CN2744826Y - Thermal recovery horizontal well casing prestress completion device - Google Patents

Thermal recovery horizontal well casing prestress completion device Download PDF

Info

Publication number
CN2744826Y
CN2744826Y CN 200420108488 CN200420108488U CN2744826Y CN 2744826 Y CN2744826 Y CN 2744826Y CN 200420108488 CN200420108488 CN 200420108488 CN 200420108488 U CN200420108488 U CN 200420108488U CN 2744826 Y CN2744826 Y CN 2744826Y
Authority
CN
China
Prior art keywords
horizontal well
ball seat
main body
thermal recovery
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420108488
Other languages
Chinese (zh)
Inventor
施连海
王谊
李永和
王峰
李松滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CN 200420108488 priority Critical patent/CN2744826Y/en
Application granted granted Critical
Publication of CN2744826Y publication Critical patent/CN2744826Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a casing prestress completion device for a thermal recovery horizontal well and a detecting and drilling horizontal well. The upper end of a suspension main body (2) is connected with a reversed buckle joint (1) through screw threads, and the center part of the suspension main body (2) is sheathed with slips (3) and a hydraulic cylinder (4). A suspension part is composed of the parts, the upper end of the reversed buckle joint (1) and the lower end of the suspension main body (2) are respectively connected with a drilling tool (18) and a tail pipe (19). A coupling clamp (5) is connected with the tail pipe (19) through the screw threads, and the lower end of the coupling clamp (5) is connected with an anchoring body (12) through a connecting pipe nipple (10). The utility model which is of simple structure, of reliable operation and of utility can achieve the casing prestress completion for the thermal recovery horizontal well and the detecting and drilling horizontal well under the action of hydraulic pressure and pulling for the purposes of extending the service life of the thermal recovery horizontal well and the detecting and drilling horizontal well and reducing production cost.

Description

A kind of horizontal well thermal recovery sleeve pipe prestressing force completion system
Technical field:
The utility model relates to a kind of horizontal well thermal recovery, sidetrack horizontal well completion system of being used for.
Background technology:
The prestressing force completion is the completion mode that conventional thick oil thermal extraction production string adopts usually.Along with the continuity of oil field development process and the development of drilling technology, horizontal well thermal recovery, sidetracked hole are more and more used in recent years.Yet, because the particularity of horizontal well, sidetracked hole technology, horizontal well thermal recovery production string prestressing force completion technique does not obtain implementing as yet, thereby cause the distortion of horizontal well thermal recovery, sidetrack horizontal well production string, bad break easily, even scrap, and then influence long-term stable yields of horizontal well thermal recovery and life-span, and make the thickened oil recovery cost up.
Summary of the invention:
The purpose of this utility model is to provide a kind of horizontal well thermal recovery sleeve pipe prestressing force completion system that can reduce horizontal well thermal recovery, the damage of sidetrack horizontal well sleeve pipe, prolongation oil well life-span, reduce the thickened oil recovery cost.
The utility model is to realize like this.This kind completion system is made up of suspension and grappling two parts, hangs by lifting of anchor portion grappling and suspended portion and realizes horizontal well thermal recovery, sidetrack horizontal well prestressing force completion.The suspended portion of this device is made up of back-off joint, suspension main body, removable slips, fluid cylinder, and anchor portion is made up of box cupling, piston, steel ball, ball seat, ball seat shear pin, connection pipe nipple, ball seat guardrail, grappling body, thrust ring, thrust bearing pin, draw ring, anchor fluke, anchor fluke axle.The course of work of this device is as follows: the anchor portion of this device is threaded in horizontal well, sidetrack horizontal well production string (tail pipe) lower end by normal sleeve, suspension arrangement is connected the production string upper end, and back-off joint and drilling tool are by being threaded onto well head; Injecting liquid moves upward by the hole promotion fluid cylinder drive slips that hangs on the main body, be provided with the conical surface owing to hang main body, make slips protruding, contact interlock with intermediate casing, suspended portion is suspended on the protective casing (being intermediate casing), finishes the suspension of sleeve pipe; In drilling tool, inject liquid by the ground slush pump, make pump pressure rising in the device, under pump function, promote steel ball and drive descent of piston, promote anchor fluke by thrust ring, thrust bearing pin and draw ring and open the wedging stratum; Lift drilling tool by ground and make the tail pipe elongation, be subjected to the prestressing force that stretches; The rising pump pressure makes the slips wedging intermediate casing of suspended portion, realizes the suspension of production string; Continue to improve pump pressure and cut off the ball seat pin, ball seat is pushed the ball seat guardrail, discharge the ground pump pressure; By the back-off joint drilling tool is poured out in the well, horizontal well, the construction of sidetrack horizontal well prestressing force completion are finished.
The utility model is simple in structure, reliable operation, practicality, utilize this device and to lift and finish horizontal well thermal recovery, sidetrack horizontal well sleeve pipe prestressing force completion under the effect, thereby reach the purpose that prolongs horizontal well thermal recovery, sidetrack horizontal well life-span, reduces cost of winning at hydraulic pressure.
Description of drawings:
Accompanying drawing is the structural representation of the utility model under in working order.
Among the figure, label " 18 " is a drilling tool, and " 19 " are tail pipe (being production string), and " 20 " are centralizer, and " 21 " are the stratum, and " 22 " are intermediate casing (being protective casing).
The specific embodiment:
The utility model is provided by following examples, is illustrated below in conjunction with accompanying drawing.
As shown in the figure, the utility model is by back-off joint 1, hang main body 2, removable slips 3, fluid cylinder 4, box cupling 5, piston 6, steel ball 7, ball seat 8, ball seat shear pin 9, connect pipe nipple 10, ball seat guardrail 11, grappling body 12, thrust ring 13, thrust bearing pin 14, draw ring 15, anchor fluke 16, anchor fluke axle 17 is formed, its structure, assembled relation is as follows: hang main body 2 upper ends and be connected with back-off joint 1 with screw thread, the middle part is set with slips 3 and fluid cylinder 4, constitute the suspended portion of this device with upper-part, back-off joint 1 upper end with hang main body 2 lower ends and be connected with tail pipe 19 with drilling tool 18 respectively; Box cupling 5 is connected with tail pipe 19 with screw thread, and the lower end is connected with grappling body 12 by connecting pipe nipple 10; Piston 6 is housed in the box cupling 5, is provided with steel ball 7 and ball seat 8 in the piston 6, the bottom is provided with ball seat guardrail 11, is connected to a fixed with ball seat shear pin 9 between piston 6 and the ball seat 8; Be provided with thrust ring 13 in the grappling body 12, thrust ring 13 belows are provided with thrust bearing pin 14, two draw rings 15 are housed on the thrust bearing pin 14, two draw ring 15 lower ends become movable with anchor fluke 16 tops separately and are connected, two anchor fluke 16 lower ends separately with 17 one-tenth movable connections of an anchor fluke axle, constitute the anchor portion of this device with upper-part.Wherein, hang main body 2 and be as general as a tubular body, its middle and upper part periphery has a step, and it is the conical surface down, and the bottom tube wall is provided with through hole, and upper and lower end is respectively equipped with to be connected with tail pipe 19 with drilling tool 18 uses internal thread.Piston 6 is a hollow circular cylinder, and its upper end is bell mouth shape, and top is provided with side opening, and inner headed face matches with the ball seat 8 that sets within it, and the middle and lower part is provided with ball seat guardrail 11.Grappling body 12 is a pipe body, and its upper end is provided with and is connected the internal thread that pipe nipple 10 matches, and top inner headed face and piston 6 and thrust ring 13 external diameters match, and the bottom is provided with the anchor mechanism that is made of thrust bearing pin 14, draw ring 15, anchor fluke 16 and anchor fluke axle 17.

Claims (1)

1, a kind of horizontal well thermal recovery sleeve pipe prestressing force completion system, by back-off joint (1), hang main body (2), removable slips (3), fluid cylinder (4), box cupling (5), piston (6), steel ball (7), ball seat (8), ball seat shear pin (9), connect pipe nipple (10), ball seat guardrail (11), grappling body (12), thrust ring (13), thrust bearing pin (14), draw ring (15), anchor fluke (16), anchor fluke axle (17) is formed, it is characterized in that: hang main body (2) upper end and be connected with back-off joint (1) with screw thread, the middle part is set with slips (3) and fluid cylinder (4), constitute the suspended portion of this device with upper-part, back-off joint (1) upper end and suspension main body (2) lower end are connected with tail pipe (19) with drilling tool (18) respectively; Box cupling (5) is connected with tail pipe (19) with screw thread, and the lower end is connected with grappling body (12) by connecting pipe nipple (10); Piston (6) is housed in the box cupling (5), is provided with steel ball (7) and ball seat (8) in the piston (6), the bottom is provided with ball seat guardrail (11), is connected to a fixed with ball seat shear pin (9) between piston (6) and the ball seat (8); Be provided with thrust ring (13) in the grappling body (12), thrust ring (13) below is provided with thrust bearing pin (14), two draw rings (15) are housed on the thrust bearing pin (14), two draw rings (15) lower end becomes movable with an anchor fluke (16) top separately and is connected, and two anchor flukes (16) lower end becomes movable with an anchor fluke axle (17) separately and is connected.
CN 200420108488 2004-10-21 2004-10-21 Thermal recovery horizontal well casing prestress completion device Expired - Fee Related CN2744826Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420108488 CN2744826Y (en) 2004-10-21 2004-10-21 Thermal recovery horizontal well casing prestress completion device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420108488 CN2744826Y (en) 2004-10-21 2004-10-21 Thermal recovery horizontal well casing prestress completion device

Publications (1)

Publication Number Publication Date
CN2744826Y true CN2744826Y (en) 2005-12-07

Family

ID=35579607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420108488 Expired - Fee Related CN2744826Y (en) 2004-10-21 2004-10-21 Thermal recovery horizontal well casing prestress completion device

Country Status (1)

Country Link
CN (1) CN2744826Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913161A (en) * 2012-11-16 2013-02-06 西安鼎盛石油科技有限责任公司 Straightening and anchoring device applied to horizontal open hole well
CN103899264A (en) * 2012-12-28 2014-07-02 中国石油化工股份有限公司 Lift prestress ground anchor device for well cementation and completion on top of screen pipe of oil-gas well and application method
CN107269228A (en) * 2016-04-07 2017-10-20 中国石油化工股份有限公司 The complete safe completion tubular column of well section prestressing force of horizontal well thermal recovery and method
CN111577218A (en) * 2020-04-28 2020-08-25 大庆长垣能源科技有限公司 Short-radius and ultrashort-radius horizontal well completion process

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913161A (en) * 2012-11-16 2013-02-06 西安鼎盛石油科技有限责任公司 Straightening and anchoring device applied to horizontal open hole well
CN103899264A (en) * 2012-12-28 2014-07-02 中国石油化工股份有限公司 Lift prestress ground anchor device for well cementation and completion on top of screen pipe of oil-gas well and application method
CN103899264B (en) * 2012-12-28 2016-08-10 中国石油化工股份有限公司 The application process of Oil/gas Well screen casing top well cementation completion lifting prestressed ground anchor device
CN107269228A (en) * 2016-04-07 2017-10-20 中国石油化工股份有限公司 The complete safe completion tubular column of well section prestressing force of horizontal well thermal recovery and method
CN111577218A (en) * 2020-04-28 2020-08-25 大庆长垣能源科技有限公司 Short-radius and ultrashort-radius horizontal well completion process
CN111577218B (en) * 2020-04-28 2020-12-01 大庆长垣能源科技有限公司 Short-radius and ultrashort-radius horizontal well completion process

Similar Documents

Publication Publication Date Title
CN201991473U (en) Casing suspension device for well repair
CN109138880B (en) Bidirectional anchor
CN112253044A (en) High-ductility small-diameter dissolvable bridge plug
CN2744826Y (en) Thermal recovery horizontal well casing prestress completion device
CN201110143Y (en) Fluid pressure tailpiece hanger
CN109025849B (en) Multifunctional drill collar lifting nipple
CN212803153U (en) High-strength casing high-pressure bridge plug for horizontal well
CN201620854U (en) Double-element split-type plunger gas-lift tool
CN201292782Y (en) Canula mobile type cardan joint
CN219472073U (en) Cable conveying directional perforation soluble bridge plug
CN201269059Y (en) Down-hole clamping apparatus used for plunger gas lift
CN2809196Y (en) Tail pipe hanger
CN116816308A (en) Oil-free pipe paraffin removal lifting device for small-bore shale oil well
CN2698958Y (en) Hydraulic expansion reinforcing device for down-hole casing patch
CN203321426U (en) Downward strike type stuck freeing packer
CN103321605A (en) Downward striking type unblocking packer
CN201276995Y (en) Tail pipe hanger with control lock
CN202117602U (en) Hydraulic anchor for continuous oil pipe
CN2651421Y (en) Tail pipe prestressed well completion device
CN112943143B (en) Hydraulic salvaging pipe column and salvaging method for coiled tubing of downhole choke
CN2869304Y (en) Screw drilling tool bypass valve
CN2864080Y (en) Hydraulic releasing tool
CN2641272Y (en) Open hole rope-like faller special fisher
CN2580096Y (en) Underwell hydraulic pulling releasing device
CN2675845Y (en) Oil pipe anchor under pump

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20051207

Termination date: 20101021