CN2791540Y - Efficient energy-saving normal pressure not water boiler - Google Patents
Efficient energy-saving normal pressure not water boiler Download PDFInfo
- Publication number
- CN2791540Y CN2791540Y CN 200520020448 CN200520020448U CN2791540Y CN 2791540 Y CN2791540 Y CN 2791540Y CN 200520020448 CN200520020448 CN 200520020448 CN 200520020448 U CN200520020448 U CN 200520020448U CN 2791540 Y CN2791540 Y CN 2791540Y
- Authority
- CN
- China
- Prior art keywords
- heat radiation
- depositing dust
- boiler
- heat
- dust case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Air Supply (AREA)
Abstract
The utility model relates to an efficient energy-saving normal pressure hot water boiler, which is the efficient energy-saving normal pressure hot water boiler mainly used for heating and bathing. The utility model gives a new structure which can thoroughly use the heat of the boiler to solve the problems of the dust fall of the fume dust. The efficient energy-saving normal pressure hot water boiler of the utility model, which is composed of a burning chamber, a heat pipe bundle, five heat radiation dust falling tanks, etc. All structures for the fume in the boiler are formed by the combustion chamber, the five heat radiation dust falling tanks formed by water wall, the heat pipe bundle and an exit flue. The solid rotation of the flue is formed by five times of dust fall and nine times of heat radiation (or heat exchange) causes the heat of the fume to be thoroughly utilized. Thus, the heat efficiency of the boiler is raised and the heat is effectively saved.
Description
One, technical field:
The utility model relates to a kind of energy-efficient normal-pressure hot-water boiler, mainly is the energy-efficient normal-pressure hot-water boiler that heating, bathing are used.
Two, background technology:
At present, everybody makes full use of at the normal-pressure hot-water boiler thermal efficiency and makes an issue of, and the utilization rate that improves boiler heat energy by the way that increases heating surface area is comparatively common, changes boiler structure, by improving the thermal efficiency, reaches object of energy saving.But,, on boiler design, also have many deficiencies utilizing aspect the heat of flue.
Three, summary of the invention:
The utility model provides a new structure, can make full use of the heat of boiler, solves the depositing dust problem of exhaust gas dust.
The technical scheme of dealing with problems is: a kind of energy-efficient normal-pressure hot-water boiler, by the combustion chamber, the heat pipe bundle, compositions such as heat radiation depositing dust case, it is characterized in that, preheating tube bank [6] is installed in the middle and upper part, combustion chamber [19] of boiler, five heat radiation depositing dust casees that are made of the water wall is installed in the middle and upper part of boiler, all be placed in combustion chamber [19] above; First heat radiation depositing dust case [7] and the 5th heat radiation depositing dust case [17] are installed in a side of boiler side by side, second heat radiation depositing dust case [11] and the 4th heat radiation depositing dust case [15] are installed in the middle part of boiler side by side, and the 3rd heat radiation depositing dust case [13] is installed in the opposite side of boiler; First heat radiation depositing dust case [7] all is by pressure-bearing type heat pipe bundle to be connected with the 4th heat radiation depositing dust case [15], the 4th heat radiation depositing dust case [15] with the 5th heat radiation depositing dust case [17] with the 3rd heat radiation depositing dust case [13], the 3rd heat radiation depositing dust case [13] with second heat radiation depositing dust case [11], second heat radiation depositing dust case [11], combustion chamber [19] is connected with first heat radiation depositing dust case [7], and the 5th heat radiation depositing dust case [17] is connected with outlet smoke pipe [9].
The beneficial effects of the utility model are: formed the whole structures of flue gas at boiler internal by combustion chamber, five heat radiation depositing dust case, heat pipe bundle, exhaust pass that are made of the water wall, passed through depositing dust five times, nine heat radiations (or heat exchange), the three-dimensional revolution of the flue that forms, the heat of flue gas is fully used, boiler thermal output improves, and has effectively saved heat.
Four, description of drawings:
Fig. 1 is vertical B-B profile of boiler.Can see height of the present utility model, length, and the structure of symmetric relation and position.
Fig. 2 is the horizontal A-A profile of boiler.Can find out that boiler is the symmetrical structure design, and the width of boiler.
Label declaration among Fig. 1, Fig. 2 is as follows:
[1] be gripper shoe, [2] are base plates, and [3] are side Shui Bi, [4] be furnace grate tube, [5] are middle water walls, and [6] are the preheating tube banks, [7] be first heat radiation depositing dust case, [8] are top boards, and [9] are the outlet smoke pipes, [10] be first heat pipe bundle, [11] be second heat radiation depositing dust case, [12] are second heat pipe bundles, and [13] are the 3rd heat radiation depositing dust casees, [14] be the 3rd heat pipe bundle, [15] be the 4th heat radiation depositing dust case, [16] are the 4th heat pipe bundles, and [17] are the 5th heat radiation depositing dust casees, [18] be downside water wall, [19] be combustion chamber (burner hearth), [20] are shoot doors, and [21] are isolation water walls, [22] be upside water wall, [23] are down preceding water walls.
Five, specific implementation method:
Fig. 1 in conjunction with the accompanying drawings, Fig. 2 are described further technical solutions of the utility model for an embodiment.
The utility model is a kind of energy-efficient normal-pressure hot-water boiler, by the combustion chamber, the heat pipe bundle, compositions such as heat radiation depositing dust case, it is characterized in that, preheating tube bank [6] is installed in the middle and upper part, combustion chamber [19] of boiler, five heat radiation depositing dust casees that are made of the water wall is installed in the middle and upper part of boiler, all be placed in combustion chamber [19] above; First heat radiation depositing dust case [7] and the 5th heat radiation depositing dust case [17] are installed in a side of boiler side by side, second heat radiation depositing dust case [11] and the 4th heat radiation depositing dust case [15] are installed in the middle part of boiler side by side, and the 3rd heat radiation depositing dust case [13] is installed in the opposite side of boiler; First heat radiation depositing dust case [7] all is by pressure-bearing type heat pipe bundle to be connected with the 4th heat radiation depositing dust case [15], the 4th heat radiation depositing dust case [15] with the 5th heat radiation depositing dust case [17] with the 3rd heat radiation depositing dust case [13], the 3rd heat radiation depositing dust case [13] with second heat radiation depositing dust case [11], second heat radiation depositing dust case [11], combustion chamber [19] is connected with first heat radiation depositing dust case [7], and the 5th heat radiation depositing dust case [17] is connected with outlet smoke pipe [9].
By the preheating settled in combustion chamber tube bank [6], middle water wall [5], make the hot flue gas anti-twist ground in the combustion chamber [19] enter first heat radiation depositing dust case [7], carry out preheating, the heat radiation depositing dust enters first heat pipe bundle [10], heats for pressure-bearing type heat pipe Shu Jinhang; Enter second heat radiation depositing dust case [11] again, carry out heat exchange, the heat radiation depositing dust enters second heat pipe bundle [12], gives pressure-bearing type heat pipe Shu Jinhang heating; Through flue gas depositing dust, the heat radiation of the 3rd heat radiation depositing dust case [13], be that pressure-bearing type heat pipe Shu Jinhang is heated again by the 3rd heat pipe bundle [14]; Through flue gas depositing dust, the heat radiation of the 4th heat radiation depositing dust case [15], be that pressure-bearing type heat pipe Shu Jinhang is heated again by the 4th heat pipe bundle [16]; Through flue gas depositing dust, the heat radiation of the 5th heat radiation depositing dust case [17], discharge again by outlet smoke pipe [9] flue gas.
Through the course of work of such flue structure, that the passage of flue gas has formed is three-dimensional, distortion, rotating structure, has passed through five depositing dusts, nine heat radiations (or heat exchange).
The energy-efficient normal-pressure hot-water boiler that the utility model provides is horizontal cuboid, and return pipe is positioned at the bottom of boiler, and hot water outlet is positioned at the middle part of going up of boiler, and boiler adopts festoon, Shui Bi to be interconnected no stagnant water angle.Hot water is extracted out by boiler under the effect of heat-exchanger pump, injects the hot system that uses.Cold water and backwater are mended into water system continually by return pipe and vacuum tank, reach the water consumption device balance circulation of boiler.
Claims (1)
1, a kind of energy-efficient normal-pressure hot-water boiler, by the combustion chamber, the heat pipe bundle, compositions such as heat radiation depositing dust case, it is characterized in that, preheating tube bank [6] is installed in the middle and upper part, combustion chamber [19] of boiler, five heat radiation depositing dust casees that are made of the water wall is installed in the middle and upper part of boiler, all be placed in combustion chamber [19] above; First heat radiation depositing dust case [7] and the 5th heat radiation depositing dust case [17] are installed in a side of boiler side by side, second heat radiation depositing dust case [11] and the 4th heat radiation depositing dust case [15] are installed in the middle part of boiler side by side, and the 3rd heat radiation depositing dust case [13] is installed in the opposite side of boiler; First heat radiation depositing dust case [7] all is by pressure-bearing type heat pipe bundle to be connected with the 4th heat radiation depositing dust case [15], the 4th heat radiation depositing dust case [15] with the 5th heat radiation depositing dust case [17] with the 3rd heat radiation depositing dust case [13], the 3rd heat radiation depositing dust case [13] with second heat radiation depositing dust case [11], second heat radiation depositing dust case [11], combustion chamber [19] is connected with first heat radiation depositing dust case [7], and the 5th heat radiation depositing dust case [17] is connected with outlet smoke pipe [9].
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520020448 CN2791540Y (en) | 2005-03-18 | 2005-03-18 | Efficient energy-saving normal pressure not water boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520020448 CN2791540Y (en) | 2005-03-18 | 2005-03-18 | Efficient energy-saving normal pressure not water boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2791540Y true CN2791540Y (en) | 2006-06-28 |
Family
ID=36807604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520020448 Expired - Fee Related CN2791540Y (en) | 2005-03-18 | 2005-03-18 | Efficient energy-saving normal pressure not water boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2791540Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101280954B (en) * | 2007-09-29 | 2010-06-09 | 尚金生 | High cold ambient pressure water boiler |
-
2005
- 2005-03-18 CN CN 200520020448 patent/CN2791540Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101280954B (en) * | 2007-09-29 | 2010-06-09 | 尚金生 | High cold ambient pressure water boiler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2861936Y (en) | Wholly welded plate type flue gas heat exchanger | |
CN201593803U (en) | Flue gas low temperature corrosion resistant efficient air preheater | |
CN101307951B (en) | Water fire direct changing type highly effective multipurpose hot water units | |
CN2791540Y (en) | Efficient energy-saving normal pressure not water boiler | |
CN202328745U (en) | Compact module furnace | |
CN207247529U (en) | Self-priming atmospheric gas hot water boiler | |
CN108131977B (en) | High-efficiency waste heat recovery heating stove | |
CN200952807Y (en) | Modular type gas combustion hot-water machine set | |
CN206018986U (en) | A kind of horizontal boiler of combustion methanol | |
CN2783134Y (en) | Energy saving device for steam boiler | |
CN2874343Y (en) | Water pipe furnace grate atmospheric boiler | |
RU58670U1 (en) | WATER BOILER | |
CN2604651Y (en) | Oil and gas fuel vacuum boiler | |
CN204786499U (en) | Clean energy -conserving oil field gas injection boiler | |
CN2896116Y (en) | Efficient energy-saving water-boiling boiler | |
CN2888347Y (en) | Boiler with quick heat conductor and water jacket door for bathing, heating and drinking water heating | |
CN2414334Y (en) | Water-fire direct heat-exchanging type boiler | |
CN208222915U (en) | Gas-fired heat pump | |
CN202350080U (en) | Heat pipe type air preheater | |
CN201237346Y (en) | Gas/oil heat exchanger type water heating boiler | |
CN103185477B (en) | Heat-pipe-type sewage heat exchanger | |
CN2656883Y (en) | Coal-fired water supply boiler | |
CN2713374Y (en) | Combined type normal pressure boiler | |
CN2356237Y (en) | Household heating stove | |
CN2804713Y (en) | Boiler for drinking water, heating and steam bathing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |