CN2799576Y - Tuyere of blast furnace - Google Patents
Tuyere of blast furnace Download PDFInfo
- Publication number
- CN2799576Y CN2799576Y CN 200520091270 CN200520091270U CN2799576Y CN 2799576 Y CN2799576 Y CN 2799576Y CN 200520091270 CN200520091270 CN 200520091270 CN 200520091270 U CN200520091270 U CN 200520091270U CN 2799576 Y CN2799576 Y CN 2799576Y
- Authority
- CN
- China
- Prior art keywords
- barrel body
- blast
- tuyere
- blast furnace
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a tuyere of a blast furnace of an ironmaking blast furnace. An end head body (1) which is made of pure copper and provided with a water ingress hole (2) and a water egress hole (3), wherein the lower end of the end head body (1) is in welding connection with a sleeve barrel body (7) which is made of a pure copper plate and provided with a cooling inner cavity, and the sleeve barrel body (7) is formed by that an inner barrel body (6) is in welding connection with an outer barrel body (5). A flow guiding body (8) of cooling water is arranged in the cooling inner cavity of the sleeve body (7). Wearproof hard alloy layers (4) which are formed in the method of the surfacing are arranged on the outer margin of the bottom part of the sleeve barrel body (7) and on the inner surface of the inner barrel body (6). The utility model can avoid sand holes and sand marks which occur when an already present tuyere of a blast furnace is formed by casting. The utility model has the advantages of smooth body wall, high thermal coefficient, low damaging degree and long service life.
Description
Technical field
The utility model relates to the blast-furnace tuyere of iron-smelting blast furnace.
Background technology
Iron-smelting blast furnace is by the blast-furnace tuyere that is equipped with on it heat air delivery in blast furnace, to provide oxygen to satisfy the needs of smelting the pig iron, wherein nearer apart from the blast-furnace roasting district of temperature higher (1700 ℃) as the blast-furnace tuyere of interior cover air port use, blast-furnace tuyere will bear the thermal radiation of combustion zone and the influence of convection current, also bearing the wearing and tearing of decline logistics, washing away of the abrasion of Coal powder spray and products of combustion and air-flow, and the splashing of scum, the scorification of flowing molten iron, blast-furnace tuyere is under this ten minutes exacting terms, be easy to be damaged, so the length in work-ing life of blast-furnace tuyere will directly influence running period and the product production and the economic benefit of iron-smelting blast furnace.
For a long time, the blast-furnace tuyere that uses as interior cover air port on China's iron-smelting blast furnace mainly is to use cast copper cavity type blast-furnace tuyere (as shown in Figure 1), this blast-furnace tuyere casting, simple in structure, be easy to processing, but because lower (the copper purity 95~98% of cast copper thermal conductivity, thermal conductivity is 186~209w/mk), be prone to sand holes, sand trace and in uneven thickness during casting on the body wall of air port, water coolant is prone to the dead angle when flowing in cooling chamber, therefore be damaged easily, lack work-ing life (generally only using 20~30 days).
Again the cast copper cavity type blast-furnace tuyere was improved to the tubular blast-furnace tuyere of cast copper (as shown in Figure 2) afterwards, in cooling chamber, increased current through-flow body, cooling performance increases, but because the thermal conductivity of cast copper is lower, be prone to sand holes, sand trace during casting, that improves work-ing life is still not obvious, and because shape complicated (having increased the through-flow body in the cooling chamber), the one-step casting moulding is difficulty comparatively, therefore also is difficult to promote the use of.
Summary of the invention
The purpose of this utility model provides a kind of blast-furnace tuyere, this blast-furnace tuyere can overcome cast copper cavity type blast-furnace tuyere and the tubular blast-furnace tuyere of cast copper all weak point, improved its work-ing life.
To achieve these goals, the utility model is the lower end of termination body that has the fine copper matter of prosopyle and posticum thereon, be welded to connect the sleeve body that is welded to connect the fine copper plate system that constitutes by inner barrel and outer cylinder body with cooling inner chamber, in the cooling inner chamber of sleeve body, be equipped with the baffle of water coolant, at sleeve body, on the bottom of sleeve body outer rim and inner barrel internal surface, be equipped with the wearable hard alloy layer of built-up welding.
The utility model is by the termination body that has prosopyle and posticum on it, sleeve body that inner barrel and outer cylinder body constitute and baffle are formed, all adopt between each parts and be welded to connect, the sand holes that occurred when having avoided the tubular blast-furnace tuyere casting of cast copper cavity type blast-furnace tuyere and cast copper, the sand trace, body wall is smooth, the wearing and tearing of decline logistics have been reduced, the abrasion of Coal powder spray, washing away of products of combustion and air-flow, greatly reduce damage intensity, and each parts adopts higher fine copper material (copper content≤99.9% of thermal conductivity, thermal conductivity is 360~390w/mk), the very fast conduction of heat is distributed, improved the work-ing life of blast-furnace tuyere greatly, use through reality, can reach 270~300 days the work-ing life of this blast-furnace tuyere, reduced the replacing and the frequency of maintenance of blast-furnace tuyere, guaranteed the ordinary production of blast furnace, so it has use value and economic worth preferably.
Description of drawings:
Fig. 1: the structural representation of existing cast copper cavity type blast-furnace tuyere
Fig. 2: the structural representation of the tubular blast-furnace tuyere of existing cast copper
Fig. 3: vertical view of the present utility model
Fig. 4: A-A is to sectional view among Fig. 3
Among the figure: 1. termination body; 2. prosopyle; 3. posticum; 4. the wearable hard alloy layer of built-up welding; 5. outer cylinder body; 6. inner barrel; 7. sleeve body; 8. baffle.
Embodiment
The utility model is the lower end of termination body 1 that has the fine copper matter of prosopyle 2 and posticum 3 thereon, be welded to connect the sleeve body 7 that is welded to connect the fine copper plate system that constitutes by endosome tube 6 and outer cylinder body 5 with cooling inner chamber, in the cooling inner chamber of sleeve body 7, be equipped with the baffle 8 of water coolant, on the bottom of sleeve body 7 outer rim and inner barrel 6 internal surfaces, be equipped with the wearable hard alloy layer 4 of built-up welding.
Claims (1)
1. blast-furnace tuyere, it is characterized in that: the lower end of termination body (1) that has the fine copper matter of prosopyle (2) and posticum (3) thereon, be welded to connect the sleeve body (7) that is welded to connect the fine copper plate system with cooling inner chamber of formation by inner barrel (6) and outer cylinder body (5), in the cooling inner chamber of sleeve body (7), be equipped with the baffle (8) of water coolant, on the bottom outer rim of sleeve body (7) and inner barrel (6) internal surface, be equipped with the wearable hard alloy layer (4) of built-up welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520091270 CN2799576Y (en) | 2005-06-10 | 2005-06-10 | Tuyere of blast furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520091270 CN2799576Y (en) | 2005-06-10 | 2005-06-10 | Tuyere of blast furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2799576Y true CN2799576Y (en) | 2006-07-26 |
Family
ID=36842071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520091270 Expired - Lifetime CN2799576Y (en) | 2005-06-10 | 2005-06-10 | Tuyere of blast furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2799576Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112481614A (en) * | 2020-12-09 | 2021-03-12 | 上海大学 | Clamping device and clamping method for blast furnace tuyere small sleeve |
-
2005
- 2005-06-10 CN CN 200520091270 patent/CN2799576Y/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112481614A (en) * | 2020-12-09 | 2021-03-12 | 上海大学 | Clamping device and clamping method for blast furnace tuyere small sleeve |
CN112481614B (en) * | 2020-12-09 | 2023-03-31 | 上海大学 | Clamping device and clamping method for blast furnace tuyere small sleeve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2799576Y (en) | Tuyere of blast furnace | |
CN101905308A (en) | High pressure water cooling method and device applied to low pressure casting technology | |
CN201670862U (en) | Air port copper water jacket for oxygen side-blown converter | |
CN201313904Y (en) | Composite copper steel cooling stick | |
CN204714837U (en) | A kind of monoblock casting blast furnace tuyere small sleeve of high-wearing feature | |
CN103611921B (en) | The production method of skimming tool | |
CN202350493U (en) | Cupola | |
CN201823887U (en) | Water-cooling metal mold for molding iron alloy | |
CN2589125Y (en) | Hollow cast iron section bar and horizontal continuous casting apparatus | |
CN213238472U (en) | Water-cooling spraying metallurgical electric furnace | |
CN210547869U (en) | Sand-coated iron mould for wear-resistant cast ball | |
CN210367746U (en) | Cooling type molten iron main ditch | |
CN102397988A (en) | Composite metal mould | |
CN2611385Y (en) | Copper cooling wall of water paper | |
CN202479471U (en) | Die-casting mould with whole charging barrel | |
CN1554776A (en) | Technological method for producing blast furnace tugere | |
CN201693162U (en) | Pulvis ferri groove brick | |
CN201421266Y (en) | Cast steel cooling plate | |
CN2747532Y (en) | Copper water-jacket | |
CN206047039U (en) | The heavy wall crystallizer of production copper-chromium alloy | |
CN212121627U (en) | Electroslag ingot heat preservation cover | |
CN202989199U (en) | Forging warm-extrusion oxygen lance nozzle | |
CN201722398U (en) | Blast-furnace tuyere for copper steel profiles | |
CN206185105U (en) | Hyperbola conticaster crystallizer water jacket | |
CN2142114Y (en) | Blast furnace tuyere water jacket with cast-in wear-resisting casing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |
Expiration termination date: 20150610 Granted publication date: 20060726 |