CN2804250Y - Floor splicing tunnel splicing - Google Patents

Floor splicing tunnel splicing Download PDF

Info

Publication number
CN2804250Y
CN2804250Y CN 200520107708 CN200520107708U CN2804250Y CN 2804250 Y CN2804250 Y CN 2804250Y CN 200520107708 CN200520107708 CN 200520107708 CN 200520107708 U CN200520107708 U CN 200520107708U CN 2804250 Y CN2804250 Y CN 2804250Y
Authority
CN
China
Prior art keywords
groove
floor
base
splicing
parallel panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520107708
Other languages
Chinese (zh)
Inventor
苗景有
朱长庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cono (Beijing) Flooring Co., Ltd.
Original Assignee
BEIJING KENUOSENHUA FLOORING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING KENUOSENHUA FLOORING Co Ltd filed Critical BEIJING KENUOSENHUA FLOORING Co Ltd
Priority to CN 200520107708 priority Critical patent/CN2804250Y/en
Application granted granted Critical
Publication of CN2804250Y publication Critical patent/CN2804250Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses an aluminum alloy floor splicing channel which is used for splicing the floor. The utility model comprises a parallel panel and a base, a flute is arranged at the middle part of the base, and drop pits are arranged at the lower part of both inner side surfaces of the flute. A right fastening structure and a left fastening structure which are matched with bucket grooves of the floor are arranged at both ends of the base, and the parallel panel and the flute of the base are buckled to form a gap. The structure of the utility model is rational, and the bucket grooves of the floor can be tightly connected with the floor through splicing the floor; since raised heads and recessed parts are matched and locked, the problems in the prior art that the splicing effect is identical and the floor is not suitable to be paved individually in a large area are overcome. The decoration of the floor and the convenience of the floor are improved, and the utility model is suitable for large-area installation in public places. Simultaneously, the defect of dimensional changes and the defect of bulges and gaps caused by the dimensional changes of the floor can be effectively avoided.

Description

Floor splicing passage
Technical field
The utility model relates to a kind of floor splicing apparatus, especially a kind of aluminium alloys floor splicing passage that is used for assembled floor.
Background technology
At present, various floors on the market all connect by tongue-and-groove, pattern similarity often in actual use, be not suitable for personalized mat formation and fitting up convenience, thereby some limitations have been brought for the use on floor, how to carry out the large tracts of land assembled floor, make and face the floor mutually and avoided drum and moved back seam defect.And the requirement of mating formation of satisfying different clients, convenient finishing and decoration, the technical problem that necessitates.
Summary of the invention
The purpose of this utility model provides a kind of rational in infrastructure, aluminium alloys floor splicing passage that can be connected with the tongue-and-groove on floor and carry out the large tracts of land assembly unit, and it has overcome the defective that prior art exists.
For overcoming above-mentioned various defective, the utility model adopts following technical scheme: it includes parallel panel and base, described base middle part is a groove, the bottom of two medial surfaces of groove is provided with pit, the two ends of base are respectively equipped with right jamming button structure and the left buckle structure that matches with the floor tongue-and-groove, and the groove of described parallel panel and base fastens and form the gap.
Described base middle part is a groove, the bottom of two medial surfaces of groove is provided with pit, the two ends of base are respectively equipped with right jamming button structure and the left buckle structure that matches with the floor tongue-and-groove, be respectively equipped with draw-in groove and boss on the described right jamming button structure, and be provided with trough below, corresponding site on it and the floor tenon fastens, described left buckle structure also is respectively equipped with boss and draw-in groove, fasten with the corresponding site of floor tongue-and-groove, both sides are respectively equipped with block tongue below the described parallel panel, and its end is provided with projection, and the groove of described parallel panel and base fastens, pit in the projection of block tongue end and the groove matches, and forms the gap.
Described base is provided with at least one groove, the medial surface bottom of two ends groove is provided with pit, the two ends of base are respectively equipped with right jamming button that matches with metope and the left buckle that matches with the floor tongue-and-groove, described right jamming button is provided with vertical plane, and be provided with trough below, described left buckle is provided with draw-in groove, both sides are respectively equipped with block tongue below the described parallel panel, its end is provided with projection, the groove of described parallel panel and base fastens, pit in the projection of block tongue end and the groove matches, and forms the gap.
Described draw-in groove is a circular arc.
Described draw-in groove and boss are trapezoidal.
The last extended surface of described groove both sides is provided with brace table.
Described parallel panel and base are the aluminium alloys manufacturing.
The surface of described parallel panel and the both ends of the surface of base are provided with cima.
Because the utility model has adopted said structure, compared with prior art have the following advantages: aluminium alloys of the present utility model floor splicing channel design is reasonable, make floor tongue-and-groove and its closely splicing by splicing with the floor, and by the locking of plush copper and recess, it is identical and be not suitable for large tracts of land, the personalization problem of mating formation to overcome assembly unit effect of the prior art.Increased the convenience of the ornamental of floor and finishing, installed, drum and the gap generation of defects of effectively having avoided floor change in size defective and change in size to cause simultaneously applicable to the large tracts of land of public place.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the structural representation of the utility model base;
Fig. 2 is the structural representation of the utility model parallel panel;
Fig. 3 is the structural representation that the utility model is pressed close to metope place base;
Fig. 4 is the structural representation that the utility model base and parallel panel fasten;
Fig. 5 is the structural representation that the utility model is pressed close to metope place base and parallel panel fastening.
Among the figure: 1. parallel panel; 2. base; 3. groove; 4. pit; 5. right jamming button structure; 6. left buckle structure; 7. gap; 8. draw-in groove; 9. draw-in groove; 10. boss; 11. trough; 12. boss; 13. boss; 14. draw-in groove; 15. block tongue; 16. projection; 17. brace table; 18. right jamming button; 19. left buckle; 20. vertical plane; 21. draw-in groove; 22. cima.
The specific embodiment
The utility model is at first processed a kind of floor splicing passage of aluminium alloys, the bulge-structure of both sides, passage bottom is matched with the floor tongue-and-groove with groove structure, and passage upper lobes structure is matched with the lower recess structure.Also be provided with groove on the end face of splicing passage bottom, described aluminium alloys floor, be used to place electric wire and other decoration material, the concaveconvex structure of both sides matches with the floor tongue-and-groove, makes between the floor to link together securely by floor splicing passage.Matching with its underpart in splicing passage top, aluminium alloys floor, and is provided with two bulge-structures in the top downside, matches with the groove of its underpart.
Particularly, upper and lower of the present utility model is respectively parallel panel 1 and base 2, described base 2 middle parts are a groove 3, the bottom of two medial surfaces of groove 3 is provided with pit 4, the last extended surface of groove 3 both sides is provided with the brace table 17 of supports parallel panel 1, is used for supports parallel panel 1 to make it firm.The two ends of base 2 are respectively equipped with right jamming button structure 5 and the left buckle structure 6 that matches with the floor tongue-and-groove, described parallel panel 1 fastens and formation gap 7 drum and the gap generation of defects that can effectively avoid floor change in size defective and change in size to cause with the groove 3 of base 2.Wherein be respectively equipped with draw-in groove 8, draw-in groove 9 and boss 10 on the right jamming button structure 5, draw-in groove 9 is a trapezium structure, has trough 11 at buckle structure 5, is used to place electric wire and other decoration material, and the corresponding site on right jamming button structure 5 and the floor tenon fastens.Described left buckle structure 6 also is respectively equipped with boss 12, boss 13 and draw-in groove 14, and boss 13 is a trapezium structure, and left buckle structure 6 fastens with the corresponding site of floor tongue-and-groove.Both sides are respectively equipped with block tongue 15 below the described parallel panel 1, its end is provided with projection 16, after the groove 3 of described parallel panel 1 and base 2 fastened, the projection 16 of block tongue 15 ends matched with pit 4 in the groove 3 it is snapped together securely, and formation gap 7.When being installed in the metope place, aluminium alloys floor splicing passage can establish a plurality of grooves 3 on the described base 2, medial surface bottom at two ends groove 3 is provided with pit 4, this moment, the two ends of base 2 were respectively equipped with right jamming button 18 that matches with metope and the left buckle 19 that matches with the floor tongue-and-groove, right jamming button 18 is provided with vertical plane 20 and fits with wall, and be provided with trough 11 below, the draw-in groove 21 that left side buckle 19 is provided with circular arc matches with the floor tongue-and-groove, both sides are respectively equipped with block tongue 15 below the parallel panel 1, its end is provided with projection 16, described parallel panel 1 fastens with the groove 3 of base 2, pit 4 in the projection 16 of block tongue 15 ends and the groove 3 matches, and forms gap 7.Aluminium alloys of the present utility model like this floor splicing passage, be stitched together by the buckle structure at two ends and the tenon groove structure on corresponding floor, the floor is faced in locking mutually, and by cima 22 or other Mechanical Builds that parallel panel 1 surface and base 2 both ends of the surface are provided with, makes the floor decorative enhancing.Its use has increased the floor extendable room to be made and faces the floor mutually and avoided drum and moved back seam defect.
In the technique scheme, the length of described floor joint tongue slightly is shorter than the degree of depth of splicing passage bottom, aluminium alloys floor one side groove structure, and the degree of depth outline of floor tongue-and-groove is longer than the length of bottom opposite side raised structures.Draw-in groove 9 and boss 13 are isosceles trapezoids, make assembly unit convenient, connect more firm.

Claims (8)

1. passage is spliced on a floor, include parallel panel (1) and base (2), it is characterized in that: described base (2) middle part is a groove (3), the bottom of two medial surfaces of groove (3) is provided with pit (4), the two ends of base (2) are respectively equipped with right jamming button structure (5) and the left buckle structure (6) that matches with the floor tongue-and-groove, and described parallel panel (1) fastens and form gap (7) with the groove (3) of base (2).
2. splicing passage in floor according to claim 1, it is characterized in that: described base (2) middle part is a groove (3), the bottom of two medial surfaces of groove (3) is provided with pit (4), the two ends of base (2) are respectively equipped with right jamming button structure (5) and the left buckle structure (6) that matches with the floor tongue-and-groove, be respectively equipped with draw-in groove (8) on the described right jamming button structure (5), (9) and boss (10), and be provided with trough (11) below, corresponding site on right jamming button structure (5) and the floor tenon fastens, described left buckle structure (6) also is respectively equipped with boss (12), (13) and draw-in groove (14), fasten with the corresponding site of floor tongue-and-groove, both sides are respectively equipped with block tongue (15) below the described parallel panel (1), its end is provided with projection (16), described parallel panel (1) fastens with the groove (3) of base (2), pit (4) in the projection (16) of block tongue (15) end and the groove (3) matches, and forms gap (7).
3. splicing passage in floor according to claim 1, it is characterized in that: described base (2) is provided with at least one groove (3), the medial surface bottom of two ends groove (3) is provided with pit (4), the two ends of base (2) are respectively equipped with right jamming button (18) that matches with metope and the left buckle (19) that matches with the floor tongue-and-groove, described right jamming button (18) is provided with vertical plane (20), and be provided with trough (11) below, described left buckle (19) is provided with draw-in groove (21), both sides are respectively equipped with block tongue (15) below the described parallel panel (1), its end is provided with projection (16), described parallel panel (1) fastens with the groove (3) of base (2), pit (4) in the projection (16) of block tongue (15) end and the groove (3) matches, and forms gap (7).
4. splicing passage in floor according to claim 3, it is characterized in that: described draw-in groove (21) is a circular arc.
5. splicing passage in floor according to claim 1 and 2, it is characterized in that: described draw-in groove (9) and boss (13) are isosceles trapezoids.
6. splicing passage in floor according to claim 1 and 2, it is characterized in that: the last extended surface of described groove (3) both sides is provided with brace table (17).
7. splicing passage in floor according to claim 1 and 2, it is characterized in that: described parallel panel (1) and base (2) are the aluminium alloys manufacturing.
8. splicing passage in floor according to claim 1 and 2, it is characterized in that: the both ends of the surface of the surface of described parallel panel (1) and base (2) are provided with cima (22).
CN 200520107708 2005-05-31 2005-05-31 Floor splicing tunnel splicing Expired - Fee Related CN2804250Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520107708 CN2804250Y (en) 2005-05-31 2005-05-31 Floor splicing tunnel splicing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520107708 CN2804250Y (en) 2005-05-31 2005-05-31 Floor splicing tunnel splicing

Publications (1)

Publication Number Publication Date
CN2804250Y true CN2804250Y (en) 2006-08-09

Family

ID=36909544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520107708 Expired - Fee Related CN2804250Y (en) 2005-05-31 2005-05-31 Floor splicing tunnel splicing

Country Status (1)

Country Link
CN (1) CN2804250Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454280A (en) * 2010-10-28 2012-05-16 吴江市七都方圆铝型材加工厂 Aluminum alloy floor and arranging structure of metal framework
CN102454283A (en) * 2010-10-28 2012-05-16 吴江市七都方圆铝型材加工厂 Aluminum alloy floor and arranging structure of framework

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454280A (en) * 2010-10-28 2012-05-16 吴江市七都方圆铝型材加工厂 Aluminum alloy floor and arranging structure of metal framework
CN102454283A (en) * 2010-10-28 2012-05-16 吴江市七都方圆铝型材加工厂 Aluminum alloy floor and arranging structure of framework

Similar Documents

Publication Publication Date Title
US7716889B2 (en) Flooring systems and methods for installation
JP2011522982A (en) How to lay a floor panel
CN2804250Y (en) Floor splicing tunnel splicing
CN2804255Y (en) Floor structure with aluminum alloy splicing tunnel
CN202148629U (en) Novel metal mesh plate ceiling
CN202202464U (en) Honeycomb panel ceiling system
CN1752374A (en) Colour combination V-groove composite floor block and mfg. method thereof
CN2804243Y (en) Floor structure with high compact buckle lap
CN2804248Y (en) Floor structure with aluminum alloy luminous tunner
CN215290932U (en) Suspended multifunctional corner line profile and ceiling system applying same
CN216075849U (en) Take assembled furred ceiling of light trough
CN211690936U (en) Multifunctional general profile
CN100357550C (en) Combined type well shaped bottom cut board
CN207776201U (en) A kind of two level furred ceiling component, two level furred ceiling and three-level furred ceiling component, three-level furred ceiling
CN2594369Y (en) Bayonet keel of wooden floor
CN1702266A (en) Combined joist
CN1752375A (en) Floor joint fastening grooving
CN2918617Y (en) Parquets bamboo floor
CN112411924A (en) Special-shaped wood veneer splicing design structure and installation method
CN206255746U (en) A kind of quick mounting type elevator car bottom
CN213626254U (en) Connecting keel of suspended ceiling for interior decoration
CN218881427U (en) GRG structure of mating formation, gypsum board butt joint structure and gypsum board connecting piece
CN107327069A (en) A kind of two grades of furred ceiling components, two grades of furred ceilings and three-level furred ceiling component, three-level furred ceiling
CN211232513U (en) Special-shaped lamp trough structure
CN2665274Y (en) Composite assembled floors

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: KENUO ( BEIJING ) FLOOR CO., LTD.

Free format text: FORMER NAME OR ADDRESS: BEIJING KRONOSENHUA FLOORING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 100068 No. 4 West Dahongmen Road, Beijing, Fengtai District

Patentee after: Cono (Beijing) Flooring Co., Ltd.

Address before: 100068 No. 4 West Dahongmen Road, Beijing, Fengtai District

Patentee before: Beijing Kenuosenhua Flooring Co., Ltd.

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee