CN2751077Y - Drainage arrangement for toilet - Google Patents
Drainage arrangement for toilet Download PDFInfo
- Publication number
- CN2751077Y CN2751077Y CN 200420020227 CN200420020227U CN2751077Y CN 2751077 Y CN2751077 Y CN 2751077Y CN 200420020227 CN200420020227 CN 200420020227 CN 200420020227 U CN200420020227 U CN 200420020227U CN 2751077 Y CN2751077 Y CN 2751077Y
- Authority
- CN
- China
- Prior art keywords
- box
- trapping box
- connecting pipe
- water
- transverse connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a drainage device for a bathroom, which relates to the technical field of bathroom drainage. The utility model is formed by that an air isolation box for a bathtub connecting opening, an air isolation box for a water tank connecting opening and an air isolation box for a floor drain are connected with branch ends of a transverse connecting pipe; a dredging box is arranged in the middle of the transverse connecting pipe; the final end of the transverse connecting pipe is connected with a vertical waste water vertical pipe; a toilet connecting opening is connected with the front end of the transverse connecting pipe; the final end of the transverse connecting pipe is connected with a vertical sewage pipe. A middle layer is formed between a floor of a toilet and a ground plane layer of the toilet by lowering the floor of the toilet or raising the ground plane layer of the toilet; the toilet connecting opening, the air isolation box for a bathtub connecting opening, the air isolation box for a water tank connecting opening, the air isolation box for a floor drain, the dredging box and the transverse connecting pipe are buried in the middle layer. The utility model changes the form that drainage pipelines of an upper layer passes through the floor, and the connecting assembly is formed in the upper space of a lower layer, and solves various problems produced by the blockage and the water leakage of the drainage pipelines and the repair of the water seepage of floors.
Description
Affiliated technical field:
The utility model relates to the indoor drainage technical field, specifically is meant a kind of toilet drainage device.
Background technology:
At present the drainage pipe of the various sanitary equipment in washroom is to pass floor, is connected with trap at the headroom of lower floor, is connected with horizontal pipeline again, black water is included in the vertical standpipe in formation toilet drainage system.When line clogging is serious, must arrive the stifle place under repair of layer open trap down, counter ceiling is equipped with in lower floor, can produce various contradictions during repairing.Because the pipeline passing through floors causes infiltration easily, leaks, and influences other people and lives in peace.
Summary of the invention:
The utility model purpose is to provide a kind of toilet drainage device, does not allow sewer pipe pass floor, does not allow the piping erection on upper strata in the space of lower floor.Allow interior plumbing system finish, can not influence attractive in appearancely again, guarantee practical again at this sheaf space.
The purpose of this utility model realizes by following technical measures: the absolute altitude of bathroom floor is reduced, or the absolute altitude of washroom terrace surface layer is raised, make and produce an intermediate layer between the two.With Means for connecting water-closet pan to flushing pipe, bathtub hole trapping box, water-tank hole trapping box, floor drain trapping box, transverse connecting pipe is arranged in the intermediate layer.Bathtub is connected with bathtub hole trapping box by self pipeline, tank is connected with water-tank hole trapping box by self pipeline, bathtub hole trapping box, water-tank hole trapping box and floor drain trapping box are connected with transverse connecting pipe, the terminal of transverse connecting pipe is connected with vertical waste stack, finishes the discharge of wastewater system.Dredging box is installed in the middle of the transverse connecting pipe, is opened the mediation lid and just can use the dredging device dredging pipeline.Water closet self has the trapping function, and water closet is connected with transverse connecting pipe by Means for connecting water-closet pan to flushing pipe (common elbow), and the terminal of transverse connecting pipe is connected with vertical sewage standpipe, finishes foul water system.Bathtub hole trapping box, water-tank hole trapping box are made up of access flap and trapping box base, and floor drain trapping box is made up of drain cover and trapping box base.The trapping box base has a water breast board, and base is divided into pool and no pool, and an end opening is all stretched out in the lower end of access flap and drain cover, and end opening is inserted with the pool, forms water seal with water, plays the effect of separation gas.Open drain cover or access flap, can take out the rubbish at the bottom of the box, and can stretch into the dredging device dredging pipeline.The delivery port of trapping box is located at trapping box base side, makes trapping box and transverse connecting pipe form vertical the connection, has changed the traditional approach of pipeline passing through floors.It is the important accessory that guarantees that the technical program is implemented.After pipeline and accessory install, the intermediate layer with yellow sand or other light material, is tamped as haydite etc., above making cement mortar terrace surface layer again.The drainage system that so respectively overlaps dwelling house is just finished in self space, has changed the present situation that enters other people space at present.
Useful result of the present utility model is: make the usage space of each household dwelling house complete, independent.Other people drainage pipe does not enter the usage space of oneself, and the drainage pipe of oneself does not enter other people space yet, and mutual contradiction has also just reduced.
Description of drawings:
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is 1 of Fig. 2---1 sectional drawing.
Fig. 2 is the washroom partial plan layout.
Fig. 3 is a trapping box base plan view.
Fig. 4 is a trapping box base sectional drawing.
Fig. 5 is the drain cover sectional drawing.
Fig. 6 is tank, bathtub hole lid sectional drawing.
Fig. 7 is the dredging box plan view.
Fig. 8 is the dredging box sectional drawing.
1. bathroom floors among the figure, 2. intermediate layer, 3. washroom terrace surface layer, 4. water-tank hole trapping box, 5. floor drain trapping box, 6. bathtub hole trapping box, 7. dredging box, 8. Means for connecting water-closet pan to flushing pipe, 9. vertical sewage standpipe.10. vertical waste stack, 11. transverse connecting pipes, 12. water breast boards, 13. delivery ports, 14. mediation cassette holders, 15. dredging box cages, 16. mediation lids.
The specific embodiment:
In embodiment illustrated in fig. 2, bathtub hole trapping box (6), water-tank hole trapping box (4) and floor drain trapping box (5) each front branched end with transverse connecting pipe (11) are connected, the terminal of transverse connecting pipe (11) is connected with the three-way interface of vertical waste stack (10), finishes the discharge of wastewater system.Dredging box (7) is installed in the middle of the transverse connecting pipe (11), and dredging box (7) two ends are connected in series with transverse connecting pipe (11).Water closet is connected with transverse connecting pipe road (11) front end by Means for connecting water-closet pan to flushing pipe (8), and the terminal of transverse connecting pipe road (11) is connected with the three-way interface of sewage standpipe (9), finishes foul water system.Need increase tank as the washroom, or washing machine drainage do not walk the floor drain socket, can corresponding increase water-tank hole trapping box (4), the arm of corresponding increase transverse connecting pipe (11) simultaneously, and interconnect.
In the embodiment shown in fig. 1, with the absolute altitude reduction of bathroom floor (1), make and produce an intermediate layer (2) between bathroom floor (1) and the washroom terrace surface layer (3).It is unified with other room ground level that the absolute altitude of washroom terrace surface layer (3) keeps.The height in intermediate layer (2) is generally 10~15 centimeters by the bore and the gradient decision of transverse connecting pipe (11).Water-tank hole trapping box (4), floor drain trapping box (5), bathtub hole trapping box (6), dredging box (7), Means for connecting water-closet pan to flushing pipe (8), transverse connecting pipe (11) are arranged in the intermediate layer (2).The face absolute altitude of each trapping box and washroom terrace surface layer (3) absolute altitude are unified, and dredging box (7) makes the absolute altitude of its face absolute altitude and washroom terrace surface layer (3) unified by the Telescopic between mediation cassette holder (14) and the dredging box cage (15).Transverse connecting pipe (11) is connected with above-mentioned accessory according to the connected mode among Fig. 2.Because this toilet drainage device has adopted its distinctive trapping box base, this trapping box base delivery port (13) is located at trapping box base side, when delivery port (13) and transverse connecting pipe (11) when being connected, can make the trapping box form vertical the connection with transverse connecting pipe (11), changed the traditional approach of pipeline passing through floors (1). after installation has been checked and accepted, intermediate layer (2) with yellow sand or other light material, are tamped as haydite etc., above making cement mortar terrace surface layer (3) again.
If the absolute altitude of bathroom floor (1) can't reduce, the absolute altitude of washroom terrace surface layer (3) can be raised, make equally and produce an intermediate layer (2) between bathroom floor (1) and the washroom terrace surface layer (3).But should establish concrete mine dam or waterproofing materials all around.Other is same as the previously described embodiments.
Bathtub hole trapping box (6) and water-tank hole trapping box (4) are combined between the higher and lower levels by the trapping box base among the tank among Fig. 6, bathtub hole lid and Fig. 4 and form; Floor drain trapping box (5) is combined between the higher and lower levels by drain cover among Fig. 5 and the trapping box base among Fig. 4 and forms, establish water breast board (12) in the trapping box base among Fig. 4, base is separated into the pool and has not had two intervals, pool, an end opening is all stretched out in the access flap among Fig. 6 and the lower end of the drain cover among Fig. 5, end opening is inserted with the pool, form water seal with water, play the separation gas effect.Delivery port (13) is located at trapping box base side, when delivery port (13) and transverse connecting pipe (11) when being connected, can make trapping box and transverse connecting pipe (11) form vertical the connection.
In Fig. 8, dredging box (7) is made up of mediation cassette holder (14), dredging box cage (15), mediation lid (16), mediation lid (16) covers on mediation cage (15), stretch out an end opening under the decorative cover of dredging box cage (15), in end opening insertion mediation cassette holder (14) is suitable for reading, gapped between the suitable for reading and end opening, can move up and down, through regulating the distance that just can adapt to ground and pipeline absolute altitude.This figure dredging box (7) is provided with two intake-outlets, is located at threeway place of transverse connecting pipe (11) as dredging box (7), can increase a water inlet in the relevant position.Dredging box (7) position is provided with should take into account the building layout.
Claims (3)
1. toilet drainage device, by bathtub hole trapping box (6), water-tank hole trapping box (4), floor drain trapping box (5), Means for connecting water-closet pan to flushing pipe (8), connect to form with vertical standpipe through transverse connecting pipe road (11), it is characterized in that: between bathroom floor (1) and the washroom terrace surface layer (3) intermediate layer (2) is arranged, water-tank hole trapping box (4), floor drain trapping box (5), bathtub hole trapping box (6), Means for connecting water-closet pan to flushing pipe (8) and transverse connecting pipe (11) are arranged in the intermediate layer (2); The delivery port (13) of bathtub hole trapping box (6), water-tank hole trapping box (4) and floor drain trapping box (5) is connected with each front branched end of transverse connecting pipe (11), and the terminal of transverse connecting pipe (11) is connected with vertical waste stack (10).
2. toilet drainage device according to claim 1, it is characterized in that: bathtub hole trapping box (6), water-tank hole trapping box (4) are engaged up and down by tank, bathtub hole lid and trapping box base to be formed, and floor drain trapping box (5) is engaged up and down by drain cover and trapping box base to be formed; All there is an end opening lower end of access flap and drain cover, and a water breast board (12) is arranged in the trapping box base, and delivery port (13) is located at trapping box base side.
3. toilet drainage device according to claim 1, it is characterized in that: dredging box (7) is installed in the middle of the transverse connecting pipe (11), dredging box (7) is connected in series with transverse connecting pipe (11), dredging box (7) is made up of mediation cassette holder (14), dredging box cage (15), mediation lid (16), an end opening is arranged under the decorative cover of dredging box cage (15), end opening place the mediation cassette holder (14) suitable for reading in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420020227 CN2751077Y (en) | 2004-02-17 | 2004-02-17 | Drainage arrangement for toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420020227 CN2751077Y (en) | 2004-02-17 | 2004-02-17 | Drainage arrangement for toilet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2751077Y true CN2751077Y (en) | 2006-01-11 |
Family
ID=35932254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420020227 Expired - Fee Related CN2751077Y (en) | 2004-02-17 | 2004-02-17 | Drainage arrangement for toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2751077Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746594A (en) * | 2015-03-31 | 2015-07-01 | 中民筑友有限公司 | Bathroom |
-
2004
- 2004-02-17 CN CN 200420020227 patent/CN2751077Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746594A (en) * | 2015-03-31 | 2015-07-01 | 中民筑友有限公司 | Bathroom |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201050093Y (en) | Kitchen-toilet modularization same floor side water draining device | |
CN2797460Y (en) | Complementary pipe network end water storing device | |
CN208578106U (en) | A kind of modular same-layer drainage arrangement for building | |
CN100497848C (en) | Kitchen-toilet modularized same floor water feeding and draining device | |
CN100485144C (en) | Co-layer drainage system | |
WO2018157846A1 (en) | Vertical reclaimed water storage, treatment and reuse system for water closet | |
CN200992726Y (en) | Same floor wastewater discharge system | |
CN102330456B (en) | Riser connecting member for draining at same layer | |
CN201339220Y (en) | Kitchen and bathroom modular same-floor water supply and drainage water-saving device | |
CN102330452B (en) | Overflow-proof same-layer water drainage riser connecting piece | |
CN100480478C (en) | Same floor draining water backfill layer seeper drainage device | |
CN1664257A (en) | Technical proposal for toilet drainage | |
CN201933603U (en) | Novel same-floor drain pipe convergence device | |
CN107237395A (en) | It is a kind of high-rise with modular same-layer drainage arrangement and its installation method | |
CN2751077Y (en) | Drainage arrangement for toilet | |
CN206800600U (en) | A kind of high level uses modular same-layer drainage arrangement | |
CN206800529U (en) | A kind of modular same-layer drainage arrangement for building | |
CN112523463A (en) | Drainage installation structure and construction method of door-passing stone for toilet | |
CN100497850C (en) | Kitchen-toilet modularized same floor side water draining device | |
CN201339221Y (en) | Modular box type same-floor water supply and drainage device | |
CN104878812A (en) | Water drainage treatment device for same-floor draining caisson | |
CN206800530U (en) | A kind of modular same-layer drainage arrangement for building | |
CN201074349Y (en) | Kitchen-toilet modularization same floor water feeding and draining device | |
CN204703240U (en) | A kind of co-layer draining caisson drain treatment apparatus | |
CN2782788Y (en) | Leakage proof structure and pipe element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |