CN2744696Y - Power supply cabinet controlled by electrolytic cell - Google Patents

Power supply cabinet controlled by electrolytic cell Download PDF

Info

Publication number
CN2744696Y
CN2744696Y CN 200420034210 CN200420034210U CN2744696Y CN 2744696 Y CN2744696 Y CN 2744696Y CN 200420034210 CN200420034210 CN 200420034210 CN 200420034210 U CN200420034210 U CN 200420034210U CN 2744696 Y CN2744696 Y CN 2744696Y
Authority
CN
China
Prior art keywords
power supply
branch road
inlet wire
relay
wire branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420034210
Other languages
Chinese (zh)
Inventor
冷蓉虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Tianfeng Electronic Electrical Equipment Co ltd
Original Assignee
Chengdu Tianfeng Electronic Electrical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Tianfeng Electronic Electrical Equipment Co ltd filed Critical Chengdu Tianfeng Electronic Electrical Equipment Co ltd
Priority to CN 200420034210 priority Critical patent/CN2744696Y/en
Application granted granted Critical
Publication of CN2744696Y publication Critical patent/CN2744696Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Water Treatment By Electricity Or Magnetism (AREA)

Abstract

The utility model discloses a power supply cabinet controlled by electrolytic cell, comprising a main power supply wire feeding branch line, a standby power supply wire feeding branch line, a selective switch, a current mutual inductor, an overvoltage protecting device, a circuit breaker, an isolation transformer, a combined switch, a power leakage detecting circuit and a double-power supply mutual-input device. The utility model is characterized in that the double-power supply mutual-input device is composed of a relay controlling circuit, relay normal closing contacts on the main power supply wire feeding branch line are connected with relay coils on the standby power supply wire feeding branch line in series, and relay normal closing contacts on the standby power supply wire feeding branch line are connected with relay coils on the main power supply wire feeding branch line in series. The double-power supply mutual-input device is the protecting core of the power supply cabinet controlled by the electrolytic cell of the utility model, the power supply cabinet controlled by the electrolytic cell can ensure that the standby power supply automatically switches to supply power when the loop of the main power supply is cut off the power and simultaneously also has power leakage detecting function through the double-power supply mutual-input device, and therefore, the power supply cabinet controlled by the electrolytic cell provides the reliable assurance for the power supply safety of the aluminum electrolyzing production and can save amount of foreign exchange for the country, having the advantages of safety, reliability, simple structure, low cost and convenient maintenance.

Description

Electrolyzer control power source special cabinet
Technical field
The utility model relates to a kind of electrolyzer control power source special cabinet.
Background technology
At aluminum electrolysis industry, microcomputer type electrolyzer controlling box is an important specific equipment in the electrolytic aluminium production process.The normal operation of electrolyzer is controlled and managed to controlling box in process of production.Because special regulation in safety, reliability requirements and the industry of electrolytic aluminium production process process, as can not introducing the interchange zero line in the potroom, in order to avoid cause the AC and DC short circuit, cause accident, cause casualties, structure deteriorate etc., therefore, its controlling box power supply there is particular requirement.
The electrolyzer control power source special cabinet of Germany Schneider company is exactly the electrolyzer control power source special cabinet that can satisfy the Electrolytic Workshop particular requirement.This power cabinet comprises that primary source inlet wire branch road, standby power supply inlet wire branch road, system selector switch, current transformer, over-pressure safety device, isolating switch, isolating transformer, switchgroup, electric-leakage detection circuit and dual power supply throw device mutually.The setting that this dual power supply is thrown device mutually is in order to guarantee when main power circuit cuts off the power supply to automatically switch and power in the standby power supply loop.Because its circuit structure complexity, cost is higher, can not satisfy the needs of domestic aluminum electrolysis industry.
The structure of domestic all related products all is to adopt for the particular requirement of satisfying the aluminium industry production to convert the AC380V power supply to AC220V through isolating transformer in cabinet, as the mode of control power supply.
Summary of the invention
Task of the present utility model be design a kind of simple in structure, cost is low, be easy to the electrolyzer control power source special cabinet producing, keep in repair.
The utility model is with reference to the constitutional features of similar products at home and abroad; new organization plan of the present utility model has been proposed; this electrolyzer control power source special cabinet comprises primary source inlet wire branch road; standby power supply inlet wire branch road; system selector switch; current transformer; over-pressure safety device; isolating switch; isolating transformer; switchgroup; electric-leakage detection circuit and dual power supply are thrown device mutually; it is characterized in that dual power supply throws device mutually and be made of a Relay-controlled Circuit; rly. normally closed contact on the primary source inlet wire branch road is connected with the relay1 coil on the standby power supply inlet wire branch road, and the rly. normally closed contact on the standby power supply inlet wire branch road is connected with the relay1 coil on the primary source inlet wire branch road.
In order to make this electrolyzer control power source special cabinet can guarantee that power supply system is safer, the utility model also has electric-leakage detection circuit.This circuit is made of current transformer, leakage relay, pilot lamp, press button and system selector switch, two pairs of contacts of leakage relay are connected with the corresponding contact of current transformer on primary source inlet wire branch road and the standby power supply inlet wire branch road respectively, and the normally opened contact of leakage relay is connected with pilot lamp with press button and after connecing again.Its principle of work is an operating selection switch, and when electric power incoming line leaked electricity, current transformer produced electric current, the leakage relay action, its normally opened contact closure, signal lamp is bright,, operate each system selector switch this moment respectively,, making it to reset, pilot lamp is also bright, is this correspondence branch road electric leakage with regard to decidable.Press the button switch, can check the quality of signal lamp.
Dual power supply in this electrolyzer control power source special cabinet is thrown the simple Relay-controlled Circuit of device utilization mutually, solved the deficiency of at present domestic and international aluminium industry electrolysis power supply technique related products safe, reliable and effectively, also increased the detection of electrical leakage function simultaneously, the Aluminium Electrolysis safe power supply is reliably guaranteed.Compare with similar products at home and abroad, have simple in structurely, cost is low, and remarkable advantage has for ease of maintenaince satisfied the particular requirement of aluminum electrolysis industry power supply, has saved a large amount of foreign exchanges to country.Use by reality, it is quite satisfied that feedback information makes us.
Description of drawings
Fig. 1 the utility model electrolyzer control power source special cabinet electrical schematic diagram
Embodiment
Embodiment 1
The utility model electrolyzer control power source special cabinet comprises primary source inlet wire branch road; standby power supply inlet wire branch road; system selector switch SA; SA current transformer LH; over-pressure safety device YAL; circuit breaker Q F; isolating transformer T; switchgroup HZ and dual power supply are thrown device mutually; it is characterized in that dual power supply throws device mutually and be made of a Relay-controlled Circuit; rly. normally closed contact 1KA on the primary source inlet wire branch road connects with relay1 coil 2KA on the standby power supply inlet wire branch road, and the rly. normally closed contact 2KA on the standby power supply inlet wire branch road connects with relay1 coil 1KA on the primary source inlet wire branch road.
Dual power supply is thrown the protection core that device is the utility model electrolyzer control power source special cabinet mutually, throws device mutually by dual power supply, can guarantee standby power supply automatic switchover power supply when main power circuit cuts off the power supply.Its principle of work is as follows:
When first the use, operate the main power switch SA1 on the control enclosure earlier, at this moment, the coil of contactor KM1, intermediate relay 1KA gets electric, the contactor main contact closure of master loop, main circuit power supply, simultaneously, signal lamp 1HL is bright; Disconnect with the interlocking of the placed in-line intermediate relay 1KA of intermediate relay 2KA coil normally closed contact, main power switch SA2 on the operation control enclosure, this moment, back-up circuit was in ready state, when master loop cuts off the power supply, 1KA dead electricity, normally closed contact closure, contactor KM2 coil gets, the main contact closure of KM2, back-up circuit comes into operation, and 2HL2 is bright for the synchronous signal pilot lamp.
Electric-leakage detection circuit is made of current transformer LH1, LH2, leakage relay KAL, pilot lamp 1HL3, press button SB1 and system selector switch SA3, SA4, by corresponding contact a1/a2, the b1/b2 input of the current transformer on primary source inlet wire branch road and the standby power supply inlet wire branch road, normally opened contact KAL's current contact 2,3 of leakage relay again of leakage relay connects with pilot lamp 1HL3 with press button SB1 and after connecing respectively.

Claims (2)

1, a kind of electrolyzer control power source special cabinet; comprise that primary source inlet wire branch road, standby power supply inlet wire branch road, system selector switch, current transformer, over-pressure safety device, isolating switch, isolating transformer, switchgroup, electric-leakage detection circuit and dual power supply throw device mutually; it is characterized in that dual power supply throws device mutually and be made of a Relay-controlled Circuit; rly. normally closed contact on the primary source inlet wire branch road is connected with the relay1 coil on the standby power supply inlet wire branch road, and the rly. normally closed contact on the standby power supply inlet wire branch road is connected with the relay1 coil on the primary source inlet wire branch road.
2, electrolyzer control power source special cabinet according to claim 1, it is characterized in that having electric-leakage detection circuit, this electric-leakage detection circuit is made of current transformer, leakage relay, pilot lamp, press button and system selector switch, two pairs of current contact of leakage relay are connected with the corresponding contact of current transformer on primary source inlet wire branch road and the standby power supply inlet wire branch road respectively, and the normally opened contact of leakage relay is connected with pilot lamp with press button and after connecing again.
CN 200420034210 2004-04-06 2004-04-06 Power supply cabinet controlled by electrolytic cell Expired - Lifetime CN2744696Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420034210 CN2744696Y (en) 2004-04-06 2004-04-06 Power supply cabinet controlled by electrolytic cell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420034210 CN2744696Y (en) 2004-04-06 2004-04-06 Power supply cabinet controlled by electrolytic cell

Publications (1)

Publication Number Publication Date
CN2744696Y true CN2744696Y (en) 2005-12-07

Family

ID=35579479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420034210 Expired - Lifetime CN2744696Y (en) 2004-04-06 2004-04-06 Power supply cabinet controlled by electrolytic cell

Country Status (1)

Country Link
CN (1) CN2744696Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108527A (en) * 2009-12-23 2011-06-29 贵阳铝镁设计研究院 Method and system for supplying power to large aluminum electrolytic plant
CN104078970A (en) * 2013-03-29 2014-10-01 沈阳铝镁设计研究院有限公司 Direct-current side networking operation networking method for double-power-source rectification system
CN105006885A (en) * 2015-08-11 2015-10-28 成都亿信标准认证集团有限公司 Independently-controlled earth leakage protection project management service system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108527A (en) * 2009-12-23 2011-06-29 贵阳铝镁设计研究院 Method and system for supplying power to large aluminum electrolytic plant
CN102108527B (en) * 2009-12-23 2014-03-26 贵阳铝镁设计研究院有限公司 Method and system for supplying power to large aluminum electrolytic plant
CN104078970A (en) * 2013-03-29 2014-10-01 沈阳铝镁设计研究院有限公司 Direct-current side networking operation networking method for double-power-source rectification system
CN104078970B (en) * 2013-03-29 2016-04-27 沈阳铝镁设计研究院有限公司 The network-building method of dual power supply commutation system DC side networking operation
CN105006885A (en) * 2015-08-11 2015-10-28 成都亿信标准认证集团有限公司 Independently-controlled earth leakage protection project management service system

Similar Documents

Publication Publication Date Title
CN201236358Y (en) Automatic water compensating apparatus for drinking water column
CN101222145A (en) Device and method for on-line switching uninterrupted power supply
CN104682431A (en) Self-starting method and self-starting system of energy storage converter
CN203589832U (en) Alternating current power supply switching device
CN201039046Y (en) High-voltage frequency conversion start cabinet
CN205195433U (en) Power transformer of energy -saving automatic distribution
CN103151830B (en) Substation with internal bridge automatic throw-in equipment of emergency power supply
CN201426052Y (en) Power-type multiple safety protection intelligent electricity-saving system
CN2744696Y (en) Power supply cabinet controlled by electrolytic cell
CN104716738B (en) A kind of circuit for the automatic change-over electric appliance with duplicate for being used for CC grades
CN201169633Y (en) Aluminum electrolysis series non-power off aluminum cell electric short circuit device
CN112165094B (en) Standby power supply control system and control method for direct-current lubrication pump
CN201910624U (en) Electrical energy optimizing device
CN200990575Y (en) Elevator frequency changer external hanging energy feedback device
CN204425033U (en) A kind of emergency lighting automatic switchover system
CN2783702Y (en) Automatic lamp light saving device
CN203722328U (en) Apparatus capable of automatically switch power frequency electric supply in case of UPS own faults
CN208027179U (en) A kind of program-controlled water-supply apparatus of water tank
CN201750596U (en) Emergency lighting control device
CN201515233U (en) Three-load switching device
CN201169634Y (en) Aluminum electrolysis series non-power off aluminum cell link mechanism short circuit device
CN2831584Y (en) Control-power source of double power source auto switching gear
CN203504284U (en) Supply circuit of auxiliary device of large-scale unit
CN203800399U (en) Low-voltage power distribution system power saver bypass cabinet
CN209472808U (en) A kind of electricity-saving appliance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140406

Granted publication date: 20051207

DD01 Delivery of document by public notice

Addressee: Leng Ronghu

Document name: Notification of Expiration of Patent Right Duration