CN2809010Y - pile frame hoisting and concrete distributing device - Google Patents
pile frame hoisting and concrete distributing device Download PDFInfo
- Publication number
- CN2809010Y CN2809010Y CN 200520115148 CN200520115148U CN2809010Y CN 2809010 Y CN2809010 Y CN 2809010Y CN 200520115148 CN200520115148 CN 200520115148 CN 200520115148 U CN200520115148 U CN 200520115148U CN 2809010 Y CN2809010 Y CN 2809010Y
- Authority
- CN
- China
- Prior art keywords
- pile frame
- boom
- frame
- arm
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 238000007599 discharging Methods 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 239000004744 fabric Substances 0.000 claims description 17
- 241000282326 Felis catus Species 0.000 claims description 11
- 238000010276 construction Methods 0.000 claims description 8
- 238000005086 pumping Methods 0.000 claims description 6
- 241000909536 Gobiesocidae Species 0.000 claims description 4
- 230000009184 walking Effects 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract 2
- 238000009434 installation Methods 0.000 description 2
- 238000007665 sagging Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000153 supplemental effect Effects 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
A hoisting and concrete distributing device installed on a pile frame. Before the pile frame is erected, a lifting arm and the tower top are installed on a pile frame top pulley block frame through a truss type connecting frame. After the crane is erected, the crane boom is pulled to be in a horizontal state by a steel wire rope connected with the tower top, and the tower top is fixed on a pile frame platform through two balance steel ropes. The existing winch on the pile frame is used for controlling the amplitude of the trolley on the crane boom and hoisting heavy objects. One of the discharging arms of the material distribution arm folded into a herringbone shape is arranged on one side of the trolley through a rotating shaft, and the other discharging arm is arranged on the same side of the root part of the crane arm through the rotating shaft. The material distribution and lifting in a large range are completed by the amplitude variation of the trolley, the rotation of the pile frame platform and the walking of the pile frame. The utility model discloses simple structure is light and handy with low costs, simple to operate. The pile frame is a movable type hoisting and distributing multipurpose machine by utilizing the existing conditions of the pile frame and the matched equipment thereof, and the idle pressure of the equipment is reduced.
Description
Technical field
The utility model relates to a kind of piling machinery parts, is a kind of lifting and concrete distribution device that is installed on the pile frame specifically.
Background technology
Pile foundation construction is an initial period very of short duration in the building operations.During pile foundation construction,, often reach tens for a common building site of reduction of erection time will enter the operation simultaneously of a lot of platform pile frames.After pile foundation construction finishes, have idle in the quite a long time greatly in these equipment that can only be used for driving piles.The pile frame that huge fund is bought is idle very unfortunate together with its supporting concrete pump.Finish when the building superstructure is partly constructed behind the pile foundation engineering, adopt constructional materialss such as pillar crane handling concrete mostly.The process of a pipeful of ground handling concrete is very slow, however this still the most common on-site so far scene that arrives that but is us, because special-purpose efficiently concrete pump truck price concerning middle-size and small-size construction enterprises is so expensive.
Summary of the invention
The technical problems to be solved in the utility model is: a kind of safe and reliable attachment device of pile frame cheaply is provided, cooperates the existing apparatus that utilizes pile frame and corollary equipment thereof, make pile frame possess the multiple function of lifting concrete cloth.
The utility model solution of the above problems is: a kind of lifting and concrete distribution device that is installed on the pile frame, comprise cat head, boom and amplitude variation trolley, it is characterized in that: cat head and boom are hinged on the link of a trussed construction, link is installed on the pile frame top pulleys group frame by bearing pin, cat head one side connects with boom mutually by steel cable, opposite side connects with the pile frame platform mutually by two wire rope, on the pile frame on lifting drum two twine pulley from link assembly pulley to opposite wire rope that walk around top pulleys group and, wherein walk around boom end pulley again and connect mutually for one with the amplitude variation trolley two ends, pulley and little pulley sheave that the wire rope of another hoist engine is walked around top pulleys group and link assembly pulley connect mutually with crampon, and a cloth arm that is fixed with the concrete pumping line becomes herringbone folding and a side that is bound up on amplitude variation trolley as master arm by rotating shaft of its discharging is fixed on boom homonymy root as slave arm by rotating shaft with its another.
This is one and makes full use of pile frame and corollary equipment existing capability, only increases a simple mechanism and just makes pile frame possess the scheme of lifting and the multiple function of concrete cloth.
Description of drawings
Introduce primary structure of the present utility model below by accompanying drawing.
Fig. 1. be that the utility model has been installed in working state schematic representation later on the pile frame (knowing that for showing each component locations changes to some extent).
Fig. 2. be the scheme of installation of utility model when pile frame plays frame.
Fig. 3. be winding of the wire rope schematic diagram of the present utility model.
Among the figure: 1. boom, 2. amplitude variation trolley, 3. cloth master arm, 4. cloth slave arm, 5. boom stay cord, 6. cat head, 7. link assembly pulley, 8. link, 9. balance stay cord, 10. open auger is buckled, 11. little hoist engines, 12. tension pulley blocks, 13. secondary hoist engine, 14. main winch, 15. concrete pumping lines, 16. crampon, 17. little pulley sheaves, 18. boom end pulleys.
The specific embodiment
We still engage description of drawings.
Among Fig. 1, boom 1 is hinged on the truncated rectangular pyramids shape link 8 of trussed construction simultaneously with cat head 6, link 8 is installed on two blocks of side plates of pile frame top pulleys group frame by bearing pin, article one, boom stay cord 5 connects the boom 1 and the top of cat head 6 mutually and makes boom 1 keep level unlikely sagging, article two, balance stay cord 9 connects the cat head top mutually with the pile frame platform, has two open augers to buckle 10 on these two balance stay cords 9 and is used for the stay cord tensioning.
On the little hoist engine 11 of pile frame two positive and negative twine to wire rope control amplitude variation trolley 2 when moving, the cloth master arm 3 that is fixed on the one side by rotating shaft also moves thereupon, the cloth slave arm is then done corresponding swing, is fixed with the concrete pumping line on them.The distance that amplitude variation trolley 2 allows to move promptly is the width of cloth scope.If boom 1 has 20m length then the nearly 15m of cloth width, and cloth scope length is decided unrestricted with moving of pile frame.Hence one can see that, and the utility model does not need very long boom just can realize than fixing much bigger cloth and the lifting scope of pillar crane.The rotation that it is boom that the utility model relies on the rotation mobile, the pile frame platform of amplitude variation trolley and three kinds of actions of walking of pile frame cooperate, and finish cloth and lifting in its cloth scope.
When the utility model is used for lifting, wire rope on the secondary hoist engine 13 of pile frame walk around the top pulleys group (its rear portion totally three pulleys wherein two be used for carriage amplitude varying) and the 3rd pulley of link assembly pulley 7, walk around dolly pulley 17 again and be fixed on the crampon 16.Because single rope tension of the secondary hoist engine 13 of pile frame is not less than 3 tons, so generally do not need to strengthen multiplying power.
Can understand referring to Fig. 2 how the utility model is installed on the pile frame: there are 4 pin-and-holes link of the present utility model 8 belows, we are not when column is pulled up before the pile frame frame, link 8 is installed on the side plate of pile frame top pulleys group frame by bearing pin, and the wire rope of two hoist engines 11 on the pile frame and 13 is all put on fixing, concrete pumping line joint on the cloth slave arm 4 and concrete pumping flexible pipe are connect.This moment, boom 1 was positioned at same direction subsides ground placement with the pile frame column.Impaired when dragging on ground for the top that prevents boom, a flat bogie can be placed on below its top.Start 14 framves of pile frame main winch, next perpendicular to the ground by slow pull-up with the pile frame column, boom 1 is sagging gradually to be held by boom stay cord 5 until horizontal level.The open auger of two balance stay cord 9 lower ends of hanging down on the cat head 6 is buckled 10 fixing and two balance stay cords 9 of tensioning on the retainer ring of pile frame platform both sides respectively.With tension pulley block 12 with the wire rope tensioning on the little hoist engine 11.Can start working after adjusting the each several part action.
Each winding of the wire rope comes into plain view among Fig. 3, and literal interpretation as described above.If desired lifting and cloth are separated, then need increase hoist engine of a dolly again.
The utility model is applicable to various walkings, electric endless track type pile frame.The counterweight that should note installing former pile frame behind the utility model must corresponding increase.Pile frame among Fig. 1 is a kind of pile frame that extendable weight is arranged, and has installed the lifting supplemental support additional on the chassis beam for the safety crawler belt.Walking pile frame is very big because of ship shape track ground connection size, and only needing increases counterweight or adopt telescopic counterweight.
The utility model structure is light and handy, installation is simple and convenient.It makes pile frame become a portable cloth lifting multipurpose machine, has improved rate of progress of the construction and has alleviated idleness of equipment pressure.
Claims (1)
1. pile frame lifting and concrete distribution device, comprise cat head, boom and amplitude variation trolley, it is characterized in that: cat head and boom are hinged on the link of a trussed construction, link is installed on the pile frame top pulleys group frame by bearing pin, cat head one side connects opposite side mutually by steel cable and boom and connects mutually by two wire rope and pile frame platform, on the pile frame on lifting drum two pulleys that twine to walk around top pulleys group and link assembly pulley to opposite wire rope wherein one walk around boom end pulley again and connect mutually with the two ends of amplitude variation trolley, pulley and little pulley sheave that the wire rope of another hoist engine is walked around top pulleys group and link assembly pulley connect mutually with crampon, and a cloth arm that is fixed with the concrete pumping line becomes herringbone folding and a side that is bound up on amplitude variation trolley as master arm by rotating shaft of its discharging is fixed on boom homonymy root as slave arm by rotating shaft with its another.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520115148 CN2809010Y (en) | 2005-07-18 | 2005-07-18 | pile frame hoisting and concrete distributing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520115148 CN2809010Y (en) | 2005-07-18 | 2005-07-18 | pile frame hoisting and concrete distributing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2809010Y true CN2809010Y (en) | 2006-08-23 |
Family
ID=36925192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520115148 Expired - Fee Related CN2809010Y (en) | 2005-07-18 | 2005-07-18 | pile frame hoisting and concrete distributing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2809010Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022020A (en) * | 2010-11-03 | 2011-04-20 | 河南省电力公司洛阳供电公司 | Hoisting tackle connector for tower and hoisting method |
CN102561350A (en) * | 2012-02-09 | 2012-07-11 | 安徽力达实业股份有限公司 | Combined static pile press |
-
2005
- 2005-07-18 CN CN 200520115148 patent/CN2809010Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022020A (en) * | 2010-11-03 | 2011-04-20 | 河南省电力公司洛阳供电公司 | Hoisting tackle connector for tower and hoisting method |
CN102561350A (en) * | 2012-02-09 | 2012-07-11 | 安徽力达实业股份有限公司 | Combined static pile press |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201901539U (en) | Internal climbing type and external climbing type tower crane with luffing jib | |
CN101806063B (en) | Crawler-type pile frame and method for mounting same | |
CN101985344B (en) | Drum tensioning method and apparatus for load hoist wire rope | |
CN201971572U (en) | Movable arm type tower crane with suspension arm possible of being folded for dismounting | |
JP2022519449A (en) | Installation of wind power generator, separation device and construction method using this | |
CN214298989U (en) | Tower crane without counter weight and capable of being turned over | |
CN106219420A (en) | A kind of fast erecting traveling tower crane | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
CN105970981B (en) | A kind of side slope construction hoistable platform and its construction method | |
CN201485194U (en) | 60T walking type full-swing erecting crane | |
CN103303817A (en) | Hoisting mechanism and dynamic compactor | |
CN205712146U (en) | A kind of side slope construction hoistable platform | |
CN110002343B (en) | Self-driven urban underground prefabricated comprehensive pipe gallery laying hoisting machine and construction method | |
CN2809010Y (en) | pile frame hoisting and concrete distributing device | |
CN202658902U (en) | Hoisting and distributing dual-purpose concrete distributing machine | |
CN101949169B (en) | Large pipeline sludge dredging machine | |
CN212374757U (en) | Tower crane stable in installation | |
CN107859084A (en) | Diaphram wall grab type chute forming machine | |
CN211113627U (en) | Unsettled self-supporting formula pile driver | |
CN104495653A (en) | Multifunctional large-tonnage beam erecting crane and beam erecting method | |
CN204609435U (en) | The auxiliary tower that hoists of emergent repairing tower | |
CN210216177U (en) | Anchor machine dragging system for beam erecting | |
CN201292509Y (en) | Suspension bridge main girder construction segment conveying facilities | |
CN211898381U (en) | Equipment for pulling out steel pipe pile under underwater concrete beam | |
CN107245957B (en) | Method and equipment for erecting stiffening beam of suspension bridge in air without track |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |