CN2755220Y - Putty scraper for internal wall - Google Patents
Putty scraper for internal wall Download PDFInfo
- Publication number
- CN2755220Y CN2755220Y CN 200420117747 CN200420117747U CN2755220Y CN 2755220 Y CN2755220 Y CN 2755220Y CN 200420117747 CN200420117747 CN 200420117747 CN 200420117747 U CN200420117747 U CN 200420117747U CN 2755220 Y CN2755220 Y CN 2755220Y
- Authority
- CN
- China
- Prior art keywords
- balance bridge
- movable platform
- gear
- platform
- scraper plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model belongs to architectural decoration engineering machinery. The utility model is formed by the method that a balance bridge is combined with a scraping plate, a moving platform, a slurry conveyer and a dynamic source, wherein the scraping plate is fixed on a stress transmission shaft, the balance bridge welded by angle iron to be formed into a dual-layer oblong frame, a balance bridge transmission shaft and a scraping plate force transferring bearing are positioned in the dual-layer oblong frame and are connected through a steel cable, a gear box, a storage tank and a pressure pump are arranged on the moving platform, and a material conveying pipeline on the pressure pump is connected with the scraping plate. The moving platform drives a driving wheel to carry out front and back rotation through a gear of the gear box, and the balance bridge is connected with the moving platform through an inclined pull support. The utility model has the advantages of mechanized puttying, high efficiency, good quality, safety assurance of human bodies.
Description
Technical field
The utility model belongs to the machinery that building decoration engineering is used.
Technical background
At present architectural decoration all is manual in the interior wall Puttying and all is to survive for twice, poor flatness, one day one artificial.Scrape wall surface putty, one time workload, 100m at most
2Scaffold also will be used in the high-altitude, one day maximum 60m of ceiling
2Time-consumingly take a lot of work and security incident takes place easily.
Summary of the invention
The purpose of this utility model be design a kind of energy fast, the interior wall paint filler scraper of high-quality, safety.
The utility model is carried by balance bridge combination and scraper plate, movable platform and slurry and power resources are formed.
The balance bridge combination is made up of balance bridge main body 1, balance bridge power transmission shaft 3, balance bridge travelling gear 4, balance bridge wire rope 21; Balance bridge main body two 5 * 5 angle steel of 1 employing and aluminium square tube 32 are welded into double-deck rectangle frame, there is balance bridge power transmission shaft 3 at two, there is scraper plate power transmission bearing 24 centre, connect with balance bridge wire rope 21 between them, on the balance bridge power transmission shaft 3 below balance bridge travelling gear 4 is arranged, be connected with the chain 33 of uni-drive gear box gear with detachable chain link.Scraper plate 8 is fixed on scraper plate and is subjected on the power transmission shafr 22, and the stressed bearing 25 of scraper plate is positioned in the middle of the balance bridge frame, and scraper plate power transmission bearing 24 is positioned at and is subjected to the power transmission shafr two ends.Balance bridge main body below is welded with four splicing sleeves 11, is connected by latch with the corresponding sleeve pipe of movable platform.
The utility model has the advantages that and improve Puttying efficient, interior wall facade per minute can be scraped 1m
2, the ceiling per minute can be scraped 3m
2, and can advance voluntarily, operating rate is higher than manual operations far away, and planeness is higher than manual operations far away.Can save artificial polishing time and abrasive material expense.The utility model has adopted the reassembling type combination, can avoid carrying inconvenience between the floor, the balance bridge adjustable height, adapt to the requirement of differing heights metope, when scraping ceiling, machinery can advance voluntarily, avoid artificial in the past Puttying with scaffold or ladder, guaranteed personal safety.
Description of drawings
Fig. 1 is a schematic perspective view of the present utility model;
Fig. 2 is a lateral view of the present utility model;
Lateral view when Fig. 3 works for the utility model end face;
Lateral view when Fig. 4 works for the utility model interior wall;
Fig. 5 is the elevation that the balance bridge main body is connected with scraper plate;
Fig. 6 is the vertical view that the balance bridge main body is connected with scraper plate;
Fig. 7 is the A-A directional diagram;
Fig. 8 is the vertical view on movable platform upper strata;
Fig. 9 is the vertical view of movable platform lower floor;
Figure 10 is the transmission clutch figure of movable platform;
Figure 11 is the expanded view of scraper plate;
Figure 12 is subjected to the power transmission shafr connection layout for scraper plate and scraper plate;
Figure 13 is a platform fine tuning structure schematic diagram.
The specific embodiment
The utility model mechanokinetic motor is 1 kilowatt, power switch adopts left and right sides rearrangeable switch, but the requirement that has the clutch controlling platform to advance and stop on the platform gear shaft finely tunes 13 by the wall working time with platform on the right, makes the movable platform upper strata near the right side metope.The pressure straight-bar of compression pump, piston adjustable length, be used to adjust the output quantity of putty slurry, the gear-box gear of travelling gear on the balance bridge power transmission shaft and movable platform is connected with the chain of detachable chain link, just power is made the power transmission bearing on the shackle line drive scraper plate on the balance bridge, make scraper plate up and down, when the needs end face is worked, unload lower chain, rely on four oblique stretchings to contract and prop balance bridge, end face is movable by the work of movable platform forward-reverse.Putty is in storage vat, and after the compression pump sucking-off, dividing equally in the groove in carrier pipe is sent to scraper plate scrapes on the wall then.Want two people operation in the construction, one people carry electric wire one people promote machinery before metope, stop after, the human trimming handle that pushes away machinery stretches out movable platform top balance bridge is contacted with metope, and can connect with the balance bridging on the movable platform two sides and to avoid the metope angle not connect with the balance bridging, when end face and balance bridging connect, can be connected tiltedly drawing to prop with end face.Can make platform axle hold gear be connected with gearbox gear make machinery oneself go ahead.
Claims (1)
1, a kind of interior wall paint filler scraper is characterized in that being carried and power resources are formed by balance bridge combination and scraper plate, movable platform and slurry:
The balance bridge combination has balance bridge main body (1), balance bridge power transmission shaft (3), balance bridge travelling gear (4), balance bridge wire rope (21) to form; Two 5 * 5 angle steel of balance bridge main body (1) employing and aluminium square tube (32) are welded into double-deck rectangle frame, there is balance bridge power transmission shaft (3) at two, there is scraper plate power transmission bearing (24) centre, connect with balance bridge wire rope (21) between them, on the balance bridge power transmission shaft (3) below balance bridge travelling gear (4) is arranged, be connected with the chain (33) of uni-drive gear box gear with detachable chain link; Scraper plate (8) is fixed on scraper plate and is subjected on the power transmission shafr (22), and the stressed bearing of scraper plate (25) is positioned in the middle of the balance bridge frame, and scraper plate power transmission bearing (24) is positioned at and is subjected to the power transmission shafr two ends; Balance bridge main body below is welded with four splicing sleeves (11), is connected by latch with the corresponding sleeve pipe of movable platform; Movable platform (2) adopts be welded two layers of branches of 5 * 5 angle steel, the upper strata is covered with 2 millimeters steel plates, be fixed with motor (6) above, uni-drive gear box (10), gear-box outer cover (26), storage vat (5), compression pump (7), the place ahead and right side edge respectively are welded with three splicing sleeves (11), are connected with latch with corresponding splicing sleeve (11) on the movable platform; Eccentric wheel is connected with the crankshaft-link rod (15) of compression pump on the uni-drive gear box, and the curved bar connecting rod is connected with the stressed straight-bar of compression pump, and compression pump has defeated material flexible pipe (16) to be communicated with scraper plate (8); There is movable platform intermediate bearing (27) in movable platform lower floor (29), platform fine setting (13), anti-collision block (9), movable platform be rubber tire (23) and passive walking rubber tire (12) initiatively, movable platform initiatively rubber tire is connected with gearbox gear by platform Bearing gear (30), there are movable keyway and platform Bearing gear to link at platform gear shaft (31), be attached on the operation handrail (18) by clutch (14) clutch line (19), passive road wheel (12) is provided with brake (28) and brake cable (20); Balance bridge and movable platform by the west group up and down four support (17) of contracting of tiltedly stretching be connected, platform is finely tuned (13) by being fixed on last two limit rods of movable platform lower floor (29) (34) and (35) and latch (36) is formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420117747 CN2755220Y (en) | 2004-10-22 | 2004-10-22 | Putty scraper for internal wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420117747 CN2755220Y (en) | 2004-10-22 | 2004-10-22 | Putty scraper for internal wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2755220Y true CN2755220Y (en) | 2006-02-01 |
Family
ID=35928849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420117747 Expired - Fee Related CN2755220Y (en) | 2004-10-22 | 2004-10-22 | Putty scraper for internal wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2755220Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493632A (en) * | 2011-12-30 | 2012-06-13 | 徐负勤 | Putty applying machine |
CN104631784A (en) * | 2015-01-19 | 2015-05-20 | 山东建筑大学 | Self-positioning plastering machine |
CN105464345A (en) * | 2015-10-16 | 2016-04-06 | 熊圣元 | Movable exterior wall putty scraping and daubing device |
-
2004
- 2004-10-22 CN CN 200420117747 patent/CN2755220Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493632A (en) * | 2011-12-30 | 2012-06-13 | 徐负勤 | Putty applying machine |
CN102493632B (en) * | 2011-12-30 | 2014-02-26 | 徐负勤 | Putty applying machine |
CN104631784A (en) * | 2015-01-19 | 2015-05-20 | 山东建筑大学 | Self-positioning plastering machine |
CN105464345A (en) * | 2015-10-16 | 2016-04-06 | 熊圣元 | Movable exterior wall putty scraping and daubing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211074017U (en) | Vibrating device with automatic floating function | |
CN108358096B (en) | Pipeline transportation overhead hoist for hydraulic engineering | |
CN2755220Y (en) | Putty scraper for internal wall | |
CN205802845U (en) | A kind of civil engineering is with hanging a liter machine | |
CN212769476U (en) | Electric hoist bridge crane | |
CN212375676U (en) | Hand-held simple crack pouring device for highway engineering | |
CN110984535B (en) | Construction treatment equipment and treatment process for dry-hanging decoration of granite on outer surface of building | |
CN212026999U (en) | Exterior wall coating paints device for building engineering | |
CN210888019U (en) | Hanging basket for building convenient to remove | |
CN218881573U (en) | Civil engineering template bearing structure | |
CN105926458A (en) | Double-drive device and method automatic in rubber rod penetrating | |
CN206328081U (en) | A kind of hoist engine lifted for plastering machine ash bucket | |
CN210317253U (en) | Non-beam tower type mechanical reversing oil pumping unit | |
CN213951982U (en) | Movable hanging basket used in sectional type efficient bridge construction | |
CN208792334U (en) | A kind of construction of hydro project concrete placing installation | |
CN209836762U (en) | Civil engineering extrusion flattening device | |
CN209854571U (en) | Highway concrete bridge deck pavement napping trolley | |
CN108103940A (en) | A kind of rammer compacter applied to science of bridge building | |
CN209430218U (en) | A kind of constructing tunnel waterproof material laying trolley | |
CN211173071U (en) | Light climbing formwork steel frame system | |
CN203475257U (en) | Hydraulic replacement equipment of railway concrete sleeper | |
CN206886191U (en) | A kind of concrete test block maintenance handling device | |
CN208167538U (en) | A kind of rammer compacter applied to science of bridge building | |
CN111422773A (en) | Movable type hoisting point device for cabin operation | |
CN216340762U (en) | Civil engineering construction support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |