CN2776959Y - Wet method desulfurization lime water regeneration equipment - Google Patents

Wet method desulfurization lime water regeneration equipment Download PDF

Info

Publication number
CN2776959Y
CN2776959Y CN 200520081410 CN200520081410U CN2776959Y CN 2776959 Y CN2776959 Y CN 2776959Y CN 200520081410 CN200520081410 CN 200520081410 CN 200520081410 U CN200520081410 U CN 200520081410U CN 2776959 Y CN2776959 Y CN 2776959Y
Authority
CN
China
Prior art keywords
water
filter material
light filter
area
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520081410
Other languages
Chinese (zh)
Inventor
翟素军
吕思忠
田相学
孙恒军
李秀丽
盛杰
Original Assignee
翟素军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 翟素军 filed Critical 翟素军
Priority to CN 200520081410 priority Critical patent/CN2776959Y/en
Application granted granted Critical
Publication of CN2776959Y publication Critical patent/CN2776959Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a wet method desulphurization lime water regeneration device which is formed by combining four identical sloped tube sedimentation and light weight filtering material filtering reactors, wherein each reactor comprises a sloped tube sedimentation area, a mixing area, a light weight filtering material filtering area and a clear water area from bottom to top; clear water areas are communicated with each other, the parts under the clear water areas are portioned into the four identical sloped tube sedimentation and light weight filtering material filtering reactors by two partition plates, a water inlet trough and a water outlet trough are distributed on the front and the rear of the middle of the clear water area, the water inlet is arranged on the upper part and the water outlet trough is arranged on the upper part. After lime water enters the water inlet trough, the lime water respectively enters the four reactors via pipelines, and after water in the clear water area flows into the water outlet trough, the water is recycled. The utility model has the characteristics of low manufacture cost, low treatment cost, small occupation area and good treatment effect.

Description

Wet desulphurization buck reclaim equiment
Technical field
The utility model relates to a kind of sewage disposal device, especially a kind of wet desulphurization buck reclaim equiment.
Background technology
At present, have following several substantially for the common method of wet desulphurization buck manipulation of regeneration: the one, semi-underground buck settling bowl natural sedimentation; The 2nd, ramps Precipitation method; The 3rd, dosing coagulation+seperator of ash and water facture.Though first kind of treatment process technical process is simple, floor space is big, and poor processing effect and instability, water quality treatment are difficult to reach the reuse requirement, and at present, this treatment process progressively is eliminated; Ramps Precipitation method is that buck adds behind the liming to be promoted by sump pump and enters inclined-plate clarifying basin and carry out solid-liquid separation, this method have investment lower, take up an area of better advantages such as (SS are about 100mg/l) of less, treatment effect, but it is still higher to go out water suspension; The third facture: the seperator of ash and water that adopts is by under sloping plate deposition and the sand filter at present, last composition, buck adds liming and coagulating agent carries out entering seperator of ash and water by the sump pump lifting behind the coagulating, carry out the solid-liquid separation of first post precipitation quartz sand filtration, after this equipment moves to certain hour, need carry out back flushing, by backwash pump backwashing water is promoted and to carry out back flushing from bottom to top, the back flushing water yield is generally 10L/m2.s, good (the SS≤10mg/l) of this facture treatment effect, floor space is little, but this art breading cost height (needs to add coagulating agent, strengthened the dosage of liming, the back flushing water yield is big) drawbacks limit promoting the use of of this equipment, this is the shortcoming of prior art.
Summary of the invention
The purpose of this utility model provides that a kind of treatment effect is good, floor space is little, processing cost and the low wet desulphurization buck manipulation of regeneration equipment of equipment manufacturing cost.
The purpose of this utility model is achieved through the following technical solutions: this equipment is combined by four identical tube settling+light filter material filtration reactors, each reactor comprises tube settling district, mixing zone, light filter material filtrating area, clear water zone from bottom to up, clear water zone interconnects, clear water zone is following vertically to be divided into four identical tube settling+light filter material filtration reactors by two dividing plates, before and after in the middle of the clear water zone, be furnished with into and out of tank, inlet flume down, effluent trough is last.Buck enters respectively in four reactors by pipeline after entering inlet flume, reuse behind the water of the clear water zone inflow effluent trough.
The utility model is owing to adopt technique scheme, it has the following advantages: (1) buck is after tube settling and light filter material filtration, and effluent quality is good, and reuse water SS is stabilized in below the 10mg/l, really accomplish buck whole closed circulation after manipulation of regeneration, do not efflux; (2) equipment manufacturing cost and processing cost are low: the low SS of reuse water makes the small-bore possibility that becomes of shower nozzle, the atomizing and the reaction effect of sweetener have been improved greatly, reduced quantity of circulating water (can reduce quantity of circulating water more than 25%), reduced medicament usage quantity (can reduce the medicament usage quantity more than 10%), this equipment does not add coagulating agent and carries out coagulating, thereby can not adding because of coagulating agent, and the dosage of increase liming, adopt light filter material to filter, the back flushing water yield is few, and the back flushing water yield is 5L/m2.s, during the equipment back flushing, the water flow by gravity of clear water zone carries out back flushing from top to bottom, and above-mentioned measure has reduced the cost and the processing cost of equipment; (3) wearing and tearing of water circulating pump and sweetener have been alleviated, the work-ing life of having improved relevant device; (4) floor space is little.
Description of drawings
That the utility model is described in further detail is as follows below in conjunction with accompanying drawing:
Fig. 1 is an orthographic plan of the present utility model.
Fig. 2 is the utility model internal structure synoptic diagram (an A-A sectional view).
Fig. 3 is the utility model internal structure synoptic diagram (a B-B sectional view).
In the accompanying drawing, 1 is tube settling+light filter material filtration reactor, 2 is inlet flume, 3 is effluent trough, 4 is the tube settling district, 5 is the light filter material filtrating area, 6 is tube settling district sludge bucket, 7 is the inclined tube packing area, 8 is the mixing zone, 9 are tube settling district water inlet reflector, 10 tube settling districts water inlet hydraucone, 11 is tube settling+light filter material filtration reactor water inlet pipe, 12 is bearing, 13 is the light filter material filtrating area, 14 is water distributor, 15 is clear water zone, 16 is stirrer, 17 is water-in, 18 is water outlet, 19 is mud discharging mouth, 20 is equipment supporter, 21 is effluent weir, 22 is the equipment wash plate.
Embodiment
The utility model comprises housing, form (being split to form) by four identical tube settling+light filter material filtration reactors 1 by two wash plates 22, single tube settling+light filter material filtration reactor 1 is made up of tube settling district 4, mixing zone 8, light filter material filtrating area 5 (the filling diameter is the light filter material of 2-3mm), clear water zone 15 from bottom to up, and the clear water zone 15 of four reactors interconnects.In the middle of being arranged on clear water zone into and out of tank 2,3, (inlet flume 2 is following) arranged in front and back, inlet flume 2 links to each other with tube settling district water inlet hydraucone 10 by water inlet pipe 11, the tube settling district is made up of mud discharging mouth 19, sludge bucket 6, water inlet reflector 9, water inlet hydraucone 10, swash plate packing area 7 from bottom to up, light filter material filtrating area 5 is made up of light filter material filtrating area 13, water distributor 14, stirrer 16 from bottom to up, and stirrer 16 stir shafts are connected by bearing 12 with water inlet pipe 11.Effluent trough 3 tops are provided with 21 effluent weirs.
Working process of the present utility model is: the buck of wet desulphurization discharging adds liming to carry out being entered in the inlet flume 2 by water-in 17 by the sump pump lifting after the neutralization reaction, enter by the water inlet pipe 11 that links to each other with inlet flume and sloping plate deposition district water inlet hydraucone 10 and to carry out solid-liquid separation (water outlet SS is about 100mg/l) in the swash plate reaction zone 4, water outlet upwards enters light filter material filtrating area 13 by mixing zone 8 and filters back (water outlet SS≤10mg/l), water outlet enters clear water zone 15, enter effluent trough 3 by effluent weir 21, at last by water outlet 18 reuses.Light filter material filtrating area 5 need carry out back flushing after work for some time, four identical tube settling+light filter material filtration reactor 1 backwashing times are set at 6 hours at interval, and backwashing period is 1 time/24 hours, and back flushing is lasted for 5 minutes.When equipment carries out back flushing, at first rotate stirrer, open mud discharging mouth 19 valves then, after 5 minutes, close stirrer, close mud discharging mouth 19 valves again.In sum, the utility model has been realized handling efficiently to buck by tube settling+light filter material filtering reaction, compared with prior art has the characteristics that equipment manufacturing cost and processing cost are low, floor space is little, treatment effect is good.

Claims (4)

1, wet desulphurization buck reclaim equiment, it is characterized in that this equipment is made up of four identical tube settlings+light filter material filtration reactor (1), single tube settling+light filter material filtration reactor (1) is made up of tube settling district (4), mixing zone (8), light filter material filtrating area (5), clear water zone (15) from bottom to up, the clear water zone of four reactors (15) interconnects, be arranged on clear water zone into and out of tank (2), (3) in the middle of.
2, wet desulphurization buck reclaim equiment according to claim 1 is characterized in that: the following housing of light filter material filtering layer (5) is cut apart four identical tube settlings+light filter material filtration reactor (1) by two wash plates (22) with it.
3, according to claim 1,2 described wet desulphurization buck reclaim equiments, it is characterized in that: light filter material filtrating area (5) filling diameter is the light filter material of 2-3mm, on the top of light filter material filtrating area (5) water distributor (14) is set, stirrer (16) blade is arranged in the light filter material layer.
4, according to claim 1,2 described wet desulphurization buck reclaim equiments, it is characterized in that: inlet flume (2) links to each other with tube settling district water inlet hydraucone (10) by water inlet pipe (11), and stirrer (16) stir shaft is connected by bearing (12) with water inlet pipe (11).
CN 200520081410 2005-01-28 2005-01-28 Wet method desulfurization lime water regeneration equipment Expired - Fee Related CN2776959Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520081410 CN2776959Y (en) 2005-01-28 2005-01-28 Wet method desulfurization lime water regeneration equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520081410 CN2776959Y (en) 2005-01-28 2005-01-28 Wet method desulfurization lime water regeneration equipment

Publications (1)

Publication Number Publication Date
CN2776959Y true CN2776959Y (en) 2006-05-03

Family

ID=36744343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520081410 Expired - Fee Related CN2776959Y (en) 2005-01-28 2005-01-28 Wet method desulfurization lime water regeneration equipment

Country Status (1)

Country Link
CN (1) CN2776959Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108786427A (en) * 2017-05-02 2018-11-13 中国石油化工股份有限公司 Flue gas desulfurization regenerates integrated tower and Regeneratable wet fuel gas desulfurizing technology
CN110078242A (en) * 2019-05-30 2019-08-02 华电电力科学研究院有限公司 A kind of processing unit and processing method of desulfurization wastewater

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108786427A (en) * 2017-05-02 2018-11-13 中国石油化工股份有限公司 Flue gas desulfurization regenerates integrated tower and Regeneratable wet fuel gas desulfurizing technology
CN108786427B (en) * 2017-05-02 2020-11-10 中国石油化工股份有限公司 Flue gas desulfurization and regeneration integrated tower and renewable wet flue gas desulfurization process
CN110078242A (en) * 2019-05-30 2019-08-02 华电电力科学研究院有限公司 A kind of processing unit and processing method of desulfurization wastewater

Similar Documents

Publication Publication Date Title
CN205774033U (en) A kind of compound efficient depositing reservoir
CN101838060B (en) Combined type integrative water purifying plant
CN105621792B (en) City river sewage draining exit sewage water treatment method and processing equipment
CN205398192U (en) Mud bed filtering layer sewage purification ware
CN206486333U (en) A kind of coagulating sedimentation integrated reactor
CN201334406Y (en) Integrated water treatment device for surface water and sewage treatment
CN202173844U (en) Reaction, sedimentation and filtration integrated device
CN100506726C (en) Steel iron wastewater coagulating sedimentation and filtration treatment system
CN209010208U (en) Hi-effect coagulation integration apparatus
CN2776959Y (en) Wet method desulfurization lime water regeneration equipment
CN113754118A (en) Adjustable inclined plate flocculation precipitation system and sewage treatment method thereof
CN110204103B (en) Suspension medium layer filtering system based on hydraulic fluidization layering
CN211004716U (en) Sewage treatment system
CN211311213U (en) Novel magnetic coagulation device
CN201292297Y (en) Integral water purifier
CN201890787U (en) Double-layered pressure type integrated deoiler
CN112551765A (en) River water purification treatment system and process
CN105999776A (en) Sludge layer filtering and settling pond and method thereof
CN207645963U (en) A kind of integrating device of improved efficient sedimentation tank and sand filter
CN109534622A (en) A kind of source water treatment system and its processing method
CN201999778U (en) Single-layer pressure integration oil eliminator
CN206298403U (en) Integrative water purifying device
CN209853875U (en) Integrated water purifying device
CN211595130U (en) Variable-speed upflow expansion type coagulation reaction and central water distribution integrated precipitation device
CN107149798A (en) Efficient hydrodynamic clarifies clarifier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant