water inlet pipe as much check valve.
The utility model can be installed on multistage preheater simultaneously.
Claims (3)
1, the cement preheater is disclosed stifled system fast, it is characterized in that: feed a water inlet pipe at least in preheater tube cone and straight-tube portion, at preheater tube outer setting water cannon, water cannon is a cavity, water inlet pipe, high-pressure pipe and vapor pipe by valve control are set on the cavity, the cavity bottom sets out water pipe, sets gradually valve and check valve on the rising pipe, and the water inlet pipe that feeds preheater is connected in the check valve outlet.
2, cement preheater as claimed in claim 1 is disclosed stifled system fast, it is characterized in that: the valve of control water inlet pipe, high-pressure pipe and vapor pipe is an electric control valve, these three electric control valves are connected with the DCS controller respectively, the valve that is provided with on the outlet conduit also is an electric control valve, this electric control valve is connected with the DCS controller, on outlet conduit, water monitor is set, this water monitor is connected with the DCS controller, in the preheater tube pressure transmitter is set, this pressure transmitter is connected with the DCS controller by lead.
3, disclose stifled system fast as claim 1,2 described cement preheaters, it is characterized in that: feed preheater tube cone or/and straight-tube portion is a plurality of water inlet pipes, a plurality of water inlet pipes are provided with ringwise.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520031511 CN2816038Y (en) | 2005-08-12 | 2005-08-12 | Quick catching blocking up system for cement preheater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520031511 CN2816038Y (en) | 2005-08-12 | 2005-08-12 | Quick catching blocking up system for cement preheater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2816038Y true CN2816038Y (en) | 2006-09-13 |
Family
ID=36995840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520031511 Expired - Fee Related CN2816038Y (en) | 2005-08-12 | 2005-08-12 | Quick catching blocking up system for cement preheater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2816038Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111115032A (en) * | 2019-12-23 | 2020-05-08 | 张顺元 | Device for removing material accumulated in bin of preheater |
CN114754593A (en) * | 2022-04-13 | 2022-07-15 | 河北科技大学 | Blockage clearing mechanical device for preheater of cement kiln |
-
2005
- 2005-08-12 CN CN 200520031511 patent/CN2816038Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111115032A (en) * | 2019-12-23 | 2020-05-08 | 张顺元 | Device for removing material accumulated in bin of preheater |
CN114754593A (en) * | 2022-04-13 | 2022-07-15 | 河北科技大学 | Blockage clearing mechanical device for preheater of cement kiln |
CN114754593B (en) * | 2022-04-13 | 2023-10-20 | 河北科技大学 | Clear stifled mechanical device of cement kiln pre-heater |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2816038Y (en) | Quick catching blocking up system for cement preheater | |
CN108212959A (en) | A kind of device and method of tube inner wall cleaning | |
CN113503151B (en) | Sand removal and gas production integrated system for tight gas well wellhead and process method thereof | |
CN206716868U (en) | A kind of bending mould auxiliary heating forming structure | |
CN102564148A (en) | Heat exchange system of sleeve kiln | |
CN206290502U (en) | A kind of large aperture flow-controllable siphoning installation | |
CN210022332U (en) | High-efficient sand mill | |
CN210442219U (en) | Sand-containing shale gas gathering and transportation pipeline erosion experiment loop platform | |
CN209602574U (en) | A kind of INBA Handling Blast Furnace Granulated Slag device | |
CN113323646B (en) | High-pressure buffering sand separation device for wellhead of compact gas well | |
CN208070831U (en) | A kind of zinc abstraction calcine trans-portation device | |
CN206694705U (en) | Exhaust snap joint for irrigation | |
CN205762764U (en) | A kind of inner chamber cleaning systems of air pipeline | |
CN205781083U (en) | A kind of double safety valve with flange | |
CN210105821U (en) | Wellhead device for intermittent gas lift liquid drainage and gas production assisted by plunger | |
CN204974635U (en) | Continuous quick cleaning device of reforming tube | |
CN205533271U (en) | Closed pump filling device for liquefied gas | |
CN204162088U (en) | A kind of storage tank discharging recoiling device | |
CN204529738U (en) | A kind of semicoke dry colling device | |
CN206676117U (en) | A kind of dust-precipitator blockage-clearing device | |
CN202485471U (en) | Heat exchange system of sleeve kiln | |
CN202516681U (en) | Ore pulp shunting device | |
CN209603945U (en) | A kind of mined out well pressurization high shutdown system of the anti-row pressure of unit extraction equipment | |
CN206113756U (en) | Water circle device of steerable temperature | |
CN201521756U (en) | Plugging device for on-line replacement of first valve of metallurgy gas pipe drainer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |