CN2758463Y - Overhaul operating machine for petroleum well - Google Patents
Overhaul operating machine for petroleum well Download PDFInfo
- Publication number
- CN2758463Y CN2758463Y CN 200420074765 CN200420074765U CN2758463Y CN 2758463 Y CN2758463 Y CN 2758463Y CN 200420074765 CN200420074765 CN 200420074765 CN 200420074765 U CN200420074765 U CN 200420074765U CN 2758463 Y CN2758463 Y CN 2758463Y
- Authority
- CN
- China
- Prior art keywords
- axle
- bearing
- welded
- frame
- propons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Vehicle Body Suspensions (AREA)
Abstract
The utility model discloses an overhauling operating machine for a petroleum well, which is composed of a steering room, an engine, a chassis frame, a transmission system, a drill floor, a headframe, a water tap and a traveling block hook, wherein the chassis frame mainly comprises a crossbeam body, a hanging frame of a balance beam of a middle rear axle, and a hanging frame of a balance beam of a front axle, wherein the crossbeam body is an integral framework which is formed by the weld of two box-shaped longitudinal beams and a plurality of transverse beams. The utility model adopts an integral box-shaped beam vehicle frame, and thus, the vehicle frame has enough strength and rigidity; the top surface of a vehicle is broad, which ensures components on a vehicle to be arranged reasonably. The front axle is connected with the middle rear axle through the hanging frame of the balance beam, which ensures superior transporting and cross running performance. The utility model is suitable for the operation of overhauling wells in regions, such as deserts, shoals, etc.
Description
Technical field
The utility model relates to a kind of oil well heavy repair task machine, belongs to the workover rig in the drilling machinery.
Technical background
Along with the most of oil field of China enters the middle and later periods exploitation, increasing oil well need carry out heavy repair tasks such as drilling out, thread making, window sidetracking, and the demand of big workover rig is increased gradually.In the workover rig that China produces,, form the oil well heavy repair task machine of self-control chassis special at present also not based on engineering bridge and tire.Domestic big workover rig mainly is the self-propelled workover rig of developing on the introduction of foreign technology basis.The implement porter that workover rig chassis adopts body with frame or develops on the basis of automobile bridge and tire, complete machine migration property is good, from taking workover derrick, job area is wide, multiple functional, but this machine purchases and the maintenance cost height, for the most operation operating modes in present oil district, the rideability surplus, cross-country ability is relatively poor.
Summary of the invention
The purpose of this utility model is exactly the shortcoming that overcomes prior art, and a kind of oil well heavy repair task machine is provided.
The purpose of this utility model is achieved in that oil well heavy repair task machine is made up of driver's cabin 1, motor 2, chassis frame 3, transmission system 4, rig floor 5, derrick 6, water tap 7, hook block 8, guy wire 9, and chassis frame 3 mainly comprises crossbeam body 10, middle back axle equalizer bar suspension 11, propons equalizer bar suspension 12, propons 13, jackshaft 14, back axle 15; Crossbeam body 10 is an integral frame that is welded by two box longerons and some crossbeams; Middle back axle equalizer bar suspension 11 comprises bearing 20, back axle 15, jackshaft 14, axle 22, longitudinal balance beam 23, axis 25, middle bearing 26, ramuscule seat 27a, ramuscule seat 27b, little axle 28a, little axle 28b, pull bar 29 and big support 30, big support 30 is welded as a whole with crossbeam body 10, middle bearing 26 is welded on the big support 30, equalizer bar 23 links to each other with middle bearing 26 by axis 25, stud with copper sheathing 32 between axis 25 and the middle bearing 26, longitudinal balance beam 23 two ends link to each other with bearing 20 by axle 22, four bearings 20 are welded on jackshaft 14 respectively, bottom, back axle 15 two ends, between axle 22 and the bearing 20 oscillating bearing 31 is arranged, pull bar 29 two ends are by little axle 28a, 28b is connected to ramuscule seat 27a, on the 27b, ramuscule seat 27a, 27b is welded on respectively on bridge and the big support 30; Propons equalizer bar suspension 12 comprises suspension 34, lateral balance beam 35, fixed head 36, bolt 37, propons 13 and bearing pin 39, two suspensions 34 are welded on the frame beam body 10, two longitudinal balance beams 35 link to each other with suspension 34 by bearing pin 39 respectively, two fixed heads 36 and two longitudinal balance beams 35 are welded as a whole, and two fixed heads 36 link to each other with propons 13 by bolt 37 again.
The utlity model has following advantage: 1, adopt monolithic box-girder vehicle frame, make vehicle frame have enough strength and stiffness, the car upper table surface is broad, has guaranteed the reasonable Arrangement of car upper-part; 2, propons be connected with vehicle frame adopt can left and right swing the equalizer bar suspension frame structure, in, back axle is connected the equalizer bar suspension frame structure that adopts vertical and horizontal all can swing with vehicle frame, whole connected mode is different from conventional heavy repair task machine fully, guarantee superior migration performance, cross-country ability, be fit to the big workover treatment in areas such as desert, beach.
Description of drawings
Fig. 1 is the job state figure of the utility model working rig;
Fig. 2 is the special-purpose frame assembly front view of self-control of the present utility model;
Fig. 3 is the special-purpose frame assembly vertical view of self-control of the present utility model;
Fig. 4 is a back axle equalizer bar suspension perspective diagram in the utility model;
Fig. 5 is the sectional view along A-A line among Fig. 6;
Fig. 6 is that the utility model propons equalizer bar suspension is along the vertical view of vehicle frame;
Fig. 7 is the vertical view of Fig. 6.
The specific embodiment
As shown in Figure 1, oil well heavy repair task machine is made up of driver's cabin 1, motor 2, chassis frame 3, transmission system 4, rig floor 5, derrick 6, water tap 7, hook block 8, guy wire 9, chassis frame 3 comprises crossbeam body 10, middle back axle equalizer bar suspension 11, propons equalizer bar suspension 12, propons 13, jackshaft 14, back axle 15, as Fig. 2, shown in Figure 3.Crossbeam body 10 is an integral frame that is welded by two box longerons and some crossbeams, cut section bar with I-shaped and to compare, the box-type section beam has better intensity and rigidity, and for some relatively more bumpy road surfaces, oil field, the box-type section beam more can be resisted the bending and the torsional deformation of vehicle frame.
Middle back axle equalizer bar suspension 11 comprises bearing 20, back axle 15, jackshaft 14, axle 22, longitudinal balance beam 23, axis 25, middle bearing 26, ramuscule seat 27a, ramuscule seat 27b, little axle 28a, little axle 28b, pull bar 29 and big support 30, big support 30 is welded as a whole with crossbeam body 10, middle bearing 26 is welded on the big support 30, equalizer bar 23 links to each other with middle bearing 26 by axis 25, stud with copper sheathing 32 between axis 25 and the middle bearing 26, longitudinal balance beam 23 two ends link to each other with bearing 20 by axle 22, four bearings 20 are welded on jackshaft 14 respectively, bottom, back axle 15 two ends, between axle 22 and the bearing 20 oscillating bearing 31 is arranged, pull bar 29 two ends are by little axle 28a, 28b is connected to ramuscule seat 27a, on the 27b, ramuscule seat 27a, 27b is welded on respectively on bridge and the big support 30, as Fig. 4, shown in Figure 5, middle back axle equalizer bar suspension frame structure vertical and horizontal all can be swung, even four tires of back axle also can support on the ground uniformly at uneven road surface in can making, avoid the over-tilting and the distortion of vehicle frame, thereby safety and stationarity that main car travels have been guaranteed, pull bar 29 is excessive for back axle amplitude of fluctuation in preventing, avoids plane and vehicle frame lower plane generation collision on the middle back axle.
Propons equalizer bar suspension 12 comprises suspension 34, lateral balance beam 35, fixed head 36, bolt 37, propons 13 and bearing pin 39, two suspensions 34 are welded on the frame beam body 10, two longitudinal balance beams 35 link to each other with suspension 34 by bearing pin 39 respectively, two fixed heads 36 and two longitudinal balance beams 35 are welded as a whole, two fixed heads 36 link to each other with propons 13 by bolt 37 again, as Fig. 6, shown in Figure 7; Propons equalizer bar suspension frame structure can make the propons teeter, thereby also can be evenly stressed even two tires of propons are travelled at uneven road surface, keeps vehicle frame steady, thereby improves driving safety and comfortableness.
Well-designed chassis special makes working rig possess superior migration performance and cross-country ability, and the geographical environment that can enter complexity such as desert, beach and marsh carries out workover treatment.
Claims (1)
1, a kind of oil well heavy repair task machine, it is made up of driver's cabin 1, motor 2, chassis frame 3, transmission system 4, rig floor 5, derrick 6, water tap 7, hook block 8, guy wire 9, it is characterized in that:
A, chassis frame 3 mainly comprise crossbeam body 10, middle back axle equalizer bar suspension 11, propons equalizer bar suspension 12, propons 13, jackshaft 14, back axle 15;
B, crossbeam body 10 are an integral frame that is welded by two box longerons and some crossbeams;
C, middle back axle equalizer bar suspension 11 comprises bearing 20, back axle 15, jackshaft 14, axle 22, longitudinal balance beam 23, axis 25, middle bearing 26, ramuscule seat 27a, ramuscule seat 27b, little axle 28a, little axle 28b, pull bar 29 and big support 30, big support 30 is welded as a whole with crossbeam body 10, middle bearing 26 is welded on the big support 30, equalizer bar 23 links to each other with middle bearing 26 by axis 25, stud with copper sheathing 32 between axis 25 and the middle bearing 26, longitudinal balance beam 23 two ends link to each other with bearing 20 by axle 22, four bearings 20 are welded on jackshaft 14 respectively, bottom, back axle 15 two ends, between axle 22 and the bearing 20 oscillating bearing 31 is arranged, pull bar 29 two ends are by little axle 28a, 28b is connected to ramuscule seat 27a, on the 27b, ramuscule seat 27a, 27b is welded on respectively on bridge and the big support 30;
D, propons equalizer bar suspension 12 comprise suspension 34, lateral balance beam 35, fixed head 36, bolt 37, propons 13 and bearing pin 39, two suspensions 34 are welded on the frame beam body 10, two longitudinal balance beams 35 link to each other with suspension 34 by bearing pin 39 respectively, two fixed heads 36 and two longitudinal balance beams 35 are welded as a whole, and two fixed heads 36 link to each other with propons 13 by bolt 37 again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420074765 CN2758463Y (en) | 2004-09-24 | 2004-09-24 | Overhaul operating machine for petroleum well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420074765 CN2758463Y (en) | 2004-09-24 | 2004-09-24 | Overhaul operating machine for petroleum well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2758463Y true CN2758463Y (en) | 2006-02-15 |
Family
ID=36078605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420074765 Expired - Fee Related CN2758463Y (en) | 2004-09-24 | 2004-09-24 | Overhaul operating machine for petroleum well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2758463Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101585484A (en) * | 2009-06-11 | 2009-11-25 | 华电重工装备有限公司 | Self-adapting following walking method and device |
CN101737007B (en) * | 2009-12-18 | 2012-09-05 | 三江瓦力特特种车辆有限公司 | Self-propelled heavy desert workover rig chassis |
CN112983315A (en) * | 2021-05-19 | 2021-06-18 | 胜利油田胜机石油装备有限公司 | Quick assembling and disassembling method for well repairing operation faucet and suspension pushing manipulator |
-
2004
- 2004-09-24 CN CN 200420074765 patent/CN2758463Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101585484A (en) * | 2009-06-11 | 2009-11-25 | 华电重工装备有限公司 | Self-adapting following walking method and device |
CN101737007B (en) * | 2009-12-18 | 2012-09-05 | 三江瓦力特特种车辆有限公司 | Self-propelled heavy desert workover rig chassis |
CN112983315A (en) * | 2021-05-19 | 2021-06-18 | 胜利油田胜机石油装备有限公司 | Quick assembling and disassembling method for well repairing operation faucet and suspension pushing manipulator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016101700A1 (en) | Wheel-beam axleless vehicle frame | |
CN203864796U (en) | Front auxiliary frame assembly | |
CN109795276B (en) | High-integration double-cross-arm front suspension steering drive axle mounting bracket and mounting structure | |
CN103786788A (en) | Automobile front auxiliary frame and corresponding automobile | |
CN2758463Y (en) | Overhaul operating machine for petroleum well | |
CN201410994Y (en) | Automobile special for workover rig in oil field | |
CN206394707U (en) | Automobile rear longitudinal girder structural assembly | |
CN107585211A (en) | A kind of car modular vehicle frame | |
CN205220828U (en) | It floats preceding suspension of driver's cabin to become rigidity half | |
CN201347166Y (en) | Motor tricycle frame | |
CN204341194U (en) | Wheel beam type is without bridge vehicle frame | |
CN201325540Y (en) | Chassis of three-wheeled motorcycle with rear-mounted engine | |
CN203427918U (en) | Caterpillar track chassis of beach cleaning vehicle | |
CN202827743U (en) | Electric motor coach frame rear section and electric motor coach | |
CN109664706A (en) | A kind of front air suspension and automobile of low chassis | |
CN105752159A (en) | Telescopic vehicle frame of small-sized electric automobile | |
CN201865140U (en) | Rear frame for loader | |
CN1094440C (en) | Mobile automatic stage | |
CN103395453B (en) | The crawler body of a kind of sandy beach cleaning cart | |
CN203902666U (en) | Special vehicle chassis | |
CN103711432B (en) | Construction of tunnel rig special-purpose machinery rotary frame | |
CN204527314U (en) | A kind of Novel tractor vehicle frame | |
CN203666815U (en) | Track frame special for tunnel track walking engineering driller | |
CN2649376Y (en) | Suspension guiding mechanism | |
CN220790761U (en) | Transmission system reinforcing structure of lifting and transverse moving equipment and stereo garage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 457001 No. 365, Daqing Road, Puyang, Henan Patentee after: Zhongyuan Zongji Petroleum Equipment Co., Ltd. Address before: 457001 No. 365, Daqing Road, Puyang, Henan Patentee before: Petroleum Equipment Co., Ltd., Henan Zhongyuan General Machinery Factory |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060215 Termination date: 20100924 |