CN2806542Y - Steel cable with new structure - Google Patents

Steel cable with new structure Download PDF

Info

Publication number
CN2806542Y
CN2806542Y CN 200520081828 CN200520081828U CN2806542Y CN 2806542 Y CN2806542 Y CN 2806542Y CN 200520081828 CN200520081828 CN 200520081828 CN 200520081828 U CN200520081828 U CN 200520081828U CN 2806542 Y CN2806542 Y CN 2806542Y
Authority
CN
China
Prior art keywords
shallow bid
lay pitch
slit
rope
enter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520081828
Other languages
Chinese (zh)
Inventor
邹广
邹明
邹仁君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520081828 priority Critical patent/CN2806542Y/en
Application granted granted Critical
Publication of CN2806542Y publication Critical patent/CN2806542Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a steel rope cable with a new structure. A ring buckle of the steel rope cable with a new structure is that two parts which are divided into three sections and one group on a ring neck part crosswise bend and turn on the top of the ring buckle to be twisted backwards to the furcated neck part to form the ring buckle; small sections [11], [12], [13], [14], [15] and [16] which are twisted backwards to the furcated part are respectively and orderly knitted to gaps of small sections [1], [2], [3], [4], [5] and [6] of a main body of an original rope on the neck part of the furcated part. The utility model has the advantages that the head part of each small section which is knitted backwards is skillfully reserved in the rope body of an original wire rope, and no redundant steel wire head is exposed outside; the utility model also has the advantages of smooth surface and firm and reliable connection. When the utility model is used, hands can not be pricked, and surfaces of equipment can not be scratched because the steel wire exposes outwards; in addition, the diameter of the neck part of the steel rope which is knitted is minimum, which is 1.2-1.5 times of the diameter of the original rope. The utility model is especially suitable for lifting in narrow situations and for lifting large-sized equipment with small gaps.

Description

A kind of rope rig of new construction
Technical field
The device that the utility model belongs to lifting, hitching machinery or other need be hung, occasions such as tractive or dead load are used, the rope rig of definite a kind of new construction of saying so.
Background technology
The rope rig, particularly two ends that uses has the rigging of latch closure at present, uses the most extensive.Can be divided into substantially: insert and compile rigging, the fixedly connected rigging of wire rope clip, pressure clamping rigging, casting rigging etc.These riggings respectively have characteristics, and still, in practical application and on-the-spot the use, particularly in the operations such as lifting transportation for the lifting of main equipment and precision equipment, to compile rigging the most general to insert.And owing to insert the outside that a broken steel wire of each shallow bid of steel wire of the rope rig of compiling all is exposed to the steel wire rope body at present, often stab operating personnel and scuffing by the surface of handling (installation) equipment, and cause a lot of construction hidden danger and accident, particularly when handling main equipment location and installation, often because the gap is too small, make the rigging that uses at present not release smoothly, and have to adopt the method for scrapping this root rope rig of cutting off, steel wire rope is taken out, cause the very big waste and the raising of cost.Once there was the people to propose solution at this point, Chinese patent 00216611.9, in the wire rope sling in order to solve difficult to handle problem, and adopted structure at the chuck of the metal of coated outside of otch, though solved the problem of not pricking the hand, but, owing to the existence that adds cover makes originally the diameter with regard to the neck of the rigging of chap further strengthen, and, when the rope rig of strap clamp cover in work with deposit and produce when crooked chuck two ends direct friction in the process, damage is caused on collide with other surfaces of steel wire rope, shorten the service life of rigging, and also increased manufacturing cost.This has not had any difference with the rigging that adopts the pressure clamping, and its use is affected equally.In order to overcome these problems, designer of the present utility model is to construction of wire rope and insert and compile technology and method and insert the woollen yarn knitting structure and done conscientiously research, has proposed design concept of the present utility model and goal of the invention.
Summary of the invention
According to the problem of above-mentioned existence, research and experimental verification through conscientious have proposed design concept of the present utility model and technical solution, goal of the invention just of the present utility model.Goal of the invention of the present utility model provides a kind of rope rig of new construction.The latch closure of this rope rig by be bifurcated at the ring neck two parts of three strands one group intersect at the top of latch closure crooked break-in backward twisted to the neck of bifurcated form latch closure, twisted is to the shallow bid [11] of turnoff backward, [12], [13], [14], [15], [16] enroll the shallow bid [1] of former rope main body respectively at the neck of this turnoff, [2], [3], [4], [5], [6] among the slit, it is characterized in that shallow bid [14] presses the shallow bid [1] of first lay pitch of former rope main body to enter in the slit of shallow bid [1] and [2] from the slit of [3] and [4] shallow bid at the back side of former rope main body and pass, shallow bid [15] is pressed in the shallow bid [1] of first lay pitch of former rope main body and the slit that [2] enter shallow bid [2] and [3] from the slit of [4] and [5] shallow bid at the back side of former rope main body and is passed, shallow bid [16] is pressed the shallow bid [1] of first lay pitch of former rope main body, [2], [3] enter in the slit of shallow bid [3] and [4], and cut off and stay wherein, shallow bid [11] is pressed the shallow bid [4] of the previous lay pitch of former rope main body to enter in the slit of the shallow bid [4] of this lay pitch and [5] from the slit of [4] and [5] shallow bid of first lay pitch of the front of former rope main body at the back side of former rope and is passed, press the shallow bid [5] of first lay pitch to enter in the slit of shallow bid [5] and [6] then, shallow bid [12] presses the shallow bid [5] of the previous lay pitch of former rope main body to pass from the slit of [4] and [5] shallow bid of first lay pitch of the front of former rope main body at the back side of former rope, press the shallow bid [5] of first lay pitch to enter the slit of shallow bid [5] and shallow bid [6] then, the shallow bid [1] that shallow bid [13] is pressed first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [1] of the shallow bid [6] of first lay pitch of the front of former rope main body and second lay pitch, press the shallow bid [1] of second lay pitch to enter in the slit of the shallow bid [1] of this second lay pitch and [2] then, the shallow bid [14] that comes out from the back side for the first time, the shallow bid [2] of pressing first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [1] of second lay pitch of the front of former rope main body and shallow bid [2], press the shallow bid [2] of second lay pitch to enter in the slit of shallow bid [2] and [3] then, the shallow bid [15] that comes out from the back side for the first time, the shallow bid [3] of pressing first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [2] of second lay pitch of the front of former rope main body and shallow bid [3], press the shallow bid [3] of second lay pitch to enter in the slit of shallow bid [3] and [4] then, and cut off and stay wherein, enter the shallow bid [11] in first lay pitch [5] and [6] shallow bid slit, from the slit of the shallow bid [3] of second lay pitch at the back side of former rope and [4], pass, press second lay pitch shallow bid in the former rope back side [4] to enter the shallow bid [4] of this lay pitch and the slit of [5], enter the shallow bid [12] in first lay pitch [6] and second lay pitch [1] shallow bid slit, from the slit of the shallow bid [4] of second lay pitch at the back side of former rope body and [5], pass, press second lay pitch shallow bid in the former rope back side [5] to enter the shallow bid [5] of this lay pitch and the slit of [6], enter the shallow bid [13] in second lay pitch [1] and second lay pitch [2] shallow bid slit, from the slit of the shallow bid [5] of second lay pitch at the back side of former rope body and [6], pass, press second lay pitch shallow bid in the former rope back side [6] to enter the slit of the shallow bid [1] of the shallow bid [6] of this lay pitch and the 3rd lay pitch, enter the shallow bid [14] in second lay pitch [2] and second lay pitch [3] shallow bid slit, from the slit of the shallow bid [1] of the 3rd lay pitch at the back side of former rope body and [2], pass, press the 3rd lay pitch shallow bid in the former rope back side [2] to enter the slit of the shallow bid [2] and the shallow bid [3] of the 3rd lay pitch, and cut off and stay wherein, the back side enters the shallow bid [11] in second lay pitch [4] and [5] shallow bid slit, pass from the slit of the shallow bid [1] of the shallow bid [6] of second lay pitch of the front of former rope body and the 3rd lay pitch, press the 3rd lay pitch shallow bid in former rope front [1] to enter the shallow bid [1] of this lay pitch and the slit of [2], the back side enters the shallow bid [12] in second lay pitch [5] and [6] shallow bid slit, from the slit of the shallow bid [2] of the shallow bid [1] of the 3rd lay pitch of the front of former rope body and the 3rd lay pitch, pass, press the 3rd lay pitch shallow bid in former rope front [2] to enter the shallow bid [2] of this lay pitch and the slit of [3], the back side enters the shallow bid [13] in second lay pitch shallow bid [6] and the 3rd lay pitch shallow bid [1] slit, passes from the slit of the shallow bid [3] of the shallow bid [2] of the 3rd lay pitch of the front of former rope body and the 3rd lay pitch, press the 3rd lay pitch shallow bid in former rope front [3] to enter the shallow bid [3] of this lay pitch and the slit of [4], and cut off and to stay wherein, the shallow bid [11] that enters from shallow bid [1] and [2] slit of the 3rd lay pitch passes from the slit of the shallow bid [3] of the back side the 3rd lay pitch of former rope and [4], press shallow bid [4] to enter the slit of this shallow bid [4] and [5], the shallow bid [12] that enters from the slit of the shallow bid [2] of the 3rd lay pitch and [3] passes from the slit of the shallow bid [4] of the 3rd lay pitch in the back side of former rope and [5], presses shallow bid [5] to enter the shallow bid [5] of the 3rd lay pitch and the slit of [6], and cut off and stay wherein, the shallow bid [11] that enters in the slit of the 3rd lay pitch in the former rope back side [4] and [5] shallow bid passes from the slit of the shallow bid [1] of the shallow bid [6] of the 3rd the positive lay pitch of former rope and the 4th lay pitch, presses the shallow bid [1] of the 4th lay pitch in former rope front to enter the slit of shallow bid [1] and [2], and cut-out is stayed wherein.
Its advantage is back that the head of each shallow bid of compiling stayed the inside of former steel wire rope rope body cleverly, and the outside does not have unnecessary steel wire to appear, smooth surface, firm and reliable connection.Can not expose and difficult to handle and scuffing equipment surface by the invar silk in the use, and the recess diameter of the rope rig of splice generally is 1.5 to 2.5 times of former rope diameter, handle through shaping, minimum only can reaching for 1.2 to 1.5 times of former rope diameter is particularly suitable for narrow occasion and lifting large-scale, little gap device.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model.Sequence number the 1,2,3,4,5, the 6th in the accompanying drawing, the shallow bid of each lay pitch on the former rope body of steel wire rope; 11,12,13,14,, the 15, the 16th, return the shallow bid of twisting with the fingers later steel wire rope backward, return shallow bid after twisting with the fingers for for the purpose of the shallow bid difference of former rope, drawn its signal of per share lay pitch direction, i.e. fine line part in the accompanying drawing.Because steel wire rope is a rope body with rigidity and flexible twisting, so, can only be in the accompanying drawing to be similar to the diagram signal that the technique of painting draws steel wire rope, the lay pitch and each shallow bid steel wire.The scopes of having drawn about 4 sth. made by twisting tools in the accompanying drawing altogether.Forward or to the description of returning is to determine as the front end benchmark with the latch closure of rigging.
The specific embodiment
With reference to accompanying drawing, the former rope of main rope of the rope rig of the present utility model schematic diagram of about 4 lay pitch that drawn in the accompanying drawings, the said steel wire rope of the utility model be the most normal employing 6 * class meet the steel wire rope that GB GBT/8918-1996 standard and other relevant criterion require.For example: 6 * 7; 6 * 19; 6 * 37 series such as grade.Rope rig is symmetrical on the plane of latch closure, so the one side of only drawing, the structure of another side (back side in the accompanying drawing) and this are in the face of claiming that it is identical inserting the structure of compiling.The latch closure of this rope rig by be bifurcated at the ring neck two parts of three strands one group intersect at the top of latch closure crooked break-in backward (in other words conj.or perhaps to returning) twisted to neck of bifurcated form latch closure, (return) shallow bid [11] of twisted backward to the turnoff, [12], [13], [14], [15], [16] enroll the shallow bid [1] of former rope main body respectively at the neck of this turnoff, [2], [3], [4], [5], [6] among the slit, it is characterized in that shallow bid [14] presses the shallow bid [1] of first lay pitch of former rope main body to enter in the slit of shallow bid [1] and [2] from the slit of [3] and [4] shallow bid at the back side of former rope main body and pass, shallow bid [15] is pressed in the shallow bid [1] of first lay pitch of former rope main body and the slit that [2] enter shallow bid [2] and [3] from the slit of [4] and [5] shallow bid at the back side of former rope main body and is passed, shallow bid [16] is pressed the shallow bid [1] of first lay pitch of former rope main body, [2], [3] enter in the slit of shallow bid [3] and [4], and cut off and stay wherein, shallow bid [11] is pressed the shallow bid [4] of the previous lay pitch of former rope main body to enter in the slit of the shallow bid [4] of this lay pitch and [5] from the slit of [4] and [5] shallow bid of first lay pitch of the front of former rope main body at the back side of former rope and is passed, press the shallow bid [5] of first lay pitch to enter in the slit of shallow bid [5] and [6] then, shallow bid [12] presses the shallow bid [5] of the previous lay pitch of former rope main body to pass from the slit of [4] and [5] shallow bid of first lay pitch of the front of former rope main body at the back side of former rope, press the shallow bid [5] of first lay pitch to enter the slit of shallow bid [5] and shallow bid [6] then, the shallow bid [1] that shallow bid [13] is pressed first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [1] of the shallow bid [6] of first lay pitch of the front of former rope main body and second lay pitch, press the shallow bid [1] of second lay pitch to enter in the slit of the shallow bid [1] of this second lay pitch and [2] then, the shallow bid [14] that comes out from the back side for the first time, the shallow bid [2] of pressing first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [1] of second lay pitch of the front of former rope main body and shallow bid [2], press the shallow bid [2] of second lay pitch to enter in the slit of shallow bid [2] and [3] then, the shallow bid [15] that comes out from the back side for the first time, the shallow bid [3] of pressing first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [2] of second lay pitch of the front of former rope main body and shallow bid [3], press the shallow bid [3] of second lay pitch to enter in the slit of shallow bid [3] and [4] then, and cut off and stay wherein, enter the shallow bid [11] in first lay pitch [5] and [6] shallow bid slit, from the slit of the shallow bid [3] of second lay pitch at the back side of former rope and [4], pass, press second lay pitch shallow bid in the former rope back side [4] to enter the shallow bid [4] of this lay pitch and the slit of [5], enter the shallow bid [12] in first lay pitch [6] and second lay pitch [1] shallow bid slit, from the slit of the shallow bid [4] of second lay pitch at the back side of former rope body and [5], pass, press second lay pitch shallow bid in the former rope back side [5] to enter the shallow bid [5] of this lay pitch and the slit of [6], enter the shallow bid [13] in second lay pitch [1] and second lay pitch [2] shallow bid slit, from the slit of the shallow bid [5] of second lay pitch at the back side of former rope body and [6], pass, press second lay pitch shallow bid in the former rope back side [6] to enter the slit of the shallow bid [1] of the shallow bid [6] of this lay pitch and the 3rd lay pitch, enter the shallow bid [14] in second lay pitch [2] and second lay pitch [3] shallow bid slit, from the slit of the shallow bid [1] of the 3rd lay pitch at the back side of former rope body and [2], pass, press the 3rd lay pitch shallow bid in the former rope back side [2] to enter the slit of the shallow bid [2] and the shallow bid [3] of the 3rd lay pitch, and cut off and stay wherein, the back side enters the shallow bid [11] in second lay pitch [4] and [5] shallow bid slit, pass from the slit of the shallow bid [1] of the shallow bid [6] of second lay pitch of the front of former rope body and the 3rd lay pitch, press the 3rd lay pitch shallow bid in former rope front [1] to enter the shallow bid [1] of this lay pitch and the slit of [2], the back side enters the shallow bid [12] in second lay pitch [5] and [6] shallow bid slit, from the slit of the shallow bid [2] of the shallow bid [1] of the 3rd lay pitch of the front of former rope body and the 3rd lay pitch, pass, press the 3rd lay pitch shallow bid in former rope front [2] to enter the shallow bid [2] of this lay pitch and the slit of [3], the back side enters the shallow bid [13] in second lay pitch shallow bid [6] and the 3rd lay pitch shallow bid [1] slit, passes from the slit of the shallow bid [3] of the shallow bid [2] of the 3rd lay pitch of the front of former rope body and the 3rd lay pitch, press the 3rd lay pitch shallow bid in former rope front [3] to enter the shallow bid [3] of this lay pitch and the slit of [4], and cut off and to stay wherein, the shallow bid [11] that enters from shallow bid [1] and [2] slit of the 3rd lay pitch passes from the slit of the shallow bid [3] of the back side the 3rd lay pitch of former rope and [4], press shallow bid [4] to enter the slit of this shallow bid [4] and [5], the shallow bid [12] that enters from the slit of the shallow bid [2] of the 3rd lay pitch and [3] passes from the slit of the shallow bid [4] of the 3rd lay pitch in the back side of former rope and [5], presses shallow bid [5] to enter the shallow bid [5] of the 3rd lay pitch and the slit of [6], and cut off and stay wherein, the shallow bid [11] that enters in the slit of the 3rd lay pitch in the former rope back side [4] and [5] shallow bid passes from the slit of the shallow bid [1] of the shallow bid [6] of the 3rd the positive lay pitch of former rope and the 4th lay pitch, presses the shallow bid [1] of the 4th lay pitch in former rope front to enter the slit of shallow bid [1] and [2], and cut-out is stayed wherein.Aforesaid structure all should adopt proper implements in when operation, and the slit of former strand of steel wire rope is strutted, and will return to compile strand to insert and will return and compile a burst tension, and then strutting tool is taken out.Such structure, be that the shallow bid steel wire that will return volume has adopted special technology and structure, wrapped up mutually and push gradually by each shallow bid of self and former steel wire rope and shrink, through the slotting volume in about 3-4 range of lay, last containing fully among the neck that the steel wire rope of former steel wire rope and time volume forms, rational in infrastructure, mechanical characteristic and face shaping are superior.
The latch closure that structure of the present utility model is not only applicable to rigging also can connect two steel wire ropes with this structure, can also dock two steel wire ropes with this structure.Further, this structure can also be used as the articulating of steel wire rope, be about to steel cable with structure of the present utility model with two ends to patching volume, form a wire line thimble.

Claims (1)

1, a kind of rope rig of new construction, the latch closure of this rope rig by be bifurcated at the ring neck two parts of three strands one group intersect at the top of latch closure crooked break-in backward twisted to the neck of bifurcated form latch closure, twisted is to the shallow bid [11] of turnoff backward, [12], [13], [14], [15], [16] enroll the shallow bid [1] of former rope main body respectively at the neck of this turnoff, [2], [3], [4], [5], [6] among the slit, it is characterized in that shallow bid [14] presses the shallow bid [1] of first lay pitch of former rope main body to enter in the slit of shallow bid [1] and [2] from the slit of [3] and [4] shallow bid at the back side of former rope main body and pass, shallow bid [15] is pressed in the shallow bid [1] of first lay pitch of former rope main body and the slit that [2] enter shallow bid [2] and [3] from the slit of [4] and [5] shallow bid at the back side of former rope main body and is passed, shallow bid [16] is pressed the shallow bid [1] of first lay pitch of former rope main body, [2], [3] enter in the slit of shallow bid [3] and [4], and cut off and stay wherein, shallow bid [11] is pressed the shallow bid [4] of the previous lay pitch of former rope main body to enter in the slit of the shallow bid [4] of this lay pitch and [5] from the slit of [4] and [5] shallow bid of first lay pitch of the front of former rope main body at the back side of former rope and is passed, press the shallow bid [5] of first lay pitch to enter in the slit of shallow bid [5] and [6] then, shallow bid [12] presses the shallow bid [5] of the previous lay pitch of former rope main body to pass from the slit of [4] and [5] shallow bid of first lay pitch of the front of former rope main body at the back side of former rope, press the shallow bid [5] of first lay pitch to enter the slit of shallow bid [5] and shallow bid [6] then, the shallow bid [1] that shallow bid [13] is pressed first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [1] of the shallow bid [6] of first lay pitch of the front of former rope main body and second lay pitch, press the shallow bid [1] of second lay pitch to enter in the slit of the shallow bid [1] of this second lay pitch and [2] then, the shallow bid [14] that comes out from the back side for the first time, the shallow bid [2] of pressing first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [1] of second lay pitch of the front of former rope main body and shallow bid [2], press the shallow bid [2] of second lay pitch to enter in the slit of shallow bid [2] and [3] then, the shallow bid [15] that comes out from the back side for the first time, the shallow bid [3] of pressing first lay pitch of former rope main body at the back side of former rope passes from the slit of the shallow bid [2] of second lay pitch of the front of former rope main body and shallow bid [3], press the shallow bid [3] of second lay pitch to enter in the slit of shallow bid [3] and [4] then, and cut off and stay wherein, enter the shallow bid [11] in first lay pitch [5] and [6] shallow bid slit, from the slit of the shallow bid [3] of second lay pitch at the back side of former rope and [4], pass, press second lay pitch shallow bid in the former rope back side [4] to enter the shallow bid [4] of this lay pitch and the slit of [5], enter the shallow bid [12] in first lay pitch [6] and second lay pitch [1] shallow bid slit, from the slit of the shallow bid [4] of second lay pitch at the back side of former rope body and [5], pass, press second lay pitch shallow bid in the former rope back side [5] to enter the shallow bid [5] of this lay pitch and the slit of [6], enter the shallow bid [13] in second lay pitch [1] and second lay pitch [2] shallow bid slit, from the slit of the shallow bid [5] of second lay pitch at the back side of former rope body and [6], pass, press second lay pitch shallow bid in the former rope back side [6] to enter the slit of the shallow bid [1] of the shallow bid [6] of this lay pitch and the 3rd lay pitch, enter the shallow bid [14] in second lay pitch [2] and second lay pitch [3] shallow bid slit, from the slit of the shallow bid [1] of the 3rd lay pitch at the back side of former rope body and [2], pass, press the 3rd lay pitch shallow bid in the former rope back side [2] to enter the slit of the shallow bid [2] and the shallow bid [3] of the 3rd lay pitch, and cut off and to stay wherein, the back side enters the shallow bid [11] in second lay pitch [4] and [5] shallow bid slit, passes from the slit of the shallow bid [1] of the shallow bid [6] of second lay pitch of the front of former rope body and the 3rd lay pitch, press the 3rd lay pitch shallow bid in former rope front [1] to enter the shallow bid [1] of this lay pitch and the slit of [2], the back side enters the shallow bid [12] in second lay pitch [5] and [6] shallow bid slit, passes from the slit of the shallow bid [2] of the shallow bid [1] of the 3rd lay pitch of the front of former rope body and the 3rd lay pitch, presses the 3rd lay pitch shallow bid in former rope front [2] to enter the shallow bid [2] of this lay pitch and the slit of [3], the back side enters the shallow bid [13] in second lay pitch shallow bid [6] and the 3rd lay pitch shallow bid [1] slit, from the slit of the shallow bid [3] of the shallow bid [2] of the 3rd lay pitch of the front of former rope body and the 3rd lay pitch, pass, press the 3rd lay pitch shallow bid in former rope front [3] to enter the shallow bid [3] of this lay pitch and the slit of [4], and cut off and stay wherein, the shallow bid [11] that enters from shallow bid [1] and [2] slit of the 3rd lay pitch, from the slit of the shallow bid [3] of the back side the 3rd lay pitch of former rope and [4], pass, press shallow bid [4] to enter the slit of this shallow bid [4] and [5], the shallow bid [12] that enters from the slit of the shallow bid [2] of the 3rd lay pitch and [3], from the slit of the shallow bid [4] of the 3rd lay pitch in the back side of former rope and [5], pass, press shallow bid [5] to enter the shallow bid [5] of the 3rd lay pitch and the slit of [6], and cut off and stay wherein, the shallow bid [11] that enters in the slit of the 3rd lay pitch in the former rope back side [4] and [5] shallow bid passes from the slit of the shallow bid [1] of the shallow bid [6] of the 3rd lay pitch in the former front of restricting and the 4th lay pitch, press the shallow bid [1] of the 4th the positive lay pitch of former rope to enter the slit of shallow bid [1] and [2], and cut off and stay wherein.
CN 200520081828 2005-03-29 2005-03-29 Steel cable with new structure Expired - Fee Related CN2806542Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520081828 CN2806542Y (en) 2005-03-29 2005-03-29 Steel cable with new structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520081828 CN2806542Y (en) 2005-03-29 2005-03-29 Steel cable with new structure

Publications (1)

Publication Number Publication Date
CN2806542Y true CN2806542Y (en) 2006-08-16

Family

ID=36920842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520081828 Expired - Fee Related CN2806542Y (en) 2005-03-29 2005-03-29 Steel cable with new structure

Country Status (1)

Country Link
CN (1) CN2806542Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101925701A (en) * 2008-01-25 2010-12-22 株式会社胜山绳索 Spineless wire-rope sling manufacturing method, wire-rope sling manufacturing apparatus, spineless wire-rope sling manufacturing method using apparatus, and spineless wire-rope sling
CN102191705A (en) * 2011-04-08 2011-09-21 巨力索具股份有限公司 Twelve-strand rope sleeve and manufacturing method thereof
CN103628338A (en) * 2012-08-22 2014-03-12 上海锡华机械工程有限公司 Method for manufacturing spliced eye end of steel wire rope
CN105256622A (en) * 2015-11-03 2016-01-20 山东鲁普科技有限公司 Splicing method of ultrahigh high molecular weight polyethylene fiber rope ring plate sling

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101925701A (en) * 2008-01-25 2010-12-22 株式会社胜山绳索 Spineless wire-rope sling manufacturing method, wire-rope sling manufacturing apparatus, spineless wire-rope sling manufacturing method using apparatus, and spineless wire-rope sling
CN102191705A (en) * 2011-04-08 2011-09-21 巨力索具股份有限公司 Twelve-strand rope sleeve and manufacturing method thereof
CN102191705B (en) * 2011-04-08 2013-07-03 巨力索具股份有限公司 Twelve-strand rope sleeve and manufacturing method thereof
CN103628338A (en) * 2012-08-22 2014-03-12 上海锡华机械工程有限公司 Method for manufacturing spliced eye end of steel wire rope
CN105256622A (en) * 2015-11-03 2016-01-20 山东鲁普科技有限公司 Splicing method of ultrahigh high molecular weight polyethylene fiber rope ring plate sling

Similar Documents

Publication Publication Date Title
CN100507177C (en) Cable reeving device and its reeving method
CN2806542Y (en) Steel cable with new structure
CN202248933U (en) Steel strands bundle threading device
CN203781627U (en) Component lifting device
CN202256824U (en) Optical cable with marks
CN205070337U (en) Net crane span structure mechanism
CN2734717Y (en) Clamping device for wire rope for drum
CN101565905A (en) Method for splicing high-bearing-capacity steel cable
CN210944507U (en) Heart ring
CN201232165Y (en) Steel strand beam reeve machine
CN2351230Y (en) Steel twisted wire puncher
CN103628338A (en) Method for manufacturing spliced eye end of steel wire rope
CN204577996U (en) Drag steel wire device
CN204959457U (en) Novel composite rope cable
CN87212234U (en) Wedge connected type log tying rope
CN205639257U (en) Control cable
CN207145431U (en) A kind of automobile divides drag-line of putting into gear
CN204694883U (en) Connector crimping protection instrument
CN2320608Y (en) Cable tackle
CN214459141U (en) Steel wire rope with safety mechanism
CN217676375U (en) High-strength lifting ring with clamping function
CN209338891U (en) A kind of engineering machinery steel cable composite twisted wire
CN203966589U (en) 8 font self-supporting cables
CN203440756U (en) Steel strand traction connector for split tube type U-shaped anchor rope pre-buried hole channel
CN207673790U (en) A kind of collet, lanyard

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060816