CN2721748Y - Semi-shutup pressing assemlbed floor of steel plate - Google Patents

Semi-shutup pressing assemlbed floor of steel plate Download PDF

Info

Publication number
CN2721748Y
CN2721748Y CN 200420081763 CN200420081763U CN2721748Y CN 2721748 Y CN2721748 Y CN 2721748Y CN 200420081763 CN200420081763 CN 200420081763 CN 200420081763 U CN200420081763 U CN 200420081763U CN 2721748 Y CN2721748 Y CN 2721748Y
Authority
CN
China
Prior art keywords
steel
semi
concrete
profiled
pressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420081763
Other languages
Chinese (zh)
Inventor
高良
黄明鑫
徐万芹
尹道林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Co., Ltd.
Original Assignee
Shanghai Baite Steel Structure Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baite Steel Structure Design Co ltd filed Critical Shanghai Baite Steel Structure Design Co ltd
Priority to CN 200420081763 priority Critical patent/CN2721748Y/en
Application granted granted Critical
Publication of CN2721748Y publication Critical patent/CN2721748Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a semi-closed pressing assembled floor of steel plate, which is composed of a pressing steel plate, a steel bar grid, and a concrete layer. The upper side of the pressing steel plate is longitudinally and separately provided with inverted triangular bayonet grooves with semi-closed undercuts. The concrete layer is poured on the pressing steel plate, and the steel bar grid, which is composed of longitudinal separation-arranged steel bars and lateral separation-arranged steel bars, is positioned on the upper part of the concrete. The assembled floor has strong structure, light dead load and easy construction, being able to be widely applied to building systems constructed with steel structures.

Description

Semi-closure shape of the mouth as one speaks profiled steel sheet combination floor
Technical field
The utility model belongs to construction engineering technical field, is specifically related to use composite floor in a kind of steel building.
Background technology
Along with a large amount of rises of steel building in China, the attention that many high-rise steel structure are built with its intensity height, from heavy and light, serial advantages such as anti-seismic performance is good, speed of application is fast, ground cost saving, area occupied is little, industrialization degree is high, good looking appearance, environmental protection more and more are subjected to various places government, large-scale steel structure company and real estate developer.And in the construction work of many high-rise steel structure, the selection of floor system is an important link, and superior floor system should possess intensity height,, short construction period good from heavy and light, anti-seismic performance, industrialization degree is high and characteristics such as good fire prevention, anticorrosion, barrier performance are arranged.In engineering in the past, floor pattern commonly used has cast-in-place concrete floor, prestressed concrete overlapped slab, two-way multi-ribbed plate, and these floor systems exist following shortcoming:
1, cast-in-place concrete floor: floor need carry out formwork, form removal from great, the construction trouble, and also formwork seal is poor, easily produces the spillage phenomenon, long construction period.
2, prestressed concrete overlapped slab: owing to adopt is partly prefabricated partly cast-in-place, and it is convenient inadequately to transport, stack, site operation layout underaction, and position in-situ processings such as bearing, plate lap-joint are cumbersome.
3, two-way multi-ribbed plate: template is had relatively high expectations, the construction trouble, stressed complexity easily produces weak part.
Based on above situation, the applicant absorbs the achievement that scientific research both at home and abroad, design, construction in recent years provide a reference in conjunction with engineering practice, has developed semi-closure shape of the mouth as one speaks profiled steel sheet combination floor.
Summary of the invention
The composite floor that the purpose of this utility model is to propose a kind of intensity height, uses from the steel building of heavy and light, easy construction.
The composite floor of the utility model design is made of profiled sheet, steel grid concrete, and its structure as shown in Figure 1.Wherein, profiled sheet 1 is positioned at the bottom, its upside vertically and be intervally distributed with the del bayonet slot 7 of end opening semi-closed, layer of concrete 2 is built on profiled sheet, steel grid is made up of longitudinal separation reinforcing bar 4 that distributes and the reinforcing bar 5 that the lateral separation distributes, and is positioned at the top section of layer of concrete 2.
The composite floor of the utility model design, its thickness is generally 90-250mm, and its width determines that according to concrete template be generally 400-800mm, length is generally 1000-12000mm.Wherein, the thickness of semi-closure shape of the mouth as one speaks profiled sheet 1 is 0.75-1.5mm, the adjacent spacing of the del bayonet slot 7 that its upside vertically distributes generally can be 80-250mm, the upper bottom portion width of bayonet slot is 30-80mm, the end opening width is less than the upper bottom portion width, be generally 20-70mm, the height of bayonet slot 7 (being the distance of del upper base to the steel floor support plate) is generally 40-80mm, in the steel grid, vertically the adjacent spacing of the reinforcing bar 4 that distributes is generally 100-250mm, and the adjacent spacing of the reinforcing bar 5 of cross direction profiles is generally 100-250mm.
Steel mesh reinforcement compartment distance from upper surface in layer of concrete 2 is generally 15-50mm.
The composite floor of the utility model design, structural strength is big, and it is little to conduct oneself with dignity, easy construction.
Description of drawings
Fig. 1 is the structural profile diagram of this composite floor.
Fig. 2 is this composite floor medium-pressure type steel plate and the diagram that is connected of girder steel.
Number in the figure: 1, profiled sheet, 2, layer of concrete, 3, WELDING STUDS, 4, vertical distribution reinforcement, 5, transversely distributed steelbar, 6, girder steel, 7, semi-closure shape of the mouth as one speaks bayonet slot.
The specific embodiment
The closed-section steel deck composite floor of the utility model design mainly is applicable to the floor system of many high-rise steel structure buildings.This profiled sheet combines with girder steel can adopt WELDING STUDS, sees shown in Figure 2.
Concrete construction sequence of the present utility model is as follows: the first step: the steel beam surface that desire is placed profiled sheet is removed clean, setting-out and finish mark.Second step: carry out the laying and the necessary perforate and the shutoff of profiled sheet.The 3rd step: treat with WELDING STUDS profiled sheet to be fixed on the girder steel after profiled sheet laying adjustment finishes.The 4th step: the laying and the necessary embedded part that carry out top reinforcement.The 5th step: concrete building and maintenance.
Certain steel work commercial affairs building engineering adopts steel frame structural system, and architectural design service life is 50 years, and safety classes of structure is a secondary, and building aseismicity is set up defences and is categorized as Class C, and seismic fortification intensity is 8 degree, flooring live load 3.5KN/m 2, the above agent structure in ground is a steel work, framework primary and secondary beam all adopts H type cross section, secondary beam minimum spacing 2.200m, maximum spacing 4.500m.Floor system adopts the semi-closure shape of the mouth as one speaks profiled steel sheet combination floor of the utility model design.Relevant design parameters is as follows: the composite floor gross thickness is 110mm, the bottom is a closed-section steel deck 1, adopt the thick G300 shaped steel plate of 1.0mm, fixing with φ 16 WELDING STUDS 3 with girder steel 6, the middle steel grid of laying is φ 10@120 (the lateral stressed muscle 4 in upper strata), φ 8@180 (the vertical distribution bar 5 in upper strata) two-way concrete slab net, and C30 layer of concrete 2 is built on top.
This composite floor can satisfy the needs of engineering design.

Claims (3)

1, a kind of semi-closure shape of the mouth as one speaks profiled steel sheet combination floor, it is characterized in that constituting by profiled sheet, steel grid concrete, wherein, profiled sheet (1) is positioned at the bottom, its upside vertically and be intervally distributed with the del bayonet slot (7) of end opening semi-closed, layer of concrete (2) is built on profiled sheet, and steel grid is made up of longitudinal separation reinforcing bar (4) that distributes and the reinforcing bar (5) that the lateral separation distributes, and is positioned at the top section of layer of concrete (2).
2, semi-closure shape of the mouth as one speaks profiled steel sheet combination floor according to claim 1, the thickness that it is characterized in that described profiled sheet (1) is 0.75-1.5mm, the adjacent spacing of the del bayonet slot (7) that its upside vertically distributes is 80-250mm, the upper bottom portion width of bayonet slot (7) is 30-80mm, the end opening width is less than the upper bottom portion width, being 20-70mm, highly is 40-80mm.
3, semi-closure shape of the mouth as one speaks profiled steel sheet combination floor according to claim 1, it is characterized in that in the described steel grid, vertically the adjacent spacing of the reinforcing bar (4) that distributes is 100-250mm, the adjacent spacing of the reinforcing bar of cross direction profiles (5) is 100-250mm, and steel mesh reinforcement compartment distance from upper surface in layer of concrete (2) is 15-50mm.
CN 200420081763 2004-08-12 2004-08-12 Semi-shutup pressing assemlbed floor of steel plate Expired - Fee Related CN2721748Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420081763 CN2721748Y (en) 2004-08-12 2004-08-12 Semi-shutup pressing assemlbed floor of steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420081763 CN2721748Y (en) 2004-08-12 2004-08-12 Semi-shutup pressing assemlbed floor of steel plate

Publications (1)

Publication Number Publication Date
CN2721748Y true CN2721748Y (en) 2005-08-31

Family

ID=35012121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420081763 Expired - Fee Related CN2721748Y (en) 2004-08-12 2004-08-12 Semi-shutup pressing assemlbed floor of steel plate

Country Status (1)

Country Link
CN (1) CN2721748Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383513A (en) * 2011-09-09 2012-03-21 邹剑强 Concrete reinforced profiled steel sheet, composite slab and method for constructing composite slab
CN102409786A (en) * 2011-09-09 2012-04-11 邹剑强 Concrete reinforced channeled steel plate, building roof panel and construction method of building roof panel
CN103967272A (en) * 2014-03-19 2014-08-06 哈尔滨工程大学 FRP permanent formwork and FRP formwork and concrete combined floor
CN106906933A (en) * 2017-04-26 2017-06-30 上海核工程研究设计院 A kind of two-way steel plate concrete composite floor
CN112267571A (en) * 2020-11-11 2021-01-26 吉林建筑科技学院 Prefabricated section steel concrete column and profiled steel sheet composite board connecting joint and construction method
CN112323987A (en) * 2020-11-11 2021-02-05 东北大学 Prefabricated stiffened steel pipe concrete column and profiled steel sheet combined plate joint and construction process
CN112411763A (en) * 2020-11-11 2021-02-26 吉林建筑科技学院 Steel column and profiled steel plate concrete composite board connecting joint and construction method
CN116927374A (en) * 2023-09-19 2023-10-24 南京工业大学 Structure heat preservation integrated prefabricated outer wall and manufacturing method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383513A (en) * 2011-09-09 2012-03-21 邹剑强 Concrete reinforced profiled steel sheet, composite slab and method for constructing composite slab
CN102409786A (en) * 2011-09-09 2012-04-11 邹剑强 Concrete reinforced channeled steel plate, building roof panel and construction method of building roof panel
CN102409786B (en) * 2011-09-09 2013-09-18 邹剑强 Concrete reinforced channeled steel plate, building roof panel and construction method of building roof panel
CN102383513B (en) * 2011-09-09 2013-11-06 邹剑强 Concrete reinforced profiled steel sheet, composite slab and method for constructing composite slab
CN103967272A (en) * 2014-03-19 2014-08-06 哈尔滨工程大学 FRP permanent formwork and FRP formwork and concrete combined floor
CN106906933A (en) * 2017-04-26 2017-06-30 上海核工程研究设计院 A kind of two-way steel plate concrete composite floor
CN112267571A (en) * 2020-11-11 2021-01-26 吉林建筑科技学院 Prefabricated section steel concrete column and profiled steel sheet composite board connecting joint and construction method
CN112323987A (en) * 2020-11-11 2021-02-05 东北大学 Prefabricated stiffened steel pipe concrete column and profiled steel sheet combined plate joint and construction process
CN112411763A (en) * 2020-11-11 2021-02-26 吉林建筑科技学院 Steel column and profiled steel plate concrete composite board connecting joint and construction method
CN112267571B (en) * 2020-11-11 2022-02-01 吉林建筑科技学院 Prefabricated section steel concrete column and profiled steel sheet composite board connecting joint and construction method
CN116927374A (en) * 2023-09-19 2023-10-24 南京工业大学 Structure heat preservation integrated prefabricated outer wall and manufacturing method
CN116927374B (en) * 2023-09-19 2023-11-24 南京工业大学 Structure heat preservation integrated prefabricated outer wall and manufacturing method

Similar Documents

Publication Publication Date Title
CN107090925B (en) Reinforced precast reinforced concrete shear wall, structural system and construction method thereof
CN204386002U (en) A kind of precast assemble floor system
CN201347598Y (en) Casting formwork component for construction
CN104532997A (en) Assembly type floor system and construction method thereof
CN103276849A (en) Castellated beam, concrete flitch beam and design method
CN106639045A (en) Prefabricated assembly type steel plate-concrete composite shear wall structure system and construction method thereof
CN111851825A (en) Fabricated form-removal-free prefabricated steel bar truss floor and construction method thereof
CN103266720A (en) Combination beam with steel beam and belly poured with concrete
CN206752676U (en) Assembled architecture agent structure
CN206428968U (en) A kind of steel bar girder formula is without supporting template system
CN212248841U (en) Connecting structure of reinforced truss concrete combined floor slab and concrete wall or beam
CN2721748Y (en) Semi-shutup pressing assemlbed floor of steel plate
CN203569795U (en) Long span prestress cube type steel rib concrete superposed beam
CN107460948B (en) The double-deck RC plate-type transfer floor and construction method of superstructure are poured after a kind of
CN2714671Y (en) Closed pressing steel plate combined floor board
CN1478968A (en) Construction method of large span building roof or floor of building and its double lattice beam structure
CN113585075A (en) Cast-in-place bridge deck formwork for steel-concrete composite beam
CN104264897B (en) Alternate tooth must superimposed beam and plate
CN103132640B (en) Detachable steel-concrete composite floor
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN2580029Y (en) Adjustable building surface steel formwork support combined piece
CN205954971U (en) Two -way coincide floor of honeycomb holes profiled sheet
CN212802185U (en) Prefabricated steel bar truss floor of assembled form removal-free
CN102587601A (en) Multistage connection cage-type staircase
CN202559618U (en) Multi-step connection type cage staircase

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHEJIANG JINGGONG STEEL STRUCTURE CO., LTD.; PATE

Free format text: FORMER OWNER: SHANGHAI BEIT STEEL STRUCTURE DESIGN CO., LTD.

Effective date: 20081010

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081010

Address after: No. 1587 Jianhu Road, Keqiao, Shaoxing, Zhejiang, zip code: 312030

Co-patentee after: Baite Steel Structure Design Co., Ltd., Shanghai

Patentee after: Zhejiang Seiko Steel Structure Co., Ltd.

Address before: Room 603, B District, Bai Shu Building,, No. 1230 North First Road, Shanghai, Zhongshan 200437, China

Patentee before: Baite Steel Structure Design Co., Ltd., Shanghai

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20091204

Address after: Zhejiang County of Shaoxing province Keqiao Jianhu Road Economic Development Zone, zip code: 312000

Patentee after: Zhejiang Jinggong Steel Structure Co., ltd.

Address before: No. 1587 Jianhu Road, Keqiao, Shaoxing, Zhejiang, zip code: 312030

Co-patentee before: Baite Steel Structure Design Co., Ltd., Shanghai

Patentee before: Zhejiang Seiko Steel Structure Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050831

Termination date: 20130812